Message Originator: Lake Michigan
SAFETY / WI - LAKE MICHIGAN - MENOMONEE RIVER / BRIDGE / SEC SLM BNM 0102-26 /
1. THE CANADIAN PACIFIC RAILROAD BRIDGE AT MM 1.05 ON THE MENOMONEE RIVER IS STUCK IN THE DOWN POSITION WITH NO ESTIMATED TIME OF REPAIR.
BT