{"type":"FeatureCollection","features":[{"type":"Feature","id":8491,"geometry":{"type":"LineString","coordinates":[[-91.54911999999996,29.184960000000046],[-91.43788999999998,29.31051000000008]]},"properties":{"ESRI_OID":8491,"MSI_UID":8491,"ATU":8,"TITLE":"Sector New Orleans, Submerged Land Act (SLA) - Atchafalaya Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384918,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:atccha","WATERWAY_NAME":"Atchafalaya Channel","CREATE_DATE":1736263768000,"MODIFIED_DATE":1773940426000,"BEGIN_DATE":1736208000000,"END_DATE":1798847999000,"DESCRIPTION":"Atchafalaya Bar Channel - Dredge Operation --- From: 2025-01-07 To: 2026-12-31 --- The Agitation Dredge ARULAQ will be dredging in the Atchafalaya Bar Channel, between Miles 167.0 and 156.0, 24-hours a day, 7-days a week.  Mariners should coordinate passing arrangements with the M/V JOHN E. GRAHAM and transit the area at their slowest safe speed to minimize wake.  VHF-FM Channels: 13 and 16,  POC: USACE (504) 862-2360, (504) 862-2153 and (504) 862-2630","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-91.54912,29.18496],[-91.43789,29.31051]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":34393,"geometry":{"type":"LineString","coordinates":[[-93.66608999999994,29.417030000000068],[-93.66700999999995,29.48201000000006],[-93.69435999999996,29.505610000000047],[-93.80364999999995,29.598400000000026],[-93.82573999999994,29.644460000000038],[-93.83517999999998,29.68608000000006],[-93.85073999999997,29.70814000000007],[-93.86527999999998,29.72733000000005],[-93.88323999999994,29.748790000000042],[-93.89033999999998,29.75714000000005],[-93.90818999999999,29.762000000000057]]},"properties":{"ESRI_OID":34393,"MSI_UID":34393,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Sabine Pass/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385196,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:sabpas","WATERWAY_NAME":"Sabine Pass","CREATE_DATE":1767036729000,"MODIFIED_DATE":1790001905000,"BEGIN_DATE":1766966400000,"END_DATE":1806883199000,"DESCRIPTION":"Sabine Bank Channel - Sabine Pass - Dredge Operation --- From: 2026-02-09 To: 2027-04-03 --- Dredging will be conducted throughout the Sabine Bank Channel and in Sabine Pass.  Operations will be conducted 24-hours a day, 7-days a week.  Dredged material will be disposed in offshore disposal sites located west of the channel.  On-scene vessels include the Dredges DODGE ISLAND, ELLIS ISLAND, PADRE ISLAND and GALVESTON ISLAND, the Survey Vessels JONATHAN WOODWARD, LADY BECKY, FM BROWN, and OHIO RIVER, the Trawling Vessels MR. TOMMY, SIMPLE MAN, JESSICA MARIE, and ANNAMARIA ROSE, and the M/Vs SMITH INVADER and SMITH HUNTER.  Currently, the Dredge GALVESTON ISLAND is dredging between Sabine Bank Channel Lighted Buoy 11 (LLNR-22350) and Sabine Bank Channel Lighted Buoy 14 (LLNR-22365), the Dredge PADRE ISLAND is working between Sabine Bank Channel Lighted Buoy 7 (LLNR-22335) and Sabine Bank Channel Lighted Buoy 12 (LLNR-22355), and the Dredge ELLIS ISLAND is operating south of Sabine Bank Channel Lighted Buoy SB (LLNR-1085).  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13 and 16","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-93.66609,29.41703],[-93.66701,29.48201],[-93.69436,29.50561],[-93.80365,29.5984],[-93.82574,29.64446],[-93.83518,29.68608],[-93.85074,29.70814],[-93.86528,29.72733],[-93.88324,29.74879],[-93.89034,29.75714],[-93.90819,29.762]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":38555,"geometry":{"type":"LineString","coordinates":[[-90.16269999999997,30.374240000000043],[-90.15965999999997,30.37504000000007]]},"properties":{"ESRI_OID":38555,"MSI_UID":38555,"ATU":8,"TITLE":"The Rigolets - Lakes Pontchartrain And Maurepas/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100117410918,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:graislcha:lakbor:therig:lakponandmau","WATERWAY_NAME":"Lakes Pontchartrain And Maurepas","CREATE_DATE":1772833826000,"MODIFIED_DATE":1775742755000,"BEGIN_DATE":1772755200000,"END_DATE":1792540799000,"DESCRIPTION":"Lake Pontchartrain - Tchefuncte River - Breakwater Construction --- From: 2026-03-09 To: 2026-10-19 --- Breakwater construction will be conducted in Lake Pontchartrain at the mouth of the Lower Tchefuncte River, near approximate positions 30-22-30.16N 090-09-34.78W and 30-22-27.29N 090-09-45.73W.  Operations will be conducted daily, from 7:00 a.m. to 5:30 p.m.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution. VHF-FM Channel: 16,  POC: (361) 533-3805","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-90.1627,30.37424],[-90.15966,30.37504]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44044,"geometry":{"type":"LineString","coordinates":[[-117.55935999999997,33.36997000000002],[-117.55754999999999,33.36901000000006],[-117.55758999999995,33.368940000000066],[-117.55694999999997,33.36851000000007],[-117.55686999999995,33.368580000000065],[-117.55570999999998,33.36775000000006]]},"properties":{"ESRI_OID":44044,"MSI_UID":44044,"ATU":11,"TITLE":"Sector San Diego, Territorial Sea - Sector San Diego, Submerged Lands Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385453,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact","WATERWAY_NAME":"Sector San Diego, Submerged Lands Act (SLA)","CREATE_DATE":1779202633000,"MODIFIED_DATE":1779913610000,"BEGIN_DATE":1779148800000,"END_DATE":1798847999000,"DESCRIPTION":"Southern California Edison (SCE) will perform maintenance on the existing SONGS revetment (riprap) by restacking the existing rock and adding new rock fill material along 1,470 linear feet of shoreline to restore the riprap to its original, permitted design. Work activities will occur within the SONGS walkway area in San Diego County, at 33.3689, -117.5556, and rock placement and stacking will extend 27 feet out from the pedestrian walkway. The project will begin on 01 June 2026 and run through the end of December 2026. For more information, contact Southern California Edison. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-117.55936,33.36997],[-117.55755,33.36901],[-117.55759,33.36894],[-117.55695,33.36851],[-117.55687,33.36858],[-117.55571,33.36775]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":45527,"geometry":{"type":"LineString","coordinates":[[-90.24624999999997,29.968150000000037],[-90.26407999999998,29.97097000000008],[-90.28453999999994,29.96724000000006],[-90.32233999999994,29.93482000000006],[-90.33664999999996,29.93303000000003],[-90.36205999999999,29.93789000000004],[-90.39317999999997,29.95237000000003],[-90.39626999999996,29.971110000000067],[-90.39821999999998,29.981120000000033],[-90.41492999999997,29.993010000000027],[-90.45909999999998,29.996880000000033],[-90.47019999999998,30.001240000000053],[-90.47328999999996,30.00976000000003],[-90.47305999999998,30.037310000000048],[-90.48484999999994,30.051570000000027],[-90.51002999999997,30.05147000000005],[-90.53176999999994,30.045430000000067],[-90.58086999999995,30.051180000000045],[-90.60237999999998,30.043350000000032],[-90.61736999999994,30.031360000000063],[-90.63064999999995,30.037010000000066],[-90.65147999999994,30.05006000000003],[-90.67481999999995,30.045700000000068],[-90.72288999999995,30.01380000000006],[-90.73478999999998,30.014000000000067],[-90.75927999999999,30.01499000000007],[-90.78559999999999,30.005080000000078],[-90.81649999999996,29.980300000000057],[-90.82359999999994,29.98169000000007],[-90.82908999999995,29.99061000000006],[-90.84213999999997,30.052040000000034],[-90.85471999999999,30.062740000000076],[-90.87211999999994,30.064520000000073],[-90.88653999999997,30.060760000000073],[-90.89912999999996,30.067300000000046],[-90.90896999999995,30.085320000000024],[-90.92109999999997,30.128880000000038],[-90.93162999999998,30.135610000000042],[-90.94123999999994,30.136600000000044],[-90.94672999999995,30.129670000000033],[-90.94558999999998,30.110470000000078],[-90.95313999999996,30.106710000000078],[-90.98106999999999,30.113240000000076],[-91.02844999999996,30.115020000000072],[-91.03210999999999,30.12453000000005],[-91.01447999999993,30.13363000000004],[-91.00051999999994,30.14393000000007],[-90.99845999999997,30.15501000000006],[-91.02912999999995,30.201310000000035],[-91.05544999999995,30.21357000000006],[-91.08520999999996,30.212390000000028],[-91.10442999999998,30.206250000000068],[-91.13143999999994,30.184300000000064],[-91.14219999999995,30.17796000000004],[-91.15501999999998,30.180340000000058],[-91.16325999999998,30.19043000000005],[-91.16714999999994,30.201700000000073],[-91.14585999999997,30.222080000000062],[-91.10872999999998,30.24655000000007],[-91.11604999999997,30.26434000000006],[-91.14763999999997,30.27857000000006],[-91.18173999999999,30.277390000000025],[-91.21377999999999,30.28075000000007],[-91.22819999999996,30.29221000000007],[-91.23163999999997,30.30111000000005],[-91.22201999999999,30.31316000000004],[-91.20027999999996,30.321060000000045],[-91.17418999999995,30.313750000000027],[-91.15518999999995,30.31454000000008],[-91.13961999999998,30.32343000000003],[-91.15312999999998,30.34042000000005],[-91.19432999999998,30.34635000000003],[-91.21789999999999,30.33746000000008],[-91.23895999999996,30.342790000000036],[-91.24490999999995,30.359380000000044],[-91.21881999999994,30.390580000000057],[-91.19798999999995,30.426510000000064],[-91.19772999999998,30.51067000000006]]},"properties":{"ESRI_OID":45527,"MSI_UID":45527,"ATU":8,"TITLE":"New Orleans Harbor - New Orleans To Baton Rouge/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100119138784,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou","WATERWAY_NAME":"New Orleans To Baton Rouge","CREATE_DATE":1780691615000,"MODIFIED_DATE":1789570131000,"BEGIN_DATE":1779408000000,"END_DATE":1798761599000,"DESCRIPTION":"Mississippi River - Dredge Operation --- Dredging will be conducted in the Mississippi River deep draft navigation channel from Mile 113.0 to Mile 234.0, AHOP, between Baton Rouge and New Orleans, LA.  Dredging will take place 24-hours a day, 7-days a week.  The following dredges will be working in the area, with the following schedule:\n• Dredge WALLACE McGEORGE:  24JUN2026 - Until Further Notice, near Baton Rouge Harbor (Mile 229.5 - 234.0, AHOP). \n• Dredge HURLEY: 12SEP2026 - Until Further Notice, near Sardine Point Crossing (Mile 219.0, AHOP). • \nMariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 16 and 67,  POC: USACE (504) 862-1253","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-90.24625,29.96815],[-90.26408,29.97097],[-90.28454,29.96724],[-90.32234,29.93482],[-90.33665,29.93303],[-90.36206,29.93789],[-90.39318,29.95237],[-90.39627,29.97111],[-90.39822,29.98112],[-90.41493,29.99301],[-90.4591,29.99688],[-90.4702,30.00124],[-90.47329,30.00976],[-90.47306,30.03731],[-90.48485,30.05157],[-90.51003,30.05147],[-90.53177,30.04543],[-90.58087,30.05118],[-90.60238,30.04335],[-90.61737,30.03136],[-90.63065,30.03701],[-90.65148,30.05006],[-90.67482,30.0457],[-90.72289,30.0138],[-90.73479,30.014],[-90.75928,30.01499],[-90.7856,30.00508],[-90.8165,29.9803],[-90.8236,29.98169],[-90.82909,29.99061],[-90.84214,30.05204],[-90.85472,30.06274],[-90.87212,30.06452],[-90.88654,30.06076],[-90.89913,30.0673],[-90.90897,30.08532],[-90.9211,30.12888],[-90.93163,30.13561],[-90.94124,30.1366],[-90.94673,30.12967],[-90.94559,30.11047],[-90.95314,30.10671],[-90.98107,30.11324],[-91.02845,30.11502],[-91.03211,30.12453],[-91.01448,30.13363],[-91.00052,30.14393],[-90.99846,30.15501],[-91.02913,30.20131],[-91.05545,30.21357],[-91.08521,30.21239],[-91.10443,30.20625],[-91.13144,30.1843],[-91.1422,30.17796],[-91.15502,30.18034],[-91.16326,30.19043],[-91.16715,30.2017],[-91.14586,30.22208],[-91.10873,30.24655],[-91.11605,30.26434],[-91.14764,30.27857],[-91.18174,30.27739],[-91.21378,30.28075],[-91.2282,30.29221],[-91.23164,30.30111],[-91.22202,30.31316],[-91.20028,30.32106],[-91.17419,30.31375],[-91.15519,30.31454],[-91.13962,30.32343],[-91.15313,30.34042],[-91.19433,30.34635],[-91.2179,30.33746],[-91.23896,30.34279],[-91.24491,30.35938],[-91.21882,30.39058],[-91.19799,30.42651],[-91.19773,30.51067]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":45755,"geometry":{"type":"LineString","coordinates":[[-74.55840999999998,39.281540000000064],[-74.55265999999995,39.28081000000003],[-74.52894999999995,39.28712000000007]]},"properties":{"ESRI_OID":45755,"MSI_UID":45755,"ATU":5,"TITLE":"Sector Delaware Bay, Submerged Land Act (SLA) - Great Egg Harbor Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382912,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:greeggharinl","WATERWAY_NAME":"Great Egg Harbor Inlet","CREATE_DATE":1780942920000,"MODIFIED_DATE":1780943241000,"BEGIN_DATE":1780876800000,"END_DATE":1792454399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-08 To: 2026-10-19\n\nLocation:\n39-16-53.544N/074-33-30.276W\n39-16-50.916N/074-33-09.576W\n39-17-13.632N/074-31-44.220W\n\nSubmerged Subline for Great Lakes Dredge and Dock, LLC beach renourishment project, Ocean City, NJ. The Cutter Suction Dredge (CSD) Illinois will dredge beachfill quality material from the Great Egg Harbor Inlet Borrow Area, located approximately 5,000 feet offshore, north east of the\nproject location, east of the Great Egg Harbor Inlet. The material will pump through one subline extending from the borrow area to the placement beach. Operations will start June 6, 2026 with completion date of October 19, 2026. Ops will be conduct 24 hours a day, 7 days a week. Vessels will monitor VHF 13 and 16. MSI # 45755.","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.55841,39.28154],[-74.55266,39.28081],[-74.52895,39.28712]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46675,"geometry":{"type":"LineString","coordinates":[[-74.25927999999993,39.55691000000007],[-74.27131999999995,39.58133000000004],[-74.26759999999996,39.58920000000006],[-74.25754999999998,39.597950000000026],[-74.25703999999996,39.61058000000003],[-74.25622999999996,39.615440000000035],[-74.24760999999995,39.624010000000055],[-74.24642999999998,39.63279000000006],[-74.23972999999995,39.64211000000006],[-74.23609999999996,39.64382000000006],[-74.22721999999999,39.64118000000008],[-74.21852999999999,39.64122000000003],[-74.21625999999998,39.64630000000005]]},"properties":{"ESRI_OID":46675,"MSI_UID":46675,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1781779560000,"MODIFIED_DATE":1790011893000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-38-58.236N/074-15-12.168W\n39-38-08.448N/074-14-11.220W\n39-37-57.936N/074-14-24.900W\n39-38-48.948N/074-15-26.784W\n39-38-58.236N/074-15-12.168W\nH &amp;amp; L Contracting will be conducting dredging in Little Egg Harbor starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Great Gun and Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46675\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.25928,39.55691],[-74.27132,39.58133],[-74.2676,39.5892],[-74.25755,39.59795],[-74.25704,39.61058],[-74.25623,39.61544],[-74.24761,39.62401],[-74.24643,39.63279],[-74.23973,39.64211],[-74.2361,39.64382],[-74.22722,39.64118],[-74.21853,39.64122],[-74.21626,39.6463]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48688,"geometry":{"type":"LineString","coordinates":[[-95.25066999999996,29.722970000000032],[-95.25272999999999,29.725150000000042],[-95.25484999999998,29.726020000000062],[-95.25727999999998,29.726740000000063],[-95.26201999999995,29.726350000000025],[-95.26686999999998,29.724960000000067],[-95.26913999999994,29.724950000000035],[-95.27207999999996,29.725610000000074],[-95.27457999999996,29.727310000000045],[-95.27641999999997,29.730240000000038],[-95.27709999999996,29.733430000000055],[-95.28024999999997,29.739700000000028],[-95.28482999999994,29.745120000000043],[-95.28852999999998,29.750890000000027],[-95.28982999999994,29.751630000000034]]},"properties":{"ESRI_OID":48688,"MSI_UID":48688,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1784030949000,"MODIFIED_DATE":1784031305000,"BEGIN_DATE":1783987200000,"END_DATE":1790207999000,"DESCRIPTION":"Houston Ship Channel - Soil Boring Operation --- From: 2026-07-15 To: 2026-09-22 --- Geotechnical soil boring will be conducted from a floating plant in the Houston Ship Channel, from approximately Sims Bayou to the Houston Ship Channel Turning Basin.  Operations will be conducted 24-hours a day, 7-days a week.  On-scene vessels will include a lift boat and a support vessel.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13 and 21A ","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-95.25067,29.72297],[-95.25273,29.72515],[-95.25485,29.72602],[-95.25728,29.72674],[-95.26202,29.72635],[-95.26687,29.72496],[-95.26914,29.72495],[-95.27208,29.72561],[-95.27458,29.72731],[-95.27642,29.73024],[-95.2771,29.73343],[-95.28025,29.7397],[-95.28483,29.74512],[-95.28853,29.75089],[-95.28983,29.75163]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49825,"geometry":{"type":"LineString","coordinates":[[-87.32661999999993,30.330400000000054],[-87.31762999999995,30.33328000000006],[-87.31670999999994,30.336870000000033],[-87.30823999999996,30.34251000000006]]},"properties":{"ESRI_OID":49825,"MSI_UID":49825,"ATU":8,"TITLE":"Pensacola Bay - Pensacola-Mobile/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384691,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:penbay:pen","WATERWAY_NAME":"Pensacola-Mobile","CREATE_DATE":1785183677000,"MODIFIED_DATE":1786382891000,"BEGIN_DATE":1785110400000,"END_DATE":1795305599000,"DESCRIPTION":"GIWW, Mile 177.8, EHL - Pensacola Bay - Shoreline Restoration --- From: 2026-07-27 To: 2026-11-20 --- Shoreline restoration will take place near Sherman Inlet and Magazine Point, along the GIWW and Pensacola Bay.  Shoreline restoration, material transfer, and breakwater construction activities will take place within the project area.  Material will be mechanically removed from Robertson Island, near GIWW, Mile 177.8, EHL, and transferred by barges to various beaches and nearshore sites located in the vicinity of the GIWW and Pensacola Harbor channels.  Additional work will consist of breakwater construction and the planting of submerged aquatic vegetation.  Breakwater structures will be constructed in close proximity to the GIWW near the Sherman Cove Inlet.  Work will be conducted 24-hours a day, 7-days a week.  On-scene vessels will include four push boats, six barges, and four crew transfer skiffs.  Mariners are requested to transit the area at no wake speed and proceed with caution.  VHF-FM Channels: 12 and 16,  POC: (251) 747-5591, (205) 616-6845, or (251) 504-6537","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-87.32662,30.3304],[-87.31763,30.33328],[-87.31671,30.33687],[-87.30824,30.34251]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52746,"geometry":{"type":"LineString","coordinates":[[-74.25562999999994,40.46870000000007],[-73.86196999999999,40.523720000000026]]},"properties":{"ESRI_OID":52746,"MSI_UID":52746,"ATU":1,"TITLE":"Sector New York, Submerged Lands Act (SLA) - Ambrose Channel/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382165,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha","WATERWAY_NAME":"Ambrose Channel","CREATE_DATE":1788275097000,"MODIFIED_DATE":1788275103000,"BEGIN_DATE":1788220800000,"END_DATE":1797292799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-09-08 To: 2026-12-14\n\nLocation:\n40-28-07.320N/074-15-20.268W\n40-31-25.392N/073-51-43.092W\n\nS. T. Hudson Engineers, Inc. plans to conduct geophysical survey operations aboard the M/V BELLA MARIE in the Raritan Bay area from September 8 through December 13, 2026. The work will occur during daylight hours only, seven days per week, and will not be conducted during hazardous sea or weather conditions. Survey activity will extend from Cheesequake Creek across the Raritan, Chapel Hill, and Ambrose channels, with the survey area beginning near 40° 28' 07.352\" N, 074° 15' 20.287\" W and ending near 40° 31' 25.423002\" N, 073° 51' 43.105434\" W.\nThe M/V BELLA MARIE is a 40-foot power catamaran survey vessel. During operations, the vessel will tow survey equipment behind and beneath it, including equipment that may extend up to 250 feet astern, which will restrict the vessel’s maneuverability. Mariners operating near the survey vessel should use caution, maintain a safe distance, and proceed at reduced speed. The vessel will continuously monitor VHF Channels 13 and 16 and will check in daily with New York/New Jersey Vessel Traffic Service. The vessel will also maintain a listening watch on VHF Channel 12 or 14 as required by location. The designated shoreside point of contact is Joe Wozniak, HSE &amp;amp; Marine Compliance Manager, S. T. Hudson Engineers, Inc., at 609-412-1242 or jwozniak@sthe.com.\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.25563,40.4687],[-73.86197,40.52372]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52855,"geometry":{"type":"LineString","coordinates":[[-89.43146999999999,28.876720000000034],[-89.43126999999998,28.904360000000054],[-89.42338999999998,28.911760000000072],[-89.39465999999999,28.95338000000004],[-89.33193999999997,29.028970000000072],[-89.31730999999996,29.04531000000003],[-89.30912999999998,29.059540000000027],[-89.28867999999994,29.077360000000056],[-89.27956999999998,29.090410000000077],[-89.26071999999994,29.125600000000077],[-89.25592999999998,29.13725000000005],[-89.25442999999996,29.162390000000073],[-89.26617999999996,29.188870000000065],[-89.28882999999996,29.22335000000004],[-89.30108999999999,29.23625000000004],[-89.31643999999994,29.248790000000042],[-89.32307999999995,29.25359000000003],[-89.34614999999997,29.27147000000008],[-89.35861999999997,29.287240000000054],[-89.36530999999997,29.300220000000024],[-89.36630999999994,29.30152000000004],[-89.36726999999996,29.302970000000073],[-89.36879999999996,29.305180000000064],[-89.36984999999999,29.306400000000053],[-89.37031999999994,29.30702000000008]]},"properties":{"ESRI_OID":52855,"MSI_UID":52855,"ATU":8,"TITLE":"Sector New Orleans, Submerged Land Act (SLA) - Southwest Pass/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384958,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:souwespas","WATERWAY_NAME":"Southwest Pass","CREATE_DATE":1788355385000,"MODIFIED_DATE":1788357869000,"BEGIN_DATE":1788307200000,"END_DATE":1793577599000,"DESCRIPTION":"Mississippi River - Southwest Pass - Dredge Operation --- From: 2026-09-04 To: 2026-10-31 --- The Dredge GLENN EDWARDS will conduct dredging in Southwest Pass, from Head of Passes (Mile 0.0) to approximately Mile -22.0, BHOP, and in the Mississippi River, from Head of Passes to approximately Mile 13.0, AHOP.  Work will take place 24-hours a day, 7-days a week.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 16 or 67, POC: USACE (504) 862-1253","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-89.43147,28.87672],[-89.43127,28.90436],[-89.42339,28.91176],[-89.39466,28.95338],[-89.33194,29.02897],[-89.31731,29.04531],[-89.30913,29.05954],[-89.28868,29.07736],[-89.27957,29.09041],[-89.26072,29.1256],[-89.25593,29.13725],[-89.25443,29.16239],[-89.26618,29.18887],[-89.28883,29.22335],[-89.30109,29.23625],[-89.31644,29.24879],[-89.32308,29.25359],[-89.34615,29.27147],[-89.35862,29.28724],[-89.36531,29.30022],[-89.36631,29.30152],[-89.36727,29.30297],[-89.3688,29.30518],[-89.36985,29.3064],[-89.37032,29.30702]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":53470,"geometry":{"type":"LineString","coordinates":[[-122.32063,47.53310000000005],[-122.30948999999998,47.526560000000075],[-122.30419999999998,47.51298000000003],[-122.30142999999998,47.51243000000005]]},"properties":{"ESRI_OID":53470,"MSI_UID":53470,"ATU":13,"TITLE":"Elliott Bay - Duwamish Waterway East/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100118213969,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:secpugsouexcecozon:secpugsoutersea:secpugsousublanact:strofjuadefuc:adminl:pugsou:ellbay:duwwateas","WATERWAY_NAME":"Duwamish Waterway East","CREATE_DATE":1789060966000,"MODIFIED_DATE":1789060975000,"BEGIN_DATE":1788998400000,"END_DATE":1802908799000,"DESCRIPTION":"Pacific Pile and Marine will be conducting dredging operations in the Lower Duwamish Waterway Upper Reach Remedial Action  \n(RM 3 – RM 5) from 01 Oct 2026 – 15 Feb 2027. Standard working hours are Mon-Sat 0600-1630. Working vessels include Construction barges, tugboats, survey boats and work skiffs. All barges will be lite with white all-round lights at each corner. Cautionary Buoys (3.6 ft height, white with black lettering and orange stripes) will designate working area. All vessels will be maintained and monitoring VHF Channel 16. Mariners are urged to transit at their slowest safe speed to minimize wake and keep a 100 ft district from working vessels. For additional information, please contact the Contract Representative Andrea Harwood and Ben Nguyen at 206-331-3873 or andreah@pacificpile.com or benn@pacificpile.com  \n\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-122.32063,47.5331],[-122.30949,47.52656],[-122.3042,47.51298],[-122.30143,47.51243]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":53855,"geometry":{"type":"LineString","coordinates":[[-124.04616999999996,46.28165000000007],[-124.04071999999996,46.28075000000007],[-124.03676999999999,46.27880000000005],[-124.03236999999996,46.275420000000054],[-124.03107999999997,46.273790000000076],[-124.02931999999998,46.26672000000008]]},"properties":{"ESRI_OID":53855,"MSI_UID":53855,"ATU":13,"TITLE":"Columbia River - Baker Bay West Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385661,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:colriv:bakbaywescha","WATERWAY_NAME":"Baker Bay West Channel","CREATE_DATE":1789581123000,"MODIFIED_DATE":1789581133000,"BEGIN_DATE":1789516800000,"END_DATE":1793059199000,"DESCRIPTION":"HME Construction Inc will be performing clamshell dredging and dump scow disposal operations near Baker Day Channel from 18 Sep – 25 Oct 2026, working 7 days a week 24 hours a day. Dredge Site extends from USCG Station Cape Disappointment to 1 NM down the channel. Dredge spoils will be transported to Columbia River Miles 4.5 - 6.5, 1000 ft north of the shipping lane. Vessels include Dredge Boat Seahorse, one split-hull dump scow, Tug Terilyn and support tug Douglas, monitoring VHF Channels 13, 16, 67, 68, or 69. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. For additional information, please contact HME Project Manager at 503-250-1827 or 360-904-2978. USACE Contracting Officers Representative is Nathan Miller, 360-899-8223. \n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-124.04617,46.28165],[-124.04072,46.28075],[-124.03677,46.2788],[-124.03237,46.27542],[-124.03108,46.27379],[-124.02932,46.26672]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":54014,"geometry":{"type":"LineString","coordinates":[[-73.46171999999996,40.55225000000007],[-73.44157999999999,40.280410000000074]]},"properties":{"ESRI_OID":54014,"MSI_UID":54014,"ATU":1,"TITLE":"NAVAREA IV/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382366,"MRN":"urn:mrn:iala:wwy:us:navIV","WATERWAY_NAME":"NAVAREA IV","CREATE_DATE":1789990527000,"MODIFIED_DATE":1789990536000,"BEGIN_DATE":1789948800000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-09-21 To: 2026-10-31\n\nH &amp;amp; L Contracting details emergency repairs to underwater diffusers at the Cedar Creek Wastewater Treatment Plant’s ocean outfall in Wantagh, New York, located in the Atlantic Ocean. The project, led by Jeffery Hawkins, will run from July 16 to October 31, 2026, operating Monday through Friday from 6:00 AM to 5:00 PM. Work will be conducted from a dive vessel, tug Manhasset Bay, and marker buoys, with vessel communications managed via VHF channels 16 and 65. The operation involves installing location buoys along the 84-inch outfall pipeline, which extends approximately two miles offshore and branches into an east-west diffuser field, each leg measuring about 1,225 feet. Commercial divers will mark the pipeline alignment to facilitate inspection and construction. The four key coordinates of the diffuser field are: 40.567939°N, 73.454662°W; 40.562960°N, 73.452567°W; 40.566250°N, 73.438921°W; and 40.571250°N, 73.441111°W. Vessels can be moved with 15 minutes’ notice to avoid impeding navigation.","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-73.46172,40.55225],[-73.44158,40.28041]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}}]}