{"type":"FeatureCollection","features":[{"type":"Feature","id":8491,"geometry":{"type":"LineString","coordinates":[[-91.54911999999996,29.184960000000046],[-91.43788999999998,29.31051000000008]]},"properties":{"ESRI_OID":8491,"MSI_UID":8491,"ATU":8,"TITLE":"Sector New Orleans, Submerged Land Act (SLA) - Atchafalaya Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384918,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:atccha","WATERWAY_NAME":"Atchafalaya Channel","CREATE_DATE":1736263768000,"MODIFIED_DATE":1773940426000,"BEGIN_DATE":1736208000000,"END_DATE":1798847999000,"DESCRIPTION":"Atchafalaya Bar Channel - Dredge Operation --- From: 2025-01-07 To: 2026-12-31 --- The Agitation Dredge ARULAQ will be dredging in the Atchafalaya Bar Channel, between Miles 167.0 and 156.0, 24-hours a day, 7-days a week.  Mariners should coordinate passing arrangements with the M/V JOHN E. GRAHAM and transit the area at their slowest safe speed to minimize wake.  VHF-FM Channels: 13 and 16,  POC: USACE (504) 862-2360, (504) 862-2153 and (504) 862-2630","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-91.54912,29.18496],[-91.43789,29.31051]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":34393,"geometry":{"type":"LineString","coordinates":[[-93.66608999999994,29.417030000000068],[-93.66700999999995,29.48201000000006],[-93.69435999999996,29.505610000000047],[-93.80364999999995,29.598400000000026],[-93.82573999999994,29.644460000000038],[-93.83517999999998,29.68608000000006],[-93.85073999999997,29.70814000000007],[-93.86527999999998,29.72733000000005],[-93.88323999999994,29.748790000000042],[-93.89033999999998,29.75714000000005],[-93.90818999999999,29.762000000000057]]},"properties":{"ESRI_OID":34393,"MSI_UID":34393,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Sabine Pass/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385196,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:sabpas","WATERWAY_NAME":"Sabine Pass","CREATE_DATE":1767036729000,"MODIFIED_DATE":1787837948000,"BEGIN_DATE":1766966400000,"END_DATE":1806883199000,"DESCRIPTION":"Sabine Bank Channel - Sabine Pass - Dredge Operation --- From: 2026-02-09 To: 2027-04-03 --- Dredging will be conducted throughout the Sabine Bank Channel and in Sabine Pass.  Operations will be conducted 24-hours a day, 7-days a week.  Dredged material will be disposed in offshore disposal sites located west of the channel.  On-scene vessels include the Dredges DODGE ISLAND, ELLIS ISLAND and GALVESTON ISLAND, the Survey Vessels JONATHAN WOODWARD, LADY BECKY, FM BROWN, and OHIO RIVER, the Trawling Vessels MR. TOMMY, SIMPLE MAN, JESSICA MARIE, and ANNAMARIA ROSE, and the M/Vs SMITH INVADER and SMITH HUNTER.  Currently, the Dredge DODGE ISLAND is dredging between Sabine Bank Channel Lighted Buoy 11 (LLNR-22350) and Sabine Bank Channel Lighted Buoy 14 (LLNR-22365) and the Dredges GALVESTON ISLAND and ELLIS ISLAND are operating south of Sabine Bank Channel Lighted Buoy SB (LLNR-1085).  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13 and 16","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-93.66609,29.41703],[-93.66701,29.48201],[-93.69436,29.50561],[-93.80365,29.5984],[-93.82574,29.64446],[-93.83518,29.68608],[-93.85074,29.70814],[-93.86528,29.72733],[-93.88324,29.74879],[-93.89034,29.75714],[-93.90819,29.762]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":38555,"geometry":{"type":"LineString","coordinates":[[-90.16269999999997,30.374240000000043],[-90.15965999999997,30.37504000000007]]},"properties":{"ESRI_OID":38555,"MSI_UID":38555,"ATU":8,"TITLE":"The Rigolets - Lakes Pontchartrain And Maurepas/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100117410918,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:graislcha:lakbor:therig:lakponandmau","WATERWAY_NAME":"Lakes Pontchartrain And Maurepas","CREATE_DATE":1772833826000,"MODIFIED_DATE":1775742755000,"BEGIN_DATE":1772755200000,"END_DATE":1792540799000,"DESCRIPTION":"Lake Pontchartrain - Tchefuncte River - Breakwater Construction --- From: 2026-03-09 To: 2026-10-19 --- Breakwater construction will be conducted in Lake Pontchartrain at the mouth of the Lower Tchefuncte River, near approximate positions 30-22-30.16N 090-09-34.78W and 30-22-27.29N 090-09-45.73W.  Operations will be conducted daily, from 7:00 a.m. to 5:30 p.m.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution. VHF-FM Channel: 16,  POC: (361) 533-3805","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-90.1627,30.37424],[-90.15966,30.37504]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44044,"geometry":{"type":"LineString","coordinates":[[-117.55935999999997,33.36997000000002],[-117.55754999999999,33.36901000000006],[-117.55758999999995,33.368940000000066],[-117.55694999999997,33.36851000000007],[-117.55686999999995,33.368580000000065],[-117.55570999999998,33.36775000000006]]},"properties":{"ESRI_OID":44044,"MSI_UID":44044,"ATU":11,"TITLE":"Sector San Diego, Territorial Sea - Sector San Diego, Submerged Lands Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385453,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact","WATERWAY_NAME":"Sector San Diego, Submerged Lands Act (SLA)","CREATE_DATE":1779202633000,"MODIFIED_DATE":1779913610000,"BEGIN_DATE":1779148800000,"END_DATE":1798847999000,"DESCRIPTION":"Southern California Edison (SCE) will perform maintenance on the existing SONGS revetment (riprap) by restacking the existing rock and adding new rock fill material along 1,470 linear feet of shoreline to restore the riprap to its original, permitted design. Work activities will occur within the SONGS walkway area in San Diego County, at 33.3689, -117.5556, and rock placement and stacking will extend 27 feet out from the pedestrian walkway. The project will begin on 01 June 2026 and run through the end of December 2026. For more information, contact Southern California Edison. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-117.55936,33.36997],[-117.55755,33.36901],[-117.55759,33.36894],[-117.55695,33.36851],[-117.55687,33.36858],[-117.55571,33.36775]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":45527,"geometry":{"type":"LineString","coordinates":[[-90.24624999999997,29.968150000000037],[-90.26407999999998,29.97097000000008],[-90.28453999999994,29.96724000000006],[-90.32233999999994,29.93482000000006],[-90.33664999999996,29.93303000000003],[-90.36205999999999,29.93789000000004],[-90.39317999999997,29.95237000000003],[-90.39626999999996,29.971110000000067],[-90.39821999999998,29.981120000000033],[-90.41492999999997,29.993010000000027],[-90.45909999999998,29.996880000000033],[-90.47019999999998,30.001240000000053],[-90.47328999999996,30.00976000000003],[-90.47305999999998,30.037310000000048],[-90.48484999999994,30.051570000000027],[-90.51002999999997,30.05147000000005],[-90.53176999999994,30.045430000000067],[-90.58086999999995,30.051180000000045],[-90.60237999999998,30.043350000000032],[-90.61736999999994,30.031360000000063],[-90.63064999999995,30.037010000000066],[-90.65147999999994,30.05006000000003],[-90.67481999999995,30.045700000000068],[-90.72288999999995,30.01380000000006],[-90.73478999999998,30.014000000000067],[-90.75927999999999,30.01499000000007],[-90.78559999999999,30.005080000000078],[-90.81649999999996,29.980300000000057],[-90.82359999999994,29.98169000000007],[-90.82908999999995,29.99061000000006],[-90.84213999999997,30.052040000000034],[-90.85471999999999,30.062740000000076],[-90.87211999999994,30.064520000000073],[-90.88653999999997,30.060760000000073],[-90.89912999999996,30.067300000000046],[-90.90896999999995,30.085320000000024],[-90.92109999999997,30.128880000000038],[-90.93162999999998,30.135610000000042],[-90.94123999999994,30.136600000000044],[-90.94672999999995,30.129670000000033],[-90.94558999999998,30.110470000000078],[-90.95313999999996,30.106710000000078],[-90.98106999999999,30.113240000000076],[-91.02844999999996,30.115020000000072],[-91.03210999999999,30.12453000000005],[-91.01447999999993,30.13363000000004],[-91.00051999999994,30.14393000000007],[-90.99845999999997,30.15501000000006],[-91.02912999999995,30.201310000000035],[-91.05544999999995,30.21357000000006],[-91.08520999999996,30.212390000000028],[-91.10442999999998,30.206250000000068],[-91.13143999999994,30.184300000000064],[-91.14219999999995,30.17796000000004],[-91.15501999999998,30.180340000000058],[-91.16325999999998,30.19043000000005],[-91.16714999999994,30.201700000000073],[-91.14585999999997,30.222080000000062],[-91.10872999999998,30.24655000000007],[-91.11604999999997,30.26434000000006],[-91.14763999999997,30.27857000000006],[-91.18173999999999,30.277390000000025],[-91.21377999999999,30.28075000000007],[-91.22819999999996,30.29221000000007],[-91.23163999999997,30.30111000000005],[-91.22201999999999,30.31316000000004],[-91.20027999999996,30.321060000000045],[-91.17418999999995,30.313750000000027],[-91.15518999999995,30.31454000000008],[-91.13961999999998,30.32343000000003],[-91.15312999999998,30.34042000000005],[-91.19432999999998,30.34635000000003],[-91.21789999999999,30.33746000000008],[-91.23895999999996,30.342790000000036],[-91.24490999999995,30.359380000000044],[-91.21881999999994,30.390580000000057],[-91.19798999999995,30.426510000000064],[-91.19772999999998,30.51067000000006]]},"properties":{"ESRI_OID":45527,"MSI_UID":45527,"ATU":8,"TITLE":"New Orleans Harbor - New Orleans To Baton Rouge/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100119138784,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou","WATERWAY_NAME":"New Orleans To Baton Rouge","CREATE_DATE":1780691615000,"MODIFIED_DATE":1782486036000,"BEGIN_DATE":1779408000000,"END_DATE":1795046399000,"DESCRIPTION":"Mississippi River - Dredge Operation --- From: 2026-06-24 To: Until Further Notice --- The Dredge WALLACE McGEORGE will be working in the Mississippi River deep draft navigation channel from Mile 113.0 to Mile 234.0, AHOP, between Baton Rouge and New Orleans, LA.  Dredging will take place 24-hours a day, 7-days a week.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 16 and 67,  POC: USACE (504) 862-1253","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-90.24625,29.96815],[-90.26408,29.97097],[-90.28454,29.96724],[-90.32234,29.93482],[-90.33665,29.93303],[-90.36206,29.93789],[-90.39318,29.95237],[-90.39627,29.97111],[-90.39822,29.98112],[-90.41493,29.99301],[-90.4591,29.99688],[-90.4702,30.00124],[-90.47329,30.00976],[-90.47306,30.03731],[-90.48485,30.05157],[-90.51003,30.05147],[-90.53177,30.04543],[-90.58087,30.05118],[-90.60238,30.04335],[-90.61737,30.03136],[-90.63065,30.03701],[-90.65148,30.05006],[-90.67482,30.0457],[-90.72289,30.0138],[-90.73479,30.014],[-90.75928,30.01499],[-90.7856,30.00508],[-90.8165,29.9803],[-90.8236,29.98169],[-90.82909,29.99061],[-90.84214,30.05204],[-90.85472,30.06274],[-90.87212,30.06452],[-90.88654,30.06076],[-90.89913,30.0673],[-90.90897,30.08532],[-90.9211,30.12888],[-90.93163,30.13561],[-90.94124,30.1366],[-90.94673,30.12967],[-90.94559,30.11047],[-90.95314,30.10671],[-90.98107,30.11324],[-91.02845,30.11502],[-91.03211,30.12453],[-91.01448,30.13363],[-91.00052,30.14393],[-90.99846,30.15501],[-91.02913,30.20131],[-91.05545,30.21357],[-91.08521,30.21239],[-91.10443,30.20625],[-91.13144,30.1843],[-91.1422,30.17796],[-91.15502,30.18034],[-91.16326,30.19043],[-91.16715,30.2017],[-91.14586,30.22208],[-91.10873,30.24655],[-91.11605,30.26434],[-91.14764,30.27857],[-91.18174,30.27739],[-91.21378,30.28075],[-91.2282,30.29221],[-91.23164,30.30111],[-91.22202,30.31316],[-91.20028,30.32106],[-91.17419,30.31375],[-91.15519,30.31454],[-91.13962,30.32343],[-91.15313,30.34042],[-91.19433,30.34635],[-91.2179,30.33746],[-91.23896,30.34279],[-91.24491,30.35938],[-91.21882,30.39058],[-91.19799,30.42651],[-91.19773,30.51067]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":45755,"geometry":{"type":"LineString","coordinates":[[-74.55840999999998,39.281540000000064],[-74.55265999999995,39.28081000000003],[-74.52894999999995,39.28712000000007]]},"properties":{"ESRI_OID":45755,"MSI_UID":45755,"ATU":5,"TITLE":"Sector Delaware Bay, Submerged Land Act (SLA) - Great Egg Harbor Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382912,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:greeggharinl","WATERWAY_NAME":"Great Egg Harbor Inlet","CREATE_DATE":1780942920000,"MODIFIED_DATE":1780943241000,"BEGIN_DATE":1780876800000,"END_DATE":1792454399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-08 To: 2026-10-19\n\nLocation:\n39-16-53.544N/074-33-30.276W\n39-16-50.916N/074-33-09.576W\n39-17-13.632N/074-31-44.220W\n\nSubmerged Subline for Great Lakes Dredge and Dock, LLC beach renourishment project, Ocean City, NJ. The Cutter Suction Dredge (CSD) Illinois will dredge beachfill quality material from the Great Egg Harbor Inlet Borrow Area, located approximately 5,000 feet offshore, north east of the\nproject location, east of the Great Egg Harbor Inlet. The material will pump through one subline extending from the borrow area to the placement beach. Operations will start June 6, 2026 with completion date of October 19, 2026. Ops will be conduct 24 hours a day, 7 days a week. Vessels will monitor VHF 13 and 16. MSI # 45755.","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.55841,39.28154],[-74.55266,39.28081],[-74.52895,39.28712]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46675,"geometry":{"type":"LineString","coordinates":[[-74.25927999999993,39.55691000000007],[-74.27131999999995,39.58133000000004],[-74.26759999999996,39.58920000000006],[-74.25754999999998,39.597950000000026],[-74.25703999999996,39.61058000000003],[-74.25622999999996,39.615440000000035],[-74.24760999999995,39.624010000000055],[-74.24642999999998,39.63279000000006],[-74.23972999999995,39.64211000000006],[-74.23609999999996,39.64382000000006],[-74.22721999999999,39.64118000000008],[-74.21852999999999,39.64122000000003],[-74.21625999999998,39.64630000000005]]},"properties":{"ESRI_OID":46675,"MSI_UID":46675,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1781779560000,"MODIFIED_DATE":1781779594000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-38-58.236N/074-15-12.168W\n39-38-08.448N/074-14-11.220W\n39-37-57.936N/074-14-24.900W\n39-38-48.948N/074-15-26.784W\n39-38-58.236N/074-15-12.168W\nH &amp;amp; L Contracting will be conducting dredging in Little Egg Harbor starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46675\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.25928,39.55691],[-74.27132,39.58133],[-74.2676,39.5892],[-74.25755,39.59795],[-74.25704,39.61058],[-74.25623,39.61544],[-74.24761,39.62401],[-74.24643,39.63279],[-74.23973,39.64211],[-74.2361,39.64382],[-74.22722,39.64118],[-74.21853,39.64122],[-74.21626,39.6463]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48688,"geometry":{"type":"LineString","coordinates":[[-95.25066999999996,29.722970000000032],[-95.25272999999999,29.725150000000042],[-95.25484999999998,29.726020000000062],[-95.25727999999998,29.726740000000063],[-95.26201999999995,29.726350000000025],[-95.26686999999998,29.724960000000067],[-95.26913999999994,29.724950000000035],[-95.27207999999996,29.725610000000074],[-95.27457999999996,29.727310000000045],[-95.27641999999997,29.730240000000038],[-95.27709999999996,29.733430000000055],[-95.28024999999997,29.739700000000028],[-95.28482999999994,29.745120000000043],[-95.28852999999998,29.750890000000027],[-95.28982999999994,29.751630000000034]]},"properties":{"ESRI_OID":48688,"MSI_UID":48688,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1784030949000,"MODIFIED_DATE":1784031305000,"BEGIN_DATE":1783987200000,"END_DATE":1790207999000,"DESCRIPTION":"Houston Ship Channel - Soil Boring Operation --- From: 2026-07-15 To: 2026-09-22 --- Geotechnical soil boring will be conducted from a floating plant in the Houston Ship Channel, from approximately Sims Bayou to the Houston Ship Channel Turning Basin.  Operations will be conducted 24-hours a day, 7-days a week.  On-scene vessels will include a lift boat and a support vessel.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13 and 21A ","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-95.25067,29.72297],[-95.25273,29.72515],[-95.25485,29.72602],[-95.25728,29.72674],[-95.26202,29.72635],[-95.26687,29.72496],[-95.26914,29.72495],[-95.27208,29.72561],[-95.27458,29.72731],[-95.27642,29.73024],[-95.2771,29.73343],[-95.28025,29.7397],[-95.28483,29.74512],[-95.28853,29.75089],[-95.28983,29.75163]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48747,"geometry":{"type":"LineString","coordinates":[[-74.75577999999996,40.187850000000026],[-74.74950999999999,40.18256000000008],[-74.74048999999997,40.17973000000006],[-74.73290999999995,40.17285000000004],[-74.72335999999996,40.16267000000005],[-74.72329999999994,40.16276000000005]]},"properties":{"ESRI_OID":48747,"MSI_UID":48747,"ATU":5,"TITLE":"Delaware River - Upper Delaware River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382818,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:delbay:delbaymaicha:lisran:delriv:delrivmaicha:mifran:eagpoi:delriv:uppdelriv","WATERWAY_NAME":"Upper Delaware River","CREATE_DATE":1784054241000,"MODIFIED_DATE":1784228290000,"BEGIN_DATE":1783987200000,"END_DATE":1789948799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-07-14 To: 2026-09-20\n\nLocation:\nCurtin Maritime will be dredging in the Delaware River between Philadelphia and Trenton NJ / Biles Island from Jul 20 concluding on or about 20 Sep 26. \nPOC Mr. Robert Collero, (772) 643-0784\n\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.75578,40.18785],[-74.74951,40.18256],[-74.74049,40.17973],[-74.73291,40.17285],[-74.72336,40.16267],[-74.7233,40.16276]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49825,"geometry":{"type":"LineString","coordinates":[[-87.32661999999993,30.330400000000054],[-87.31762999999995,30.33328000000006],[-87.31670999999994,30.336870000000033],[-87.30823999999996,30.34251000000006]]},"properties":{"ESRI_OID":49825,"MSI_UID":49825,"ATU":8,"TITLE":"Pensacola Bay - Pensacola-Mobile/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384691,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:penbay:pen","WATERWAY_NAME":"Pensacola-Mobile","CREATE_DATE":1785183677000,"MODIFIED_DATE":1786382891000,"BEGIN_DATE":1785110400000,"END_DATE":1795305599000,"DESCRIPTION":"GIWW, Mile 177.8, EHL - Pensacola Bay - Shoreline Restoration --- From: 2026-07-27 To: 2026-11-20 --- Shoreline restoration will take place near Sherman Inlet and Magazine Point, along the GIWW and Pensacola Bay.  Shoreline restoration, material transfer, and breakwater construction activities will take place within the project area.  Material will be mechanically removed from Robertson Island, near GIWW, Mile 177.8, EHL, and transferred by barges to various beaches and nearshore sites located in the vicinity of the GIWW and Pensacola Harbor channels.  Additional work will consist of breakwater construction and the planting of submerged aquatic vegetation.  Breakwater structures will be constructed in close proximity to the GIWW near the Sherman Cove Inlet.  Work will be conducted 24-hours a day, 7-days a week.  On-scene vessels will include four push boats, six barges, and four crew transfer skiffs.  Mariners are requested to transit the area at no wake speed and proceed with caution.  VHF-FM Channels: 12 and 16,  POC: (251) 747-5591, (205) 616-6845, or (251) 504-6537","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-87.32662,30.3304],[-87.31763,30.33328],[-87.31671,30.33687],[-87.30824,30.34251]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51629,"geometry":{"type":"LineString","coordinates":[[-124.77143999999998,48.36529000000007],[-126.22163999999998,48.26008000000007],[-125.79097999999999,46.06438000000003],[-126.22163999999998,42.876280000000065],[-125.95356999999996,42.02350000000007],[-124.48579999999998,42.03329000000008]]},"properties":{"ESRI_OID":51629,"MSI_UID":51629,"ATU":13,"TITLE":"Sector Columbia River, Submerged Land Act (SLA) - Willapa Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385858,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:wilbay","WATERWAY_NAME":"Willapa Bay","CREATE_DATE":1787089105000,"MODIFIED_DATE":1787089121000,"BEGIN_DATE":1787011200000,"END_DATE":1789516799000,"DESCRIPTION":"J.E. McAmis submits the following information for dredging and disposal operations to occur on the\nabove referenced project W i l l a p a Ba y M a i n t e n a n c e D r e d g i n g located on the Palix River near Bay Center, WA. Dredging and disposal operations will be 24 hours per day, 7 days per week. The Derrick \"Ellis Island\" will perform\nall dredging. The tug \"James T\" will perform all towing operations. Both the Derrick \"Ellis Island\" and Tug “James T\" will monitor VHF channel 16 and use VHF channel 72 for operations. Dredge Ellis Island and tug James T will begin dredging operations at the Palix River Access Channel on July 27, 2026. Disposals for the project will occur at the South Channel Placement Site located in Willapa Bay. Dredging operations are estimated to be completed by August 21, 2026. Upon Palix River completion, Dredging will resume at the Bay Center Entrance Channel. Bay Center Entrance Channel is estimated to be completed September 15, 2026. It is requested that mariners use extreme caution in work areas and are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. If you have any questions or need additional information, please call or email. I can be reached at (360) 984-9178 or email djamieson@orn.net","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-124.77144,48.36529],[-126.22164,48.26008],[-125.79098,46.06438],[-126.22164,42.87628],[-125.95357,42.0235],[-124.4858,42.03329]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52035,"geometry":{"type":"LineString","coordinates":[[-74.02144999999996,40.65912000000003],[-74.04387999999994,40.636370000000056],[-74.04387999999994,40.61587000000003],[-74.03357999999997,40.60128000000003],[-74.01572999999996,40.57468000000006],[-73.99764999999996,40.55791000000005],[-73.92165999999997,40.51964000000004],[-73.69185999999996,40.43363000000005],[-73.46526999999998,40.370190000000036]]},"properties":{"ESRI_OID":52035,"MSI_UID":52035,"ATU":1,"TITLE":"Sector New York, Submerged Lands Act (SLA) - Ambrose Channel/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382165,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha","WATERWAY_NAME":"Ambrose Channel","CREATE_DATE":1787602777000,"MODIFIED_DATE":1787602782000,"BEGIN_DATE":1784678400000,"END_DATE":1789603199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-07-22 To: 2026-09-16\n\nINSPIRE Environmental will conduct a Remotely Operated Vehicle (ROV) video survey to monitor hard bottom habitats as part of the Empire Wind 1 and Empire Wind 2 projects, including the Empire 1 Export Cable Route. The survey is scheduled to take place offshore New York between July 31 and August 15, 2026, though the timeline may shift depending on weather conditions. Operations will occur within Lease Area OCS-A 0512 and at select cable mattress protection areas along the export cable route, with specific locations identified by precise coordinates. The survey vessel, M/V Precision, will be on scene and equipped with an ROV system, conducting deployments at five stations within the lease area and two stations along the cable route. Each deployment will last between one and four hours, during which the vessel will be stationary and have reduced maneuverability due to equipment in the water. Survey operations are planned for seven days a week, twelve hours per day, with remaining time spent on standby or repositioning as needed.\n\nFor maritime safety, the vessel will monitor VHF channels 16 and 13 to coordinate with other mariners, and passing arrangements should be made to avoid impeding navigation during survey activities. \n\n\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.02145,40.65912],[-74.04388,40.63637],[-74.04388,40.61587],[-74.03358,40.60128],[-74.01573,40.57468],[-73.99765,40.55791],[-73.92166,40.51964],[-73.69186,40.43363],[-73.46527,40.37019]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52504,"geometry":{"type":"LineString","coordinates":[[-74.00554999999997,40.70292000000006],[-74.00519999999995,40.702770000000044]]},"properties":{"ESRI_OID":52504,"MSI_UID":52504,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1787925782000,"MODIFIED_DATE":1787925802000,"BEGIN_DATE":1787875200000,"END_DATE":1789257599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-08-28 To: 2026-09-12\n\nLocation:\n40-42-10.512N/074-00-19.980W\n40-42-09.972N/074-00-18.720W\n\nWarren George Inc. will conduct soil sampling operations in the East River, Manhattan, New York, in the vicinity of Pier 11 from August 31, 2026, through September 11, 2026. Work will take place Monday through Friday from 7:00 a.m. to 3:00 p.m. Operations will occur at approximate positions B-1: 40°42'10.5000\"N, 074°00'19.9800\"W (40.702917, -74.005550) and B-2: 40°42'09.9600\"N, 074°00'18.7200\"W (40.702767, -74.005200). A 30-foot by 90-foot spud barge will be on scene. Mariners may contact the vessel on VHF-FM channels 13 and 16. The barge requires approximately four hours to move and should not impede navigation. ","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.00555,40.70292],[-74.0052,40.70277]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52647,"geometry":{"type":"LineString","coordinates":[[-74.00279999999998,40.662420000000054],[-74.03781999999995,40.64575000000008],[-74.04399999999998,40.63064000000003],[-74.04055999999997,40.61136000000005],[-74.01583999999997,40.571210000000065],[-73.84486999999996,40.48509000000007],[-73.53518999999994,40.40932000000004],[-73.43905999999998,40.34394000000003]]},"properties":{"ESRI_OID":52647,"MSI_UID":52647,"ATU":1,"TITLE":"Sector New York, Submerged Lands Act (SLA)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382294,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact","WATERWAY_NAME":"Sector New York, Submerged Lands Act (SLA)","CREATE_DATE":1788195060000,"MODIFIED_DATE":1788195064000,"BEGIN_DATE":1788134400000,"END_DATE":1788479999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-31 To: 2026-09-03\n\nINSPIRE Environmental will be conducting Baited Remote Underwater Video Fisheries Survey for the Empire Wind lease area, OCS-A 0512, off New York. The survey is scheduled for August 31 through September 2, 2026, as the Quarter 3 survey in a recurring quarterly survey program. Each survey is expected to last approximately three calendar days, with operations conducted up to 12 hours per day, although the schedule may shift due to weather.\nSurvey operations will occur within the Empire Wind lease area, generally between approximately 40° 20' 50.7834\" N, 73° 32' 0.3618\" W and 40° 19' 38.7798\" N, 73° 20' 1.053\" W. The work involves deploying baited remote underwater video systems at eight stations within the lease area. Each deployment is expected to last slightly over one hour, with the vessel remaining at each station for roughly one hour. During hauling activities, the vessel will operate at approximately 4 knots or less and will have reduced maneuverability.\nThe vessel identified for the work is F/V Cailyn and Maren II, equipped with video systems. The vessel can be contacted on VHF channels 16 and 13. Mariners should be aware of the vessel’s limited maneuverability during deployment and recovery operations and make appropriate passing arrangements to avoid impeding navigation. Contact information provided for the project is Brian Gervelis of INSPIRE Environmental/Venterra Group.\n\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.0028,40.66242],[-74.03782,40.64575],[-74.044,40.63064],[-74.04056,40.61136],[-74.01584,40.57121],[-73.84487,40.48509],[-73.53519,40.40932],[-73.43906,40.34394]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52652,"geometry":{"type":"LineString","coordinates":[[-74.00828999999999,40.66398000000004],[-74.03918999999996,40.64471000000003],[-74.04605999999995,40.62491000000006],[-74.03987999999998,40.60823000000005],[-74.01240999999999,40.570160000000044],[-73.93069999999994,40.532080000000065],[-73.60041999999999,40.41664000000003],[-73.57707999999997,40.37952000000007]]},"properties":{"ESRI_OID":52652,"MSI_UID":52652,"ATU":1,"TITLE":"Sector New York, Submerged Lands Act (SLA)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382294,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact","WATERWAY_NAME":"Sector New York, Submerged Lands Act (SLA)","CREATE_DATE":1788195447000,"MODIFIED_DATE":1788195452000,"BEGIN_DATE":1788134400000,"END_DATE":1789775999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-09-09 To: 2026-09-18\n\n INSPIRE Environmental  will be conducting bottom trawl fisheries survey operations conducted by in support of the Empire Wind project off New York. The work is scheduled in two September 2026 survey legs: September 9 to 11, 2026, and September 15 to 17, 2026. Each leg is expected to last approximately three days, with operations conducted up to 12 hours per day. Exact dates may change, and an update is expected if either survey leg shifts.\nSurvey activities will occur within Lease Area OCS-A 0512, generally between approximately 40° 20' 50.7834\" N, 73° 32' 0.3618\" W and 40° 19' 38.7798\" N, 73° 20' 1.053\" W, as well as at an adjacent reference area located near 40° 33' 32.4282\" N, 72° 51' 45.2736\" W. The survey vessel will tow bottom trawl gear at four stations within the lease area and conduct four additional tows at the reference site. Each tow is expected to last approximately 20 minutes.\nThe vessel identified for the work is F/V Susan L, using bottom trawl net equipment. The vessel can be contacted on VHF channels 16 and 13. During trawling operations, the vessel will be moving at approximately 4 knots or less and will have reduced maneuverability. Mariners operating in the area should use caution, maintain awareness, and make passing arrangements as needed to avoid impeding the survey vessel. Project contact information is provided for Brian Gervelis of INSPIRE Environmental/Venterra Group.\n\n\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.00829,40.66398],[-74.03919,40.64471],[-74.04606,40.62491],[-74.03988,40.60823],[-74.01241,40.57016],[-73.9307,40.53208],[-73.60042,40.41664],[-73.57708,40.37952]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52700,"geometry":{"type":"LineString","coordinates":[[-74.02957999999995,40.64627000000007],[-74.03472999999997,40.645230000000026],[-74.04261999999994,40.63299000000006],[-74.04296999999997,40.619170000000054],[-74.03781999999995,40.60432000000003],[-74.02545999999995,40.60197000000005],[-74.01824999999997,40.59832000000006],[-74.01206999999994,40.59441000000004],[-74.01068999999995,40.583980000000054],[-74.01515999999998,40.57773000000003],[-74.01240999999999,40.57042000000007],[-73.91524999999996,40.52503000000007],[-73.81568999999996,40.47856000000007],[-73.71817999999996,40.451400000000035],[-73.54308999999995,40.419520000000034],[-73.49707999999998,40.40226000000007],[-73.44489999999996,40.38448000000005],[-73.43527999999998,40.33478000000008],[-73.40369999999996,40.32379000000003]]},"properties":{"ESRI_OID":52700,"MSI_UID":52700,"ATU":1,"TITLE":"Sector New York, Submerged Lands Act (SLA) - Ambrose Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382165,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha","WATERWAY_NAME":"Ambrose Channel","CREATE_DATE":1788263545000,"MODIFIED_DATE":1788263550000,"BEGIN_DATE":1788220800000,"END_DATE":1789948799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-09-10 To: 2026-09-20\n\nCurtin Maritime Corporation will be conducting planned maintenance dredging in the Hudson River Federal Navigation Project at Haverstraw Bay, New York, under USACE Contract No. W912DS26CA020. The work is scheduled to begin on or about September 10, 2026, and conclude on or about September 19, 2026. Operations are expected to occur 24 hours per day, seven days per week. The project will involve mechanical clamshell dredging within existing federal navigation channels in Haverstraw Bay. Dredged material will be loaded into split-hull scows and transported offshore for placement as remediation material at the Historic Area Remediation Site in the Atlantic Ocean. Curtin Maritime’s planned fleet includes the mechanical dredge DB Avalon, three split-hull scows, Crown Point, Stony Point, and Rincon Point, and four towing or support vessels, Alice C, Kimberly C, Comet, and David Winslow. Manned vessels will monitor VHF-FM Channels 13 and 16. Mariners are advised to proceed with caution in the vicinity of operations and to make passing arrangements in advance and are requested to transit at their slowest safe speed and asks for one hour of notice to move vessels so as not to impede navigation.\n","COORDINATES_JSON":"{\"type\":\"LineString\",\"coordinates\":[[-74.02958,40.64627],[-74.03473,40.64523],[-74.04262,40.63299],[-74.04297,40.61917],[-74.03782,40.60432],[-74.02546,40.60197],[-74.01825,40.59832],[-74.01207,40.59441],[-74.01069,40.58398],[-74.01516,40.57773],[-74.01241,40.57042],[-73.91525,40.52503],[-73.81569,40.47856],[-73.71818,40.4514],[-73.54309,40.41952],[-73.49708,40.40226],[-73.4449,40.38448],[-73.43528,40.33478],[-73.4037,40.32379]]}","COORDINATES_TYPE":"LineString","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}}]}