{"type":"FeatureCollection","features":[{"type":"Feature","id":270,"geometry":{"type":"Polygon","coordinates":[[[-77.05249999999995,38.88825000000003],[-77.05277999999998,38.88812000000007],[-77.04957999999993,38.88540000000006],[-77.04176999999999,38.879680000000064],[-77.04008999999996,38.87990000000008],[-77.04054999999994,38.88018000000005],[-77.04182999999995,38.88012000000003],[-77.05249999999995,38.88825000000003]]]},"properties":{"ESRI_OID":270,"MSI_UID":270,"ATU":5,"TITLE":"Chesapeake Channel - Potomac River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383115,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:potriv:uppmaccredahcha","WATERWAY_NAME":"Upper Machodoc Creek Dahlgren Channel","CREATE_DATE":1725907983000,"MODIFIED_DATE":1726164183000,"BEGIN_DATE":1725840000000,"END_DATE":1801440000000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2024-09-09 To: 2027-02-01\n\nLocation:\n38.88825° N / 77.0525° W\n38.88012° N / 77.04183° W\n38.88018° N / 77.04055° W\n38.8799° N / 77.04009° W\n38.87968° N / 77.04177° W\n38.8854° N / 77.04958° W\n38.88812° N / 77.05278° W\n38.88825° N / 77.0525° W\n\nStarting on April 15th, 2024 Cianbro Corporation will be mobilizing to begin the Tidal Basin and West Potomac Park Seawall Rehabilitation Project for The National Park Service. This project is scheduled from April 15th, 2024 to February 1st, 2027; with waterside activities being completed by the end of 2026. Starting in mid-June of 2024, one (1) temporary trestle will be installed between 38.8805754591474N, -77.04249015204742W and will extend approximately 94 feet into the river. In July 2024, one additional (1) temporary trestle in the Tidal Basin will be installed at 38.88154282457337N, -77.04085444069864W and will extend approximately 55 feet into the basin. The work area in the Potomac River will span from Arlington Memorial Bridge to The Inlet Bridge following the shoreline of West Potomac Park in stages starting in March of 2025. Directly surrounding the work areas we will have turbidity curtain deployed to contain the work impact zone, two (2) Turbidity Monitoring Bouy’s Twenty-Five (25) LF upstream and downstream from the immediate work area. Additional equipment such as boats, crane barges, and material barges in the Potomac River to facilitate the completion of the work. While work is in proximity to a navigable channel, mariners are asked to refrain from entering the work area and maintain a respectful distance with minimize wake to prevent any hazardous conditions from arising for the safety of our Team Members and the traveling public.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-77.0525,38.88825],[-77.05278,38.88812],[-77.04958,38.8854],[-77.04177,38.87968],[-77.04009,38.8799],[-77.04055,38.88018],[-77.04183,38.88012],[-77.0525,38.88825]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":424,"geometry":{"type":"Polygon","coordinates":[[[-68.79509999999993,44.388780000000054],[-68.79698999999994,44.38605000000007],[-68.79677999999996,44.38587000000007],[-68.79471999999998,44.38861000000003],[-68.79509999999993,44.388780000000054]]]},"properties":{"ESRI_OID":424,"MSI_UID":424,"ATU":1,"TITLE":"East Penobscot Bay - Castine Harbor/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381768,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact:islauhaubay:easpenbay:cashar","WATERWAY_NAME":"Castine Harbor","CREATE_DATE":1726665407000,"MODIFIED_DATE":1726665414000,"BEGIN_DATE":1720396800000,"END_DATE":1806451200000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2024-07-08 To: 2027-03-31\n\nLocation:\n44.38878° N / 68.7951° W\n44.38861° N / 68.79472° W\n44.38587° N / 68.79678° W\n44.38605° N / 68.79699° W\n44.38878° N / 68.7951° W\n\nME-PENOBSCOT BAY-CASTINE HARBOR\nRedd &amp;amp; Reed will be conducting marine construction and pier replacement and expansion operations at the Maine Maritime Academy, in Castine, in position 44-23-10.8N, 068-47-47.9W, from July 8, 2024, to the winter of 2027. Work will be conducted between 7:00am to 7:00pm, by deck barges, tugboats, push boats, and work skiffs, who will monitoring VHF-FM CH 11 for any concerned traffic. Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made.\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-68.7951,44.38878],[-68.79699,44.38605],[-68.79678,44.38587],[-68.79472,44.38861],[-68.7951,44.38878]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":913,"geometry":{"type":"Polygon","coordinates":[[[-73.97141999999997,40.72676000000007],[-73.97156999999999,40.72676000000007],[-73.97186999999997,40.72541000000007],[-73.97347999999994,40.718800000000044],[-73.97525999999993,40.714350000000024],[-73.97671999999994,40.71144000000004],[-73.97786999999994,40.710570000000075],[-73.98128999999994,40.71022000000005],[-73.98121999999995,40.70981000000006],[-73.98422999999997,40.709550000000036],[-73.98420999999996,40.70947000000007],[-73.98105999999996,40.70978000000008],[-73.98106999999999,40.71014000000008],[-73.97782999999998,40.71049000000005],[-73.97658999999999,40.71142000000003],[-73.97512999999998,40.714350000000024],[-73.97334999999998,40.718800000000044],[-73.97173999999995,40.72541000000007],[-73.97141999999997,40.72676000000007]]]},"properties":{"ESRI_OID":913,"MSI_UID":913,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382167,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1727718232000,"MODIFIED_DATE":1727718320000,"BEGIN_DATE":1641168000000,"END_DATE":1798588800000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nNY-NYC-EAST RIVER-MONGOMERY STREET TO E 14 STREET\n\nFrom: 2022-01-03 To: 2026-12-30\n\nLocation:\n40.72676° N / 73.97142° W\n40.72541° N / 73.97174° W\n40.7188° N / 73.97335° W\n40.71435° N / 73.97513° W\n40.71142° N / 73.97659° W\n40.71049° N / 73.97783° W\n40.71014° N / 73.98107° W\n40.70978° N / 73.98106° W\n40.70947° N / 73.98421° W\n40.70955° N / 73.98423° W\n40.70981° N / 73.98122° W\n40.71022° N / 73.98129° W\n40.71057° N / 73.97787° W\n40.71144° N / 73.97672° W\n40.71435° N / 73.97526° W\n40.7188° N / 73.97348° W\n40.72541° N / 73.97187° W\n40.72676° N / 73.97157° W\n40.72676° N / 73.97142° W\n\nIPCP will be conducting esplanade, bulkhead, and park reconstruction, on the East River, Montgomery St to East 14th Street, from January 2022 to December 2026, 5-7 days a week, between 6:00am to 6:00pm.  Equipment on scene will be Tugboat DEBRA QUINN, Inspection Boat, 290 x 40 Mooring Barges, 250 x 62 Gantry Crane Barge, Crawler Crane Barge, 150 x 60 Deck Barges, 140 x 40 Hopper Barges All moving of vessels to occur by tugboat; vessels will be moved at all times of day and night and will be monitoring VHF-CH 13 and 66. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-73.97142,40.72676],[-73.97157,40.72676],[-73.97187,40.72541],[-73.97348,40.7188],[-73.97526,40.71435],[-73.97672,40.71144],[-73.97787,40.71057],[-73.98129,40.71022],[-73.98122,40.70981],[-73.98423,40.70955],[-73.98421,40.70947],[-73.98106,40.70978],[-73.98107,40.71014],[-73.97783,40.71049],[-73.97659,40.71142],[-73.97513,40.71435],[-73.97335,40.7188],[-73.97174,40.72541],[-73.97142,40.72676]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":925,"geometry":{"type":"Polygon","coordinates":[[[-75.46333999999996,37.00195000000008],[-75.48942999999997,36.97837000000004],[-75.49148999999994,36.81638000000004],[-75.21064999999999,36.81528000000003],[-75.21133999999995,37.00085000000007],[-75.46333999999996,37.00195000000008]]]},"properties":{"ESRI_OID":925,"MSI_UID":925,"ATU":5,"TITLE":"Sector Virginia, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119415117,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon","WATERWAY_NAME":"Sector Virginia, Exclusive Economic Zone (EEZ)","CREATE_DATE":1727724428000,"MODIFIED_DATE":1756403158000,"BEGIN_DATE":1730332800000,"END_DATE":1811807999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nLocation:\n37.00195° N / 75.46334° W\n37.00085° N / 75.21134° W\n36.81528° N / 75.21065° W\n36.81638° N / 75.49149° W\n36.97837° N / 75.48943° W\n37.00195° N / 75.46334° W\n\nCVOW Lease Area\n\nUse caution, ongoing Marine Construction activities present.\n\nThe U.S. Coast Guard has established 179 temporary 500-meter safety zones around the construction of 176 wind turbine generators and three (3) offshore substations in Federal waters on the Outer Continental Shelf, east northeast of Virginia Beach, Virginia. This action is necessary to protect life, property and the environment during construction of the foundations and the subsequent installation of the turbine components, from May 1, 2024, to May 1, 2027. When enforced, only attending vessels and those vessels specifically authorized by the Fifth Coast Guard District Commander, or a designated representative, are permitted to enter or remain in the temporary safety zones. Each of the 179 temporary safety zones will be enforced individually, for a period lasting approximately 48 hours, as construction progresses from one structure to the next.\n\nSee Dominion Energy Monthly Mariner's Update for all activity. https://safe.menlosecurity.com/https://coastalvawind.com/resources.aspx\n\nAll offshore construction activities are weather dependent and may be pushed out due to projected weather conditions.\n \nF/Vs NOREEN MARIE and PONTOS will be providing safety vessel duties in the wind energy area and the export cable corridor and can be hailed on CH 16 24/7.  Mariners are encouraged to reference the latest Mariner’s Update publication for further information on project planning and progress.\n\n\n\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.46334,37.00195],[-75.48943,36.97837],[-75.49149,36.81638],[-75.21065,36.81528],[-75.21134,37.00085],[-75.46334,37.00195]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":2560,"geometry":{"type":"Polygon","coordinates":[[[-74.18921999999998,40.644250000000056],[-74.19007999999997,40.644240000000025],[-74.19011999999998,40.64372000000003],[-74.18921999999998,40.644250000000056]]]},"properties":{"ESRI_OID":2560,"MSI_UID":2560,"ATU":1,"TITLE":"Main Channel - Kill Van Kull/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382313,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:kilvankul","WATERWAY_NAME":"Kill Van Kull","CREATE_DATE":1729174228000,"MODIFIED_DATE":1729174235000,"BEGIN_DATE":1727827200000,"END_DATE":1864425599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2024-10-02 To: 2029-01-29\n\nTrevcon Construction Company, LLC will be conducting dredging operations and wharf construction in Arthur Kill, Elizabeth, NJ, in position 40-38-37N, 074-11-24W, from October 2, 2024, to January 29, 2029, Monday through Friday, between 6:00am to 3:00pm. Equipment on scene will be a crane and material barges. Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.18922,40.64425],[-74.19012,40.64372],[-74.19008,40.64424],[-74.18922,40.64425]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":5509,"geometry":{"type":"Polygon","coordinates":[[[-76.26477999999997,38.341530000000034],[-76.27035999999998,38.340250000000026],[-76.25962999999996,38.32113000000004],[-76.24855999999994,38.32362000000006],[-76.25026999999994,38.32692000000003],[-76.25559999999996,38.32558000000006],[-76.26477999999997,38.341530000000034]]]},"properties":{"ESRI_OID":5509,"MSI_UID":5509,"ATU":5,"TITLE":"Chesapeake Channel - Tar Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382393,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:tarbay","WATERWAY_NAME":"Tar Bay","CREATE_DATE":1732025425000,"MODIFIED_DATE":1736801956000,"BEGIN_DATE":1731974400000,"END_DATE":1811894399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nMariners are advised that Seacoast Construction will be conducting stone breakwater and revetment construction on the West and South sides of Barren Island in the Chesapeake Bay (Approximate 38°19’40”N 76°15’20”W) from 12/16/2024 to 06/01/2027 . Work hours are 12 hours a day (daylight), 7 days a week. There will be multiple tugboats, barges and scows in the area. All work will be outside of but near the shipping channel. All mariners are advised that a slow bell may be required upon request. All marine equipment operators will be monitoring VHF-FM Channel 65 and Channels 16 and 13. Work vessels will monitor Channel 13 and 16. Mariners are advised to proceed with caution when transiting the area. \n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-76.26478,38.34153],[-76.27036,38.34025],[-76.25963,38.32113],[-76.24856,38.32362],[-76.25027,38.32692],[-76.2556,38.32558],[-76.26478,38.34153]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":6092,"geometry":{"type":"Polygon","coordinates":[[[-81.69999999999999,24.887520000000052],[-81.70457999999996,24.887520000000052],[-81.70457999999996,24.883330000000058],[-81.69999999999999,24.883330000000058],[-81.69999999999999,24.887520000000052]]]},"properties":{"ESRI_OID":6092,"MSI_UID":6092,"ATU":7,"TITLE":"Sector Key West, Exclusive Economic Zone (EEZ)  - Sector Key West, Territorial Sea/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383403,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:seckeywesexcecozon:seckeywestersea","WATERWAY_NAME":"Sector Key West, Territorial Sea","CREATE_DATE":1732637648000,"MODIFIED_DATE":1734025865000,"BEGIN_DATE":1732579200000,"END_DATE":2048284799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2024-11-26 To: 2024-11-27\n\nLocation:\n24.88752° N / 81.7° W\n24.88333° N / 81.7° W\n24.88333° N / 81.70458° W\n24.88752° N / 81.70458° W\n24.88752° N / 81.7° W\n\nA 10-year Corps permit to construct an offshore artificial reef to be known as The Gulfside Ten Mile Reef. All deployed material will retain at least a 25-foot navigational clearance. Authorization of a new artificial reef site with multiple deployments of approved materials to enhance the marine habitat in the offshore waters of the Gulf of Mexico, north of Monroe County, Florida.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.7,24.88752],[-81.70458,24.88752],[-81.70458,24.88333],[-81.7,24.88333],[-81.7,24.88752]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":10263,"geometry":{"type":"Polygon","coordinates":[[[-75.57405999999997,35.788050000000055],[-75.61203999999998,35.741210000000024],[-75.60462999999999,35.738600000000076],[-75.58799999999997,35.75923000000006],[-75.57662999999997,35.75932000000006],[-75.56879999999995,35.76272000000006],[-75.56010999999995,35.77299000000005],[-75.54272999999995,35.76315000000005],[-75.53896999999995,35.76646000000005],[-75.56074999999998,35.77699000000007],[-75.58617999999996,35.76393000000007],[-75.57008999999994,35.787000000000035],[-75.57405999999997,35.788050000000055]]]},"properties":{"ESRI_OID":10263,"MSI_UID":10263,"ATU":5,"TITLE":"Sector North Carolina, Submerged Lands Act (SLA) - Oregon Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383163,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secnorcarexcecozon:secnorcartersea:secnorcarsublanact:oreinl","WATERWAY_NAME":"Oregon Inlet","CREATE_DATE":1738586009000,"MODIFIED_DATE":1761742989000,"BEGIN_DATE":1738540800000,"END_DATE":1790380799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2025-02-01 To: 2026-09-25\n\nLocation:\n35.78805° N / 75.57406° W\n35.787° N / 75.57009° W\n35.76393° N / 75.58618° W\n35.77699° N / 75.56075° W\n35.76646° N / 75.53897° W\n35.76315° N / 75.54273° W\n35.77299° N / 75.56011° W\n35.76272° N / 75.5688° W\n35.75932° N / 75.57663° W\n35.75923° N / 75.588° W\n35.7386° N / 75.60463° W\n35.74121° N / 75.61204° W\n35.78805° N / 75.57406° W\n\nThe \"MISS KATIE\" dredge vessel has routine dredging operations scheduled at the Oregon Inlet, the Inside Channel (Ranges 1 -3), the Walter Slough Channel, the Old House Channel, and Roanoke Sound Channel from Light 1 (LLNR 28365) to Light 17 (LLNR 28470) periodically throughout the year, dependent upon authorization, weather conditions, maintenance, and/or other emergency dredging projects out of the area. Dredging operations will be performed on a schedule of 12 hours and/or 24 hours a day, seven (7) days a week. Material that is hopper dredged will be transported to a disposal site located in deep scour holes near the Basnight Bridge on the south side of Oregon Inlet and/or a nearshore site located off Pea Island. All mariners are requested to use caution in the area. MISS KATIE can be reached on VHF-FM CH 16 and 13. For more information, contact Jordan Hennessy at jhennessy@ejedredgng.com or (252) 597-5752. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.57406,35.78805],[-75.61204,35.74121],[-75.60463,35.7386],[-75.588,35.75923],[-75.57663,35.75932],[-75.5688,35.76272],[-75.56011,35.77299],[-75.54273,35.76315],[-75.53897,35.76646],[-75.56075,35.77699],[-75.58618,35.76393],[-75.57009,35.787],[-75.57406,35.78805]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":10264,"geometry":{"type":"Polygon","coordinates":[[[-75.55974999999995,35.79365000000007],[-75.56315999999998,35.793390000000045],[-75.57178999999996,35.787900000000036],[-75.57262999999995,35.78636000000006],[-75.56103999999993,35.79218000000003],[-75.55710999999997,35.791660000000036],[-75.55283999999995,35.78093000000007],[-75.56058999999993,35.776230000000055],[-75.55839999999995,35.77548000000007],[-75.54996999999997,35.779220000000066],[-75.55601999999999,35.79242000000005],[-75.55974999999995,35.79365000000007]]]},"properties":{"ESRI_OID":10264,"MSI_UID":10264,"ATU":5,"TITLE":"Oregon Inlet - Oregon Inlet Cut/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100119167683,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secnorcarexcecozon:secnorcartersea:secnorcarsublanact:oreinl:oreinlcut","WATERWAY_NAME":"Oregon Inlet Cut","CREATE_DATE":1738586149000,"MODIFIED_DATE":1761743038000,"BEGIN_DATE":1738540800000,"END_DATE":1790380799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2025-02-03 To: 2026-09-25\n\nLocation:\n35.79365° N / 75.55975° W\n35.79242° N / 75.55602° W\n35.77922° N / 75.54997° W\n35.77548° N / 75.5584° W\n35.77623° N / 75.56059° W\n35.78093° N / 75.55284° W\n35.79166° N / 75.55711° W\n35.79218° N / 75.56104° W\n35.78636° N / 75.57263° W\n35.7879° N / 75.57179° W\n35.79339° N / 75.56316° W\n35.79365° N / 75.55975° W\n\nThe \"MISS KATIE\" dredge vessel has routine dredging operations scheduled at the Oregon Inlet, the Inside Channel (Ranges 1 -3), the Walter Slough Channel, the Old House Channel, and Roanoke Sound Channel from Light 1 (LLNR 28365) to Light 17 (LLNR 28470) periodically throughout the year, dependent upon authorization, weather conditions, maintenance, and/or other emergency dredging projects out of the area. Dredging operations will be performed on a schedule of 12 hours and/or 24 hours a day, seven (7) days a week. Material that is hopper dredged will be transported to a disposal site located in deep scour holes near the Basnight Bridge on the south side of Oregon Inlet and/or a nearshore site located off Pea Island. All mariners are requested to use caution in the area. MISS KATIE can be reached on VHF-FM CH 16 and 13. For more information, contact Jordan Hennessy at jhennessy@ejedredgng.com or (252) 597-5752. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.55975,35.79365],[-75.56316,35.79339],[-75.57179,35.7879],[-75.57263,35.78636],[-75.56104,35.79218],[-75.55711,35.79166],[-75.55284,35.78093],[-75.56059,35.77623],[-75.5584,35.77548],[-75.54997,35.77922],[-75.55602,35.79242],[-75.55975,35.79365]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":10265,"geometry":{"type":"Polygon","coordinates":[[[-75.61005999999998,35.851230000000044],[-75.61205999999999,35.85065000000003],[-75.58315999999996,35.79767000000004],[-75.57221999999996,35.78851000000003],[-75.57059999999996,35.78989000000007],[-75.58166999999997,35.79861000000005],[-75.61005999999998,35.851230000000044]]]},"properties":{"ESRI_OID":10265,"MSI_UID":10265,"ATU":5,"TITLE":"Roanoke Sound/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382947,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secnorcarexcecozon:secnorcartersea:secnorcarsublanact:oreinl:mancha:roasou","WATERWAY_NAME":"Roanoke Sound","CREATE_DATE":1738586326000,"MODIFIED_DATE":1761743081000,"BEGIN_DATE":1738540800000,"END_DATE":1790380799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2025-02-03 To: 2026-09-25\n\nLocation:\n35.85123° N / 75.61006° W\n35.79861° N / 75.58167° W\n35.78989° N / 75.5706° W\n35.78851° N / 75.57222° W\n35.79767° N / 75.58316° W\n35.85065° N / 75.61206° W\n35.85123° N / 75.61006° W\n\nThe \"MISS KATIE\" dredge vessel has routine dredging operations scheduled at the Oregon Inlet, the Inside Channel (Ranges 1 -3), the Walter Slough Channel, the Old House Channel, and Roanoke Sound Channel from Light 1 (LLNR 28365) to Light 17 (LLNR 28470) periodically throughout the year, dependent upon authorization, weather conditions, maintenance, and/or other emergency dredging projects out of the area. Dredging operations will be performed on a schedule of 12 hours and/or 24 hours a day, seven (7) days a week. Material that is hopper dredged will be transported to a disposal site located in deep scour holes near the Basnight Bridge on the south side of Oregon Inlet and/or a nearshore site located off Pea Island. All mariners are requested to use caution in the area. MISS KATIE can be reached on VHF-FM CH 16 and 13. For more information, contact Jordan Hennessy at jhennessy@ejedredgng.com or (252) 597-5752. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.61006,35.85123],[-75.61206,35.85065],[-75.58316,35.79767],[-75.57222,35.78851],[-75.5706,35.78989],[-75.58167,35.79861],[-75.61006,35.85123]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":12164,"geometry":{"type":"Polygon","coordinates":[[[-79.86087999999995,32.760200000000054],[-79.86218999999994,32.75944000000004],[-79.85821999999996,32.75570000000005],[-79.85663999999997,32.75621000000007],[-79.86087999999995,32.760200000000054]]]},"properties":{"ESRI_OID":12164,"MSI_UID":12164,"ATU":7,"TITLE":"Sector Charleston, Submerged Land Act (SLA) - Winyah Bay Charleston Harbor/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384278,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:winbaychahar","WATERWAY_NAME":"Winyah Bay Charleston Harbor","CREATE_DATE":1740502247000,"MODIFIED_DATE":1740504759000,"BEGIN_DATE":1740441600000,"END_DATE":1794614399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-02-25 To: 2026-11-13\n\nLocation:\n32.7602° N / 79.86088° W\n32.75736° N / 79.85803° W\n32.7566° N / 79.85931° W\n32.75944° N / 79.86219° W\n32.7602° N / 79.86088° W\n\nCape Romain Contractors will be replacing Fort Sumter and Fort Moultrie Docks and rehabilitate Liberty Square Pier. They will have a crane barge starting March 3, 2025, until May 31, 2026, at Fort Moultrie and crane barges at Fort Sumter and Liberty Square Pier as the project progresses. Estimated completion date of the entire project is 31October 31, 2026. All Vessels should use caution when transiting the work area. The crew at Fort Moultrie will monitor VHF-FM channels 13 and 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.86088,32.7602],[-79.86219,32.75944],[-79.85822,32.7557],[-79.85664,32.75621],[-79.86088,32.7602]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":12166,"geometry":{"type":"Polygon","coordinates":[[[-79.87483999999995,32.75374000000005],[-79.87646999999998,32.75317000000007],[-79.87582999999995,32.752050000000054],[-79.87404999999995,32.752850000000024],[-79.87483999999995,32.75374000000005]]]},"properties":{"ESRI_OID":12166,"MSI_UID":12166,"ATU":7,"TITLE":"Sector Charleston, Submerged Land Act (SLA) - Charleston Harbor/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384333,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:chahar","WATERWAY_NAME":"Charleston Harbor","CREATE_DATE":1740502345000,"MODIFIED_DATE":1740504718000,"BEGIN_DATE":1740441600000,"END_DATE":1794614399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-02-25 To: 2026-11-13\n\nLocation:\n32.75328° N / 79.87473° W\n32.75232° N / 79.87355° W\n32.75075° N / 79.87546° W\n32.75198° N / 79.87705° W\n32.75328° N / 79.87473° W\n\nCape Romain Contractors will be replacing Fort Sumter and Fort Moultrie Docks and rehabilitate Liberty Square Pier. They will have a crane barge starting March 3, 2025, until May 31, 2026, at Fort Moultrie and crane barges at Fort Sumter and Liberty Square Pier as the project progresses. Estimated completion date of the entire project is 31October 31, 2026. All Vessels should use caution when transiting the work area. The crew at Fort Moultrie will monitor VHF-FM channels 13 and 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.87484,32.75374],[-79.87647,32.75317],[-79.87583,32.75205],[-79.87405,32.75285],[-79.87484,32.75374]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":12168,"geometry":{"type":"Polygon","coordinates":[[[-79.92437999999999,32.79142000000007],[-79.92555999999996,32.791360000000054],[-79.92552999999998,32.79010000000005],[-79.92430999999993,32.79006000000004],[-79.92437999999999,32.79142000000007]]]},"properties":{"ESRI_OID":12168,"MSI_UID":12168,"ATU":7,"TITLE":"Charleston Harbor - Charleston Harbor North Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384362,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:chahar:chaharnorcha","WATERWAY_NAME":"Charleston Harbor North Channel","CREATE_DATE":1740502454000,"MODIFIED_DATE":1740504287000,"BEGIN_DATE":1740441600000,"END_DATE":1794614399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-02-25 To: 2026-11-13\n\nLocation:\n32.78003° N / 79.92337° W\n32.77867° N / 79.9233° W\n32.77871° N / 79.92452° W\n32.77997° N / 79.92455° W\n32.78003° N / 79.92337° W\n\nCape Romain Contractors will be replacing Fort Sumter and Fort Moultrie Docks and rehabilitate Liberty Square Pier. They will have a crane barge starting March 3, 2025, until May 31, 2026, at Fort Moultrie and crane barges at Fort Sumter and Liberty Square Pier as the project progresses. Estimated completion date of the entire project is 31October 31, 2026. All Vessels should use caution when transiting the work area. The crew at Fort Moultrie will monitor VHF-FM channels 13 and 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.92438,32.79142],[-79.92556,32.79136],[-79.92553,32.7901],[-79.92431,32.79006],[-79.92438,32.79142]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":13219,"geometry":{"type":"Polygon","coordinates":[[[-74.82081999999997,40.12914000000006],[-74.82273999999995,40.128390000000024],[-74.82259999999997,40.12823000000003],[-74.82068999999996,40.12896000000006],[-74.82081999999997,40.12914000000006]]]},"properties":{"ESRI_OID":13219,"MSI_UID":13219,"ATU":5,"TITLE":"Delaware River - Upper Delaware River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382818,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:delbay:delbaymaicha:lisran:delriv:delrivmaicha:mifran:eagpoi:delriv:uppdelriv","WATERWAY_NAME":"Upper Delaware River","CREATE_DATE":1741722888000,"MODIFIED_DATE":1741722895000,"BEGIN_DATE":1741651200000,"END_DATE":1830211199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-03-11 To: 2027-12-30\n\nLocation:\n40.12914° N / 74.82082° W\n40.12896° N / 74.82069° W\n40.12823° N / 74.8226° W\n40.12839° N / 74.82274° W\n40.12914° N / 74.82082° W\n\nCommerce Construction Corporation, on behalf of Silvi Materials, will be performing demolition and construction at the Silvi Riverside Materials Facility pier, on the Delaware River, in Bristol, PA. Work will begin on March 17, 2025, and continue until December 30, 2027. Commerce Construction will have a crane barge and multiple material barges on site, all work vessels will be outside of the navigational channel. The crane barge will monitor VHF radio channels 13 and 16. Mariners are cautioned to stay clear of the crane barges, operating wires, anchors, buoys, small boats, tenders, and divers associated with the marine activities. Mariners are requested to transit the area at the slowest safe speed to maintain navigation and minimize wake. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.82082,40.12914],[-74.82274,40.12839],[-74.8226,40.12823],[-74.82069,40.12896],[-74.82082,40.12914]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":15545,"geometry":{"type":"Polygon","coordinates":[[[-95.00571999999994,29.68715000000003],[-95.00885999999997,29.686830000000043],[-95.00901999999996,29.685040000000072],[-95.00005999999996,29.68214000000006],[-94.98388999999997,29.683700000000044],[-94.98130999999995,29.675380000000075],[-94.97955999999994,29.67569000000003],[-94.98238999999995,29.683840000000032],[-94.98624999999998,29.684780000000046],[-95.00046999999995,29.682720000000074],[-95.00149999999996,29.683520000000044],[-95.00087999999994,29.683920000000057],[-95.00185999999997,29.685220000000072],[-95.00571999999994,29.68715000000003]]]},"properties":{"ESRI_OID":15545,"MSI_UID":15545,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1744043416000,"MODIFIED_DATE":1751466208000,"BEGIN_DATE":1743984000000,"END_DATE":1814572799000,"DESCRIPTION":"Houston Ship Channel - Barbours Terminal Channel - Marine Construction and Dredging --- From: 2025-04-07 To: 2027-07-01 --- Dredging and marine construction will be taking place along the Houston Ship Channel and the Barbours Terminal Channel, 24-hours a day, 7-days a week.  Dredging and demolition will take place along Morgans Point and transition into concrete bulkhead construction.  An additional bulkhead wall will be built along Spilmans Island.  Dive operations may take place intermittently throughout the project.  On-scene vessels will include the T/Vs MOONEY and EVERLINE, the Work Boat SCULLY, the Crane Barge CB01 and the Barge GD-2013.  Mariners are urged to transit the area at their slowest safe speed, observe all day shapes and dive flags, and proceed with caution.  VHF-FM Channels: 13 and 16","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-95.00572,29.68715],[-95.00886,29.68683],[-95.00902,29.68504],[-95.00006,29.68214],[-94.98389,29.6837],[-94.98131,29.67538],[-94.97956,29.67569],[-94.98239,29.68384],[-94.98625,29.68478],[-95.00047,29.68272],[-95.0015,29.68352],[-95.00088,29.68392],[-95.00186,29.68522],[-95.00572,29.68715]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":16114,"geometry":{"type":"Polygon","coordinates":[[[-81.69999999999999,24.887520000000052],[-81.70457999999996,24.887520000000052],[-81.70457999999996,24.883330000000058],[-81.69999999999999,24.883330000000058],[-81.69999999999999,24.887520000000052]]]},"properties":{"ESRI_OID":16114,"MSI_UID":16114,"ATU":7,"TITLE":"Sector Key West, Exclusive Economic Zone (EEZ)  - Sector Key West, Territorial Sea/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384385,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:seckeywesexcecozon:seckeywestersea","WATERWAY_NAME":"Sector Key West, Territorial Sea","CREATE_DATE":1744642577000,"MODIFIED_DATE":1744642633000,"BEGIN_DATE":1744588800000,"END_DATE":2107900799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nLocation:\n24.88752° N / 81.7° W\n24.88333° N / 81.7° W\n24.88333° N / 81.70458° W\n24.88752° N / 81.70458° W\n24.88752° N / 81.7° W\n\nMonroe County has continued adding to a new artificial reef site off Monroe County with a 10-year permit. The Gulfside Ten Mile Reef site is a 0.25 nautical mile by 0.25 nautical mile square, encompassing 53 acres of sand bottom of which less than one acre of artificial reef material footprint will be deployed during the lifetime of the permit. The site is located in the Gulf of America within federal waters and lies outside of the boundaries for the Florida Keys National Marine Sanctuary. The center of the site is located approximately 16.7 nautical miles at a bearing of 23° north of Key West at an average depth of 45 feet MLLW. All deployed material will retain at least a 25-ft navigational clearance.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.7,24.88752],[-81.70458,24.88752],[-81.70458,24.88333],[-81.7,24.88333],[-81.7,24.88752]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":17465,"geometry":{"type":"Polygon","coordinates":[[[-82.50050999999996,27.192670000000078],[-82.50492999999994,27.19234000000006],[-82.50125999999995,27.182830000000024],[-82.49694999999997,27.18327000000005],[-82.50050999999996,27.192670000000078]]]},"properties":{"ESRI_OID":17465,"MSI_UID":17465,"ATU":7,"TITLE":"Venice Inlet - Matheny Creek/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383919,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipetsublanact:veninl:matcre","WATERWAY_NAME":"Matheny Creek","CREATE_DATE":1746018358000,"MODIFIED_DATE":1746018430000,"BEGIN_DATE":1745971200000,"END_DATE":1809734399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n17465\n\nContinental Heavy Civil Corp. will conduct shoreline reconstruction and coastal armoring. Work will be performed between 22 North Casey Key Road to 400 N Casey Key Road, and 526 to 840 N Casey Key Road. Staging and loading area will be the entire footprint of the Nokomis Beach “spillover” parking lot, located at 101 S Casey Key Road. Heavy equipment such as lattice-boom crawler cranes and heavy excavators will load onto barges from Albee Road and will route down to intercoastal to the Venice inlet, proceed to the Gulf and then up the coast to the jobsite and back. Continental Heavy Civil expects to work a regular schedule from 6am to 6pm Monday through Saturday, with some necessary Sundays. Estimated completion time for the entire project May 1st, 2027.  All Vessels should use caution when transiting the work area. The crew at Casey Road will monitor VHF-FM channels 13 and 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.50051,27.19267],[-82.50493,27.19234],[-82.50126,27.18283],[-82.49695,27.18327],[-82.50051,27.19267]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":22053,"geometry":{"type":"Polygon","coordinates":[[[-79.92974999999996,32.57996000000003],[-79.92888999999997,32.562740000000076],[-79.90313999999995,32.561870000000056],[-79.90365999999995,32.57923000000005],[-79.92974999999996,32.57996000000003]]]},"properties":{"ESRI_OID":22053,"MSI_UID":22053,"ATU":7,"TITLE":"Sector Charleston, Exclusive Economic Zone (EEZ) - Sector Charleston, Territorial Sea/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383726,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea","WATERWAY_NAME":"Sector Charleston, Territorial Sea","CREATE_DATE":1750859578000,"MODIFIED_DATE":1750859927000,"BEGIN_DATE":1750809600000,"END_DATE":1862956799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n22053\n\nSouth Carolina Department of Natural Resources will be establishing an artificial fishing reef. Estimated completion date is December 31, 2028.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.92975,32.57996],[-79.92889,32.56274],[-79.90314,32.56187],[-79.90366,32.57923],[-79.92975,32.57996]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":26111,"geometry":{"type":"Polygon","coordinates":[[[-73.97197999999997,40.74270000000007],[-73.97257999999994,40.739990000000034],[-73.97215999999997,40.73988000000003],[-73.97147999999999,40.742650000000026],[-73.97197999999997,40.74270000000007]]]},"properties":{"ESRI_OID":26111,"MSI_UID":26111,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1755513410000,"MODIFIED_DATE":1755513629000,"BEGIN_DATE":1756684800000,"END_DATE":1814831999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-09-01 To: 2027-07-05\n\nLocation:\n40.7427° N / 73.97198° W\n40.74265° N / 73.97148° W\n40.73988° N / 73.97216° W\n40.73999° N / 73.97258° W\n40.7427° N / 73.97198° W\n\nPhoenix Marine Co. will be conducting diver\\ operations in the East River at the Marginal Wharf Platforms at The Water Club and E. 34th St. Heliport, in position 40*44’36”N-73*58’16” W through 40*44’22”N-73*58’20”W. Work will be conducted between 6:00am-2:00pm, from September 15, 2025 to July 5, 2027. Equipment on scene will be (1) crane barge, (1) material barge and (1) work platform barge monitoring VHF-CH 9. Mariners transiting the work area are urged to exercise extreme caution, travel at the slowest safe speed to minimize wake, and proceed with caution","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-73.97198,40.7427],[-73.97258,40.73999],[-73.97216,40.73988],[-73.97148,40.74265],[-73.97198,40.7427]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":26963,"geometry":{"type":"Polygon","coordinates":[[[-85.61941999999993,30.10805000000005],[-85.62022999999994,30.107600000000048],[-85.61915999999997,30.106880000000046],[-85.61804999999998,30.106210000000033],[-85.61679999999996,30.105650000000026],[-85.61623999999995,30.10660000000007],[-85.61941999999993,30.10805000000005]]]},"properties":{"ESRI_OID":26963,"MSI_UID":26963,"ATU":8,"TITLE":"Sector Mobile, Submerged Land Act (SLA) - East Bay To West Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384556,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:standbayenttowesbay","WATERWAY_NAME":"East Bay To West Bay","CREATE_DATE":1756316693000,"MODIFIED_DATE":1785335485000,"BEGIN_DATE":1756252800000,"END_DATE":1878767999000,"DESCRIPTION":"GIWW - East Bay - Temporary Pile Installation --- From: 2025-09-10 To: 2029-07-13 --- Temporary mooring piles will be installed in the area in support of the Dupont Bridge construction project.  The piles will be lit and utilized throughout the project.  VHF-FM Channel: 16,  POC: (334) 740-0569","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-85.61942,30.10805],[-85.62023,30.1076],[-85.61916,30.10688],[-85.61805,30.10621],[-85.6168,30.10565],[-85.61624,30.1066],[-85.61942,30.10805]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":27315,"geometry":{"type":"Polygon","coordinates":[[[-88.27044999999998,30.384150000000034],[-88.27077999999995,30.383260000000064],[-88.26960999999994,30.382640000000038],[-88.26870999999994,30.38235000000003],[-88.26787999999999,30.38223000000005],[-88.26774999999998,30.38313000000005],[-88.27044999999998,30.384150000000034]]]},"properties":{"ESRI_OID":27315,"MSI_UID":27315,"ATU":8,"TITLE":"Sector Mobile, Submerged Land Act (SLA) - Bayou La Batre/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384735,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:baylabat","WATERWAY_NAME":"Bayou La Batre","CREATE_DATE":1756904945000,"MODIFIED_DATE":1756905983000,"BEGIN_DATE":1756857600000,"END_DATE":1821139199000,"DESCRIPTION":"Bayou La Batre - Dock Construction --- From: 2025-09-15 To: 2027-09-15 --- Marine construction will be taking place along Bayou La Batre at the Bayou La Batre City Docks.  Demolition and the new construction of a boat launch, marina and fishing vessel pier will be taking place in the area.  Work will be conducted Monday through Friday, from 6:00 a.m. to 6:00 p.m.  The main channel will not be obstructed during construction operations.  The boat launch basin will be closed to marine traffic during some phases of construction and may be blocked by booms/turbidity controls.  Mariners are urged to transit the area with caution.  VHF-FM Channels: 9 and 16","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.27045,30.38415],[-88.27078,30.38326],[-88.26961,30.38264],[-88.26871,30.38235],[-88.26788,30.38223],[-88.26775,30.38313],[-88.27045,30.38415]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":27367,"geometry":{"type":"Polygon","coordinates":[[[-122.23028999999997,38.06671000000006],[-122.23109,38.06651000000005],[-122.23068999999998,38.065720000000056],[-122.22915999999998,38.06538000000006],[-122.22915999999998,38.06638000000004],[-122.23028999999997,38.06671000000006]]]},"properties":{"ESRI_OID":27367,"MSI_UID":27367,"ATU":11,"TITLE":"San Pablo Bay - Carquinez Strait/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385512,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:sanpabbay:carstr","WATERWAY_NAME":"Carquinez Strait","CREATE_DATE":1756916694000,"MODIFIED_DATE":1756928161000,"BEGIN_DATE":1756857600000,"END_DATE":1827705599000,"DESCRIPTION":"The Dutra Group will be conducting Marine construction in the vicinity of Vallejo, California within the California State University Maritime Academy Boat Basin. The initiation of waterside operations for this project will entail the deployment of multiple crane barges secured by both anchors and\nspuds, along with a continuous rotation of material supply barges, tug tenders, “Linda T” workboat, and various small skiffs. Activities are\nscheduled to commence as early as September 12, 2025 to December 2027. Beginning with the mobilization of Crane Barge Kelso (“CB Kelso”) and EM1106 (“Morty”) barge fitted with appropriately sized crawler cranes. The designated vessels will be monitoring VHF-FM channels 9 &amp;amp; 16, with the working channels 68A or 80. All mariners are advised to use caution when transiting the area, for more information contact: Scott 707-333-5029","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.23029,38.06671],[-122.23109,38.06651],[-122.23069,38.06572],[-122.22916,38.06538],[-122.22916,38.06638],[-122.23029,38.06671]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":27918,"geometry":{"type":"Polygon","coordinates":[[[-80.02403999999996,26.136870000000044],[-80.03078999999997,26.136700000000076],[-80.03080999999997,26.122630000000072],[-80.10442999999998,26.097710000000063],[-80.10485999999997,26.094980000000078],[-80.10535999999996,26.094890000000078],[-80.10573999999997,26.09391000000005],[-80.09831999999994,26.09397000000007],[-80.03014999999994,26.12023000000005],[-80.02376999999996,26.120100000000036],[-80.02403999999996,26.136870000000044]]]},"properties":{"ESRI_OID":27918,"MSI_UID":27918,"ATU":7,"TITLE":"Sector Miami, Submerged Land Act (SLA) - Port Everglades/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384314,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secmiaexcecozon:secmiatersea:secmiasublanact:poreve","WATERWAY_NAME":"Port Everglades","CREATE_DATE":1757605933000,"MODIFIED_DATE":1765849407000,"BEGIN_DATE":1757548800000,"END_DATE":1817078399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n27918\n\nGreat Lakes Dredge and Dock Company, LLC will begin mobilizing for a dredge project on or about September 22, 2025. Vessels and equipment being used are DREDGE 54 (Mechanical Clamshell Dredge), DREDGE NEW YORK (Backhoe Bucket Dredge),Tug BERING DAWN, Tug AMY E. HEBERT, Tug LARRY J. HEBERT and Tug LIZ ALMA, SURVEY BOAT PEARL RIVER, CREW BOAT COOPER RIVER, Scows GL501, GL502, GL701, GL702. Vessels will be monitoring VHF-FM channels 07 and 12/16 \n\nThe purpose of the Port Everglades Sand Bypass project is to create infrastructure on the north side of the Port Everglades Inlet in Broward County, Florida. Work to be completed under this contract consists of dredging a sand trap and a portion of the rubble spoil shoal and disposal of the dredge material in the Port Everglades Harbor Ocean Dredged Material Disposal Site (ODMDS). Dredging operations are anticipated to commence on October 22, 2025, and will take place 24 hours a day, 7 days a week. With an estimated completion date of July 18, 2027. The DREDGE 54, along with DREDGE NEW YORK which will start on or about December 18, 2025, are planned to collectively dredge more than 400,000 CY of material from the north side of the Port Everglades entrance channel, immediately seaward of the north jetty and beach north of the inlet. The dredges would appreciate slow bell passing.\n\nWhile approaching the jetty dredging work area location. The material will be placed into scows and towed to the Port Everglades Harbor ODMDS, which is located approximately 3.1 nautical miles northeast of the entrance to Port Everglades Channel, outside of State Waters. \n\nThere is a project tow route between Red Buoy 2 and the ODMDS CenterPoint. Fishermen and trawlers should be aware of limited mobility for tug and scow transits. Small-Vessel Captains should take caution to avoid passing between the scow and towing tug while under transit. While not always visible at a distance, there is a large steel-tow cable that passes between the bow of the scow and the stern of the towing tug. The survey vessel, Pearl River, will conduct survey operations of the ODMDS disposal area and work area corridors (during daylight hours/7 days per week). A crew transfer vessel, the Cooper River, will transfer crew between the shoreside boarding location at Bahia Mar Yachting Center and the dredging equipment. \n\nDisposal Location: \n26.1315693N / 080.0333404W\n26.1315700N / 080.0305700W\n26.1211186N / 080.0305709W\n26.1211207N / 080.0333410W\n\nDredging Location:\n26.0942747N / 080.1060199W\n26.0945457N / 080.1057116W\n26.0947778N / 080.1053881W\n26.0947770N / 080.1049664W\n26.0948133N / 080.1046524W\n26.0948637N / 080.1045246W\n26.0949547N / 080.1044314W\n26.0952883N / 080.1040902W\n26.0954573N / 080.1040690W\n26.0969380N / 080.1038831W\n26.0969390N / 080.1040363W\n26.0977375N/ 080.1039367W\n26.0977215N / 080.1013560W\n26.0961361N / 080.1013842W\n26.0961403N / 080.1020684W\n26.0958314N / 080.1022291W\n26.0953104N / 080.1022933W\n26.0949923N / 080.1025778W\n26.0949941N / 080.1028349W\n26.0943524N / 080.1027938W\n26.0942799N / 080.1052630W","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.02404,26.13687],[-80.03079,26.1367],[-80.03081,26.12263],[-80.10443,26.09771],[-80.10486,26.09498],[-80.10536,26.09489],[-80.10574,26.09391],[-80.09832,26.09397],[-80.03015,26.12023],[-80.02377,26.1201],[-80.02404,26.13687]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":30739,"geometry":{"type":"Polygon","coordinates":[[[-117.90943999999996,33.61017000000004],[-117.90962999999999,33.609570000000076],[-117.90999999999997,33.609050000000025],[-117.91089999999997,33.608010000000036],[-117.91317999999995,33.606580000000065],[-117.91084999999998,33.60596000000004],[-117.90955999999994,33.60564000000005],[-117.90895999999998,33.605290000000025],[-117.90863999999999,33.60525000000007],[-117.90757999999994,33.60558000000003],[-117.90697999999998,33.606130000000064],[-117.90621999999996,33.60651000000007],[-117.90528999999998,33.607440000000054],[-117.90433999999999,33.60795000000007],[-117.90943999999996,33.61017000000004]]]},"properties":{"ESRI_OID":30739,"MSI_UID":30739,"ATU":11,"TITLE":"Sector Los Angeles, Submerged Land Act (SLA) - Newport Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385463,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact:newbay","WATERWAY_NAME":"Newport Bay","CREATE_DATE":1761079356000,"MODIFIED_DATE":1764952131000,"BEGIN_DATE":1761004800000,"END_DATE":1793318399000,"DESCRIPTION":"R.E. Staite Engineering, Inc. will conduct dredging operations within Newport Bay Harbor, California. The scope of operations includes dredging activities with disposal occurring at the LA-3 Ocean Dredged Material Disposal Site and the Port of Long Beach Pier G facility.\n\nPre-dredge surveying and diving operations began on October 23, 2025, and are ongoing. Equipment mobilization is scheduled to start on December 8, 2025, with dredging expected to commence on or about December 10, 2025. Equipment demobilization is anticipated to be completed by October 28, 2026.\n\nThe center of the dredging area is located at coordinates 33.60898° N, -117.90689° W (degree decimal format) and is referenced on NOAA Chart No. 18754. A temporary mooring buoy will be placed on a rotating basis at one of three locations:\n\n33.61126° N, -117.90715° W\n33.60857° N, -117.91713° W\n33.60733° N, -117.91232° W\nVessels involved in the project include the DB Point Loma, Jeanie R push boat, John Drake work boat, RES Survey Boat, Tug Killeen, Tug Sagittarian, and disposal scows Rob P. and Mike J. All equipment will monitor VHF-FM Channel 16.\n\nMariners are advised to stay at least 300 feet away from equipment, transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made.\n\nFor additional information, please contact:\n\nDalton Elzey, R.E. Staite Engineering, Inc.: 925-822-6775\nJose Rocha, U.S. Army Corps of Engineers: 909-253-9921","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.90944,33.61017],[-117.90963,33.60957],[-117.91,33.60905],[-117.9109,33.60801],[-117.91318,33.60658],[-117.91085,33.60596],[-117.90956,33.60564],[-117.90896,33.60529],[-117.90864,33.60525],[-117.90758,33.60558],[-117.90698,33.60613],[-117.90622,33.60651],[-117.90529,33.60744],[-117.90434,33.60795],[-117.90944,33.61017]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":30938,"geometry":{"type":"Polygon","coordinates":[[[-78.55580999999995,33.84830000000005],[-78.58216999999996,33.84465000000006],[-78.62666999999999,33.832790000000045],[-78.69615999999996,33.80838000000006],[-78.76646999999997,33.77368000000007],[-78.83320999999995,33.72869000000003],[-78.86863999999997,33.700590000000034],[-78.88566999999995,33.682990000000075],[-78.93647999999996,33.64139000000006],[-78.95378999999997,33.62355000000008],[-79.00514999999996,33.569560000000024],[-79.02189999999996,33.54255000000006],[-78.95460999999995,33.54141000000004],[-78.90296999999998,33.596100000000035],[-78.81919999999997,33.67065000000002],[-78.75163999999995,33.719100000000026],[-78.67225999999994,33.762260000000026],[-78.59947999999997,33.78738000000004],[-78.58326999999997,33.78920000000005],[-78.56843999999995,33.79445000000004],[-78.54467999999997,33.791600000000074],[-78.53108999999995,33.79468000000003],[-78.55580999999995,33.84830000000005]]]},"properties":{"ESRI_OID":30938,"MSI_UID":30938,"ATU":7,"TITLE":"Sector Charleston, Territorial Sea - Sector Charleston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384376,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact","WATERWAY_NAME":"Sector Charleston, Submerged Land Act (SLA)","CREATE_DATE":1761320306000,"MODIFIED_DATE":1788260682000,"BEGIN_DATE":1761264000000,"END_DATE":1792195199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2025-10-24 \n30938\n\nGreat Lakes Dredge and Dock Company, LLC (GLDD) has completed dredging activities for the FY24 Myrtle Beach Emergency Renourishment Project, The dredges, submerged dredge pipelines (subline), booster pump and pump-out assemblies have\nbeen removed from the beach areas.\nVarious sections of subline have been anchored off south of Little River Inlet. The sections of subline will all be floated, rafted and towed off site by the end of\nSeptember 2026. The pipeline is marked per U.S.C.G. regulations. Boaters should avoid these\nareas.\n\nLittle River Staging Area \n33-51.90147N / 078-34.45133W\n33-51.90979N / 078-34.41234W\n33-51.36061N / 078-33.77017W\n33-51.31399N / 078-33.77702W\nCane South Borrow Area \n33-38.79839N / 078-53.40689W\n33-39.54862N / 078-52.48496W\n33-38.21411N / 078-51.43486W\n33-37.47282N / 078-52.29550W\nSurfside Borrow Area\n33-32.82023N / 078-58.51570W\n33-34.40117N / 078-57.20107W\n33-33.69146N / 078-56.09151W\n 33-32.15614N / 078-57.52680W\n\nSubline 2-1\n33-44.55927N / 078-48.88852W\n33-43.93452N / 078-48.28760W\nSubline 2-2\n33-43.73423N / 078-50.12075W\n33-43.10958N / 078-49.51977W\nSubline 2-3\n33-42.90920N / 078-51.13826W\n33-42.33078N / 078-50.47441W\nSubline 2-4\n33-42.06742N / 078-52.08347W\n33-41.53964N / 078-51.36185W\nSubline 2-5\n33-40.81401N / 078-53.51260W\n33-40.12990N / 078-52.72720W\n\nVessels will be monitoring VHF-FM channels 13 and 16. Mariners are urged to use extreme caution in the area. For dredging and placement operations, mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-78.55581,33.8483],[-78.58217,33.84465],[-78.62667,33.83279],[-78.69616,33.80838],[-78.76647,33.77368],[-78.83321,33.72869],[-78.86864,33.70059],[-78.88567,33.68299],[-78.93648,33.64139],[-78.95379,33.62355],[-79.00515,33.56956],[-79.0219,33.54255],[-78.95461,33.54141],[-78.90297,33.5961],[-78.8192,33.67065],[-78.75164,33.7191],[-78.67226,33.76226],[-78.59948,33.78738],[-78.58327,33.7892],[-78.56844,33.79445],[-78.54468,33.7916],[-78.53109,33.79468],[-78.55581,33.8483]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":31708,"geometry":{"type":"Polygon","coordinates":[[[-90.68980999999997,39.00663000000003],[-90.69198999999998,39.00573000000003],[-90.68787999999995,38.999870000000044],[-90.68566999999996,39.00076000000007],[-90.68636999999995,39.00157000000007],[-90.68803999999994,39.00342000000006],[-90.68944999999997,39.00505000000004],[-90.68980999999997,39.00663000000003]]]},"properties":{"ESRI_OID":31708,"MSI_UID":31708,"ATU":2,"TITLE":"Lower Mississippi River - Upper Mississippi River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381438,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:uppmisriv","WATERWAY_NAME":"Upper Mississippi River","CREATE_DATE":1762541007000,"MODIFIED_DATE":1785767234000,"BEGIN_DATE":1762473600000,"END_DATE":1790899199000,"DESCRIPTION":"Continuing through October 2026, construction will be conducted for a new 50 ft diameter guide cell downstream of Lock and Dam 25.  The new guide cell will be constructed approximately 340 ft downstream of the existing guide cell.  Intermittent periods of active construction will take place adjacent to the navigation channel throughout the duration of the project.  L/D 25 will be closed from 7:00 a.m. to 7:00 p.m., from August 10, 2026, and continuing until September 19, 2026.  Additional Lock closures may be required as construction of the guide cell continues.  Mariners should be on the lookout for construction activities and related equipment to include barges, cranes, and work boats that will be operating in the area.  All vessels should be alert for, and abide by, any special instructions that may be issued by the Lockmaster.  Mariners may contact the Lockmaster via VHF-FM Channel 14, or at (636) 566-8120, for further information.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.68981,39.00663],[-90.69199,39.00573],[-90.68788,38.99987],[-90.68567,39.00076],[-90.68637,39.00157],[-90.68804,39.00342],[-90.68945,39.00505],[-90.68981,39.00663]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":32302,"geometry":{"type":"Polygon","coordinates":[[[-93.31804999999997,30.100490000000036],[-93.32143999999994,30.09755000000007],[-93.32031999999998,30.096580000000074],[-93.31692999999996,30.09952000000004],[-93.31804999999997,30.100490000000036]]]},"properties":{"ESRI_OID":32302,"MSI_UID":32302,"ATU":8,"TITLE":"General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100118285173,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:sechouexcecozon:secneworltersea:sechoutersea:secneworlsublanact:sechousublanact:neworl","WATERWAY_NAME":"New Orleans Port Arthur","CREATE_DATE":1763480000000,"MODIFIED_DATE":1763480814000,"BEGIN_DATE":1763424000000,"END_DATE":1802822399000,"DESCRIPTION":"GIWW - Devils Elbow - Staging Area --- From: 2025-11-24 To: 2027-02-15 --- A staging area for dredge pipe and equipment will be located along the GIWW, Mile 240.7, WHL.  All pipe will be marked with buoys and lights.  Mariners are urged to use caution in the area and transit at their slowest safe speed to minimize wake after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.31805,30.10049],[-93.32144,30.09755],[-93.32032,30.09658],[-93.31693,30.09952],[-93.31805,30.10049]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":33666,"geometry":{"type":"Polygon","coordinates":[[[-73.93986999999998,40.50100000000003],[-73.94880999999998,40.498320000000035],[-73.89469999999994,40.47724000000005],[-73.89165999999994,40.48222000000004],[-73.93986999999998,40.50100000000003]]]},"properties":{"ESRI_OID":33666,"MSI_UID":33666,"ATU":1,"TITLE":"General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382294,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact","WATERWAY_NAME":"Sector New York, Submerged Lands Act (SLA)","CREATE_DATE":1765395204000,"MODIFIED_DATE":1765395213000,"BEGIN_DATE":1765324800000,"END_DATE":1917043199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2025-12-10 To: 2030-09-30\n\nNorth American Aggregates, LLC, will be conducting maintenance dredging for the purpose of sand mining\nAt the eastern end of Ambrose Federal Navigation Channel, bounded by the following positions:\nSoutheast Corner: 40o28’38.09N, 073o53’40.95W; Northeast Corner: 40o28.56.01N, 073o53’29.99W;            \nNorthwest Corner: 40o30’03.63N, 073o56’23.56W; Southwest Corner: 40o29’53.98N, 073o56’55.75W.          \nWork Start &amp;amp; Stop dates and Hours of Operation: 24/7 365-days per year (weather dependent)\nEquipment of scene: Dredge Eleanor &amp;amp; Associated Notched Tug the vessel is able to move on demand for traffic\nAnd will be monitoring VHF Radio Channel Monitored: 13, 14, 65. Disposal Site/Alternative Use Determination\nNorth American Aggregates, LLC, 1250 State Street, Perth Amboy, New Jersey 08861.\n\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-73.93987,40.501],[-73.94881,40.49832],[-73.8947,40.47724],[-73.89166,40.48222],[-73.93987,40.501]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":34656,"geometry":{"type":"Polygon","coordinates":[[[-74.00660999999997,40.75561000000005],[-74.01329999999996,40.75528000000003],[-74.01342999999997,40.753810000000044],[-74.00800999999996,40.75351000000006],[-74.00660999999997,40.75561000000005]]]},"properties":{"ESRI_OID":34656,"MSI_UID":34656,"ATU":1,"TITLE":"Main Channel - Hudson River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:hudriv","WATERWAY_NAME":"Hudson River","CREATE_DATE":1767715067000,"MODIFIED_DATE":1787680794000,"BEGIN_DATE":1767657600000,"END_DATE":1800575999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-01-06 To: 2027-01-21\n\nFrom November 24, 2024, through January 20, 2027, \n\nWeeks Marine and Frontier-Kemper Tutor Perini JV will conduct marine construction in the Hudson River on behalf of the Hudson Tunnel Project. The construction area is bounded by the following positions off the Manhattan bulkhead: 40-45-20.32N 074-00-23.84W; 40-45-18.89N, 074-00-48.18W; 40-45-13.80N 074-00-48.64W; 40-45-12.40N. 074-00-28.47W. The USCG has established a Safety Zone, 33 CFR 165.T01-0336 Safety Zone; Hudson River, Manhattan, NY. Mariners transiting west of the safety zone should proceed at a speed to minimize potential wake or surge damage to the vessels working the construction area. There are two distinct jobsites within the construction area. The first jobsite, which is operated by Weeks Marine, is west of Pier 66. Within this jobsite, Weeks Marine is conducting soil mixing within a 110’ wide x 600’ long cofferdam for the Hudson River Ground Stabilization (HRGS) Project. Work hours are approximately 7AM – 7PM, Monday through Saturday. The cofferdam is marked with FL W 4s lights at each corner and at 30 ft intervals, and with white retro-reflective tape 6” high and at least 4’ long is installed above the MHHW mark every 50 feet on the cofferdam.  The Weeks 61 barge (AIS - WEEKS 61 Barge) will move between the south and north sides of the cofferdam to excavate spoils within the cofferdam.  The Weeks 61 barge monitors VHF-FM channels 13 / 16 / 82.  The Weeks 263 barge (AIS- WEEKS 263) and material barges will be on the southern side outside of the cofferdam to support drilling operations within the cofferdam. The Weeks 263 barge monitors VHF-FM channels 13 / 16 / 67.  The Weeks 526 barge (AIS - WEEKS 526) will remove piles from the west end, lay them down on barges, shift east, and reinstall them.  The Weeks 526 barge monitors VHF-FM channels 13 / 16 / 66.  The second jobsite, which is north of Pier 66 in close proximity to the Manhattan bulkhead and near position 40-45-15.270N, 074-0-28.007W, is operated by Frontier-Kemper Tutor Perini JV. Within this jobsite, Posillico Civil has constructed a 200 ft x 150 ft temporary marine structure to facilitate grouting and freezing operations to stabilize the ground beneath the Manhattan bulkhead in preparation for tunnel boring.  The 150 ft x 50 ft Joseph D barge with a 184 ft crane on deck will be moored along the west face of the temporary marine structure.  The 150 ft x 150 ft scow Angela will be moored on west side of the Joseph D barge.  All barges require tug assistance for a movement and a minimum notice of 24 hours via VHF radio is required for any barge relocation. All moored barges display fixed white lights in accordance with the Inland Navigation Rules. Four seasonal white lighted buoys have been reset. Two (LLNR 37663, 37663.1) are upriver of the construction area, and two (LLNR 37663.2, 37663.3) are downriver. All four lighted buoys exhibit FL W 2.5s characteristics.  From September 1 to September 30, Normandeau Associates, Inc. will be on site within the Safety Zone conducting monitoring for Atlantic and shortnose sturgeon.  As part of this monitoring activity, the vessel Parker will be on scene.  Work hours are approximately 7AM – 7PM, Monday through Saturday.  Parker monitors VHF-FM channels 13 / 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.00661,40.75561],[-74.0133,40.75528],[-74.01343,40.75381],[-74.00801,40.75351],[-74.00661,40.75561]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":35103,"geometry":{"type":"Polygon","coordinates":[[[-97.25940999999995,26.565320000000042],[-97.27119999999996,26.564810000000023],[-97.27645999999999,26.56465000000003],[-97.29871999999995,26.563730000000078],[-97.33854999999994,26.56230000000005],[-97.36526999999995,26.561120000000074],[-97.39962999999995,26.559810000000027],[-97.42358999999999,26.558730000000025],[-97.42544999999996,26.557780000000037],[-97.43070999999998,26.554970000000026],[-97.43159999999995,26.553490000000068],[-97.43238999999994,26.550220000000024],[-97.43140999999997,26.54976000000005],[-97.43029999999999,26.553420000000074],[-97.42535999999996,26.55708000000004],[-97.42208999999997,26.557980000000043],[-97.39067999999997,26.558830000000057],[-97.35668999999996,26.560050000000047],[-97.32686999999999,26.56107000000003],[-97.29282999999998,26.562550000000044],[-97.27714999999995,26.56307000000004],[-97.25923999999998,26.563320000000033],[-97.25940999999995,26.565320000000042]]]},"properties":{"ESRI_OID":35103,"MSI_UID":35103,"ATU":8,"TITLE":"Sector Corpus Christi, Submerged Land Act (SLA) - Port Mansfield Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385125,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon:seccorchrtersea:seccorchrsublanact:pormancha","WATERWAY_NAME":"Port Mansfield Channel","CREATE_DATE":1768324737000,"MODIFIED_DATE":1773942136000,"BEGIN_DATE":1768262400000,"END_DATE":1802476799000,"DESCRIPTION":"Port Mansfield Channel - Dredge Operation --- From: 2026-01-19 To: 2027-02-11 --- The Dredges GENERAL BRADLEY and GENERAL MARSHALL will conduct dredging operations in the Port Mansfield Channel, from just east of the jetties, through the entire inland portion of the Port Mansfield Channel, and into the Port Mansfield Harbor.  The Dredge GENERAL MARSHALL will start working near Port Mansfield Channel Daybeacon 18 (LLNR-29360) with anchors set on either side of the channel.  A combination of steel and HDPE pipeline will be used with floating rubber hose, floating pipe, submerged pipe and shore pipe leading to the placement areas at Bird Island and along the Padre Island Beach.  Submerged pipelines will be placed across the channel in locations that provides sufficient depth and will be marked with lights and buoys.  No fishing or trawling activities should take place along or within the area of pipeline, to avoid damage to nets, vessels, and the dredge equipment.  Mariners are requested to coordinate passing arrangements 1-hour in advance and transit the area with extreme caution.  VHF-FM Channels: 13 and 79, POC: Dredge (409) 739-6508","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-97.25941,26.56532],[-97.2712,26.56481],[-97.27646,26.56465],[-97.29872,26.56373],[-97.33855,26.5623],[-97.36527,26.56112],[-97.39963,26.55981],[-97.42359,26.55873],[-97.42545,26.55778],[-97.43071,26.55497],[-97.4316,26.55349],[-97.43239,26.55022],[-97.43141,26.54976],[-97.4303,26.55342],[-97.42536,26.55708],[-97.42209,26.55798],[-97.39068,26.55883],[-97.35669,26.56005],[-97.32687,26.56107],[-97.29283,26.56255],[-97.27715,26.56307],[-97.25924,26.56332],[-97.25941,26.56532]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":35372,"geometry":{"type":"Polygon","coordinates":[[[-82.45970999999997,27.944430000000068],[-82.45948999999996,27.943970000000036],[-82.45905999999997,27.94148000000007],[-82.45930999999996,27.940870000000075],[-82.45850999999999,27.94100000000003],[-82.45917999999995,27.944420000000036],[-82.45970999999997,27.944430000000068]]]},"properties":{"ESRI_OID":35372,"MSI_UID":35372,"ATU":7,"TITLE":"Hillsborough Cut C Channel - Hillsborough River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383358,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipetsublanact:mulkeycha:tambaycutfcha:gadpoicut:bigbencha:hilcutccha:hilriv","WATERWAY_NAME":"Hillsborough River","CREATE_DATE":1768787609000,"MODIFIED_DATE":1768787823000,"BEGIN_DATE":1768694400000,"END_DATE":1809302399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-01-18 \n35372\n\nOrion Marine Group (Orion) is currently contracted by The Haskell Company, through the City of Tampa, to construct two new pedestrian bridges beneath the Platt Street and Brorein Street bridges, in addition to an overlook at Tony Jannus Park. \n\nThe construction operations will utilize a combination of Orion floating vessels as well as rental material barges provided by McDonough Marine Services (specifically MCD 354, MCD 365, and MCD 545), in conjunction with the Orion 2508 Tug. Floating equipment will be strategically positioned within the designated Jobsite Working Limits, which are delineated in the attached drawing of the City of Tampa West Riverwalk project site.\n\nTo secure the floating equipment in place within the job site limits, Orion will deploy spud barges and a mooring pile at the construction site. All floating equipment will be equipped with illuminating lights at all times to enhance visibility during operational activities and in low-visibility conditions. Additionally, Orion will actively monitor VHF-FM channels 13, 16, and 74 for vessel communications.\nConstruction is scheduled to take place from February 9, 2026, to March 31, 2027. During this period, operations will take place from 6 a.m. to 6 p.m., six days a week (Monday through Saturday). The floating equipment will remain on-site for the duration of the project.\n\nOrion advises all mariners to exercise heightened caution when navigating in the construction area. They kindly request that vessels reduce speed while transiting through this section of the Hillsborough River. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.45971,27.94443],[-82.45949,27.94397],[-82.45906,27.94148],[-82.45931,27.94087],[-82.45851,27.941],[-82.45918,27.94442],[-82.45971,27.94443]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":35376,"geometry":{"type":"Polygon","coordinates":[[[-80.79064999999997,32.230530000000044],[-80.79072999999994,32.23025000000007],[-80.79029999999995,32.230090000000075],[-80.79019999999997,32.230270000000075],[-80.78321999999997,32.22529000000003],[-80.78342999999995,32.22517000000005],[-80.78334999999998,32.22509000000008],[-80.78314999999998,32.225220000000036],[-80.78198999999995,32.22404000000006],[-80.78221999999994,32.223910000000046],[-80.78210999999999,32.22381000000007],[-80.78187999999994,32.22394000000003],[-80.78319999999997,32.225280000000055],[-80.79017999999996,32.23034000000007],[-80.79064999999997,32.230530000000044]]]},"properties":{"ESRI_OID":35376,"MSI_UID":35376,"ATU":7,"TITLE":"Jenkins Island Flat - Skull Creek/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116384282,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:calsouent:calsou:chaharsavriv:jenislfla:skucre","WATERWAY_NAME":"Skull Creek","CREATE_DATE":1768790374000,"MODIFIED_DATE":1769005428000,"BEGIN_DATE":1768694400000,"END_DATE":1799798399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-01-18 \n35376\n\nF&amp;amp;ME Consultants, Inc. will be creating three geotechnical test borings to aid in deep foundation design for the replacement of transmission line poles. Each boring will take place adjacent to the existing electric transmission line pole slated for replacement.\n\nThe borings will be 6 inches in diameter and 50 feet deep. The in-water boring will be done with a flat barge with centrally located drill. All work is expected to remain outside of\nthe navigable channel. The barge is approximately 41 feet x 62 feet and will be lit at night using white lights. The barge will be scuppered at the boring location for the duration of each test. The estimated completion date is February 19, 2026.\n\nSkull Creek SB-5: 32.225644N / -080.782546W\n\nSkull Creek SB-6: 32.224283N / -080.781334W\n\nMacKays Creek SB-3: 32.230178N / -080.790522W","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.79065,32.23053],[-80.79073,32.23025],[-80.7903,32.23009],[-80.7902,32.23027],[-80.78322,32.22529],[-80.78343,32.22517],[-80.78335,32.22509],[-80.78315,32.22522],[-80.78199,32.22404],[-80.78222,32.22391],[-80.78211,32.22381],[-80.78188,32.22394],[-80.7832,32.22528],[-80.79018,32.23034],[-80.79065,32.23053]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":35520,"geometry":{"type":"Polygon","coordinates":[[[-78.86493999999999,33.70328000000006],[-78.86664999999994,33.701850000000036],[-78.86512999999997,33.70063000000005],[-78.86341999999996,33.702060000000074],[-78.86493999999999,33.70328000000006]]]},"properties":{"ESRI_OID":35520,"MSI_UID":35520,"ATU":7,"TITLE":"Sector Charleston, Territorial Sea - Sector Charleston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384376,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact","WATERWAY_NAME":"Sector Charleston, Submerged Land Act (SLA)","CREATE_DATE":1769006790000,"MODIFIED_DATE":1788259732000,"BEGIN_DATE":1768953600000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-01-21\n35520\n\nManson Construction will be building a temporary work trestle starting at the public beach access parking lot on 24th Ave N, Myrtle Beach, SC that extends approximately 1400 LF into the open water. Dive operations will be performed within/around the coffer cell and trestle footprint. The trestle will be furnished with appropriate signage and lighting. This work will commence on November 1, 2024, with an estimated completion date of December 31, 2026. During this time, the temporary trestle and adjacent structure will act as an obstruction in the water. This operation poses a hazard to vessels traveling within 1400 LF of the beach at 24th Ave N, Myrtle Beach, SC. Mariners are advised to take caution and observe all dive flags, signage, and lighting. For further information, please contact Jerry Martinez at GMartinez@mansonconstruction.com or (904) 821-0211.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-78.86494,33.70328],[-78.86665,33.70185],[-78.86513,33.70063],[-78.86342,33.70206],[-78.86494,33.70328]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":36797,"geometry":{"type":"Polygon","coordinates":[[[-118.26028999999994,33.76645000000008],[-118.26316999999995,33.766290000000026],[-118.26384999999999,33.765660000000025],[-118.26377999999994,33.76526000000007],[-118.26114999999999,33.76331000000005],[-118.26087999999999,33.758710000000065],[-118.25949999999995,33.75939000000005],[-118.26028999999994,33.76645000000008]]]},"properties":{"ESRI_OID":36797,"MSI_UID":36797,"ATU":11,"TITLE":"Los Angeles Main Channel - Los Angeles East Basin Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385486,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact:losangappcha:losangmaicha:losangeasbascha","WATERWAY_NAME":"Los Angeles East Basin Channel","CREATE_DATE":1770670681000,"MODIFIED_DATE":1785712953000,"BEGIN_DATE":1773619200000,"END_DATE":1793145599000,"DESCRIPTION":"JILK Heavy Construction will conduct timber pile installation that will be conducted as part of the Berths 187, 188, 189 &amp;amp; 190, located in Wilmington, CA from 23 March 2026 thru 26 October 2026.  Jilk Heavy Construction’s 60’x70’ Flexi-Float mounted barge crane will be located at various points along berths 187 thru 191 and will be moored with the use of spuds. Alongside there will be several 18’ work skiffs. The operations during this project will include the removal and reinstallation of timber piles, steel pile and concrete repairs. (general area bound by the following waypoints):\n\n33.76401             -118.26001\n\nThis work will be conducted during daylight hours Monday through Friday. Crews will work various hours between 6:00 am and 6:00 pm on those days.\nAll floating and water-based equipment will monitor VHF-FM channel 16 during working shifts. Mariners are advised to use caution when transiting the area. For further comments or details the General Superintendent Joe Salgado can be reached at (310) 505-0142 or Barge Forman Joe Carrico at (310) 505-7346 and will be available to address any questions or concerns regarding the on-site operations.\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-118.26029,33.76645],[-118.26317,33.76629],[-118.26385,33.76566],[-118.26378,33.76526],[-118.26115,33.76331],[-118.26088,33.75871],[-118.2595,33.75939],[-118.26029,33.76645]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":37215,"geometry":{"type":"Polygon","coordinates":[[[-80.64495999999997,28.32313000000005],[-80.64573999999999,28.309190000000058],[-80.62705999999997,28.312530000000038],[-80.64495999999997,28.32313000000005]]]},"properties":{"ESRI_OID":37215,"MSI_UID":37215,"ATU":7,"TITLE":"Canaveral Barge Canal - Banana River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383773,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:canhar:canbarcan:banriv","WATERWAY_NAME":"Banana River","CREATE_DATE":1771346841000,"MODIFIED_DATE":1771346944000,"BEGIN_DATE":1771286400000,"END_DATE":1830297599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-02-17\n37215\n\nLocation:\n28-19-23.268N/080-38-41.856W\n28-18-45.108N/080-37-37.416W\n28-18-33.084N/080-38-44.664W\n28-19-23.268N/080-38-41.856W\n\nJF Brennan Co will be preforming marine construction consisting of capping along the shoreline. The project is expected to being on or about April 6, 2026, with an estimated completion date of October 1, 2027. Operations will be conducted Monday thru Saturday, 7 a.m. to 7 p.m.\nMarine equipment to be used:\nBroadcast Capping System (60’x120’ barge), utility barge (30’x40’), pipeline tugger (12’x12’)\n\nBrennan will have mooring lights on all corners of the stationary platforms and vessels will utilize marine lighting during movements. Equipment will be spudded down and vessels docked during non-working hours. 4 Floating “Construction Ahead” warning signs will be placed, 1 on each end of the zone and the other 2 in between. Vessels will be monitoring VHF-FM channel 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.64496,28.32313],[-80.64574,28.30919],[-80.62706,28.31253],[-80.64496,28.32313]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":37936,"geometry":{"type":"Polygon","coordinates":[[[-93.32666999999998,30.09552000000008],[-93.32786999999996,30.09442000000007],[-93.33283999999998,30.094390000000033],[-93.33368999999999,30.08988000000005],[-93.33985999999999,30.088760000000036],[-93.34259999999995,30.08734000000004],[-93.34688999999997,30.085540000000037],[-93.35167999999999,30.083420000000046],[-93.35545999999994,30.082310000000064],[-93.35793999999999,30.080840000000023],[-93.36575999999997,30.071270000000027],[-93.36667999999997,30.060200000000066],[-93.38149999999996,30.060290000000066],[-93.39642999999995,30.060160000000053],[-93.40880999999996,30.060220000000072],[-93.42675999999994,30.060340000000053],[-93.45702999999997,30.060260000000028],[-93.48494999999997,30.06012000000004],[-93.48494999999997,30.05968000000007],[-93.45692999999994,30.059800000000052],[-93.39641999999998,30.05968000000007],[-93.36292999999995,30.05976000000004],[-93.36151999999998,30.062170000000037],[-93.36513999999994,30.065210000000036],[-93.36423999999994,30.070740000000058],[-93.35900999999996,30.077600000000075],[-93.35478999999998,30.081200000000024],[-93.35194999999999,30.082070000000044],[-93.34583999999995,30.08481000000006],[-93.34328999999997,30.086080000000038],[-93.33941999999996,30.08800000000008],[-93.33353999999997,30.088320000000067],[-93.32675999999998,30.087010000000078],[-93.32636999999994,30.09057000000007],[-93.32666999999998,30.09552000000008]]]},"properties":{"ESRI_OID":37936,"MSI_UID":37936,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Calcasieu Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384877,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:calcha","WATERWAY_NAME":"Calcasieu Channel","CREATE_DATE":1772132750000,"MODIFIED_DATE":1785335423000,"BEGIN_DATE":1772668800000,"END_DATE":1790553599000,"DESCRIPTION":"Calcasieu Channel - GIWW - Dredge Operation --- From: 2026-03-10 To: 2026-09-26 --- The Dredge OHIO will be dredging along the Calcasieu River near the intersection with the GIWW, approximate River Mile 22.5, for the Louisiana Woodside LNG project.  Approximately 8.5 miles of pipeline and booster pumps have been installed and staged from the dredging area along the Calcasieu Channel, routed through Choupique Bayou, and into the GIWW along the northern edge and outside of the navigable limits.  Floating and submerged pipelines along with a series of Boosters are located between GIWW Miles 241.0 and 252.0, WHL.  A subline crossing is located between GIWW Miles 249.0 and 250.0, WHL, near the Booster ERIN.  On-scene vessels include the Boosters TEXAS JR, JESSIE, BUSTER, REGGIE, CAPTAIN BARNEY, and ERIN C, Anchor Barges 112 and 120, Derrick Barges 66 and 72, T/Vs SMITH BUCCANEER, KJ LEBOEUF, CAPTAIN EDDIE, and EMILY A HERBERT, and the Crew Vessels TARPON 1, TARPON 3, JOHN NEWMAN, and COLUMBIA RIVER.  All dredge pipeline will be marked with buoys and lighted accordingly.  Barges and vessels are requested to avoid staging on the north side of the GIWW between the project limits.  Mariners are urged to use caution in the area and transit at their slowest safe speed to minimize wake after passing arrangements have been made.  VHF-FM Channels: 13 and 16, POC: (630) 247-6207","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.32667,30.09552],[-93.32787,30.09442],[-93.33284,30.09439],[-93.33369,30.08988],[-93.33986,30.08876],[-93.3426,30.08734],[-93.34689,30.08554],[-93.35168,30.08342],[-93.35546,30.08231],[-93.35794,30.08084],[-93.36576,30.07127],[-93.36668,30.0602],[-93.3815,30.06029],[-93.39643,30.06016],[-93.40881,30.06022],[-93.42676,30.06034],[-93.45703,30.06026],[-93.48495,30.06012],[-93.48495,30.05968],[-93.45693,30.0598],[-93.39642,30.05968],[-93.36293,30.05976],[-93.36152,30.06217],[-93.36514,30.06521],[-93.36424,30.07074],[-93.35901,30.0776],[-93.35479,30.0812],[-93.35195,30.08207],[-93.34584,30.08481],[-93.34329,30.08608],[-93.33942,30.088],[-93.33354,30.08832],[-93.32676,30.08701],[-93.32637,30.09057],[-93.32667,30.09552]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":37937,"geometry":{"type":"Polygon","coordinates":[[[-93.33250999999996,30.09214000000003],[-93.33404999999999,30.091540000000066],[-93.33558999999997,30.09101000000004],[-93.33815999999996,30.090000000000032],[-93.33974999999998,30.089560000000063],[-93.34877999999998,30.08603000000005],[-93.35020999999995,30.085090000000037],[-93.35167999999999,30.084320000000048],[-93.35511999999994,30.082900000000052],[-93.35999999999996,30.080110000000047],[-93.36598999999995,30.07137000000006],[-93.36633999999998,30.060100000000034],[-93.38115999999997,30.060200000000066],[-93.39608999999996,30.060060000000078],[-93.40846999999997,30.06012000000004],[-93.42641999999995,30.060250000000053],[-93.45668999999998,30.060170000000028],[-93.48460999999998,30.060020000000065],[-93.48460999999998,30.05958000000004],[-93.45658999999995,30.059700000000078],[-93.39607999999998,30.05958000000004],[-93.36258999999995,30.059660000000065],[-93.36117999999999,30.062110000000075],[-93.36296999999996,30.06510000000003],[-93.36240999999995,30.071720000000028],[-93.35866999999996,30.077800000000025],[-93.34988999999996,30.08215000000007],[-93.34435999999994,30.084740000000068],[-93.34225999999995,30.086130000000026],[-93.33930999999995,30.087690000000066],[-93.33319999999998,30.08871000000005],[-93.33248999999995,30.089660000000038],[-93.33197999999999,30.09080000000006],[-93.33250999999996,30.09214000000003]]]},"properties":{"ESRI_OID":37937,"MSI_UID":37937,"ATU":8,"TITLE":"New Orleans Port Arthur/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100118285173,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:sechouexcecozon:secneworltersea:sechoutersea:secneworlsublanact:sechousublanact:neworl","WATERWAY_NAME":"New Orleans Port Arthur","CREATE_DATE":1772132874000,"MODIFIED_DATE":1772134927000,"BEGIN_DATE":1772668800000,"END_DATE":1790553599000,"DESCRIPTION":"GIWW - Calcasieu Channel - Dredge Operation --- From: 2026-03-10 To: 2026-09-26 --- The Dredge OHIO will be dredging along the Calcasieu Channel, near Mile 22.5, for the Louisiana Woodside LNG project.  Approximately 8.5 miles of pipeline and booster pumps have been installed and staged from the dredging area along the Calcasieu Channel, routed through Choupique Bayou, and into the GIWW, along the northern edge and outside of the navigable limits.  Floating and submerged pipelines along with a series of Boosters are located between GIWW Miles 241.0 and 252.0, WHL.  A subline crossing is located between GIWW Miles 249.0 to 250.0, WHL, near the Booster ERIN C.  On-scene vessels include the Boosters TEXAS JR, JESSIE, BUSTER, REGGIE, CAPTAIN BARNEY, and ERIN C, Anchor Barges 112 and 120, Derrick Barges 66 and 72, T/Vs SMITH BUCCANEER, KJ LEBOEUF, CAPTAIN EDDIE, and EMILY A HERBERT, and the Crew Vessels TARPON 1, TARPON 3, JOHN NEWMAN, and COLUMBIA RIVER.  All dredge pipeline will be marked with buoys and lighted accordingly.  Barges and vessels are requested to avoid staging on the north side of the GIWW, between the project limits.  Mariners are urged to use caution in the area and transit at their slowest safe speed to minimize wake after passing arrangements have been made.  VHF-FM Channels: 13 and 16, POC: (630) 247-6207","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.33251,30.09214],[-93.33405,30.09154],[-93.33559,30.09101],[-93.33816,30.09],[-93.33975,30.08956],[-93.34878,30.08603],[-93.35021,30.08509],[-93.35168,30.08432],[-93.35512,30.0829],[-93.36,30.08011],[-93.36599,30.07137],[-93.36634,30.0601],[-93.38116,30.0602],[-93.39609,30.06006],[-93.40847,30.06012],[-93.42642,30.06025],[-93.45669,30.06017],[-93.48461,30.06002],[-93.48461,30.05958],[-93.45659,30.0597],[-93.39608,30.05958],[-93.36259,30.05966],[-93.36118,30.06211],[-93.36297,30.0651],[-93.36241,30.07172],[-93.35867,30.0778],[-93.34989,30.08215],[-93.34436,30.08474],[-93.34226,30.08613],[-93.33931,30.08769],[-93.3332,30.08871],[-93.33249,30.08966],[-93.33198,30.0908],[-93.33251,30.09214]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":38369,"geometry":{"type":"Polygon","coordinates":[[[-81.40922999999998,31.132150000000024],[-81.42652999999996,31.112930000000063],[-81.43387999999999,31.10916000000003],[-81.45166999999998,31.10528000000005],[-81.45955999999995,31.10799000000003],[-81.46099999999996,31.106110000000058],[-81.45152999999993,31.10293000000007],[-81.42749999999995,31.108110000000067],[-81.41204999999997,31.12662000000006],[-81.40229999999997,31.129090000000076],[-81.37612999999999,31.12316000000004],[-81.24164999999994,31.046970000000044],[-81.27491999999995,31.043390000000045],[-81.29431999999997,31.04368000000005],[-81.29445999999996,31.00873000000007],[-81.27460999999994,31.008670000000052],[-81.27467999999999,31.043030000000044],[-81.24082999999996,31.046500000000037],[-81.23955999999998,31.048060000000078],[-81.37400999999994,31.124450000000024],[-81.40922999999998,31.132150000000024]]]},"properties":{"ESRI_OID":38369,"MSI_UID":38369,"ATU":7,"TITLE":"Sector Charleston, Submerged Land Act (SLA) - St Simons Sound/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383690,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:stsimsou","WATERWAY_NAME":"St Simons Sound","CREATE_DATE":1772644403000,"MODIFIED_DATE":1772644460000,"BEGIN_DATE":1772582400000,"END_DATE":1796083199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-03-04 \n38369\n\nGreat Lakes Dredge &amp;amp; Dock Company will be commencing operations for the Brunswick Entrance Channel Widener Maintenance Dredging Project March of 2026. This project consists of 2.3M CY of maintenance dredging with disposal in the Brunswick Harbor ODMDS. Operations are expected to be completed on October 31, 2026.\n\nEquipment being used: TSHD PADRE ISLAND and AMELIA ISLAND; Mechanical Dredges GL 54 and GL 58; Dump Scows GL 701 and 702. Vessels will be monitoring VHF-FM channels 13 and 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.40923,31.13215],[-81.42653,31.11293],[-81.43388,31.10916],[-81.45167,31.10528],[-81.45956,31.10799],[-81.461,31.10611],[-81.45153,31.10293],[-81.4275,31.10811],[-81.41205,31.12662],[-81.4023,31.12909],[-81.37613,31.12316],[-81.24165,31.04697],[-81.27492,31.04339],[-81.29432,31.04368],[-81.29446,31.00873],[-81.27461,31.00867],[-81.27468,31.04303],[-81.24083,31.0465],[-81.23956,31.04806],[-81.37401,31.12445],[-81.40923,31.13215]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":38373,"geometry":{"type":"Polygon","coordinates":[[[-122.43617999999998,37.80919000000006],[-122.43996999999996,37.808880000000045],[-122.44010999999995,37.808550000000025],[-122.44034999999997,37.808200000000056],[-122.44095999999996,37.808110000000056],[-122.44133999999997,37.80789000000004],[-122.44152999999994,37.80800000000005],[-122.44241999999997,37.80791000000005],[-122.44241,37.80734000000007],[-122.44220999999999,37.806760000000054],[-122.43589999999995,37.80761000000007],[-122.43617999999998,37.80919000000006]]]},"properties":{"ESRI_OID":38373,"MSI_UID":38373,"ATU":11,"TITLE":"Golden Gate Bridge - San Francisco Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385418,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay","WATERWAY_NAME":"San Francisco Bay","CREATE_DATE":1772645971000,"MODIFIED_DATE":1772663081000,"BEGIN_DATE":1772755200000,"END_DATE":1796169599000,"DESCRIPTION":"Marinship Development will commence dredging operations for the San Francisco Marina West Basin, City and County of San Francisco. The scope of operations includes dredging activities west of the marina entrance, centered at approximately 37.80889° N, -122.43998° W\n\nOperations are scheduled to begin on or about March 20, 2026, and will continue through November 30, 2026.\n\nVessels involved in the project include the self-contained dredge/dump barges “DB2” and “Alaska,” and tugboat “Harvey.” All vessels will monitor VHF channels 13, 14, and 77. For more information regarding the operation, please contact: 415-601-1024.\n\nAll mariners are advised to use extreme caution when transiting these areas.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.43618,37.80919],[-122.43997,37.80888],[-122.44011,37.80855],[-122.44035,37.8082],[-122.44096,37.80811],[-122.44134,37.80789],[-122.44153,37.808],[-122.44242,37.80791],[-122.44241,37.80734],[-122.44221,37.80676],[-122.4359,37.80761],[-122.43618,37.80919]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":38431,"geometry":{"type":"Polygon","coordinates":[[[-87.19183999999996,30.41507000000007],[-87.19212999999996,30.414590000000032],[-87.19232999999997,30.414600000000064],[-87.18982999999997,30.408000000000072],[-87.18917999999996,30.40820000000008],[-87.19183999999996,30.41507000000007]]]},"properties":{"ESRI_OID":38431,"MSI_UID":38431,"ATU":8,"TITLE":"Sector Mobile, Submerged Land Act (SLA) - Pensacola Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384579,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:penbay","WATERWAY_NAME":"Pensacola Bay","CREATE_DATE":1772723670000,"MODIFIED_DATE":1773942056000,"BEGIN_DATE":1772668800000,"END_DATE":1798847999000,"DESCRIPTION":"Pensacola Bay - Pier Demolition and Construction --- From: 2026-03-05 To: 2027-01-01 --- The demolition and reconstruction of the Pensacola Bay Bridge Fishing Pier will be conducted in Pensacola Bay.  Operations will take place from 7:00 a.m. to 7:00 p.m., daily.  Work will consist of the complete demolition of the existing pier structure, include pile cutting and removal, and the rebuilding of the fishing pier.  On-scene vessels and equipment will include crane barges, pile driving equipment, towing vessels, and other support craft.  Mariners are urged to use caution when transiting near the construction area and should maintain a safe distance from construction equipment and vessels. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-87.19184,30.41507],[-87.19213,30.41459],[-87.19233,30.4146],[-87.18983,30.408],[-87.18918,30.4082],[-87.19184,30.41507]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":38473,"geometry":{"type":"Polygon","coordinates":[[[-95.38126999999997,28.897280000000023],[-95.38861999999995,28.896640000000048],[-95.38864999999998,28.895470000000046],[-95.38073999999995,28.896150000000034],[-95.38126999999997,28.897280000000023]]]},"properties":{"ESRI_OID":38473,"MSI_UID":38473,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Brazos River Crossing/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384761,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:brarivcro","WATERWAY_NAME":"Brazos River Crossing","CREATE_DATE":1772737490000,"MODIFIED_DATE":1787758853000,"BEGIN_DATE":1772668800000,"END_DATE":1798847999000,"DESCRIPTION":"Brazos River Floodgates - GIWW, Mile 400.8, WHL - Floodgate Closure --- From: 2024-02-29 To: 2026-12-31 --- The Brazos River Floodgates on the GIWW, Mile 400.8, WHL, will undergo repairs to the guide-walls and sector gates.  The floodgates will have daily daytime closures to marine traffic, Monday through Friday,  from 7:00 a.m. to 7:00 p.m.  Work will not be performed on weekends or Federal Holidays.  Mariners should confirm closure times prior to transiting the area to avoid delays.  POC: Lockmaster (979) 402-2888","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-95.38127,28.89728],[-95.38862,28.89664],[-95.38865,28.89547],[-95.38074,28.89615],[-95.38127,28.89728]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":39325,"geometry":{"type":"Polygon","coordinates":[[[-79.95786999999996,32.903710000000046],[-79.96283999999997,32.898900000000026],[-79.96522999999996,32.89501000000007],[-79.95628999999997,32.893260000000055],[-79.95096999999998,32.90065000000004],[-79.95786999999996,32.903710000000046]]]},"properties":{"ESRI_OID":39325,"MSI_UID":39325,"ATU":7,"TITLE":"Charleston Harbor - Cooper River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384350,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:chahar:cooriv","WATERWAY_NAME":"Cooper River","CREATE_DATE":1773769548000,"MODIFIED_DATE":1780504841000,"BEGIN_DATE":1773705600000,"END_DATE":1789343999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-03-17\n39325\n\nSouthern Dredging Co., Inc. and their Dredge BRUNSWICK will be working in the Port Terminal Reach of the Cooper River at the North Charleston Terminal between Buoys 58 and 60 commencing on or about June 7, 2026. The Dredge will operate on a 24 hour per day, 7 day per week basis until approximately June 21, 2026. To ensure safe passage in the vicinity of the operation, boaters should establish contact with the dredge on VHF-FM 13 and 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.95787,32.90371],[-79.96284,32.8989],[-79.96523,32.89501],[-79.95629,32.89326],[-79.95097,32.90065],[-79.95787,32.90371]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":39553,"geometry":{"type":"Polygon","coordinates":[[[-88.88556999999997,30.39399000000003],[-88.93866999999995,30.39300000000003],[-88.97139999999996,30.39142000000004],[-89.00480999999996,30.38668000000007],[-89.05356999999998,30.37444000000005],[-89.06271999999996,30.374050000000068],[-89.09819999999996,30.362400000000036],[-89.28564999999998,30.30293000000006],[-89.29251999999997,30.305300000000045],[-89.23117999999994,30.220890000000054],[-89.14969999999994,30.277040000000056],[-88.88916999999998,30.282580000000053],[-88.90135999999995,30.359410000000025],[-88.90043999999995,30.387100000000032],[-88.89700999999997,30.390160000000037],[-88.88481999999999,30.389820000000043],[-88.88487999999995,30.391450000000077],[-88.88556999999997,30.39399000000003]]]},"properties":{"ESRI_OID":39553,"MSI_UID":39553,"ATU":8,"TITLE":"Sector Mobile, Submerged Land Act (SLA) - Mississippi Sound/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384544,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:missou","WATERWAY_NAME":"Mississippi Sound","CREATE_DATE":1774018639000,"MODIFIED_DATE":1774019134000,"BEGIN_DATE":1774828800000,"END_DATE":1811289599000,"DESCRIPTION":"Mississippi Sound - Dredge Operation --- From: 2026-03-30 To: 2027-05-24 --- Dredging operations will be conducted from Deer Island to Henderson Point in the Mississippi Sound and adjacent navigation channels.  Work will take place 24-hours a day, 7-days a week.  On-scene vessels and equipment will include the Dredge CREW COMPASS, barges, pipeline, and support craft.  Operations may restrict navigation due to the presence of floating and submerged pipelines, anchor wires, and limited maneuverability of the dredging equipment.  Vessels are requested to transit the area at their slowest safe speed and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13 and 16,  POC: (904) 334-0893","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.88557,30.39399],[-88.93867,30.393],[-88.9714,30.39142],[-89.00481,30.38668],[-89.05357,30.37444],[-89.06272,30.37405],[-89.0982,30.3624],[-89.28565,30.30293],[-89.29252,30.3053],[-89.23118,30.22089],[-89.1497,30.27704],[-88.88917,30.28258],[-88.90136,30.35941],[-88.90044,30.3871],[-88.89701,30.39016],[-88.88482,30.38982],[-88.88488,30.39145],[-88.88557,30.39399]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":39689,"geometry":{"type":"Polygon","coordinates":[[[-81.80673999999993,26.13256000000007],[-81.81068999999997,26.13229000000007],[-81.81044999999995,26.130130000000065],[-81.80632999999995,26.13056000000006],[-81.80673999999993,26.13256000000007]]]},"properties":{"ESRI_OID":39689,"MSI_UID":39689,"ATU":7,"TITLE":"Sector St. Petersburg, Territorial Sea - Sector St. Petersburg, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383296,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipeterseala","WATERWAY_NAME":"Sector St. Petersburg, Submerged Land Act (SLA)","CREATE_DATE":1774286906000,"MODIFIED_DATE":1774287068000,"BEGIN_DATE":1774224000000,"END_DATE":1822348799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-03-23 \n39689\n\nLocation:\n26-07-57.216N/081-48-24.264W\n26-07-50.016N/081-48-22.788W\n26-07-48.468N/081-48-37.620W\n26-07-56.244N/081-48-38.484W\n26-07-57.216N/081-48-24.264W\n\nShoreline Foundation, Inc. will be conducting demolition and reconstruction of the City of Naples Fishing Pier.\n\nOperations are expected to begin on or about March 1, 2026, with an estimated completion date of September 1, 2027. Hours of operation will be Monday – Saturday 7 a.m. to 6 p.m. No work will be occurring at night or on Sundays, but barges may still be moored at site during non-work periods. They request a 300 foot no-entry zone around the pier construction site.\nMultiple barges, tugs, and constructed trestle will be used. Barges have running lights as well as secondary white lights for visibility in low-light conditions and be monitoring VHF-FM channel 16. For further information contact: Tim@thanaples.com.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.80674,26.13256],[-81.81069,26.13229],[-81.81045,26.13013],[-81.80633,26.13056],[-81.80674,26.13256]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":39771,"geometry":{"type":"Polygon","coordinates":[[[-66.93199999999996,44.75066000000004],[-67.44815999999997,44.40216000000004],[-67.28682999999995,44.18533000000008],[-67.14465999999999,44.23700000000008],[-67.04532999999998,44.363500000000045],[-67.04282999999998,44.42316000000005],[-67.06482999999997,44.48433000000006],[-67.04599999999994,44.511330000000044],[-67.05215999999996,44.55950000000007],[-67.01332999999994,44.61683000000005],[-66.96315999999996,44.65600000000006],[-66.93832999999995,44.74466000000007],[-66.93199999999996,44.75066000000004]]]},"properties":{"ESRI_OID":39771,"MSI_UID":39771,"ATU":1,"TITLE":"Sector Northern New England, Submerged Lands Act (SLA)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116381693,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact","WATERWAY_NAME":"Sector Northern New England, Submerged Lands Act (SLA)","CREATE_DATE":1774357720000,"MODIFIED_DATE":1774360217000,"BEGIN_DATE":1774310400000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-04-01 To: 2026-12-31\n\nSAILDRONE INC. intends to conduct operations with up to ten Uncrewed Surface Vehicles (USVs), contracted by the United States Coast Guard District Northeast from 01 April through 31 December 2026. The SAILDRONE VOYAGER is 33 feet in length, 19 feet tall, gray in color with an orange wing, and has a tricolor light on the top wing and is marked “SAILDRONE.”  These vehicles will be operating in waters predominantly offshore of Maine in the New England Grey Zone area, down to 300NM off the coast of Connecticut and New York. Mariners are requested to maintain 500m CPA from the vehicle. The plan for Saildrone USVs is to transit from Portland, Maine \n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-66.932,44.75066],[-67.44816,44.40216],[-67.28683,44.18533],[-67.14466,44.237],[-67.04533,44.3635],[-67.04283,44.42316],[-67.06483,44.48433],[-67.046,44.51133],[-67.05216,44.5595],[-67.01333,44.61683],[-66.96316,44.656],[-66.93833,44.74466],[-66.932,44.75066]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":39798,"geometry":{"type":"Polygon","coordinates":[[[-69.03332999999998,43.116660000000024],[-69.43332999999996,42.825000000000045],[-69.29165999999998,42.708330000000046],[-68.97499999999997,42.72500000000008],[-68.84165999999993,42.775000000000034],[-68.76665999999994,42.825000000000045],[-69.03332999999998,43.116660000000024]]]},"properties":{"ESRI_OID":39798,"MSI_UID":39798,"ATU":1,"TITLE":"Sector Boston, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100117260294,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secbosexcecozon","WATERWAY_NAME":"Sector Boston, Exclusive Economic Zone (EEZ)","CREATE_DATE":1774361048000,"MODIFIED_DATE":1774361056000,"BEGIN_DATE":1774310400000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-04-01 To: 2026-12-31\n\nSAILDRONE INC. intends to conduct operations with up to ten Uncrewed Surface Vehicles (USVs), contracted by the United States Coast Guard District Northeast from 01 April through 31 December 2026. The SAILDRONE VOYAGER is 33 feet in length, 19 feet tall, gray in color with an orange wing, and has a tricolor light on the top wing and is marked “SAILDRONE.”  These vehicles will be operating in waters predominantly offshore of Maine in the New England Grey Zone area, down to 300NM off the coast of Connecticut and New York. Mariners are requested to maintain 500m CPA from the vehicle. The plan for Saildrone USVs is to transit from Portland, Maine ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-69.03333,43.11666],[-69.43333,42.825],[-69.29166,42.70833],[-68.975,42.725],[-68.84166,42.775],[-68.76666,42.825],[-69.03333,43.11666]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":39800,"geometry":{"type":"Polygon","coordinates":[[[-70.24999999999994,43.25000000000006],[-70.24999999999994,42.25000000000006],[-69.99999999999994,42.25000000000006],[-69.99999999999994,43.25000000000006],[-70.24999999999994,43.25000000000006]]]},"properties":{"ESRI_OID":39800,"MSI_UID":39800,"ATU":1,"TITLE":"General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100117260294,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secbosexcecozon","WATERWAY_NAME":"Sector Boston, Exclusive Economic Zone (EEZ)","CREATE_DATE":1774361615000,"MODIFIED_DATE":1774361622000,"BEGIN_DATE":1774310400000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-04-01 To: 2026-12-31\n\nSAILDRONE INC. intends to conduct operations with up to ten Uncrewed Surface Vehicles (USVs), contracted by the United States Coast Guard District Northeast from 01 April through 31 December 2026. The SAILDRONE VOYAGER is 33 feet in length, 19 feet tall, gray in color with an orange wing, and has a tricolor light on the top wing and is marked “SAILDRONE.”  These vehicles will be operating in waters predominantly offshore of Maine in the New England Grey Zone area, down to 300NM off the coast of Connecticut and New York. Mariners are requested to maintain 500m CPA from the vehicle. The plan for Saildrone USVs is to transit from Portland, Maine ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-70.25,43.25],[-70.25,42.25],[-70,42.25],[-70,43.25],[-70.25,43.25]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":39803,"geometry":{"type":"Polygon","coordinates":[[[-67.33332999999993,42.36660000000006],[-67.33332999999993,40.00000000000006],[-65.87682999999998,40.00000000000006],[-67.33332999999993,42.36660000000006]]]},"properties":{"ESRI_OID":39803,"MSI_UID":39803,"ATU":1,"TITLE":"General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382374,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secsounewengexcecozon","WATERWAY_NAME":"Sector Southeastern New England, Exclusive Economic Zone (EEZ)","CREATE_DATE":1774362043000,"MODIFIED_DATE":1774362050000,"BEGIN_DATE":1774310400000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-04-01 To: 2026-12-31\n\nSAILDRONE INC. intends to conduct operations with up to ten Uncrewed Surface Vehicles (USVs), contracted by the United States Coast Guard District Northeast from 01 April through 31 December 2026. The SAILDRONE VOYAGER is 33 feet in length, 19 feet tall, gray in color with an orange wing, and has a tricolor light on the top wing and is marked “SAILDRONE.”  These vehicles will be operating in waters predominantly offshore of Maine in the New England Grey Zone area, down to 300NM off the coast of Connecticut and New York. Mariners are requested to maintain 500m CPA from the vehicle. The plan for Saildrone USVs is to transit from Portland, Maine \n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-67.33333,42.3666],[-67.33333,40],[-65.87683,40],[-67.33333,42.3666]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":40068,"geometry":{"type":"Polygon","coordinates":[[[-123.96271999999999,45.567480000000046],[-123.96277999999995,45.566970000000026],[-123.95224999999999,45.56580000000008],[-123.95209999999997,45.56619000000006],[-123.96271999999999,45.567480000000046]]]},"properties":{"ESRI_OID":40068,"MSI_UID":40068,"ATU":13,"TITLE":"Sector Columbia River, Submerged Land Act (SLA) - Tillamook Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385764,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:tilbay","WATERWAY_NAME":"Tillamook Bay","CREATE_DATE":1774557798000,"MODIFIED_DATE":1774557807000,"BEGIN_DATE":1774483200000,"END_DATE":1793750399000,"DESCRIPTION":"Trade West Construction is moving jetty material to a material offloading facility for use on the Tillamook Bay South Jetty repairs. Jetty stone will be transported from the Port of Garibaldi, approximate location 45-33-14 N, 123-54-54 W, to a Material Offload Facility on Kincheloe Point on the Bay Ocean Peninsula in approximate location 45-33-07 N, 123-56-09 W.  The tugboat and support vessel involved in this operation will monitor VHF-FM channels 8 and 10. Mariners are asked to maintain at least 100 feet from all tug and barge operations. Please keep crab pots clear of the navigational channel leading into Crab Harbor. Pots obstructing barge movement will be respectfully relocated. Additionally, stone material will be transported and placed on the jetty. Mariners are strongly advised to keep a safe distance from the repair work on the jetty. This project is expected to continue into the Fall of 2026. For more information, contact Keyanee Faught at (435) 669-7976 or email keyaneef@gmail.com.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-123.96272,45.56748],[-123.96278,45.56697],[-123.95225,45.5658],[-123.9521,45.56619],[-123.96272,45.56748]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":40213,"geometry":{"type":"Polygon","coordinates":[[[-81.64454999999998,38.35513000000003],[-81.64487999999994,38.35489000000007],[-81.64534999999995,38.354640000000074],[-81.64483999999999,38.35427000000004],[-81.64410999999996,38.35486000000003],[-81.64454999999998,38.35513000000003]]]},"properties":{"ESRI_OID":40213,"MSI_UID":40213,"ATU":2,"TITLE":"Ohio River - Kanawha River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381292,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv:kanriv","WATERWAY_NAME":"Kanawha River","CREATE_DATE":1774878935000,"MODIFIED_DATE":1774879062000,"BEGIN_DATE":1774828800000,"END_DATE":1790467199000,"DESCRIPTION":"Continuing until approximately April 24, 2026, Amherst Madison is conducting sewer main sub-crossing replacement operations in the vicinity of Mile 0.05.  Work will be conducted from 6:30 a.m. until 4:30 p.m., Monday through Friday.  The contractors floating plant will consist of the M/Vs TOM COOK and LUCEDALE, a barge mounted crane, excavator barge and jumbo deck barge.  The M/Vs TOM COOK and LUCEDALE will monitor VHF-FM Channel 13 or 16.  During non-working hours, the contractors floating plant will be moored at the worksite and lighted accordingly.  Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.64455,38.35513],[-81.64488,38.35489],[-81.64535,38.35464],[-81.64484,38.35427],[-81.64411,38.35486],[-81.64455,38.35513]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":40306,"geometry":{"type":"Polygon","coordinates":[[[-78.54324999999994,33.84417000000008],[-78.56332999999995,33.839440000000025],[-78.54499999999996,33.81917000000004],[-78.52724999999998,33.82298000000003],[-78.54324999999994,33.84417000000008]]]},"properties":{"ESRI_OID":40306,"MSI_UID":40306,"ATU":7,"TITLE":"Sector Charleston, Territorial Sea - Sector Charleston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384376,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact","WATERWAY_NAME":"Sector Charleston, Submerged Land Act (SLA)","CREATE_DATE":1774973240000,"MODIFIED_DATE":1774974396000,"BEGIN_DATE":1774915200000,"END_DATE":1790553599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-03-31 \n40306\n\nLocation:\n33-50-21.984N/078-33-47.988W\n33-50-16.008N/078-33-36.000W\n33-49-03.000N/078-32-30.012W\n33-49-09.012N/078-32-42.000W\n33-50-21.984N/078-33-47.988W\n\nDredgit Corp. will be conducting maintenance dredging in the Little River Inlet. Operations are expected to begin on or about April 3, 2026, with an estimated completion date of June 18, 2026. Dredge M/V LADY DIANA and Tug PATRICIA will be monitoring VHF-FM channels 13, 16 and 22. Dredge requests mariners contact them on VHF-FM channel 22 for passage coordination\n\nTow Configuration:\nTowing approximately 4,500 LF of discharge pipeline and one 40' x 40' work barge.\nPipeline Type:\nHydraulic discharge pipeline (floating/submerged as required) approximately 4,500 LF deployed\nAIS Status:\nAIS transponders active on all floating plant at all times per contract requirements.\nMaterial Placement Area:\nUpcoast Sand Dike and Beach Berm, Bird Island / Waites Island area. Pipeline Corridor Floating/submerged pipeline routed from borrow area to beach fill placement area; submerged to project depth where crossing navigation channel; marked per 33 CFR 88.15 Jetty Reference Points North jetty: 3,284 ft seaward from Bird Island, NC; South jetty: 3,830 ft seaward from Waites Island, SC. \nBuoy Marking: All marker buoys painted yellow with yellow flashing lights; pipeline, booster pumps, and equipment.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-78.54325,33.84417],[-78.56333,33.83944],[-78.545,33.81917],[-78.52725,33.82298],[-78.54325,33.84417]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":40473,"geometry":{"type":"Polygon","coordinates":[[[-122.41291999999999,37.81053000000003],[-122.41445999999996,37.80986000000007],[-122.41305999999997,37.80934000000008],[-122.41303999999997,37.809270000000026],[-122.41292999999996,37.809240000000045],[-122.41217999999998,37.80967000000004],[-122.41291999999999,37.81053000000003]]]},"properties":{"ESRI_OID":40473,"MSI_UID":40473,"ATU":11,"TITLE":"Golden Gate Bridge - San Francisco Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385418,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay","WATERWAY_NAME":"San Francisco Bay","CREATE_DATE":1775149340000,"MODIFIED_DATE":1784818739000,"BEGIN_DATE":1778457600000,"END_DATE":1796169599000,"DESCRIPTION":"The Sevenson Environmental Services and PGE will be conducting environmental dredging and installing steel piles from 19 May, 2026 - 30 November, 2026. Operation times will be five to six days per week, with hours of operations 5am to 7pm(local). \n\nThis operation will include the use the following vessels and equipment: 40x80 PC650-01, 40x80 PC650-02, Crane Barge MICHEAL LIND, Staging barge STELLA LIND, Tug CASSIE LIND, Tug ARCHIE LIND, SEVENSON 01 and 02 work boats.\n\nThe project location is centered at approximately at the San Francisco Pier 41 to Pier 43, in position: 37°48'35.20\"N; 122°24'46.41\"W. All vessels and equipment on site will monitor VHF-FM Channels 13, 14 and operating on 11.\n\nSevenson will utilize two 40x80 barges with PC650 excavators on them to perform environmental dredging and capping via clam shell bucket and conventional buckets. Sevenson has hired Lind marine to subcontract out work including the transloading operations via E-Crane “Greta Jean Lind”. The Michael Lind (Crane Barge) will be in the area for support, along with another spud barge “Stella Lind” for staging room. Steel pipe pile will be installed roughly up to 400 ft offshore to hold the turbidity curtain. During the project, we will also install 504 wooden piles for slope stability. The PC650 will load into 6x – 100CY (30’ x 40’) scows and pushed to the edge of the curtain. From there the E-Crane will take the material and transload into large Jumbo Hoppers. Lind Marine will use the Cassie Lind (1200 HP tug) to push the scows up to Birds Landing, CA to an offload facility. At the offload facility there will be an E-Crane to offload the material from the scows onto land. Lind Marine will use the Cassie Lind (1200 HP tug) to push the scows up to Birds Landing, CA to an offload facility. At the offload facility there will be an E-Crane to offload the material from the scows onto land. Lind Marine will also use the Cassie Lind to push scows to Redwood City, CA to an offload facility. \n\nAll mariners are advised to use caution when transiting the area. For further comments or details, please contact SEVENSON ENVIROMENTAL project manager at (716) 807-1937. Alternate contacts: Jake Wood (607) 794-1654 and Terry Templeton (716) 476-6790.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.41292,37.81053],[-122.41446,37.80986],[-122.41306,37.80934],[-122.41304,37.80927],[-122.41293,37.80924],[-122.41218,37.80967],[-122.41292,37.81053]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":40749,"geometry":{"type":"Polygon","coordinates":[[[-78.91649999999998,32.63980000000004],[-79.65249999999997,32.508800000000065],[-80.25159999999994,32.12500000000006],[-79.98249999999996,31.788500000000056],[-78.91649999999998,32.63980000000004]]]},"properties":{"ESRI_OID":40749,"MSI_UID":40749,"ATU":7,"TITLE":"District 7, Oceanic boundary to EEZ - Sector Charleston, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116384309,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon","WATERWAY_NAME":"Sector Charleston, Exclusive Economic Zone (EEZ)","CREATE_DATE":1775569435000,"MODIFIED_DATE":1775569521000,"BEGIN_DATE":1775520000000,"END_DATE":1791158399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-04-07\n40749\n\nLocation:\n32-38-23.280N/078-54-59.400W\n31-47-18.600N/079-58-57.000W\n32-07-30.000N/080-15-05.760W\n32-30-31.680N/079-39-09.000W\n32-38-23.280N/078-54-59.400W\n\nNOAA Ship Ferdinand R. Hassler (S250) will be conducting hydrographic survey operations in the approaches to Charleston Harbor from April 1, 2026, to August 31, 2026. Ferdinand R. Hassler is a 124‐foot, white, twin‐hulled survey vessel; the ship can be identified on AIS, and will be monitoring VHF channels 13 and 16. Survey operations will be conducted 24‐hrs a day from the ship. Mariners are requested to exercise caution when transiting the operational area. When towed hydrographic instrumentation is deployed, Ferdinand R. Hassler will be restricted in her ability to maneuver. Questions or concerns can be addressed to the ship’s Operations Officer via phone at: (757) 655-1807 or via email at: ops.ferdinand.hassler@noaa.gov.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-78.9165,32.6398],[-79.6525,32.5088],[-80.2516,32.125],[-79.9825,31.7885],[-78.9165,32.6398]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":40757,"geometry":{"type":"Polygon","coordinates":[[[-80.61093999999997,28.154040000000066],[-80.63344999999998,28.145930000000078],[-80.57961999999998,28.034160000000043],[-80.55407999999994,28.04555000000005],[-80.59115999999995,28.119470000000035],[-80.61093999999997,28.154040000000066]]]},"properties":{"ESRI_OID":40757,"MSI_UID":40757,"ATU":7,"TITLE":"Banana River - Indian River North Section/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384162,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:canhar:canbarcan:banriv:indrivnorsec","WATERWAY_NAME":"Indian River North Section","CREATE_DATE":1775575721000,"MODIFIED_DATE":1781374231000,"BEGIN_DATE":1775520000000,"END_DATE":1814399999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-04-07 \n40757\n\nLocation:\n28-09-14.544N/080-36-39.384W\n28-07-10.092N/080-35-28.176W\n28-02-43.980N/080-33-14.688W\n28-02-02.976N/080-34-46.632W\n28-08-45.348N/080-38-00.420W\n28-09-14.544N/080-36-39.384W\n\nGator Dredging will begin dredging of the Indian River on or about April 7, 2026, with an estimated completion dats of April 1, 2027. Dredge vessel MACKENZIE LYNNE will be working 7 days per week during daylight hours. Mariners are urged to use extreme caution in the area, transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made. floating and submerged high density polyethylene (hdpe) and steel pipeline associated with the hydraulic dredging operations of the river will be utilized. Pipeline, work vessels, dredge barge, booster pump barge(s) and buoys will be visibly lighted and marked according to Coast Guard regulations and will be in the area until all work is complete and can change configuration daily. Vessels and/or Equipment will be in multiple locations at the same time. Dredge vessel MACKENZIE LYNNE  will be monitoring VHF-FM channel 16.\n\nFor Further information contact: CHARLIE GERTZ (727) 902-6055,\nHORACE HUGGINS (850) 447-4757, or\nCHRIS COUGHLIN (727) 742-4704","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.61094,28.15404],[-80.63345,28.14593],[-80.57962,28.03416],[-80.55408,28.04555],[-80.59116,28.11947],[-80.61094,28.15404]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":40900,"geometry":{"type":"Polygon","coordinates":[[[-149.89419999999998,61.25719000000004],[-149.89593999999997,61.25150000000008],[-149.88971999999998,61.25397000000004],[-149.89419999999998,61.25719000000004]]]},"properties":{"ESRI_OID":40900,"MSI_UID":40900,"ATU":17,"TITLE":"Sector Anchorage, Territorial Sea - Sector Anchorage, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385232,"MRN":"urn:mrn:iala:wwy:us:navXII:dis17:secancexcecozon:secanctersea:secancsublanact","WATERWAY_NAME":"Sector Anchorage, Submerged Land Act (SLA)","CREATE_DATE":1775763700000,"MODIFIED_DATE":1775764797000,"BEGIN_DATE":1775692800000,"END_DATE":1793491199000,"DESCRIPTION":"ALASKA – SOUTHCENTRAL – COOK INLET – PORT OF ALASKA – MARINE CONSTRUCTION\nDredging, demolition, pile driving, wharf construction, and other miscellaneous marine construction will be conducted at the Port of Alaska from 01 April through 31 October 2026. Three temporary mooring buoys with flashing white lights will be established northwest of Terminal 3 in positions:\n\n61-15-05.4N 149-53-45.4W\n61-15-14.3N 149-53-23.0W\n61-15-25.9N 149-53-39.2W\n\nDuring operations, VHF-FM channel 8 will be monitored. Derrick barges will have anchors deployed and submerged anchor cables will be marked by crown buoys over each submerged anchor. Mariners are advised to maintain a minimum closest point of approach of 1,000 feet, transit at slow speed, and exercise caution when transiting this area. For additional information, mariners can contact the U.S. Coast Guard on VHF-FM channel 16, by phone to Sector Western Alaska and U.S. Arctic Command Center at 907-428-4100, or by email at SECTORWESTERNAK@USCG.MIL\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-149.8942,61.25719],[-149.89594,61.2515],[-149.88972,61.25397],[-149.8942,61.25719]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":41058,"geometry":{"type":"Polygon","coordinates":[[[-82.51683999999995,27.778680000000065],[-82.52651999999995,27.778500000000065],[-82.58543999999995,27.691160000000025],[-82.63096999999993,27.641740000000027],[-82.67511999999994,27.61737000000005],[-82.66329999999994,27.602160000000026],[-82.61440999999996,27.625830000000065],[-82.55260999999996,27.683790000000045],[-82.51868999999994,27.745790000000056],[-82.51683999999995,27.778680000000065]]]},"properties":{"ESRI_OID":41058,"MSI_UID":41058,"ATU":7,"TITLE":"Paradise Bay Estates Channel - Tampa Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383309,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipetsublanact:soucha:parbayestcha:tambay","WATERWAY_NAME":"Tampa Bay","CREATE_DATE":1776166156000,"MODIFIED_DATE":1776166208000,"BEGIN_DATE":1776124800000,"END_DATE":1791763199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-04-14 \n41058\n\nLocation:\n27-46-43.248N/082-31-00.624W\n27-44-44.844N/082-31-07.284W\n27-41-01.644N/082-33-09.396W\n27-37-32.988N/082-36-51.876W\n27-36-07.776N/082-39-47.880W\n27-37-02.532N/082-40-30.432W\n27-38-30.264N/082-37-51.492W\n27-41-28.176N/082-35-07.584W\n27-46-42.600N/082-31-35.472W\n27-46-43.248N/082-31-00.624W\n\nOn or about March 31, 2026, Cashman Dredging and Marine Contracting Company, LLC will be moving dredging operations from the northern channels of Hillsborough Bay in Tampa Bay to the Tampa Bay Channel Cuts A through E. Dredging operations will be conducted within the Federal Navigation Channel encompassing Tampa Bay Cuts A through E. The project will involve the Trailing Suction Hopper Dredge “Mighty Quinn” removing shoaled material from the Federal Channel and will then transit to our mooring barge to pump the material onto DMPF-2D Island. The mooring barge will be positioned on the north side of DMPF-2D Island, about 3,200 feet east of the Federal Channel. The dredge will be supported by the survey vessel “Survey 7”, tug “John Joseph”, tug “Michael Daigle” and “Dana 55” bedleveling barge. All vessels will monitor VHF channels 16,13,12, and use 74 as the working channel.\nMariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. The dredge will operate 7 days a week, 24 hours a day. The work is scheduled to be completed on or about May 17, 2026.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.51684,27.77868],[-82.52652,27.7785],[-82.58544,27.69116],[-82.63097,27.64174],[-82.67512,27.61737],[-82.6633,27.60216],[-82.61441,27.62583],[-82.55261,27.68379],[-82.51869,27.74579],[-82.51684,27.77868]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":41087,"geometry":{"type":"Polygon","coordinates":[[[-94.97946999999994,29.684620000000052],[-94.98340999999994,29.68363000000005],[-94.96017999999998,29.618850000000066],[-94.98184999999995,29.618820000000028],[-94.98143999999996,29.60836000000006],[-94.95566999999994,29.60692000000006],[-94.86767999999995,29.491400000000056],[-94.86342999999994,29.493580000000065],[-94.95062999999999,29.609140000000025],[-94.97946999999994,29.684620000000052]]]},"properties":{"ESRI_OID":41087,"MSI_UID":41087,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1776177348000,"MODIFIED_DATE":1787687880000,"BEGIN_DATE":1776124800000,"END_DATE":1790467199000,"DESCRIPTION":"Houston Ship Channel - Bayport Ship Channel - Dredge Operation --- From: 2026-05-01 To: 2026-09-25 --- The Dredge MAGDALEN, Dredge R.B. WEEKS, and M/V BREAK OF DAWN are working in the Houston Ship Channel and Bayport Flare, between Houston Ship Channel Light 50 (LLNR-24125) and Houston Ship Channel Light 92 (LLNR-24600).  Operations will be conducted 24-hours a day, 7-days a week.  Dredged material will be deposited in the ocean dredged material disposal site (ODMDS) charted west of the Galveston Entrance Channel.  Vessels are requested to avoid meeting or overtaking near the operating dredges.  Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made.  VHF-FM Channels: 13 and 16, POC: (985) 237-9667 or (985) 705-1477","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.97947,29.68462],[-94.98341,29.68363],[-94.96018,29.61885],[-94.98185,29.61882],[-94.98144,29.60836],[-94.95567,29.60692],[-94.86768,29.4914],[-94.86343,29.49358],[-94.95063,29.60914],[-94.97947,29.68462]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":41133,"geometry":{"type":"Polygon","coordinates":[[[-121.48219999999998,37.88597000000004],[-121.54279999999994,37.81057000000004],[-121.44829999999996,37.820170000000076],[-121.48219999999998,37.88597000000004]]]},"properties":{"ESRI_OID":41133,"MSI_UID":41133,"ATU":11,"TITLE":"Sector San Francisco, Territorial Sea - Sector San Francisco, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385565,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact","WATERWAY_NAME":"Sector San Francisco, Submerged Land Act (SLA)","CREATE_DATE":1776195920000,"MODIFIED_DATE":1776283661000,"BEGIN_DATE":1776384000000,"END_DATE":1796169599000,"DESCRIPTION":"Rock barrier construction will be conducted in the channels of Middle River, Old River, and Grant Line Canal, San Joaquin County. The scope of operations includes excavators from the levee dropping rock in the channels to build barriers across to the opposite levee. No barges will be used for the installation of the barriers.\n\nOperations are scheduled as follows:\n\nConstruction: May 1, 2026, through the first week of June 2026\nBarrier in place: First week of June 2026 through end of October 2026\nRemoval: November 1, 2026, through November 30, 2026\nThe channels will be blocked until approximately November 30, 2026. DWR will provide boat portage at Old River and Grant Line Canal, but not at Middle River, which is not navigable due to shallow depth.\n\nLocations of operation:\n\nMiddle River near Victoria Canal: 37.8857° N, -121.4822° W\nOld River near Tracy: 37.8103° N, -121.5428° W\nGrant Line Canal near Tracy Boulevard Bridge: 37.8199° N, -121.4483° W\nNo vessels are involved in the operation. This activity is referenced on Chart US4CA46M.\n\nFor additional information, please contact the Area Control Center at (209) 833-2180 (24-hour phone).\n\nAll mariners are advised to transit the area with caution and observe all navigation restrictions and portage instructions.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-121.4822,37.88597],[-121.5428,37.81057],[-121.4483,37.82017],[-121.4822,37.88597]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":41386,"geometry":{"type":"Polygon","coordinates":[[[-82.18300999999997,26.62688000000003],[-86.47124999999994,22.129450000000077],[-85.71538999999996,21.754440000000045],[-81.63725999999997,25.88596000000007],[-82.18300999999997,26.62688000000003]]]},"properties":{"ESRI_OID":41386,"MSI_UID":41386,"ATU":7,"TITLE":"District 7, Oceanic boundary to EEZ - Sector Key West, Exclusive Economic Zone (EEZ) /General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384410,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:seckeywesexcecozon","WATERWAY_NAME":"Sector Key West, Exclusive Economic Zone (EEZ) ","CREATE_DATE":1776354535000,"MODIFIED_DATE":1776354720000,"BEGIN_DATE":1776297600000,"END_DATE":1807919999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-04-16\n41386\n\nThe vessel ILE DE SEIN (ISN) (9247039) is looking to come to Tampa area April 26, 2026, conduct a crew swap, and begin trenching and burying fiber optic cable for for Telcosub. More information will be provided as soon as it's available. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.18301,26.62688],[-86.47125,22.12945],[-85.71539,21.75444],[-81.63726,25.88596],[-82.18301,26.62688]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":41393,"geometry":{"type":"Polygon","coordinates":[[[-82.79397999999998,28.01377000000008],[-82.79424999999998,28.012800000000027],[-82.79315999999994,28.012590000000046],[-82.79294999999996,28.01359000000008],[-82.79397999999998,28.01377000000008]]]},"properties":{"ESRI_OID":41393,"MSI_UID":41393,"ATU":7,"TITLE":"Clearwater Harbor - St Joseph Sound/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383332,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipetsublanact:clepascha:clehar:stjossou","WATERWAY_NAME":"St Joseph Sound","CREATE_DATE":1776356167000,"MODIFIED_DATE":1776356552000,"BEGIN_DATE":1776297600000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-04-16 \n41393\n\nOn-Point Contracting Company will be conducting pier demo and rebuild back new in approximate position 28-00-46.5N / 82-47-37.9W for the Dunedin Marina Fishing Pier. Operations will be conducting Monday – Friday 7:30 a.m. to 5:30 p.m. starting during June 2026, with an estimated completion date of November 2026.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.79398,28.01377],[-82.79425,28.0128],[-82.79316,28.01259],[-82.79295,28.01359],[-82.79398,28.01377]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":41553,"geometry":{"type":"Polygon","coordinates":[[[-75.44948999999997,37.890750000000025],[-75.45321999999999,37.89024000000006],[-75.44735999999995,37.87662000000006],[-75.44510999999994,37.87738000000007],[-75.44948999999997,37.890750000000025]]]},"properties":{"ESRI_OID":41553,"MSI_UID":41553,"ATU":5,"TITLE":"Sector Virginia, Submerged Land Act (SLA) - Chincoteague Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383172,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:chicha","WATERWAY_NAME":"Chincoteague Channel","CREATE_DATE":1776699066000,"MODIFIED_DATE":1776699989000,"BEGIN_DATE":1777852800000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-05-04 To: 2026-10-31\n\nSalmons Incorporated will conduct dredging using excavator and material barge, with pushed boat Gail Waring. Project will run from May 4, 2026 to Oct 31, 2026.\n\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.44949,37.89075],[-75.45322,37.89024],[-75.44736,37.87662],[-75.44511,37.87738],[-75.44949,37.89075]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":41863,"geometry":{"type":"Polygon","coordinates":[[[-80.90677999999997,32.095380000000034],[-80.91538999999995,32.08432000000005],[-80.91944999999998,32.084960000000024],[-80.92270999999994,32.089270000000056],[-80.92586999999997,32.08680000000004],[-80.92033999999995,32.08060000000006],[-80.91284999999993,32.08089000000007],[-80.90275999999994,32.09308000000004],[-80.90677999999997,32.095380000000034]]]},"properties":{"ESRI_OID":41863,"MSI_UID":41863,"ATU":7,"TITLE":"Fields Cut - Walls Cut/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384287,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:tybknocutran:lonislcro:lowflaran:fiecut:walcut","WATERWAY_NAME":"Walls Cut","CREATE_DATE":1776868462000,"MODIFIED_DATE":1776868650000,"BEGIN_DATE":1776816000000,"END_DATE":3333052799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-04-22\n41863\n\nCottrell Contracting Corporation of Chesapeake, Virginia advises that the DREDGE NEWMARKET will be conducting dredging operations in \"Walls Cut\" of the Georgia Atlantic Intracoastal Waterway (AIWW). Work will take place between Walls Cut Light 44 (LLNR 35850) and New River Daybeacon 41 (LLNR 35835). Specifically, between coordinates 32.08339N / 080.91960W and 32.27027N / 080.9105W. Pipeline will be submerged and run from the work area to a disposal island on the north side of the Savannah River. The work is estimated to begin on April 27, 2026, and be completed by May 17, 2026. The DREDGE NEWMARKET monitors VHF-FM station 13 and 16. All mariners are requested to contact the dredge prior to passing. For emergencies the dredge can be reached at (757) 635-4513.\n\nAll mariners are requested to stay clear of the dredge, pipelines, barge, derricks and operating wires about the dredge. All operators should be aware that the dredge and pontoon lines are held in place by cables, which are attached to anchors some distance from the dredge and pontoons. Buoys are attached to the anchors so that they may be moved as the dredge moves. Submerged lines should be avoided. Mariners are requested to exercise extreme caution when approaching, passing, and leaving the dredging plant. Mariners are cautioned to strictly comply with the Inland Rules of the Road when approaching, passing and leaving the area of operations, and remain a safe distance away from the dredge, booster, buoys, cables, pipeline, barges, derricks, wires and related equipment.\n\nOwners and lessees of fishnets, crabpots and other structures that may be in the vicinity and that may hinder the free navigation of attending vessels and equipment must remove these from the area where tugs, tenderboats and other attendant equipment will be navigating. Dredging operations will be conducted 24/7, all fishnets, crabpots and structures in the general area must be removed prior to commencement of any work, a slow NO WAKE speed is requested of transiting vessels. All vessels are requested to contact the dredge prior to passing.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.90678,32.09538],[-80.91539,32.08432],[-80.91945,32.08496],[-80.92271,32.08927],[-80.92587,32.0868],[-80.92034,32.0806],[-80.91285,32.08089],[-80.90276,32.09308],[-80.90678,32.09538]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":41867,"geometry":{"type":"Polygon","coordinates":[[[-81.14373999999998,32.14241000000004],[-81.14292999999998,32.135740000000055],[-81.13778999999994,32.135820000000024],[-81.13952999999998,32.13659000000007],[-81.14058999999997,32.13897000000003],[-81.14054999999996,32.140480000000025],[-81.14013999999997,32.14183000000003],[-81.13958999999994,32.14225000000005],[-81.14373999999998,32.14241000000004]]]},"properties":{"ESRI_OID":41867,"MSI_UID":41867,"ATU":7,"TITLE":"Oglethorpe Range - Kings Island Turning Basin/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383704,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:tybknocutran:lonislcro:lowflaran:elbislbas:thebigcha:forjac:oglran:kinislturbas","WATERWAY_NAME":"Kings Island Turning Basin","CREATE_DATE":1776870704000,"MODIFIED_DATE":1782917043000,"BEGIN_DATE":1776816000000,"END_DATE":1792454399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-04-22 \n41867\n\nMarinex Construction, Inc. has shifted the DREDGE HAMPTON ROADS to the Savannah River near Sharks Tooth Beach. Their current orders of work will have them dredging the channel, along side Sharks Tooth Beach from, 32.13622301685029N, -81.14110522861196W to 32.142416N, -81.142037W. Their estimated completion date for that section is TBD. Operations will continue 24/7. The dredge will monitor VHF-FM channels 13 and 16. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.14374,32.14241],[-81.14293,32.13574],[-81.13779,32.13582],[-81.13953,32.13659],[-81.14059,32.13897],[-81.14055,32.14048],[-81.14014,32.14183],[-81.13959,32.14225],[-81.14374,32.14241]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":42163,"geometry":{"type":"Polygon","coordinates":[[[-76.29151999999993,36.82178000000005],[-76.29206999999997,36.82172000000003],[-76.29215999999997,36.820550000000026],[-76.29159999999996,36.820580000000064],[-76.29151999999993,36.82178000000005]]]},"properties":{"ESRI_OID":42163,"MSI_UID":42163,"ATU":5,"TITLE":"Elizabeth River - Elizabeth River Southern Branch/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382754,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:jamriv:eliriv:elirivsoubra","WATERWAY_NAME":"Elizabeth River Southern Branch","CREATE_DATE":1777300789000,"MODIFIED_DATE":1777300820000,"BEGIN_DATE":1777248000000,"END_DATE":1799193599000,"DESCRIPTION":"Mariners are advised of marine construction at the Norfolk Naval Shipyard that will commence on May 4th and is expected to last 8 months.  The construction is to build a temporary Cofferdam.  A crane, 2 barges, and a workboat will be on scene.  Mariners should use caution when transiting the area.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-76.29152,36.82178],[-76.29207,36.82172],[-76.29216,36.82055],[-76.2916,36.82058],[-76.29152,36.82178]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":42333,"geometry":{"type":"Polygon","coordinates":[[[-82.46334999999993,27.114550000000065],[-82.46576999999996,27.11426000000006],[-82.46552999999994,27.11352000000005],[-82.46679999999998,27.11361000000005],[-82.46974999999998,27.112900000000025],[-82.50660999999997,27.11268000000007],[-82.51065999999997,27.053710000000024],[-82.52292999999997,26.911100000000033],[-82.49482999999998,26.897340000000042],[-82.48719999999997,26.907680000000028],[-82.48263999999995,27.03331000000003],[-82.47738999999996,27.05224000000004],[-82.44502999999997,27.053890000000024],[-82.46273999999994,27.104660000000024],[-82.46640999999994,27.11152000000004],[-82.46976999999998,27.11217000000005],[-82.46766999999994,27.112670000000037],[-82.46302999999995,27.11208000000005],[-82.46334999999993,27.114550000000065]]]},"properties":{"ESRI_OID":42333,"MSI_UID":42333,"ATU":7,"TITLE":"Venice Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383572,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipetsublanact:veninl","WATERWAY_NAME":"Venice Inlet","CREATE_DATE":1777394235000,"MODIFIED_DATE":1787677640000,"BEGIN_DATE":1777334400000,"END_DATE":1792972799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-04-28 \n42338 42333 42340\n\nDemobilization will occur until approximately September 15, 2026.The borrow area will be bound by following approximate positions:\n26-54-37.54N / 82-31-11.89W\n26-55-16.24N / 82-30-43.71W\n26-54-24.58N / 82-29-04.95W\n26-53-47.36N / 82-29-32.43W\nA subline is installed in a designed pipeline corridor bound by the following approximate positions:\n27-06-41.27N / 82-27-55.36W\n27-03-10.98N / 82-26-33.13W\n27-03-27.09N / 82-30-19.42W\n27-06-22.65N / 82-30-08.46W\nThe submerged line(s) will be removed at the completion of dredging operations.\n\nA sail route limits for Tugboats, Scows and Vessels will be bound by the following approximate\npositions:\n26-54-59.52N, 82-30-39.25W\n27-01-51.97N, 82-29-46.91W\n27-05-24.28N, 82-29-19.68W\n27-05-27.41N, 82-28-15.67W\n27-02-08.91N, 82-28-49.71W\n26-54-19.06N, 82-29-19.16W\n\nOffshore staging areas for pipeline and equipment:\nAn anchorage area located just South of Fort De Soto Park will be bound by the following\napproximate positions:\n\n27-36-53.22N, 82-43-06.99W\n27-37-59.50N, 82-41-37.52W\n27-37-24.82N, 82-41-04.47W\n27-36-14.44N, 82-42-31.02W\n\nAn anchorage area at Venice Inlet will be bound by the following approximate positions:\n27-06-44.65N, 82-28-10.99W\n27-06-46.43N, 82-28-03.46W\n27-06-45.68N, 82-27-55.37W\n27-06-44.17N, 82-27-55.56W\n27-06-43.58N, 82-28-10.60W\nAnd\n27-06-52.10N, 82-27-53.81W\n27-06-48.28N, 82-27-52.29W\n27-06-47.47N, 82-27-56.59W\n27-06-51.35N, 82-27-57.16W\n\nAn anchorage area just East of Gasparilla Island will be bound by the following approximate\npositions:\n26-43-32.53N, 82-15-02.92W\n26-43-12.39N, 82-15-03.85W\n26-42-55.44N, 82-15-24.55W\n26-43-03.24N, 82-15-30.39W\n26-43-14.69N, 82-15-15.85W\n26-43-32.22N, 82-15-16.06W\n\nThe staging areas will be utilized for the duration of the project.\n\nOnce underway, operations will conducted 24/7. Vessels, pipelines, and equipment will have all required Coast Guard lighting for night operations. On-scene vessels will monitor marine VHF-FM channels 13, 16 and 72. Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.46335,27.11455],[-82.46577,27.11426],[-82.46553,27.11352],[-82.4668,27.11361],[-82.46975,27.1129],[-82.50661,27.11268],[-82.51066,27.05371],[-82.52293,26.9111],[-82.49483,26.89734],[-82.4872,26.90768],[-82.48264,27.03331],[-82.47739,27.05224],[-82.44503,27.05389],[-82.46274,27.10466],[-82.46641,27.11152],[-82.46977,27.11217],[-82.46767,27.11267],[-82.46303,27.11208],[-82.46335,27.11455]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":42338,"geometry":{"type":"Polygon","coordinates":[[[-82.25080999999994,26.725700000000074],[-82.25445999999994,26.72562000000005],[-82.25439999999998,26.720750000000066],[-82.25843999999995,26.717570000000023],[-82.25681999999995,26.715400000000045],[-82.25106999999997,26.720110000000034],[-82.25080999999994,26.725700000000074]]]},"properties":{"ESRI_OID":42338,"MSI_UID":42338,"ATU":7,"TITLE":"Pine Island Sound - Gasparilla Sound Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383756,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipetsublanact:sancarbay:pinislsou:gassoucha","WATERWAY_NAME":"Gasparilla Sound Channel","CREATE_DATE":1777395118000,"MODIFIED_DATE":1787677573000,"BEGIN_DATE":1777334400000,"END_DATE":1792972799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-04-28 \n42338 42333 42340\n\nDemobilization will occur until approximately September 15, 2026. The borrow area will be bound by following approximate positions:\n26-54-37.54N / 82-31-11.89W\n26-55-16.24N / 82-30-43.71W\n26-54-24.58N / 82-29-04.95W\n26-53-47.36N / 82-29-32.43W\nA subline is installed in a designed pipeline corridor bound by the following approximate positions:\n27-06-41.27N / 82-27-55.36W\n27-03-10.98N / 82-26-33.13W\n27-03-27.09N / 82-30-19.42W\n27-06-22.65N / 82-30-08.46W\nThe submerged line(s) will be removed at the completion of dredging operations.\n\nA sail route limits for Tugboats, Scows and Vessels will be bound by the following approximate\npositions:\n26-54-59.52N, 82-30-39.25W\n27-01-51.97N, 82-29-46.91W\n27-05-24.28N, 82-29-19.68W\n27-05-27.41N, 82-28-15.67W\n27-02-08.91N, 82-28-49.71W\n26-54-19.06N, 82-29-19.16W\n\nOffshore staging areas for pipeline and equipment:\nAn anchorage area located just South of Fort De Soto Park will be bound by the following\napproximate positions:\n\n27-36-53.22N, 82-43-06.99W\n27-37-59.50N, 82-41-37.52W\n27-37-24.82N, 82-41-04.47W\n27-36-14.44N, 82-42-31.02W\n\nAn anchorage area at Venice Inlet will be bound by the following approximate positions:\n27-06-44.65N, 82-28-10.99W\n27-06-46.43N, 82-28-03.46W\n27-06-45.68N, 82-27-55.37W\n27-06-44.17N, 82-27-55.56W\n27-06-43.58N, 82-28-10.60W\nAnd\n27-06-52.10N, 82-27-53.81W\n27-06-48.28N, 82-27-52.29W\n27-06-47.47N, 82-27-56.59W\n27-06-51.35N, 82-27-57.16W\n\nAn anchorage area just East of Gasparilla Island will be bound by the following approximate\npositions:\n26-43-32.53N, 82-15-02.92W\n26-43-12.39N, 82-15-03.85W\n26-42-55.44N, 82-15-24.55W\n26-43-03.24N, 82-15-30.39W\n26-43-14.69N, 82-15-15.85W\n26-43-32.22N, 82-15-16.06W\n\nThe staging areas will be utilized for the duration of the project.\n\nOnce underway, operations will conducted 24/7. Vessels, pipelines, and equipment will have all required Coast Guard lighting for night operations. On-scene vessels will monitor marine VHF-FM channels 13, 16 and 72. Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.25081,26.7257],[-82.25446,26.72562],[-82.2544,26.72075],[-82.25844,26.71757],[-82.25682,26.7154],[-82.25107,26.72011],[-82.25081,26.7257]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":42340,"geometry":{"type":"Polygon","coordinates":[[[-82.69375999999994,27.63319000000007],[-82.71860999999996,27.614780000000053],[-82.70861999999994,27.604010000000073],[-82.68456999999995,27.623560000000055],[-82.69375999999994,27.63319000000007]]]},"properties":{"ESRI_OID":42340,"MSI_UID":42340,"ATU":7,"TITLE":"Mullet Key Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383593,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipetsublanact:mulkeycha","WATERWAY_NAME":"Mullet Key Channel","CREATE_DATE":1777395433000,"MODIFIED_DATE":1787677698000,"BEGIN_DATE":1777334400000,"END_DATE":1792972799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-04-28 \n42338 42333 42340\n\nDemobilization will occur until approximately September 15, 2026.\n\nThe borrow area will be bound by following approximate positions:\n26-54-37.54N / 82-31-11.89W\n26-55-16.24N / 82-30-43.71W\n26-54-24.58N / 82-29-04.95W\n26-53-47.36N / 82-29-32.43W\nA subline is installed in a designed pipeline corridor bound by the following approximate positions:\n27-06-41.27N / 82-27-55.36W\n27-03-10.98N / 82-26-33.13W\n27-03-27.09N / 82-30-19.42W\n27-06-22.65N / 82-30-08.46W\nThe submerged line(s) will be removed at the completion of dredging operations.\n\nA sail route limits for Tugboats, Scows and Vessels will be bound by the following approximate\npositions:\n26-54-59.52N, 82-30-39.25W\n27-01-51.97N, 82-29-46.91W\n27-05-24.28N, 82-29-19.68W\n27-05-27.41N, 82-28-15.67W\n27-02-08.91N, 82-28-49.71W\n26-54-19.06N, 82-29-19.16W\n\nOffshore staging areas for pipeline and equipment:\nAn anchorage area located just South of Fort De Soto Park will be bound by the following\napproximate positions:\n\n27-36-53.22N, 82-43-06.99W\n27-37-59.50N, 82-41-37.52W\n27-37-24.82N, 82-41-04.47W\n27-36-14.44N, 82-42-31.02W\n\nAn anchorage area at Venice Inlet will be bound by the following approximate positions:\n27-06-44.65N, 82-28-10.99W\n27-06-46.43N, 82-28-03.46W\n27-06-45.68N, 82-27-55.37W\n27-06-44.17N, 82-27-55.56W\n27-06-43.58N, 82-28-10.60W\nAnd\n27-06-52.10N, 82-27-53.81W\n27-06-48.28N, 82-27-52.29W\n27-06-47.47N, 82-27-56.59W\n27-06-51.35N, 82-27-57.16W\n\nAn anchorage area just East of Gasparilla Island will be bound by the following approximate\npositions:\n26-43-32.53N, 82-15-02.92W\n26-43-12.39N, 82-15-03.85W\n26-42-55.44N, 82-15-24.55W\n26-43-03.24N, 82-15-30.39W\n26-43-14.69N, 82-15-15.85W\n26-43-32.22N, 82-15-16.06W\n\nThe staging areas will be utilized for the duration of the project.\n\nOnce underway, operations will conducted 24/7. Vessels, pipelines, and equipment will have all required Coast Guard lighting for night operations. On-scene vessels will monitor marine VHF-FM channels 13, 16 and 72. Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.69376,27.63319],[-82.71861,27.61478],[-82.70862,27.60401],[-82.68457,27.62356],[-82.69376,27.63319]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":42418,"geometry":{"type":"Polygon","coordinates":[[[-80.09330999999997,25.930490000000077],[-80.05050999999997,25.91814000000005],[-80.01229999999998,25.892790000000048],[-79.97336999999999,25.808280000000025],[-79.95255999999995,25.79463000000004],[-79.88604999999995,25.775840000000073],[-79.84934999999996,25.736330000000066],[-79.81751999999994,25.692680000000053],[-79.78550999999999,25.647070000000042],[-79.70723999999996,25.62098000000003],[-79.78497999999996,25.647510000000068],[-79.84893999999997,25.73631000000006],[-79.88516999999996,25.776220000000023],[-79.95206999999994,25.79514000000006],[-79.97292999999996,25.80827000000005],[-80.01171999999997,25.893260000000055],[-80.04921999999993,25.91868000000005],[-80.09330999999997,25.930490000000077]]]},"properties":{"ESRI_OID":42418,"MSI_UID":42418,"ATU":7,"TITLE":"NAVAREA IV - District 7, Oceanic boundary to EEZ/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116384413,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7","WATERWAY_NAME":"District 7, Oceanic boundary to EEZ","CREATE_DATE":1777411330000,"MODIFIED_DATE":1777411389000,"BEGIN_DATE":1777334400000,"END_DATE":1792972799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-04-28 \n42418\n\nGeographic Limits (WGS 84):\n25-55.8297N / 080-05.5986W\n25-55.0886N / 080-03.0306W\n25-53.5676N / 080-00.7379W\n25-48.4968N / 079-58.4025W\n25-47.6777N / 079-57.1534W\n25-46.5503N / 079-53.1630W\n25-44.2914N / 079-50.8214W\n25-41.5609N / 079-49.0514W\n25-38.8241N / 079-47.1306W\n25-37.2588N / 079-42.4347W\n\nSubmarine cable survey operations will be conducted along the route described above. Activities will be performed by dynamically positioned research vessel OCEAN INVINCIBLE and may include slow speed transits and stationary operations. Operations are expected to begin on or about 29 April 29, 2026, with an expected completion date of May 8, 2026, 24/7, weather permitting.\n\nMariners are advised to exercise caution while transiting the area, maintain a safe distance from the vessel and associated operations, avoid anchoring or fishing adjacent to or along the survey corridor, and monitor VHF-FM channel 16 for safety broadcasts.\n\nFor further information cpntact: Sarah K. Leighton\nMarine Routing Specialist, SubCom\nPhone: +1 617 775 6109\nEmail: sleighton@subcom.com","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.09331,25.93049],[-80.05051,25.91814],[-80.0123,25.89279],[-79.97337,25.80828],[-79.95256,25.79463],[-79.88605,25.77584],[-79.84935,25.73633],[-79.81752,25.69268],[-79.78551,25.64707],[-79.70724,25.62098],[-79.78498,25.64751],[-79.84894,25.73631],[-79.88517,25.77622],[-79.95207,25.79514],[-79.97293,25.80827],[-80.01172,25.89326],[-80.04922,25.91868],[-80.09331,25.93049]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":42427,"geometry":{"type":"Polygon","coordinates":[[[-80.10118999999997,26.094370000000026],[-80.11725999999999,26.09424000000007],[-80.11420999999996,26.08060000000006],[-80.10118999999997,26.094370000000026]]]},"properties":{"ESRI_OID":42427,"MSI_UID":42427,"ATU":7,"TITLE":"Sector Miami, Submerged Land Act (SLA) - Port Everglades/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384314,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secmiaexcecozon:secmiatersea:secmiasublanact:poreve","WATERWAY_NAME":"Port Everglades","CREATE_DATE":1777416537000,"MODIFIED_DATE":1777417206000,"BEGIN_DATE":1777334400000,"END_DATE":1817078399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-04-28 \n42427\n\nLocation:\n26-05-39.732N/080-06-04.284W\n26-04-50.160N/080-06-51.156W\n26-05-39.264N/080-07-02.136W\n26-05-39.732N/080-06-04.284W\n\nContinental Heavy Civil Corp. will begin the Port Everglades Inlet Sand Bypass Jetty Improvements Project on or about May 25, 2026, with an estimated completion date of June 1, 2027. \n\nVessels used:\n•LIL T (pushboat for barge movements)\n•MARK Z (truckable pushboat)\n•HERCULES (tug for barge movements)\n•OLIVER (tug for barge movements)\n•MB 154 (spud barge)\n•MOP 19 (deck barge)\n•MOP 18 (deck barge)\n \nVessels will monitor VHF-FM channels 9, 13, 14 and 16. Project vessels may be working 24/7. Project consists of improving and extending the Fort Lauderdale North Jetty. Various stone materials and equipment will be transported to the jetty work location by tugs and barges. Various smaller vessels will support the project for crew transportation and survey activities. The North Jetty will be extended approximately 200 feet northeast of the existing jetty head by placing stone materials. All construction work will be performed outside the Federal Navigation Channel and Intracoastal Waterway limits. Barge movements and work activities will not hinder ICWW traffic.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.10119,26.09437],[-80.11726,26.09424],[-80.11421,26.0806],[-80.10119,26.09437]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":43016,"geometry":{"type":"Polygon","coordinates":[[[-76.34986999999995,38.54182000000003],[-76.35323999999997,38.54088000000007],[-76.35878999999994,38.53084000000007],[-76.35797999999994,38.52960000000007],[-76.35020999999995,38.52933000000007],[-76.35126999999994,38.523870000000045],[-76.33720999999997,38.522640000000024],[-76.33517999999998,38.526440000000036],[-76.33527999999995,38.52959000000004],[-76.34763999999996,38.54153000000008],[-76.34986999999995,38.54182000000003]]]},"properties":{"ESRI_OID":43016,"MSI_UID":43016,"ATU":5,"TITLE":"Chesapeake Channel - Little Choptank River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382449,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:litchoriv","WATERWAY_NAME":"Little Choptank River","CREATE_DATE":1777980999000,"MODIFIED_DATE":1777981795000,"BEGIN_DATE":1777939200000,"END_DATE":1824249599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-05-05 To: 2027-10-22\n\nLocation:\n38-32-30.552N/076-20-59.532W\n38-32-29.508N/076-20-51.504W\n38-31-46.524N/076-20-07.008W\n38-31-35.184N/076-20-06.648W\n38-31-21.504N/076-20-13.956W\n38-31-25.932N/076-21-04.572W\n38-31-45.588N/076-21-00.756W\n38-31-46.560N/076-21-28.728W\n38-31-51.024N/076-21-31.644W\n38-32-27.168N/076-21-11.664W\n38-32-30.552N/076-20-59.532W\n\nCoastal Design and Construction will conduct construction project consisting of building a rock fill dike. Construction area and dredge borrow area will be marked by white and orange danger buoys with white lights on them. Project will run from May 18, 2026 to October 22, 2027. All manned equipment will monitor VHF FM - Ch 16 and 13. In addition 20 barge moorings will be established during project around the outside of the construction area. Mooring buoy will be white with blue markings and white flashing lights. For additional information contact Eppa Dale Wroten – Marine Superintendent, Cell: 804-366-0447 or Wayne Clark – Superintendent, Cell: 301-643-4323. MSI # 43016.\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-76.34987,38.54182],[-76.35324,38.54088],[-76.35879,38.53084],[-76.35798,38.5296],[-76.35021,38.52933],[-76.35127,38.52387],[-76.33721,38.52264],[-76.33518,38.52644],[-76.33528,38.52959],[-76.34764,38.54153],[-76.34987,38.54182]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":43086,"geometry":{"type":"Polygon","coordinates":[[[-94.67477999999994,29.662330000000054],[-94.67572999999999,29.661460000000034],[-94.67703999999998,29.660240000000044],[-94.67738999999995,29.65912000000003],[-94.67798999999997,29.65778000000006],[-94.67875999999995,29.65718000000004],[-94.68170999999995,29.656490000000076],[-94.68316999999996,29.656390000000044],[-94.68459999999999,29.65674000000007],[-94.68613999999997,29.657160000000033],[-94.68762999999996,29.657130000000052],[-94.68882999999994,29.65686000000005],[-94.68968999999998,29.656240000000025],[-94.69097999999997,29.655170000000055],[-94.69180999999998,29.654420000000073],[-94.69288999999998,29.65423000000004],[-94.69497999999999,29.65423000000004],[-94.69649999999996,29.65408000000008],[-94.69852999999995,29.653230000000065],[-94.70421999999996,29.648510000000044],[-94.77746999999994,29.624760000000038],[-94.77723999999995,29.624360000000024],[-94.73591999999996,29.637680000000046],[-94.70393999999999,29.647970000000043],[-94.69769999999994,29.65280000000007],[-94.69620999999995,29.65369000000004],[-94.69397999999995,29.653790000000072],[-94.69145999999995,29.653890000000047],[-94.69065999999998,29.65444000000008],[-94.68956999999995,29.655670000000043],[-94.68865999999997,29.65629000000007],[-94.68768999999998,29.65664000000004],[-94.68665999999996,29.656690000000026],[-94.68539999999996,29.65656000000007],[-94.68424999999996,29.656190000000038],[-94.68336999999997,29.655970000000025],[-94.68261999999999,29.655920000000037],[-94.68155999999999,29.655970000000025],[-94.67969999999997,29.656360000000063],[-94.67846999999995,29.656790000000058],[-94.67752999999999,29.65736000000004],[-94.67695999999995,29.658430000000067],[-94.67652999999996,29.659820000000025],[-94.67569999999995,29.660740000000033],[-94.67437999999999,29.66211000000004],[-94.67477999999994,29.662330000000054]]]},"properties":{"ESRI_OID":43086,"MSI_UID":43086,"ATU":8,"TITLE":"Trinity Bay - Double Bayou Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385106,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha:tribay:doubaycha","WATERWAY_NAME":"Double Bayou Channel","CREATE_DATE":1777994042000,"MODIFIED_DATE":1779372275000,"BEGIN_DATE":1777939200000,"END_DATE":1794527999000,"DESCRIPTION":"Double Bayou Channel - Dredge Operation --- From: 2026-05-22 To: 2026-11-11 --- Maintenance dredging will be conducted throughout the Double Bayou Channel.  Work will take place from 6:00 a.m. to 6:00 p.m., daily.  Dredged material will be transported via floating and submerged pipeline and placed into open water placement areas along the channel.  Project pipeline and dredging equipment may be staged near Oak Island.  On-scene vessels will include the T/Vs TINA L, SANDRA G and NACOLE, and the Crew Boats BO33, BO15 and BO32.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 8 and 16, POC: (972) 800-3395","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.67478,29.66233],[-94.67573,29.66146],[-94.67704,29.66024],[-94.67739,29.65912],[-94.67799,29.65778],[-94.67876,29.65718],[-94.68171,29.65649],[-94.68317,29.65639],[-94.6846,29.65674],[-94.68614,29.65716],[-94.68763,29.65713],[-94.68883,29.65686],[-94.68969,29.65624],[-94.69098,29.65517],[-94.69181,29.65442],[-94.69289,29.65423],[-94.69498,29.65423],[-94.6965,29.65408],[-94.69853,29.65323],[-94.70422,29.64851],[-94.77747,29.62476],[-94.77724,29.62436],[-94.73592,29.63768],[-94.70394,29.64797],[-94.6977,29.6528],[-94.69621,29.65369],[-94.69398,29.65379],[-94.69146,29.65389],[-94.69066,29.65444],[-94.68957,29.65567],[-94.68866,29.65629],[-94.68769,29.65664],[-94.68666,29.65669],[-94.6854,29.65656],[-94.68425,29.65619],[-94.68337,29.65597],[-94.68262,29.65592],[-94.68156,29.65597],[-94.6797,29.65636],[-94.67847,29.65679],[-94.67753,29.65736],[-94.67696,29.65843],[-94.67653,29.65982],[-94.6757,29.66074],[-94.67438,29.66211],[-94.67478,29.66233]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":43222,"geometry":{"type":"Polygon","coordinates":[[[-68.18560999999994,44.38757000000004],[-68.19472999999994,44.38280000000003],[-68.19339999999994,44.38128000000006],[-68.18404999999996,44.38599000000005],[-68.18560999999994,44.38757000000004]]]},"properties":{"ESRI_OID":43222,"MSI_UID":43222,"ATU":1,"TITLE":"Sector Northern New England, Submerged Lands Act (SLA) - Frenchman Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381785,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact:frebay","WATERWAY_NAME":"Frenchman Bay","CREATE_DATE":1778150499000,"MODIFIED_DATE":1778150520000,"BEGIN_DATE":1778112000000,"END_DATE":1838159999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-18 To: 2028-03-31\n\nL Beginning May 18, 2026, and continuing until March 02, 2028, a Crane Barge along with an attendant plant will be operating at various locations in and around the Bar Harbor Breakwater located adjacent to Bald Porcupine Island and the Porcupine Dry Ledge. Materials will be delivered to this Crane Barge via Tug transit. The work zone in general extends approximately 300 feet on either the north or south sides of the existing breakwater rock structure. Mariners are urged to transit at their slowest safe speed to minimize wake and procced with caution when travelling near the work area. \nWhen construction vessels are to navigate to the Bar Harbor breakwater they shall follow a designated haul route to minimize any disruptions to local marine traffic or fishermen. Vessels shall enter the harbor on a course of 343°. Upon reaching vertex of N 264340.78, E 1069401.28 (northeast of Bald Porcupine Island) they shall alter course to a heading of 270°. They will then continue at this heading until reaching a vertex of N264340.78, E 1067401.28 where they shall set a heading of 210° and maintain this heading to enter the work zone. The work zone in general extends approximately 300 feet on either the north or south sides of the existing breakwater rock structure. Its vertices are: Northeast corner: N 262830.48, E 1066588.92, Southeast corner: N 262354.34, E 1066858.96, Northwest corner: N 261413.24, E 1064383.15, Southwest corner: N 260917.96, E 1064721.87. When leaving the work zone any vessels shall navigate the course described above with opposite headings. Should any construction vessels need to leave the work zone for safe harbor they shall exit the work zone at its northeast corner (N 262830.48, E 1066588.92) on a course heading of 0° until reaching a vertex of N 268623.87, E 1066472.54 and start a heading of 45°. A safe harbor point shall be N 269679.20, E 1067527.92 which is west of Burnt Porcupine Island. An alternate safe harbor spot shall continue on the same course until reaching vertex N 270669.19, E 1068517.87 and then alter course to heading 148° until reaching safe harbor at N 269494.97, E 1070376.68. This safer harbor location is between Burnt Porcupine Island and Long Porcupine Island, east of Rum Key. Vessels may leave this safe harbor location on a heading of 210° back into the work zone. The above described safe harbor locations may be reached in the opposite direction if chosen. The Crane Barge will not be sitting in the federally marked navigation channel while repairing the breakwater. Should any construction vessels need to leave the work zone for safe harbor they shall exit the work zone and travel across the navigation channel to a designated safe harbor point that is located west of Burnt Porcupine Island. An alternate designated safe harbor point is located between Burnt Porcupine Island and Long Porcupine Island, east of Rum Key. The crew will be working Monday through Friday during daylight hours. The Crane and attendant plant will both monitor marine VHF Channel 16. Mariners are urged to use extreme caution and transit the area at a safe speed. If you have any questions or require additional information, please contact me via e-mail at mlayton@agatenj.com or via telephone at (609) 364-2078.\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-68.18561,44.38757],[-68.19473,44.3828],[-68.1934,44.38128],[-68.18405,44.38599],[-68.18561,44.38757]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":43572,"geometry":{"type":"Polygon","coordinates":[[[-81.59152999999998,30.409250000000043],[-81.63245999999998,30.385090000000048],[-81.63272999999998,30.37253000000004],[-81.62778999999995,30.370640000000037],[-81.61927999999995,30.358790000000056],[-81.62421999999998,30.340770000000077],[-81.61020999999994,30.340540000000033],[-81.61322999999999,30.362820000000056],[-81.62610999999998,30.388370000000066],[-81.59163999999998,30.409080000000074],[-81.56183999999996,30.38346000000007],[-81.47734999999994,30.392070000000047],[-81.45447999999999,30.37680000000006],[-81.44005999999996,30.38118000000003],[-81.42796999999996,30.398240000000044],[-81.41505999999998,30.40061000000003],[-81.40435999999994,30.39718000000005],[-81.36534999999998,30.39551000000006],[-81.30396999999994,30.341720000000066],[-81.30423999999994,30.32086000000004],[-81.28775999999993,30.32086000000004],[-81.28720999999996,30.341480000000047],[-81.30149999999998,30.341480000000047],[-81.37152999999995,30.40256000000005],[-81.41822999999994,30.40665000000007],[-81.42948999999999,30.40357000000006],[-81.44376999999997,30.385980000000075],[-81.45063999999996,30.38390000000004],[-81.46827999999994,30.39318000000003],[-81.56186999999994,30.383670000000052],[-81.59152999999998,30.409250000000043]]]},"properties":{"ESRI_OID":43572,"MSI_UID":43572,"ATU":7,"TITLE":"Sector Jacksonville, Submerged Land Act (SLA) - St Johns River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383440,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:stjohriv","WATERWAY_NAME":"St Johns River","CREATE_DATE":1778631537000,"MODIFIED_DATE":1781181956000,"BEGIN_DATE":1778544000000,"END_DATE":1794182399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-05-12\n43572\n\nGreat Lakes Dredge and Dock Company, LLC will be dredging for the FY26 Jacksonville Harbor maintenance dredging project. Estimated project start date May 31, 2026, with an estimated completion date of August 16, 2026. Project work consists of maintenance dredging the Jacksonville Harbor channel with the Trailing Suction Hopper Dredge Padre Island. Work to be performed consists of maintenance dredging portions of Bar Cut-3 through Cut-17 with disposal of material into the Ocean Dredge Material Disposal Site (ODMDS) Zone C1 and maintenance dredging portions of Cut-55 through the Lower Terminal Channel (LTC) with disposal of material into Bartram Island Dredge Material Management Area (DMMA) Cell F. Approximately 340 feet of subline on pontoon tanks and float hose will be utilized for disposal in the Bartram Island Dredge Material Management Area Cell F. A spud barge will also be anchored off in this location (approximate coordinates below). All equipment will be lighted as per USCG requirements.\n\nDredging Locations:\nBase Dredging (Centerline Coordinates)\n30-23-22.8313N / 081-28-06.1896W\n30-23-00.5389N / 081-27-34.8890W\n30-22-53.1663N / 081-27-14.7951W\n30-22-51.7378N / 081-27-09.4080W\n30-22-50.9085N / 081-27-02.7334W\n30-22-51.4059N / 081-26-54.2071W\n30-23-01.2354N / 081-26-29.4729W\n30-23-21.8009N / 081-26-09.2672W\n30-23-45.0736N / 081-25-58.9144W\n30-24-03.2149N / 081-25-39.9706W\n30-24-08.6656N / 081-25-25.7923W\n30-24-10.9524N / 081-25-08.4181W\n30-23-58.8435N / 081-23-09.3296W\nOption Dredging (Centerline Coordinates)\n30-20-45.3435N / 081-37-13.7692W\n30-21-48.7627N / 081-37-01.2716W\n30-22-09.1706N / 081-37-30.5299W\nDisposal Locations:\nODMDS Zone C1\n30-20-21.0016N / 081-17-59.3152W\n30-20-21.0062N / 081-17-31.0248W\n30-19-10.3157N / 081-17-59.3053W\n30-19-10.3203N / 081-17-31.0206W\n\nPump-Off Location - Bartram Island Cell F (Approximate)\n30-22-54.4359N / 081-33-16.1997W\n30-22-52.9081N / 081-32-58.6148W\n30-22-49.7482N / 081-33-00.1075W\n30-22-45.0987N / 081-32-57.4276W\n30-22-42.6701N / 081-33-11.4548W\nSubline Location\n30-22-59.9602N / 081-33-15.7946W\n30-22-56.6154N / 081-33-16.2238W\n\nProposed Spud Barge Location\n30-23-00.0446N / 081-33-13.9827W\n30-23-00.1562N / 081-33-11.5886W\n30-22-59.6422N / 081-33-11.5567W\n30-22-59.5306N / 081-33-13.9508W\n\nDredging and disposal operations are often done at slow speeds with limited maneuverability. Mariners are urged to use extreme caution in the area of the dredge. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. There will be a small survey vessel conducting surveys operations daily and will be crossing perpendicular to channel. Please pass survey vessels stern and provide a slow bell.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.59153,30.40925],[-81.63246,30.38509],[-81.63273,30.37253],[-81.62779,30.37064],[-81.61928,30.35879],[-81.62422,30.34077],[-81.61021,30.34054],[-81.61323,30.36282],[-81.62611,30.38837],[-81.59164,30.40908],[-81.56184,30.38346],[-81.47735,30.39207],[-81.45448,30.3768],[-81.44006,30.38118],[-81.42797,30.39824],[-81.41506,30.40061],[-81.40436,30.39718],[-81.36535,30.39551],[-81.30397,30.34172],[-81.30424,30.32086],[-81.28776,30.32086],[-81.28721,30.34148],[-81.3015,30.34148],[-81.37153,30.40256],[-81.41823,30.40665],[-81.42949,30.40357],[-81.44377,30.38598],[-81.45064,30.3839],[-81.46828,30.39318],[-81.56187,30.38367],[-81.59153,30.40925]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44384,"geometry":{"type":"Polygon","coordinates":[[[-73.94234999999998,40.77884000000006],[-73.94287999999995,40.77865000000003],[-73.94252999999998,40.77780000000007],[-73.94206999999994,40.77797000000004],[-73.94234999999998,40.77884000000006]]]},"properties":{"ESRI_OID":44384,"MSI_UID":44384,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1779796784000,"MODIFIED_DATE":1779796794000,"BEGIN_DATE":1779753600000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-26 To: 2026-09-30\n\nThis Local Notice to Mariners (LNM) Information Form, submitted to the U.S. Coast Guard District Northeast, details a marine construction project by C.A.C. Industries, managed by Michal Mludzik. The project involves timber pile repair, dive work, and concrete infill under the esplanade at Bobby Wagner Walk, New York, NY (just north of the E 90th Street ferry and south of DSNY 91st Street MTS), with precise coordinates at 40°46'41.2\"N, 73°56'33.4\"W. Operations are scheduled to begin May 27, 2026, and continue through September 2028, taking place Monday through Friday from 0600 to 1600 hours, dependent on tidal conditions. The site will utilize a 120x55 deck barge equipped with an MLC-150 crane, and marine radio communications will be available via channel 16 (hail) and channel 78 (monitor). The barge will be stationed along the bulkhead to minimize navigation impact.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-73.94235,40.77884],[-73.94288,40.77865],[-73.94253,40.7778],[-73.94207,40.77797],[-73.94235,40.77884]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44409,"geometry":{"type":"Polygon","coordinates":[[[-65.69570999999996,18.060170000000028],[-65.71350999999999,18.060060000000078],[-65.71317999999997,18.043340000000057],[-65.81200999999999,18.041000000000054],[-65.81081999999998,18.043660000000045],[-65.83041999999995,18.053420000000074],[-65.83240999999998,18.05574000000007],[-65.83714999999995,18.053320000000042],[-65.83120999999994,18.050580000000025],[-65.81208999999996,18.040890000000047],[-65.69547999999998,18.04319000000004],[-65.69570999999996,18.060170000000028]]]},"properties":{"ESRI_OID":44409,"MSI_UID":44409,"ATU":7,"TITLE":"Sector San Juan, Territorial Sea/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384492,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsanjuaexcecozon:secsanjuatersea","WATERWAY_NAME":"Sector San Juan, Territorial Sea","CREATE_DATE":1779800324000,"MODIFIED_DATE":1779800739000,"BEGIN_DATE":1779753600000,"END_DATE":1795391999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-05-26\n44409\n\nOn or about May 29, 2026, Cashman Dredging and Marine Contracting Co., LLC will begin dredging operations of the Puerto Yabucoa Channel.\nThe project will utilize the Dredge Dale Pyatt, dump scows GL603 and GL69. Loaded scows will be transported by tug (TBD) to the designated disposal site located approximately 8 miles Southeast from the entrance of the Puerto Yabucoa Channel. All vessels will monitor VHF-FM channels 14, 13, and 67.\nMariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.\nMarine operations will be conducted 24 hours a day, Monday through Sunday, and will be completed on or before September 1, 2026.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-65.69571,18.06017],[-65.71351,18.06006],[-65.71318,18.04334],[-65.81201,18.041],[-65.81082,18.04366],[-65.83042,18.05342],[-65.83241,18.05574],[-65.83715,18.05332],[-65.83121,18.05058],[-65.81209,18.04089],[-65.69548,18.04319],[-65.69571,18.06017]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44415,"geometry":{"type":"Polygon","coordinates":[[[-66.15742999999998,17.937960000000032],[-66.15996999999999,17.936680000000024],[-66.16130999999996,17.93417000000005],[-66.16055999999998,17.933840000000032],[-66.16013999999996,17.93237000000005],[-66.16614999999996,17.922900000000027],[-66.16264999999999,17.921460000000025],[-66.16003999999998,17.928490000000068],[-66.15800999999993,17.93028000000004],[-66.15862999999996,17.932210000000055],[-66.15711999999996,17.93306000000007],[-66.15598999999997,17.935350000000028],[-66.15570999999994,17.93724000000003],[-66.15742999999998,17.937960000000032]]]},"properties":{"ESRI_OID":44415,"MSI_UID":44415,"ATU":7,"TITLE":"Sector San Juan, Territorial Sea/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384492,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsanjuaexcecozon:secsanjuatersea","WATERWAY_NAME":"Sector San Juan, Territorial Sea","CREATE_DATE":1779801291000,"MODIFIED_DATE":1779801445000,"BEGIN_DATE":1779753600000,"END_DATE":1795391999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-05-26 \n44415\n\nOn or about May 29, 2026, Cashman Dredging and Marine Contracting Co., LLC will begin dredging operations of the Laguna de las Mareas Channel.\nThe project will utilize the Dredge Dale Pyatt, Offloading platform Kraken and dump scows GL603 and GL69. Loaded scows will be transported by tug (TBD) to the designated offloading area, Kraken will be used to transport material from loaded scows to the disposal site. The marine equipment will be supported by the survey vessel Cape Elizabeth. All vessels will monitor VHF-FM channels 14, 13, and 67.\nMariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.\nMarine operations will be conducted 12 hours a day 06 a.m. to 6 p.m., Monday through Sunday, and will be completed on or before August 29, 2026.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-66.15743,17.93796],[-66.15997,17.93668],[-66.16131,17.93417],[-66.16056,17.93384],[-66.16014,17.93237],[-66.16615,17.9229],[-66.16265,17.92146],[-66.16004,17.92849],[-66.15801,17.93028],[-66.15863,17.93221],[-66.15712,17.93306],[-66.15599,17.93535],[-66.15571,17.93724],[-66.15743,17.93796]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44436,"geometry":{"type":"Polygon","coordinates":[[[-81.68874999999997,24.800020000000075],[-81.69333999999998,24.800020000000075],[-81.69333999999998,24.795830000000024],[-81.68874999999997,24.795830000000024],[-81.68874999999997,24.800020000000075]]]},"properties":{"ESRI_OID":44436,"MSI_UID":44436,"ATU":7,"TITLE":"Sector Key West, Territorial Sea - Sector Key West, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384388,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:seckeywesexcecozon:seckeywestersea:seckeywessublanact","WATERWAY_NAME":"Sector Key West, Submerged Land Act (SLA)","CREATE_DATE":1779807716000,"MODIFIED_DATE":1779808319000,"BEGIN_DATE":1779753600000,"END_DATE":2080339199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-26 \n44436\n\nLocation:\n24-48-00.072N/081-41-19.500W\n24-47-44.988N/081-41-19.500W\n24-47-52.548N/081-41-27.744W\n24-47-44.988N/081-41-36.024W\n24-48-00.072N/081-41-36.024W\n24-48-00.072N/081-41-19.500W\n\nMonroe County Florida has a 10-year Corps permit to construct an\noffshore artificial reef to be known as the Monroe County BOCC Gulfside Five Mile Artificial Reef. The artificial reef site area would measure 0.25 nautical miles by 0.25\nnautical miles, encompassing a total area of 53 acres of submerged sand sea-bottom of which less than 1 acre of artificial reef material footprint would be deployed during the\nlifetime of the permit. The navigational vertical clearance at the site shall be -25’ MLLW. Operations are expected to be completed by November 3, 2035.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.68875,24.80002],[-81.69334,24.80002],[-81.69334,24.79583],[-81.68875,24.79583],[-81.68875,24.80002]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44441,"geometry":{"type":"Polygon","coordinates":[[[-81.55830999999995,24.906070000000057],[-81.55830999999995,24.901910000000044],[-81.55372999999997,24.901910000000044],[-81.55372999999997,24.906070000000057],[-81.55830999999995,24.906070000000057]]]},"properties":{"ESRI_OID":44441,"MSI_UID":44441,"ATU":7,"TITLE":"Sector Key West, Territorial Sea - Sector Key West, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384388,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:seckeywesexcecozon:seckeywestersea:seckeywessublanact","WATERWAY_NAME":"Sector Key West, Submerged Land Act (SLA)","CREATE_DATE":1779808691000,"MODIFIED_DATE":1779808909000,"BEGIN_DATE":1779753600000,"END_DATE":2098483199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-26 \n44441\n\nLocation:\n24-54-21.852N/081-33-29.916W\n24-54-21.852N/081-33-13.428W\n24-54-06.876N/081-33-13.428W\n24-54-06.876N/081-33-29.916W\n24-54-21.852N/081-33-29.916W\n\nMonroe County Florida has a 10-year Corps permit to construct an\noffshore artificial reef to be known as the Monroe County BOCC Gulfside\nEight (8) Mile Artificial Reef. The approved artificial reef footprint is 0.25 nautical\nmiles by 0.25 nautical miles, encompassing a total area of 53 acres of submerged sand\nsea-bottom, of which less than 1 acre of the artificial reef material would be deployed\nduring the lifetime of the Corps permit, 10-years. The site will maintain a navigational\nvertical clearance at the site of -22’ MLLW from the top of any deployed structure. Operations are expected to be completed by May 12, 2036.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.55831,24.90607],[-81.55831,24.90191],[-81.55373,24.90191],[-81.55373,24.90607],[-81.55831,24.90607]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44446,"geometry":{"type":"Polygon","coordinates":[[[-81.60830999999996,24.90107000000006],[-81.60830999999996,24.896910000000048],[-81.60372999999998,24.896910000000048],[-81.60372999999998,24.90107000000006],[-81.60830999999996,24.90107000000006]]]},"properties":{"ESRI_OID":44446,"MSI_UID":44446,"ATU":7,"TITLE":"Sector Key West, Territorial Sea - Sector Key West, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384388,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:seckeywesexcecozon:seckeywestersea:seckeywessublanact","WATERWAY_NAME":"Sector Key West, Submerged Land Act (SLA)","CREATE_DATE":1779809415000,"MODIFIED_DATE":1779809497000,"BEGIN_DATE":1779753600000,"END_DATE":2098483199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-26\n44446\n\nLocation:\n24-54-03.852N/081-36-29.916W\n24-54-03.852N/081-36-13.428W\n24-53-48.876N/081-36-13.428W\n24-53-48.876N/081-36-29.916W\n24-54-03.852N/081-36-29.916W\n\nMonroe County Florida has a 10-year Corps permit to construct an\noffshore artificial reef to be known as the Monroe County BOCC Gulfside 9 Mile\nArtificial Reef. The artificial reef site area would measure 0.25 nautical miles by 0.25\nnautical miles, encompassing a total area of 53 acres of submerged sand sea-bottom of\nwhich less than 1 acre of artificial reef material footprint would be deployed during the\nlifetime of the permit. The navigational vertical clearance at the site shall be -25’ MLLW. Operations are expected to be completed by February 4, 2036.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.60831,24.90107],[-81.60831,24.89691],[-81.60373,24.89691],[-81.60373,24.90107],[-81.60831,24.90107]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44454,"geometry":{"type":"Polygon","coordinates":[[[-95.44899999999996,28.86851000000007],[-95.45280999999994,28.86764000000005],[-95.45772999999997,28.867020000000025],[-95.46464999999995,28.865940000000023],[-95.46791999999994,28.86531000000008],[-95.47005999999999,28.86524000000003],[-95.47881999999998,28.863110000000063],[-95.48264999999998,28.861380000000054],[-95.48541999999998,28.860150000000033],[-95.48673999999994,28.859120000000075],[-95.48916999999994,28.85835000000003],[-95.48956999999996,28.857440000000054],[-95.49168999999995,28.856970000000047],[-95.49529999999999,28.854190000000074],[-95.50693999999999,28.84862000000004],[-95.50836999999996,28.847290000000044],[-95.51031999999998,28.846670000000074],[-95.51302999999996,28.84441000000004],[-95.51523999999995,28.843590000000063],[-95.51909999999998,28.841260000000034],[-95.52275999999995,28.839150000000075],[-95.52833999999996,28.83612000000005],[-95.53185999999994,28.833660000000066],[-95.53414999999995,28.831630000000075],[-95.53571999999997,28.82887000000005],[-95.53706999999997,28.825360000000046],[-95.53831999999994,28.819250000000068],[-95.53940999999998,28.813910000000078],[-95.54447999999996,28.809520000000077],[-95.55016999999998,28.80574000000007],[-95.56352999999996,28.79907000000003],[-95.56385999999998,28.79905000000008],[-95.56441999999998,28.79866000000004],[-95.56869999999998,28.796200000000056],[-95.56913999999995,28.79618000000005],[-95.57246999999995,28.79445000000004],[-95.57417999999996,28.793790000000058],[-95.58302999999995,28.78908000000007],[-95.58914999999996,28.786380000000065],[-95.59110999999996,28.78571000000005],[-95.59183999999999,28.784790000000044],[-95.59658999999999,28.782250000000033],[-95.60751999999997,28.77634000000006],[-95.61734999999999,28.77135000000004],[-95.61700999999994,28.770850000000053],[-95.55721999999997,28.800610000000063],[-95.54903999999999,28.804970000000026],[-95.54417999999998,28.808230000000037],[-95.54125999999997,28.81053000000003],[-95.53844999999995,28.813140000000033],[-95.53421999999995,28.82928000000004],[-95.53003999999999,28.833750000000066],[-95.50506999999999,28.84764000000007],[-95.48051999999996,28.861140000000034],[-95.47734999999994,28.862420000000043],[-95.45660999999996,28.866000000000042],[-95.44844999999998,28.867480000000057],[-95.44899999999996,28.86851000000007]]]},"properties":{"ESRI_OID":44454,"MSI_UID":44454,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384754,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact","WATERWAY_NAME":"Sector Houston-Galveston, Submerged Land Act (SLA)","CREATE_DATE":1779812375000,"MODIFIED_DATE":1779813000000,"BEGIN_DATE":1782864000000,"END_DATE":1801439999000,"DESCRIPTION":"GIWW - Breakwater Construction --- From: 2026-07-21 To: 2027-01-30 --- Breakwater construction will be conducted along the GIWW, between Miles 405.4 and 417.6, WHL.  On-scene vessels will include hopper barges, towing vessels, spud barges, and crew boats.  Mariners are urged to transit the project area at their slowest safe speed to minimize wake and proceed with caution.  VHF-FM Channel: 16,  POC: (337) 519-2759 or (337) 519-8883","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-95.449,28.86851],[-95.45281,28.86764],[-95.45773,28.86702],[-95.46465,28.86594],[-95.46792,28.86531],[-95.47006,28.86524],[-95.47882,28.86311],[-95.48265,28.86138],[-95.48542,28.86015],[-95.48674,28.85912],[-95.48917,28.85835],[-95.48957,28.85744],[-95.49169,28.85697],[-95.4953,28.85419],[-95.50694,28.84862],[-95.50837,28.84729],[-95.51032,28.84667],[-95.51303,28.84441],[-95.51524,28.84359],[-95.5191,28.84126],[-95.52276,28.83915],[-95.52834,28.83612],[-95.53186,28.83366],[-95.53415,28.83163],[-95.53572,28.82887],[-95.53707,28.82536],[-95.53832,28.81925],[-95.53941,28.81391],[-95.54448,28.80952],[-95.55017,28.80574],[-95.56353,28.79907],[-95.56386,28.79905],[-95.56442,28.79866],[-95.5687,28.7962],[-95.56914,28.79618],[-95.57247,28.79445],[-95.57418,28.79379],[-95.58303,28.78908],[-95.58915,28.78638],[-95.59111,28.78571],[-95.59184,28.78479],[-95.59659,28.78225],[-95.60752,28.77634],[-95.61735,28.77135],[-95.61701,28.77085],[-95.55722,28.80061],[-95.54904,28.80497],[-95.54418,28.80823],[-95.54126,28.81053],[-95.53845,28.81314],[-95.53422,28.82928],[-95.53004,28.83375],[-95.50507,28.84764],[-95.48052,28.86114],[-95.47735,28.86242],[-95.45661,28.866],[-95.44845,28.86748],[-95.449,28.86851]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44595,"geometry":{"type":"Polygon","coordinates":[[[-81.84896999999995,26.337100000000078],[-82.12160999999998,26.22225000000003],[-82.11418999999995,26.217990000000043],[-81.84530999999998,26.328270000000032],[-81.84896999999995,26.337100000000078]]]},"properties":{"ESRI_OID":44595,"MSI_UID":44595,"ATU":7,"TITLE":"District 7, Oceanic boundary to EEZ - Sector St. Peterburg, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383750,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon","WATERWAY_NAME":"Sector St. Peterburg, Exclusive Economic Zone (EEZ)","CREATE_DATE":1779896422000,"MODIFIED_DATE":1779897004000,"BEGIN_DATE":1779840000000,"END_DATE":1795478399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-27 \n44595\n\n26-19.8197N / 81-51.0155W to 26-13.2594N / 82-06.9393W \n\nCable Laying Vessel SARAH BORDELON will be completing a cable route running from the HDD exit located 500 m offshore to the cable abandonment position located around 30 km offshore. operations are expected to begin on or about May 6, 2026 with an estimated completion date of July 25, 2026. Vessel will be monitoring VHF-FM channel 16.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.84897,26.3371],[-82.12161,26.22225],[-82.11419,26.21799],[-81.84531,26.32827],[-81.84897,26.3371]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44696,"geometry":{"type":"Polygon","coordinates":[[[-89.99467999999996,29.99983000000003],[-90.01149999999996,29.998320000000035],[-90.01543999999996,29.996020000000044],[-90.02385999999996,29.993610000000047],[-90.02156999999994,29.986290000000054],[-90.02250999999995,29.982230000000072],[-90.02280999999994,29.979870000000062],[-90.02486999999996,29.98007000000007],[-90.02619999999996,29.977090000000032],[-90.02410999999995,29.976320000000044],[-90.02710999999994,29.966860000000054],[-90.02802999999994,29.963690000000042],[-90.02960999999999,29.959700000000055],[-90.02857999999998,29.95760000000007],[-90.02669999999995,29.957200000000057],[-90.02802999999994,29.959940000000074],[-90.02740999999997,29.962800000000072],[-90.02621999999997,29.96637000000004],[-90.02550999999994,29.967750000000024],[-90.02472999999998,29.96867000000003],[-90.02374999999995,29.97055000000006],[-90.02298999999994,29.97368000000006],[-90.02161999999998,29.97622000000007],[-90.02079999999995,29.979350000000068],[-90.02124999999995,29.98058000000003],[-90.02062999999998,29.982290000000035],[-90.01893999999999,29.986690000000067],[-90.01744999999994,29.98867000000007],[-90.01435999999995,29.992120000000057],[-90.01181999999994,29.99436000000003],[-90.00792999999999,29.99595000000005],[-89.99533999999994,29.99682000000007],[-89.99467999999996,29.99983000000003]]]},"properties":{"ESRI_OID":44696,"MSI_UID":44696,"ATU":8,"TITLE":"Head Of Passes To New Orleans - Inner Harbor Navigation Canal/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385063,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:innharnavcan","WATERWAY_NAME":"Inner Harbor Navigation Canal","CREATE_DATE":1779973967000,"MODIFIED_DATE":1784299463000,"BEGIN_DATE":1776643200000,"END_DATE":1790899199000,"DESCRIPTION":"Inner Harbor Navigation Canal - GIWW - Sewer Line Repairs and Dive Operations --- From: 2026-04-20 To: 2026-09-30 --- The damaged sewer main that was discharging sewage into the Gulf Intracoastal Waterway has been temporarily repaired.  While the immediate health threat has been mitigated, the sewer main is currently undergoing a multi-week repair process.  Daily daylight dive assessments of the damaged sewage line are being conducted, from 8:00 a.m. to 7:00 p.m.  Divers will access the work location from shore and will need an approximate 70-foot work area from the bank.  The dive operations will take place in approximate position 29-58-49.18N 090-01-21.60W.  The U.S. Coast Guard Captain of the Port New Orleans lifted the Emergency Safety Zone in the area; however, the COTP recommends all vessels transit at their slowest safe speed and avoid meeting or overtaking between GIWW Miles 6.5 and 10.0, EHL.  The on-scene dive operations supervisor may be contacted via VHF-FM Channel 67 or at (985) 273-1756.  For further information, mariners can contact the U.S. Coast Guard Sector New Orleans Command Center at (504) 365-2545 or the Waterways Management Division at wwmnola@uscg.mil.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-89.99468,29.99983],[-90.0115,29.99832],[-90.01544,29.99602],[-90.02386,29.99361],[-90.02157,29.98629],[-90.02251,29.98223],[-90.02281,29.97987],[-90.02487,29.98007],[-90.0262,29.97709],[-90.02411,29.97632],[-90.02711,29.96686],[-90.02803,29.96369],[-90.02961,29.9597],[-90.02858,29.9576],[-90.0267,29.9572],[-90.02803,29.95994],[-90.02741,29.9628],[-90.02622,29.96637],[-90.02551,29.96775],[-90.02473,29.96867],[-90.02375,29.97055],[-90.02299,29.97368],[-90.02162,29.97622],[-90.0208,29.97935],[-90.02125,29.98058],[-90.02063,29.98229],[-90.01894,29.98669],[-90.01745,29.98867],[-90.01436,29.99212],[-90.01182,29.99436],[-90.00793,29.99595],[-89.99534,29.99682],[-89.99468,29.99983]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44834,"geometry":{"type":"Polygon","coordinates":[[[-79.94571999999994,32.86032000000006],[-79.94614999999999,32.85429000000005],[-79.95059999999995,32.85200000000003],[-79.94772999999998,32.85105000000004],[-79.94367999999997,32.85340000000008],[-79.94571999999994,32.86032000000006]]]},"properties":{"ESRI_OID":44834,"MSI_UID":44834,"ATU":7,"TITLE":"Charleston Harbor - Cooper River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384350,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:chahar:cooriv","WATERWAY_NAME":"Cooper River","CREATE_DATE":1780064894000,"MODIFIED_DATE":1780065174000,"BEGIN_DATE":1780012800000,"END_DATE":1795651199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-05-29 \n44834\n\nMarinex Construction, Inc. will begin mobilizing equipment and pipeline to commence work at the USCG Station Pier November in the Cooper River. All submerged pipeline for this work will be appropriately lit and laid from the South cell of the Cl outer Creek Disposal Area across the river to Pier November. The Dredge Wadmalaw will operate in this area through approximately July 31, 2026. \nThe Dredge Wadmalaw will operate 24-7 and monitor VHF-FM channels 13 and 16. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.94572,32.86032],[-79.94615,32.85429],[-79.9506,32.852],[-79.94773,32.85105],[-79.94368,32.8534],[-79.94572,32.86032]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44967,"geometry":{"type":"Polygon","coordinates":[[[-94.29963999999995,35.34990000000005],[-94.29988999999995,35.34967000000006],[-94.29529999999994,35.346940000000075],[-94.29510999999997,35.34719000000007],[-94.29963999999995,35.34990000000005]]]},"properties":{"ESRI_OID":44967,"MSI_UID":44967,"ATU":2,"TITLE":"Arkansas Post Canal - Arkansas River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381231,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:whiriv:arkposcan:arkriv","WATERWAY_NAME":"Arkansas River","CREATE_DATE":1780319934000,"MODIFIED_DATE":1780320182000,"BEGIN_DATE":1780272000000,"END_DATE":1790899199000,"DESCRIPTION":"Commencing June 15, 2026, and continuing until September 30, 2026, the James W. Trimble L/D (Nr. 13), in the vicinity of Mile 292.8, will be closed from 7:00 a.m. until 7:00 p.m., daily.  The lock will be open from 7:00 p.m. until 7:00 a.m., with a 70-foot width restriction.  Mariners are urged to transit the area with caution.  Mariners may contact the USACE Little Rock District Office, at (501) 324-5096 or you may email ceswl-op-om@usace.army.mil, for additional information. \n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.29964,35.3499],[-94.29989,35.34967],[-94.2953,35.34694],[-94.29511,35.34719],[-94.29964,35.3499]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44968,"geometry":{"type":"Polygon","coordinates":[[[-93.81358999999998,35.474150000000066],[-93.81411999999995,35.474060000000065],[-93.81180999999998,35.470210000000066],[-93.81144999999998,35.47026000000005],[-93.81358999999998,35.474150000000066]]]},"properties":{"ESRI_OID":44968,"MSI_UID":44968,"ATU":2,"TITLE":"Arkansas Post Canal - Arkansas River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381231,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:whiriv:arkposcan:arkriv","WATERWAY_NAME":"Arkansas River","CREATE_DATE":1780320155000,"MODIFIED_DATE":1780320421000,"BEGIN_DATE":1780272000000,"END_DATE":1790899199000,"DESCRIPTION":"Commencing June 15, 2026, and continuing until September 30, 2026, the Ozark-Jetta Taylor L/D (Nr. 12), in the vicinity of Mile 256.9 will be closed from 7:00 a.m. until 7:00 p.m., daily.  The lock will be open from 7:00 p.m. until 7:00 a.m., with a 70-foot width restriction.  Mariners are urged to transit the area with caution.  Mariners may contact the USACE Little Rock District Office, at (501) 324-5096 or you may email ceswl-op-om@usace.army.mil, for additional information.                                                                                               ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.81359,35.47415],[-93.81412,35.47406],[-93.81181,35.47021],[-93.81145,35.47026],[-93.81359,35.47415]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44969,"geometry":{"type":"Polygon","coordinates":[[[-93.17023999999998,35.25221000000005],[-93.17073999999997,35.251820000000066],[-93.16712999999999,35.248710000000074],[-93.16687999999994,35.24897000000004],[-93.17023999999998,35.25221000000005]]]},"properties":{"ESRI_OID":44969,"MSI_UID":44969,"ATU":2,"TITLE":"Arkansas Post Canal - Arkansas River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381231,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:whiriv:arkposcan:arkriv","WATERWAY_NAME":"Arkansas River","CREATE_DATE":1780320489000,"MODIFIED_DATE":1780322167000,"BEGIN_DATE":1780272000000,"END_DATE":1790899199000,"DESCRIPTION":"Commencing June 15, 2026, and continuing until September 30, 2026, the Dardanelle L/D (Nr. 10), in the vicinity of Mile 205.5, will be closed from 7:00 a.m. until 7:00 p.m., daily.  The lock will be open from 7:00 p.m. until 7:00 a.m., with a 70-foot width restriction.  Mariners are urged to transit the area with caution.  Mariners may contact the USACE Little Rock District Office, at (501) 324-5096 or at ceswl-op-om@usace.army.mil, for additional information. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.17024,35.25221],[-93.17074,35.25182],[-93.16713,35.24871],[-93.16688,35.24897],[-93.17024,35.25221]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44970,"geometry":{"type":"Polygon","coordinates":[[[-92.78237999999999,35.12629000000004],[-92.78809999999999,35.12339000000003],[-92.78789999999998,35.12312000000003],[-92.78208999999998,35.126100000000065],[-92.78237999999999,35.12629000000004]]]},"properties":{"ESRI_OID":44970,"MSI_UID":44970,"ATU":2,"TITLE":"Arkansas Post Canal - Arkansas River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381231,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:whiriv:arkposcan:arkriv","WATERWAY_NAME":"Arkansas River","CREATE_DATE":1780320639000,"MODIFIED_DATE":1780322204000,"BEGIN_DATE":1780272000000,"END_DATE":1790899199000,"DESCRIPTION":"Commencing June 15, 2026, and continuing until September 30, 2026, the Arthur V. Ormond L/D (Nr. 9), in the vicinity of Mile 176.9, will be closed from 7:00 a.m. until 7:00 p.m., daily.  The lock will be open from 7:00 p.m. until 7:00 a.m., with a 70-foot width restriction.  Mariners are urged to transit the area with caution.  Mariners may contact the USACE Little Rock District Office, at (501) 324-5096 or at ceswl-op-om@usace.army.mil, for additional information.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-92.78238,35.12629],[-92.7881,35.12339],[-92.7879,35.12312],[-92.78209,35.1261],[-92.78238,35.12629]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44971,"geometry":{"type":"Polygon","coordinates":[[[-92.53920999999997,35.07922000000008],[-92.53999999999996,35.07424000000003],[-92.53969999999998,35.07417000000004],[-92.53886999999997,35.07919000000004],[-92.53920999999997,35.07922000000008]]]},"properties":{"ESRI_OID":44971,"MSI_UID":44971,"ATU":2,"TITLE":"Arkansas Post Canal - Arkansas River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381231,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:whiriv:arkposcan:arkriv","WATERWAY_NAME":"Arkansas River","CREATE_DATE":1780320782000,"MODIFIED_DATE":1780322245000,"BEGIN_DATE":1780272000000,"END_DATE":1790899199000,"DESCRIPTION":"Commencing June 15, 2026, and continuing until September 30, 2026, the Toad Suck Ferry L/D (Nr. 8), in the vicinity of Mile 155.9, will be closed from 7:00 a.m. until 7:00 p.m., daily.  The lock will be open from 7:00 p.m. until 7:00 a.m., with a 70-foot width restriction.  Mariners are urged to transit the area with caution.  Mariners may contact the USACE Little Rock District Office, at (501) 324-5096 or at ceswl-op-om@usace.army.mil, for additional information.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-92.53921,35.07922],[-92.54,35.07424],[-92.5397,35.07417],[-92.53887,35.07919],[-92.53921,35.07922]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44972,"geometry":{"type":"Polygon","coordinates":[[[-92.36120999999997,34.79159000000004],[-92.36128999999994,34.791360000000054],[-92.35457999999994,34.78980000000007],[-92.35450999999995,34.79011000000003],[-92.36120999999997,34.79159000000004]]]},"properties":{"ESRI_OID":44972,"MSI_UID":44972,"ATU":2,"TITLE":"Arkansas Post Canal - Arkansas River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381231,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:whiriv:arkposcan:arkriv","WATERWAY_NAME":"Arkansas River","CREATE_DATE":1780320969000,"MODIFIED_DATE":1780322274000,"BEGIN_DATE":1780272000000,"END_DATE":1790899199000,"DESCRIPTION":"Commencing June 15, 2026, and continuing until September 30, 2026, the Murray L/D (Nr. 7), in the vicinity of Mile 125.4, will be closed from 7:00 a.m. until 7:00 p.m., daily.  The lock will be open from 7:00 p.m. until 7:00 a.m., with a 70-foot width restriction.  Mariners are urged to transit the area with caution.  Mariners may contact the USACE Little Rock District Office, at (501) 324-5096 or at ceswl-op-om@usace.army.mil, for additional information. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-92.36121,34.79159],[-92.36129,34.79136],[-92.35458,34.7898],[-92.35451,34.79011],[-92.36121,34.79159]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44983,"geometry":{"type":"Polygon","coordinates":[[[-93.85428999999999,29.972330000000056],[-93.85771999999997,29.96995000000004],[-93.85657999999995,29.96658000000008],[-93.86684999999994,29.94127000000003],[-93.92589999999996,29.87719000000004],[-93.93024999999994,29.873620000000074],[-93.93230999999997,29.868660000000034],[-93.95015999999998,29.85000000000008],[-93.95336999999995,29.840870000000052],[-93.95427999999998,29.832730000000026],[-93.95948999999996,29.826190000000054],[-93.96040999999997,29.826630000000023],[-93.95988999999997,29.83110000000005],[-93.95548999999994,29.834430000000054],[-93.95633999999995,29.835920000000044],[-93.96125999999998,29.83259000000004],[-93.96675999999997,29.836060000000032],[-93.96835999999996,29.84197000000006],[-93.96578999999997,29.844250000000045],[-93.96835999999996,29.84609000000006],[-93.97224999999997,29.851800000000026],[-93.96778999999998,29.834920000000068],[-93.96194999999994,29.830260000000067],[-93.96291999999994,29.824550000000045],[-93.94781999999998,29.78391000000005],[-93.94392999999997,29.776760000000024],[-93.93385999999998,29.770200000000045],[-93.90009999999995,29.757090000000062],[-93.89654999999999,29.761060000000043],[-93.92260999999996,29.769890000000032],[-93.93771999999996,29.775850000000048],[-93.94412999999997,29.782800000000066],[-93.95751999999999,29.819350000000043],[-93.95201999999995,29.835630000000037],[-93.94858999999997,29.84546000000006],[-93.91219999999998,29.888130000000046],[-93.90086999999994,29.895570000000077],[-93.87820999999997,29.923350000000028],[-93.86435999999998,29.94001000000003],[-93.85131999999999,29.96876000000003],[-93.85428999999999,29.972330000000056]]]},"properties":{"ESRI_OID":44983,"MSI_UID":44983,"ATU":8,"TITLE":"Port Arthur Canal - Sabine-Neches Canal/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385199,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:sabpas:porartcan:sabcan","WATERWAY_NAME":"Sabine-Neches Canal","CREATE_DATE":1780325868000,"MODIFIED_DATE":1785420630000,"BEGIN_DATE":1780272000000,"END_DATE":1846022399000,"DESCRIPTION":"Sabine Neches Canal - GIWW - Taylor Bayou - Port Arthur Canal - Dredge Operation --- From: 2026-06-01 To: June 2028 --- The Dredges GENERAL MACARTHUR, GENERAL BRADLEY and GENERAL MARSHALL will conduct dredging in the Sabine-Neches Waterway, Port Arthur Canal, and Taylor Bayou.  Work will take place 24-hours a day, 7-days a week.  Additional on-scene vessels will include an idler barge, three anchor barges, a material barge, a crane barge, a spill barge, the Survey Vessel CONSTITUITION V, the Crew Boats DC3 BRUCKENTHAL and SMI MUNRO, and the T/Vs SGT. HARRELL, MISS SYDNEY, LIL EMI, DOUGLAS B, GUAM, CORAL SEA and SARATOGA.  Advance notification timelines for ship traffic in the area is 2-hours prior to transiting, 1-hour prior to transiting, and again at 30-minutes prior to transiting the area.  Advance notification timelines for tow traffic in the area is 1-hour prior to transiting and again at 30-minutes prior to transiting the area.  Mariners are urged to exercise extreme caution within the work area and should transit at their slowest safe speed to minimize wake.  VHF-FM Channels: 13, 16 and 82, POC:  (848) 333-2694","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.85429,29.97233],[-93.85772,29.96995],[-93.85658,29.96658],[-93.86685,29.94127],[-93.9259,29.87719],[-93.93025,29.87362],[-93.93231,29.86866],[-93.95016,29.85],[-93.95337,29.84087],[-93.95428,29.83273],[-93.95949,29.82619],[-93.96041,29.82663],[-93.95989,29.8311],[-93.95549,29.83443],[-93.95634,29.83592],[-93.96126,29.83259],[-93.96676,29.83606],[-93.96836,29.84197],[-93.96579,29.84425],[-93.96836,29.84609],[-93.97225,29.8518],[-93.96779,29.83492],[-93.96195,29.83026],[-93.96292,29.82455],[-93.94782,29.78391],[-93.94393,29.77676],[-93.93386,29.7702],[-93.9001,29.75709],[-93.89655,29.76106],[-93.92261,29.76989],[-93.93772,29.77585],[-93.94413,29.7828],[-93.95752,29.81935],[-93.95202,29.83563],[-93.94859,29.84546],[-93.9122,29.88813],[-93.90087,29.89557],[-93.87821,29.92335],[-93.86436,29.94001],[-93.85132,29.96876],[-93.85429,29.97233]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44984,"geometry":{"type":"Polygon","coordinates":[[[-94.08662999999996,30.08134000000007],[-94.08502999999996,30.075690000000066],[-94.07884999999999,30.075390000000027],[-94.07152999999994,30.077180000000055],[-94.06168999999994,30.075200000000052],[-94.04623999999995,30.064500000000066],[-94.03707999999995,30.06153000000006],[-94.03124999999994,30.05668000000003],[-94.02906999999999,30.04925000000003],[-94.03112999999996,30.040130000000033],[-94.03467999999998,30.037360000000035],[-94.03433999999999,30.027750000000026],[-94.02792999999997,30.02091000000007],[-93.98500999999999,30.007430000000056],[-93.97756999999996,30.007730000000038],[-93.96383999999995,30.012980000000027],[-93.95834999999994,30.011100000000056],[-93.95799999999997,30.002680000000055],[-93.95353999999998,29.998610000000042],[-93.93339999999995,29.98980000000006],[-93.87663999999995,29.980180000000075],[-93.86003999999997,29.97482000000008],[-93.85923999999994,29.967490000000055],[-93.85431999999997,29.972050000000024],[-93.85500999999994,29.97601000000003],[-93.86083999999994,29.980570000000057],[-93.90512999999999,29.989000000000033],[-93.91050999999999,29.99604000000005],[-93.91107999999997,29.989000000000033],[-93.93076999999994,29.99237000000005],[-93.95021999999994,30.00030000000004],[-93.95422999999994,30.010510000000068],[-93.95937999999995,30.015460000000076],[-93.96761999999995,30.015460000000076],[-93.97619999999995,30.010800000000074],[-93.98134999999996,30.010110000000054],[-93.98168999999996,30.013280000000066],[-93.98512999999997,30.01397000000003],[-93.98592999999994,30.011400000000037],[-94.01556999999997,30.020020000000045],[-94.01304999999996,30.026360000000068],[-94.02185999999995,30.031120000000044],[-94.02872999999994,30.026760000000024],[-94.03089999999997,30.02953000000008],[-94.03043999999994,30.03508000000005],[-94.02643999999998,30.05024000000003],[-94.02963999999997,30.05895000000004],[-94.03444999999994,30.06212000000005],[-94.04199999999997,30.06490000000008],[-94.06213999999994,30.078070000000025],[-94.07072999999997,30.079260000000033],[-94.07941999999997,30.07797000000005],[-94.08662999999996,30.08134000000007]]]},"properties":{"ESRI_OID":44984,"MSI_UID":44984,"ATU":8,"TITLE":"Sabine-Neches Canal - Neches River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100117404704,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:sabpas:porartcan:sabcan:necriv","WATERWAY_NAME":"Neches River","CREATE_DATE":1780326095000,"MODIFIED_DATE":1785420667000,"BEGIN_DATE":1780272000000,"END_DATE":1846022399000,"DESCRIPTION":"Neches River - Sabine Neches Canal - GIWW - Dredge Operation --- From: 2026-06-01 To: June 2028 --- The Dredges GENERAL MACARTHUR, GENERAL BRADLEY and GENERAL MARSHALL are conducting dredging operations in the Neches River.  Work will take place 24-hours a day, 7-days a week.  Additional on-scene vessels will include an idler barge, three anchor barges, a material barge, a crane barge, a spill barge, the Survey Vessel CONSTITUITION V, the Crew Boats DC3 BRUCKENTHAL and SMI MUNRO, and the T/Vs SGT. HARRELL, MISS SYDNEY, LIL EMI, DOUGLAS B, GUAM, CORAL SEA and SARATOGA.  Advance notification timelines for ship traffic in the area is 2-hours prior to transiting, 1-hour prior to transiting, and again at 30-minutes prior to transiting the area.  Advance notification timelines for tow traffic in the area is 1-hour prior to transiting and again at 30-minutes prior to transiting the area.  Mariners are urged to exercise extreme caution within the work area and should transit at their slowest safe speed to minimize wake.  VHF-FM Channels: 13, 16 and 82, POC:  (848) 333-2694","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.08663,30.08134],[-94.08503,30.07569],[-94.07885,30.07539],[-94.07153,30.07718],[-94.06169,30.0752],[-94.04624,30.0645],[-94.03708,30.06153],[-94.03125,30.05668],[-94.02907,30.04925],[-94.03113,30.04013],[-94.03468,30.03736],[-94.03434,30.02775],[-94.02793,30.02091],[-93.98501,30.00743],[-93.97757,30.00773],[-93.96384,30.01298],[-93.95835,30.0111],[-93.958,30.00268],[-93.95354,29.99861],[-93.9334,29.9898],[-93.87664,29.98018],[-93.86004,29.97482],[-93.85924,29.96749],[-93.85432,29.97205],[-93.85501,29.97601],[-93.86084,29.98057],[-93.90513,29.989],[-93.91051,29.99604],[-93.91108,29.989],[-93.93077,29.99237],[-93.95022,30.0003],[-93.95423,30.01051],[-93.95938,30.01546],[-93.96762,30.01546],[-93.9762,30.0108],[-93.98135,30.01011],[-93.98169,30.01328],[-93.98513,30.01397],[-93.98593,30.0114],[-94.01557,30.02002],[-94.01305,30.02636],[-94.02186,30.03112],[-94.02873,30.02676],[-94.0309,30.02953],[-94.03044,30.03508],[-94.02644,30.05024],[-94.02964,30.05895],[-94.03445,30.06212],[-94.042,30.0649],[-94.06214,30.07807],[-94.07073,30.07926],[-94.07942,30.07797],[-94.08663,30.08134]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":44986,"geometry":{"type":"Polygon","coordinates":[[[-90.08789999999999,30.361050000000034],[-90.08918999999997,30.360790000000065],[-90.08927999999997,30.36101000000008],[-90.09034999999994,30.36044000000004],[-90.09013999999996,30.359780000000057],[-90.08790999999997,30.360610000000065],[-90.08566999999994,30.36032000000006],[-90.08554999999996,30.36077000000006],[-90.08789999999999,30.361050000000034]]]},"properties":{"ESRI_OID":44986,"MSI_UID":44986,"ATU":8,"TITLE":"The Rigolets - Lakes Pontchartrain And Maurepas/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100117410918,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:graislcha:lakbor:therig:lakponandmau","WATERWAY_NAME":"Lakes Pontchartrain And Maurepas","CREATE_DATE":1780327639000,"MODIFIED_DATE":1780327723000,"BEGIN_DATE":1780272000000,"END_DATE":1798934399000,"DESCRIPTION":"Lake Pontchartrain - Fishing Pier Repairs --- From: 2026-06-16 To: 2027-01-01 --- The M/V CAPTAIN BUDDY and a barge will be working on Lake Pontchartrain in the vicinity of the Sunset Point Fishing Piers, located in approximate positions 30-21-36.0N 090-05-24.0W and 30-21-38.5N 090-05-10.0W.  Operations will take place from 7:00 a.m. to 4:00 p.m., Monday through Friday.  Mariners are urged to transit the project area with caution.  VHF-FM Channel: 16,  POC: (504) 952-0394","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.0879,30.36105],[-90.08919,30.36079],[-90.08928,30.36101],[-90.09035,30.36044],[-90.09014,30.35978],[-90.08791,30.36061],[-90.08567,30.36032],[-90.08555,30.36077],[-90.0879,30.36105]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":45471,"geometry":{"type":"Polygon","coordinates":[[[-74.50347999999997,39.298100000000034],[-74.53260999999998,39.29514000000006],[-74.61154999999997,39.24651000000006],[-74.51421999999997,39.24328000000003],[-74.50347999999997,39.298100000000034]]]},"properties":{"ESRI_OID":45471,"MSI_UID":45471,"ATU":5,"TITLE":"Sector Delaware Bay, Submerged Land Act (SLA) - Great Egg Harbor Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382912,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:greeggharinl","WATERWAY_NAME":"Great Egg Harbor Inlet","CREATE_DATE":1780658812000,"MODIFIED_DATE":1780658936000,"BEGIN_DATE":1780617600000,"END_DATE":1792454399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)\n\nFrom: 2026-06-05 To: 2026-10-19\n\nLocation:\n39° 17' 25.35\" N;\n74° 31' 22.89\" W\n\n Great Lakes Dredge and Dock, LLC will be conducting Beach Renourishment in Great Egg Harbor Inlet and Peck Beach including placement of approximately 1,600,000 cubic yards of beach fill starting from the groin at Seaview Road and ending between 14th and 15th Streets in Ocean City, New Jersey. The Cutter Suction Dredge (CSD) Illinois will dredge beach fill quality material from the Great\nEgg Harbor Inlet Borrow Area, located approximately 5,000 feet offshore, north east of the project location, east of the Great Egg Harbor Inlet. The material will pump through one subline extending from the borrow area to the placement beach. \nGLDD has secured two waterside staging areas on the northeast side of Absecon Inlet in Atlantic City where rafted pipeline and equipment will be stored when not in use. The survey vessel Wolf River and crew transfer vessel (CTV) Cooper River will traverse between the work areas and Golden Nugget Marina in Atlantic City throughout the duration of the project.\n 24 hours per day, 7 days per week\nEQUIPMENT ON SCENE: Cutter Suction Dredge (CSD) Illinois, Derrick GL77, Multicat Cape Canaveral, Tug McBoys, CTV Saginaw River, Survey vessel TBD .\nMariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. Contact all vessels on 13 and 16.  P.O.C  Johan Van Bladel (630) 235-9612    JVanBladel@gldd.com","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.50348,39.2981],[-74.53261,39.29514],[-74.61155,39.24651],[-74.51422,39.24328],[-74.50348,39.2981]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":45750,"geometry":{"type":"Polygon","coordinates":[[[-74.53048999999999,39.29499000000004],[-74.53788999999995,39.292880000000025],[-74.53720999999996,39.28630000000004],[-74.54335999999995,39.284530000000075],[-74.53897999999998,39.27804000000003],[-74.52033999999998,39.28564000000006],[-74.52301999999997,39.29037000000005],[-74.53048999999999,39.29499000000004]]]},"properties":{"ESRI_OID":45750,"MSI_UID":45750,"ATU":5,"TITLE":"Sector Delaware Bay, Submerged Land Act (SLA) - Great Egg Harbor Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382912,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:greeggharinl","WATERWAY_NAME":"Great Egg Harbor Inlet","CREATE_DATE":1780942505000,"MODIFIED_DATE":1780943269000,"BEGIN_DATE":1780876800000,"END_DATE":1792454399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-08 To: 2026-10-19\n\nLocation:\n39-17-41.964N/074-31-49.764W\n39-17-25.332N/074-31-22.872W\n39-17-08.304N/074-31-13.224W\n39-16-40.944N/074-32-20.328W\n39-17-04.308N/074-32-36.096W\n39-17-10.680N/074-32-13.956W\n39-17-34.368N/074-32-16.404W\n39-17-41.964N/074-31-49.764W\n\nBorrow area for Great Lakes Dredge and Dock, LLC beach renourishment project, Ocean City, NJ. The Cutter Suction Dredge (CSD) Illinois will dredge beachfill quality material from the Great Egg Harbor Inlet Borrow Area, located approximately 5,000 feet offshore, north east of the\nproject location, east of the Great Egg Harbor Inlet. The material will pump through one subline extending from the borrow area to the placement beach. Operations will start June 6, 2026 with completion date of October 19, 2026. Ops will be conduct 24 hours a day, 7 days a week. Vessels will monitor VHF 13 and 16. MSI # 45750.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.53049,39.29499],[-74.53789,39.29288],[-74.53721,39.2863],[-74.54336,39.28453],[-74.53898,39.27804],[-74.52034,39.28564],[-74.52302,39.29037],[-74.53049,39.29499]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":45757,"geometry":{"type":"Polygon","coordinates":[[[-74.41869999999994,39.38536000000005],[-74.41919999999999,39.38498000000004],[-74.41674999999998,39.382660000000044],[-74.41623999999996,39.383110000000045],[-74.41869999999994,39.38536000000005]]]},"properties":{"ESRI_OID":45757,"MSI_UID":45757,"ATU":5,"TITLE":"Sector Delaware Bay, Submerged Land Act (SLA) - Absecon Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382908,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:absinl","WATERWAY_NAME":"Absecon Inlet","CREATE_DATE":1780943100000,"MODIFIED_DATE":1780943214000,"BEGIN_DATE":1780876800000,"END_DATE":1792454399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-08 To: 2026-10-19\n\nLocation:\n39-23-07.296N/074-25-07.320W\n39-22-59.196N/074-24-58.464W\n39-22-57.576N/074-25-00.300W\n39-23-05.928N/074-25-09.120W\n39-23-07.296N/074-25-07.320W\n\nWaterside Staging Area for Great Lakes Dredge and Dock, LLC beach renourishment project, Ocean City, NJ.  Operations will start June 6, 2026 with completion date of October 19, 2026. Ops will be conduct 24 hours a day, 7 days a week. Vessels will monitor VHF 13 and 16. MSI # 45757.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.4187,39.38536],[-74.4192,39.38498],[-74.41675,39.38266],[-74.41624,39.38311],[-74.4187,39.38536]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":45758,"geometry":{"type":"Polygon","coordinates":[[[-74.42544999999996,39.39062000000007],[-74.42587999999995,39.38999000000007],[-74.42243999999994,39.38851000000005],[-74.42206999999996,39.38922000000008],[-74.42544999999996,39.39062000000007]]]},"properties":{"ESRI_OID":45758,"MSI_UID":45758,"ATU":5,"TITLE":"Sector Delaware Bay, Submerged Land Act (SLA) - Absecon Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382908,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:absinl","WATERWAY_NAME":"Absecon Inlet","CREATE_DATE":1780943170000,"MODIFIED_DATE":1781001151000,"BEGIN_DATE":1780876800000,"END_DATE":1792454399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-08 To: 2026-10-19\n\nLocation:\n39-23-26.232N/074-25-31.620W\n39-23-21.192N/074-25-19.452W\n39-23-18.636N/074-25-20.784W\n39-23-23.964N/074-25-33.168W\n39-23-26.232N/074-25-31.620W\n\nWaterside Staging Area for Great Lakes Dredge and Dock, LLC beach renourishment project, Ocean City, NJ.  Operations will start June 6, 2026 with completion date of October 19, 2026. Ops will be conduct 24 hours a day, 7 days a week. Vessels will monitor VHF 13 and 16. MSI # 45758.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.42545,39.39062],[-74.42588,39.38999],[-74.42244,39.38851],[-74.42207,39.38922],[-74.42545,39.39062]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46043,"geometry":{"type":"Polygon","coordinates":[[[-117.20689999999996,32.72863000000007],[-117.21313999999995,32.72802000000007],[-117.21440999999999,32.72240000000005],[-117.20468999999997,32.723160000000064],[-117.20506999999998,32.72479000000004],[-117.21300999999994,32.72383000000008],[-117.21395999999999,32.72428000000008],[-117.21378999999996,32.72488000000004],[-117.20530999999994,32.725990000000024],[-117.20689999999996,32.72863000000007]]]},"properties":{"ESRI_OID":46043,"MSI_UID":46043,"ATU":11,"TITLE":"Approaches To San Diego Bay - San Diego Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385494,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:apptosandiebay:sandiebay","WATERWAY_NAME":"San Diego Bay","CREATE_DATE":1781109063000,"MODIFIED_DATE":1781114938000,"BEGIN_DATE":1781049600000,"END_DATE":1790467199000,"DESCRIPTION":"Power Engineering Construction will conduct crane barge operations from June 24 through September 25, 2026, in the vicinity of Harbor Island, San Diego at 32.72447, -117.20550 and Spanish Landing Park, San Diego at 32.72808, -117.21222. Work will be conducted Monday through Friday from 0600 to 1800. Operations will utilize a 110-ton crane on a 60’ x 100’ Flexi-float barge and a 60’ x 80’ material barge, with barges spudded down. All vessels and equipment on site will monitor VHF-FM channels 9, 12, and 16. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. For further comments or details, contact Juan Apodaca at (925) 234-8339. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.2069,32.72863],[-117.21314,32.72802],[-117.21441,32.7224],[-117.20469,32.72316],[-117.20507,32.72479],[-117.21301,32.72383],[-117.21396,32.72428],[-117.21379,32.72488],[-117.20531,32.72599],[-117.2069,32.72863]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46047,"geometry":{"type":"Polygon","coordinates":[[[-96.55706999999995,28.645350000000064],[-96.55706999999995,28.64390000000003],[-96.56287999999995,28.640250000000037],[-96.56438999999995,28.637520000000052],[-96.56686999999994,28.637520000000052],[-96.56695999999994,28.62952000000007],[-96.56759999999997,28.600750000000062],[-96.56484999999998,28.594720000000052],[-96.55532999999997,28.588010000000054],[-96.35305999999997,28.445440000000076],[-96.35208999999998,28.44640000000004],[-96.56346999999994,28.595770000000073],[-96.56602999999996,28.60083000000003],[-96.56648999999999,28.60674000000006],[-96.56592999999998,28.629710000000046],[-96.56507999999997,28.63387000000006],[-96.56237999999996,28.638550000000066],[-96.55779999999999,28.64214000000004],[-96.55713999999995,28.64235000000008],[-96.54969999999997,28.64247000000006],[-96.54978999999997,28.645260000000064],[-96.55706999999995,28.645350000000064]]]},"properties":{"ESRI_OID":46047,"MSI_UID":46047,"ATU":8,"TITLE":"Sector Corpus Christi, Submerged Land Act (SLA) - Matagorda Ship Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385135,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon:seccorchrtersea:seccorchrsublanact:matshicha","WATERWAY_NAME":"Matagorda Ship Channel","CREATE_DATE":1781112049000,"MODIFIED_DATE":1781112571000,"BEGIN_DATE":1781049600000,"END_DATE":1796255999000,"DESCRIPTION":"Matagorda Ship Channel - Dredge Operation --- From: 2026-06-15 To: 2026-12-01 --- The Dredge EMIL KURTZ will dredge in the Matagorda Ship Channel between Matagorda Ship Channel Light 19 (LLNR-27205) and the Matagorda Ship Channel Point Comfort Turning Basin.  Dredging operations will start in the northern portion of the channel and work in a southerly direction.  Work will be conducted 24-hours a day, 7-days a week.  Additional on-scene vessels will include M/Vs BRUCE M., ELENA LAQUAY, KETTIE JO, BA-24, and BA-21, one supply barge, and a fuel barge.  The dredge requests 2-hours advance notice for passing arrangements.  Mariners are urged to transit at their slowest safe speed to minimize wake and procced with caution after passing arrangements have been made.  VHF-FM Channels: 16 and 79,  POC: (361) 487-6471","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-96.55707,28.64535],[-96.55707,28.6439],[-96.56288,28.64025],[-96.56439,28.63752],[-96.56687,28.63752],[-96.56696,28.62952],[-96.5676,28.60075],[-96.56485,28.59472],[-96.55533,28.58801],[-96.35306,28.44544],[-96.35209,28.4464],[-96.56347,28.59577],[-96.56603,28.60083],[-96.56649,28.60674],[-96.56593,28.62971],[-96.56508,28.63387],[-96.56238,28.63855],[-96.5578,28.64214],[-96.55714,28.64235],[-96.5497,28.64247],[-96.54979,28.64526],[-96.55707,28.64535]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46064,"geometry":{"type":"Polygon","coordinates":[[[-90.61049999999994,27.411830000000066],[-90.62066999999996,26.932000000000073],[-90.06082999999995,26.921500000000037],[-90.04832999999996,27.401000000000067],[-90.61049999999994,27.411830000000066]]]},"properties":{"ESRI_OID":46064,"MSI_UID":46064,"ATU":8,"TITLE":"Sector New Orleans, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116384641,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon","WATERWAY_NAME":"Sector New Orleans, Exclusive Economic Zone (EEZ)","CREATE_DATE":1781115000000,"MODIFIED_DATE":1781115462000,"BEGIN_DATE":1781049600000,"END_DATE":1789603199000,"DESCRIPTION":"Gulf of America – Survey Operation --- From: 2026-06-09 To: 2026-09-15 --- The M/Vs OLYMPIC ARTEMIS, SANCO SWIFT, ISLAND PRIDE, and KOLY LEVI will be conducting survey operations offshore in the Gulf of America.  The survey area is bound by approximate positions: 27-24-03.6N 090-02-54.0W, 27-24-42.6N 090-36-37.8W, 26-55-55.2N 090-37-14.4W, 26-55-17.4N 090-03-39.0W.  Mariners are requested to maintain a wide berth to reduce impacts to survey data and to avoid entanglement with towed/deployed equipment.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.6105,27.41183],[-90.62067,26.932],[-90.06083,26.9215],[-90.04833,27.401],[-90.6105,27.41183]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46197,"geometry":{"type":"Polygon","coordinates":[[[-90.06176999999997,35.21237000000008],[-90.06287999999995,35.21237000000008],[-90.06161999999995,35.20058000000006],[-90.06004999999999,35.20049000000006],[-90.06001999999995,35.20685000000003],[-90.06176999999997,35.21237000000008]]]},"properties":{"ESRI_OID":46197,"MSI_UID":46197,"ATU":2,"TITLE":"New Orleans To Baton Rouge - Lower Mississippi River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100118284592,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv","WATERWAY_NAME":"Lower Mississippi River","CREATE_DATE":1781197614000,"MODIFIED_DATE":1781206289000,"BEGIN_DATE":1781136000000,"END_DATE":1806710399000,"DESCRIPTION":"Commencing July 1, 2026, and continuing until April 1, 2027, the Dredge M. GARRISON will be conducting dredging operations at Fullen Dock, along the LDB, in the vicinity of Mile 740.0.  Work will be conducted 6:00 a.m. until 6:00 p.m., 7-days a week.  The Dredge M. GARRISON will monitor VHF-FM Channel 7.  Mariners are urged transit the area at their slowest safe speed to minimize their wake and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.06177,35.21237],[-90.06288,35.21237],[-90.06162,35.20058],[-90.06005,35.20049],[-90.06002,35.20685],[-90.06177,35.21237]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46237,"geometry":{"type":"Polygon","coordinates":[[[-74.12451999999996,39.77457000000004],[-74.12727999999998,39.76873000000006],[-74.12811999999997,39.75849000000005],[-74.12554999999998,39.75819000000007],[-74.12232999999998,39.77452000000005],[-74.12451999999996,39.77457000000004]]]},"properties":{"ESRI_OID":46237,"MSI_UID":46237,"ATU":5,"TITLE":"Sector Delaware Bay, Submerged Land Act (SLA) - Barnegat Inlet/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382918,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:barinl","WATERWAY_NAME":"Barnegat Inlet","CREATE_DATE":1781269815000,"MODIFIED_DATE":1781269870000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-46-28.452N/074-07-28.272W\n39-46-28.272N/074-07-20.388W\n39-45-29.484N/074-07-31.980W\n39-45-30.564N/074-07-41.232W\n39-46-07.428N/074-07-38.208W\n39-46-28.452N/074-07-28.272W\nH &amp;amp; L Contracting will be conducting dredging in Double Creek Channel starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46237\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.12452,39.77457],[-74.12728,39.76873],[-74.12812,39.75849],[-74.12555,39.75819],[-74.12233,39.77452],[-74.12452,39.77457]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46238,"geometry":{"type":"Polygon","coordinates":[[[-74.25337999999994,39.64951000000008],[-74.25743999999997,39.646930000000054],[-74.24024999999995,39.632760000000076],[-74.23644999999993,39.635680000000036],[-74.25337999999994,39.64951000000008]]]},"properties":{"ESRI_OID":46238,"MSI_UID":46238,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1781270011000,"MODIFIED_DATE":1781270031000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-38-58.236N/074-15-12.168W\n39-38-08.448N/074-14-11.220W\n39-37-57.936N/074-14-24.900W\n39-38-48.948N/074-15-26.784W\n39-38-58.236N/074-15-12.168W\nH &amp;amp; L Contracting will be conducting dredging in Cedar Run Channel starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46238\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.25338,39.64951],[-74.25744,39.64693],[-74.24025,39.63276],[-74.23645,39.63568],[-74.25338,39.64951]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46240,"geometry":{"type":"Polygon","coordinates":[[[-74.21876999999995,39.65941000000004],[-74.21995999999996,39.65849000000003],[-74.20927999999998,39.656630000000064],[-74.20911999999998,39.65790000000004],[-74.21876999999995,39.65941000000004]]]},"properties":{"ESRI_OID":46240,"MSI_UID":46240,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1781270383000,"MODIFIED_DATE":1781270405000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-39-33.876N/074-13-07.572W\n39-39-28.440N/074-12-32.832W\n39-39-23.868N/074-12-33.408W\n39-39-30.564N/074-13-11.856W\n39-39-33.876N/074-13-07.572W\nH &amp;amp; L Contracting will be conducting dredging in Beach Haven West starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46240.\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.21877,39.65941],[-74.21996,39.65849],[-74.20928,39.65663],[-74.20912,39.6579],[-74.21877,39.65941]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46241,"geometry":{"type":"Polygon","coordinates":[[[-74.21321999999998,39.66790000000003],[-74.21538999999996,39.665580000000034],[-74.21462999999994,39.66501000000005],[-74.21264999999994,39.66667000000007],[-74.20806999999996,39.66493000000003],[-74.20748999999995,39.66551000000004],[-74.21321999999998,39.66790000000003]]]},"properties":{"ESRI_OID":46241,"MSI_UID":46241,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1781270629000,"MODIFIED_DATE":1781270899000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-40-04.440N/074-12-47.592W\n39-39-55.836N/074-12-26.964W\n39-39-53.748N/074-12-29.052W\n39-40-00.012N/074-12-45.540W\n39-39-54.036N/074-12-52.668W\n39-39-56.088N/074-12-55.404W\n39-40-04.440N/074-12-47.592W\nH &amp;amp; L Contracting will be conducting dredging in Margos Channel starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46241.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.21322,39.6679],[-74.21539,39.66558],[-74.21463,39.66501],[-74.21265,39.66667],[-74.20807,39.66493],[-74.20749,39.66551],[-74.21322,39.6679]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46242,"geometry":{"type":"Polygon","coordinates":[[[-74.21151999999995,39.657350000000065],[-74.21286999999995,39.65197000000006],[-74.21724999999998,39.64764000000008],[-74.21621999999996,39.64677000000006],[-74.21118999999999,39.65057000000007],[-74.20967999999993,39.65706000000006],[-74.21151999999995,39.657350000000065]]]},"properties":{"ESRI_OID":46242,"MSI_UID":46242,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1781270877000,"MODIFIED_DATE":1781270895000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-39-26.460N/074-12-41.472W\n39-39-25.416N/074-12-34.848W\n39-39-02.052N/074-12-40.284W\n39-38-48.372N/074-12-58.392W\n39-38-51.504N/074-13-02.100W\n39-39-07.092N/074-12-46.332W\n39-39-26.460N/074-12-41.472W\nH &amp;amp; L Contracting will be conducting dredging in Mill Creek Channel starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46241.\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.21152,39.65735],[-74.21287,39.65197],[-74.21725,39.64764],[-74.21622,39.64677],[-74.21119,39.65057],[-74.20968,39.65706],[-74.21152,39.65735]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46243,"geometry":{"type":"Polygon","coordinates":[[[-74.13447999999994,39.71184000000005],[-74.14194999999995,39.71177000000006],[-74.14194999999995,39.71063000000004],[-74.13428999999996,39.71070000000003],[-74.13447999999994,39.71184000000005]]]},"properties":{"ESRI_OID":46243,"MSI_UID":46243,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1781271062000,"MODIFIED_DATE":1781271087000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-42-42.624N/074-08-04.128W\n39-42-38.520N/074-08-03.444W\n39-42-38.268N/074-08-31.020W\n39-42-42.372N/074-08-31.020W\n39-42-42.624N/074-08-04.128W\nH &amp;amp; L Contracting will be conducting dredging in Harveys Cedar 2 Channel starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46243\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.13448,39.71184],[-74.14195,39.71177],[-74.14195,39.71063],[-74.13429,39.7107],[-74.13448,39.71184]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46247,"geometry":{"type":"Polygon","coordinates":[[[-74.14049999999997,39.69756000000007],[-74.14605999999998,39.69476000000003],[-74.15114999999997,39.69659000000007],[-74.15146999999996,39.69632000000007],[-74.15191999999996,39.695850000000064],[-74.14589999999998,39.69382000000007],[-74.13978999999995,39.69694000000004],[-74.14049999999997,39.69756000000007]]]},"properties":{"ESRI_OID":46247,"MSI_UID":46247,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1781271361000,"MODIFIED_DATE":1781271406000,"BEGIN_DATE":1781222400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-12 To: 2027-01-31\n\nLocation:\n39-41-51.216N/074-08-25.800W\n39-41-48.984N/074-08-23.244W\n39-41-37.752N/074-08-45.240W\n39-41-45.060N/074-09-06.912W\n39-41-46.752N/074-09-05.292W\n39-41-47.724N/074-09-04.140W\n39-41-41.136N/074-08-45.816W\n39-41-51.216N/074-08-25.800W\n\nH &amp;amp; L Contracting will be conducting dredging in Harveys Cedar Channel starting 26, 2026 to January 31, 2027. Operations will be conducted 24 hours a day, 7 days a week. Dredge Scrod, 30' x 80' excavator barge, and tugs Dixie and Ike will monitor VHF CH 16 &amp;amp; 65. Equipment will need a one hour notification if needed to move. On site contact Keith Johnson can be reached at 631-553-1034. The discharge pipeline aft of the dredge to the disposal site(s) will have submerged pipeline crossings, that will be marked with red and green navigations aids along with red and green lights. The pipeline will be marked with spar buoys and yellow flashing lights. Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area. MSI # 46247","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.1405,39.69756],[-74.14606,39.69476],[-74.15115,39.69659],[-74.15147,39.69632],[-74.15192,39.69585],[-74.1459,39.69382],[-74.13979,39.69694],[-74.1405,39.69756]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46302,"geometry":{"type":"Polygon","coordinates":[[[-93.32489999999996,30.097880000000032],[-93.32836999999995,30.097560000000044],[-93.32780999999994,30.095510000000047],[-93.32750999999996,30.094170000000076],[-93.32726999999994,30.093380000000025],[-93.32705999999996,30.092810000000043],[-93.32709999999997,30.09197000000006],[-93.32722999999999,30.091420000000028],[-93.32756999999998,30.09074000000004],[-93.32833999999997,30.088950000000068],[-93.32349999999997,30.088550000000055],[-93.32328999999999,30.089040000000068],[-93.32306999999997,30.08991000000003],[-93.32297999999997,30.090780000000052],[-93.32267999999999,30.091660000000047],[-93.32289999999995,30.092570000000023],[-93.32319999999999,30.093380000000025],[-93.32392999999996,30.095060000000046],[-93.32489999999996,30.097880000000032]]]},"properties":{"ESRI_OID":46302,"MSI_UID":46302,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Calcasieu Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384877,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:calcha","WATERWAY_NAME":"Calcasieu Channel","CREATE_DATE":1781285142000,"MODIFIED_DATE":1785335451000,"BEGIN_DATE":1781222400000,"END_DATE":1814486399000,"DESCRIPTION":"Calcasieu Channel - Material Offloading --- From: 2026-06-01 To: 2027-06-30 --- Material offloading will be conducted along the Calcasieu Channel in the vicinity of Mile 23.0, RDB.  Work will take place Monday through Saturday, during daylight hours.  On-scene vessels will include the T/V REPENTANCE, deck barges, and hopper barges.  Mariners are requested to transit the area at their slowest safe speed to minimize wake or wash, and proceed with caution between Miles 22.0 and 23.0 due to LA-LNG marine construction activities. VHF-FM Channels: 16 and 88,  POC: (337) 512-4074 or (832) 621-9655","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.3249,30.09788],[-93.32837,30.09756],[-93.32781,30.09551],[-93.32751,30.09417],[-93.32727,30.09338],[-93.32706,30.09281],[-93.3271,30.09197],[-93.32723,30.09142],[-93.32757,30.09074],[-93.32834,30.08895],[-93.3235,30.08855],[-93.32329,30.08904],[-93.32307,30.08991],[-93.32298,30.09078],[-93.32268,30.09166],[-93.3229,30.09257],[-93.3232,30.09338],[-93.32393,30.09506],[-93.3249,30.09788]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46646,"geometry":{"type":"Polygon","coordinates":[[[-95.42019999999997,28.836470000000077],[-95.47842999999995,28.832620000000077],[-95.85342999999995,28.632240000000024],[-96.22403999999995,28.479130000000055],[-96.37197999999995,28.37865000000005],[-96.43789999999996,28.29871000000003],[-96.59024999999997,28.22646000000003],[-96.90957999999995,27.995190000000036],[-97.18057999999996,27.61035000000004],[-97.32705999999996,27.30750000000006],[-97.36807999999996,26.95551000000006],[-97.31387999999998,26.713700000000074],[-97.19522999999998,26.341480000000047],[-97.14248999999995,26.066790000000026],[-97.14141999999998,25.975090000000023],[-96.97952999999995,25.976230000000044],[-96.98465999999996,26.018030000000067],[-96.98755999999997,26.044130000000052],[-96.99048999999997,26.110580000000027],[-96.99854999999997,26.128990000000044],[-97.03090999999995,26.348740000000078],[-97.09682999999995,26.582160000000044],[-97.12612999999999,26.642400000000066],[-97.18618999999995,26.837320000000034],[-97.20961999999997,26.995370000000037],[-97.19789999999995,27.174040000000048],[-97.13198999999997,27.38235000000003],[-96.99868999999995,27.62402000000003],[-96.87709999999998,27.799090000000035],[-96.72182999999995,27.96353000000005],[-96.54311999999999,28.09671000000003],[-96.38198999999997,28.181970000000035],[-96.31459999999998,28.205200000000048],[-96.25014999999996,28.26457000000005],[-96.23549999999994,28.290370000000053],[-96.10805999999997,28.370310000000075],[-95.75942999999995,28.515860000000032],[-95.46205999999995,28.662490000000048],[-95.43843999999996,28.677270000000078],[-95.41719999999998,28.688190000000077],[-95.42019999999997,28.836470000000077]]]},"properties":{"ESRI_OID":46646,"MSI_UID":46646,"ATU":8,"TITLE":"Sector Corpus Christi, Territorial Sea - Sector Corpus Christi, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116384647,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon:seccorchrtersea:seccorchrsublanact","WATERWAY_NAME":"Sector Corpus Christi, Submerged Land Act (SLA)","CREATE_DATE":1781722316000,"MODIFIED_DATE":1781778621000,"BEGIN_DATE":1781654400000,"END_DATE":1789603199000,"DESCRIPTION":"Gulf of America - Texas State Waters - Survey Operation --- From: 2026-07-01 To: 2026-09-15 --- The R/V JAMES K GOODWIN will conduct vibracore survey sampling in the Gulf of America in the state waters off the coast of Texas, from Freeport, TX to the U.S./Mexico Maritime Boundary Line near South Padre Island, TX.  Two hundred and sixteen vibracore surveys will be conducted in the survey area, starting in the southern portion of the work area and proceeding north.  Work will take place daily, from sunrise to sunset.  The research vessel will be restricted in maneuverability during sampling operations.  Mariners are urged to maintain a wide berth from the research vessel to avoid interfering with data and sampling collections.  VHF-FM Channels: 16,  POC: (850) 443-1253","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-95.4202,28.83647],[-95.47843,28.83262],[-95.85343,28.63224],[-96.22404,28.47913],[-96.37198,28.37865],[-96.4379,28.29871],[-96.59025,28.22646],[-96.90958,27.99519],[-97.18058,27.61035],[-97.32706,27.3075],[-97.36808,26.95551],[-97.31388,26.7137],[-97.19523,26.34148],[-97.14249,26.06679],[-97.14142,25.97509],[-96.97953,25.97623],[-96.98466,26.01803],[-96.98756,26.04413],[-96.99049,26.11058],[-96.99855,26.12899],[-97.03091,26.34874],[-97.09683,26.58216],[-97.12613,26.6424],[-97.18619,26.83732],[-97.20962,26.99537],[-97.1979,27.17404],[-97.13199,27.38235],[-96.99869,27.62402],[-96.8771,27.79909],[-96.72183,27.96353],[-96.54312,28.09671],[-96.38199,28.18197],[-96.3146,28.2052],[-96.25015,28.26457],[-96.2355,28.29037],[-96.10806,28.37031],[-95.75943,28.51586],[-95.46206,28.66249],[-95.43844,28.67727],[-95.4172,28.68819],[-95.4202,28.83647]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46693,"geometry":{"type":"Polygon","coordinates":[[[-86.36083999999994,38.12960000000004],[-86.36106999999998,38.12825000000004],[-86.35322999999994,38.127800000000036],[-86.35316999999998,38.12878000000006],[-86.36083999999994,38.12960000000004]]]},"properties":{"ESRI_OID":46693,"MSI_UID":46693,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1781788991000,"MODIFIED_DATE":1781789830000,"BEGIN_DATE":1781740800000,"END_DATE":1793577599000,"DESCRIPTION":"Continuing until October 31, 2026, pile driving operations are being conducted at the Sandy Quarry, in the vicinity of Mile 674.0.  Work will be conducted from 7:00 a.m. until 6:00 p.m.  The construction crew will monitor VHF-FM Channels 73 and 74.  Mariners are urged to exercise caution in the area.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-86.36084,38.1296],[-86.36107,38.12825],[-86.35323,38.1278],[-86.35317,38.12878],[-86.36084,38.1296]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46696,"geometry":{"type":"Polygon","coordinates":[[[-88.01755999999995,35.386960000000045],[-88.01778999999999,35.386190000000056],[-88.01422999999994,35.385800000000074],[-88.01409999999998,35.38653000000005],[-88.01755999999995,35.386960000000045]]]},"properties":{"ESRI_OID":46696,"MSI_UID":46696,"ATU":2,"TITLE":"Ohio River - Tennessee River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381408,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv:tenriv","WATERWAY_NAME":"Tennessee River","CREATE_DATE":1781790503000,"MODIFIED_DATE":1781802462000,"BEGIN_DATE":1781740800000,"END_DATE":1789603199000,"DESCRIPTION":"Commencing June 29, 2026, and continuing through September 15, 2026, dive operations will be conducted along the RDB, in the vicinity of Mile 159.2.  Dive operations will be conducted from 7:00 a.m. to 5:00 p.m., daily.  The dive platform will be a 25-foot workboat displaying diver down and an alpha flag, along with 2 dive barges.  The dive platform will monitor VHF-FM Channel 13 or 16, for additional information.  Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.01756,35.38696],[-88.01779,35.38619],[-88.01423,35.3858],[-88.0141,35.38653],[-88.01756,35.38696]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46780,"geometry":{"type":"Polygon","coordinates":[[[-76.38598999999994,38.40739000000008],[-76.38814999999994,38.40619000000004],[-76.38117999999997,38.39814000000007],[-76.37896999999998,38.39939000000004],[-76.38598999999994,38.40739000000008]]]},"properties":{"ESRI_OID":46780,"MSI_UID":46780,"ATU":5,"TITLE":"Sector Virginia, Submerged Land Act (SLA) - Chesapeake Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100117224627,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha","WATERWAY_NAME":"Chesapeake Channel","CREATE_DATE":1782126870000,"MODIFIED_DATE":1782126890000,"BEGIN_DATE":1782777600000,"END_DATE":1789603199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-06-30 To: 2026-09-16\n\nLocation:\n38-24-26.604N/076-23-09.564W\n38-23-57.804N/076-22-44.292W\n38-23-53.304N/076-22-52.248W\n38-24-22.284N/076-23-17.340W\n38-24-26.604N/076-23-09.564W\n\nMcLean Contracting Company will conduct crane and diving operations to rehabilitate select concrete piles at the Offshore Cove Point LNG Marine Facilities, in approximate position: 38°24'10.25\"N 76°23'03.03\"W. Project will run from July 15, 2026 to September 15, 2026 and be conducted 24 hours a day, 7 days a week. Contractor will monitor VHF 74, 16, and 13 and can be contacted at, Mr. Matthew Tirrel, McLean Contracting Dive Supervisor, (203) 710-8559, Bob Eisenhart, Senior Safety Coordinator, (410) 982-5596. MSI # 46780.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-76.38599,38.40739],[-76.38815,38.40619],[-76.38118,38.39814],[-76.37897,38.39939],[-76.38599,38.40739]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46900,"geometry":{"type":"Polygon","coordinates":[[[-122.41078999999996,37.92258000000004],[-122.41143999999997,37.922210000000064],[-122.40974999999997,37.92050000000006],[-122.40909999999997,37.920810000000074],[-122.41078999999996,37.92258000000004]]]},"properties":{"ESRI_OID":46900,"MSI_UID":46900,"ATU":11,"TITLE":"San Francisco Oakland Bay Bridge West Crossing - San Francisco Bay North Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385434,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:sanfraoakbaybriwescro:sanfrabaynorcha","WATERWAY_NAME":"San Francisco Bay North Channel","CREATE_DATE":1782150301000,"MODIFIED_DATE":1782160312000,"BEGIN_DATE":1782086400000,"END_DATE":1796083199000,"DESCRIPTION":"Dredging operations will be conducted at the Chevron Long Wharf, Richmond, beginning on or about July 1, 2026, and ending before November 30, 2026. The clamshell dredge “DB 24” will carry out dredging operations, and a fleet of three split hull scows with capacities of 2,000 CY and 3,000 CY will be utilized for all disposal operations to SF-10, SF-11, or MWRP. The tow tug “Sarah Reed” will serve as the tow tug during disposal operations, with support from the tender tug “Phyllis T.” All equipment will monitor VHF channels 13, 14, and 80A. Operations will be conducted 24 hours a day, 7 days a week, between the Richmond Long Wharf Dredge Sites located at approximately 37.92191, -122.41122 and disposal sites. For more information, contact Operations Manager Dennis Salyers at (415) 497-5289. Mariners are advised to use extreme caution while transiting the dredge area. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.41079,37.92258],[-122.41144,37.92221],[-122.40975,37.9205],[-122.4091,37.92081],[-122.41079,37.92258]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":46962,"geometry":{"type":"Polygon","coordinates":[[[-89.97089999999997,29.916150000000073],[-89.97379999999998,29.91414000000003],[-89.97345999999999,29.913970000000063],[-89.97074999999995,29.915910000000054],[-89.97089999999997,29.916150000000073]]]},"properties":{"ESRI_OID":46962,"MSI_UID":46962,"ATU":8,"TITLE":"Via Mississippi River And Harvey Canal - Algiers Alternate Route/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384711,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:viamisrivandharcan:algaltrou","WATERWAY_NAME":"Algiers Alternate Route","CREATE_DATE":1782223239000,"MODIFIED_DATE":1782223477000,"BEGIN_DATE":1782172800000,"END_DATE":1798847999000,"DESCRIPTION":"Algiers Canal – GIWW – Lock Precautions --- From: 2026-06-23 To: Until Further Notice --- Mariners are to avoid making contact with the canal end long guidewall at Algiers Lock, due to deteriorating timbers and wall instability.  Tows are to navigate with extreme caution while entering and exiting the lock and at slow safe speeds to avoid the canal long guidewall area entirely.  For up-to-date information, the Lockmaster at Algiers Lock can be reached at (504) 354-1795 or the Lockwall can be contacted at (504) 354-1861.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-89.9709,29.91615],[-89.9738,29.91414],[-89.97346,29.91397],[-89.97075,29.91591],[-89.9709,29.91615]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":47073,"geometry":{"type":"Polygon","coordinates":[[[-79.28979999999996,33.36808000000008],[-79.29141999999996,33.366040000000055],[-79.29172999999997,33.36536000000007],[-79.29021999999998,33.36366000000004],[-79.28694999999993,33.36266000000006],[-79.28615999999994,33.36048000000005],[-79.28959999999995,33.35928000000007],[-79.29145999999997,33.35931000000005],[-79.29423999999995,33.35856000000007],[-79.29979999999995,33.358070000000055],[-79.29894999999993,33.35793000000007],[-79.29406999999998,33.358420000000024],[-79.29128999999995,33.35913000000005],[-79.28943999999996,33.359110000000044],[-79.28390999999993,33.36014000000006],[-79.28349999999995,33.361830000000054],[-79.28565999999995,33.36444000000006],[-79.28785999999997,33.36516000000006],[-79.28829999999994,33.365410000000054],[-79.28771999999998,33.36645000000004],[-79.28664999999995,33.36642000000006],[-79.28379999999999,33.36430000000007],[-79.28163999999998,33.36194000000006],[-79.28173999999996,33.358960000000025],[-79.28287999999998,33.358220000000074],[-79.28056999999995,33.35426000000007],[-79.27929999999998,33.35982000000007],[-79.28073999999998,33.363150000000076],[-79.28458999999998,33.36642000000006],[-79.28712999999993,33.367710000000045],[-79.28979999999996,33.36808000000008]]]},"properties":{"ESRI_OID":47073,"MSI_UID":47073,"ATU":7,"TITLE":"Winyah Bay Channel - Sampit Point/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384348,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:winbaycha:sampoi","WATERWAY_NAME":"Sampit Point","CREATE_DATE":1782309084000,"MODIFIED_DATE":1782309126000,"BEGIN_DATE":1782259200000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-24 \n47073\n\nSouthern Dreding’s dredge “BRUNSWICK” will be working in the Bypass Channel and the Steel Mill Channel of Georgetown Harbor commencing on or about June 26, 2026. The Dredge will operate on a 24 hour per day, 7 day per week basis until approximately August 31, 2026. To ensure safe passage in the vicinity of the operation, boaters should establish contact with the dredge on VHF-FM channel13 and 16 or by telephone at (843) 729-1691.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.2898,33.36808],[-79.29142,33.36604],[-79.29173,33.36536],[-79.29022,33.36366],[-79.28695,33.36266],[-79.28616,33.36048],[-79.2896,33.35928],[-79.29146,33.35931],[-79.29424,33.35856],[-79.2998,33.35807],[-79.29895,33.35793],[-79.29407,33.35842],[-79.29129,33.35913],[-79.28944,33.35911],[-79.28391,33.36014],[-79.2835,33.36183],[-79.28566,33.36444],[-79.28786,33.36516],[-79.2883,33.36541],[-79.28772,33.36645],[-79.28665,33.36642],[-79.2838,33.3643],[-79.28164,33.36194],[-79.28174,33.35896],[-79.28288,33.35822],[-79.28057,33.35426],[-79.2793,33.35982],[-79.28074,33.36315],[-79.28459,33.36642],[-79.28713,33.36771],[-79.2898,33.36808]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":47163,"geometry":{"type":"Polygon","coordinates":[[[-94.96510999999998,29.690590000000043],[-94.97574999999995,29.687430000000063],[-94.96868999999998,29.676870000000065],[-94.95764999999994,29.669980000000066],[-94.94768999999997,29.670180000000073],[-94.93425999999994,29.674040000000048],[-94.93906999999996,29.678670000000068],[-94.96510999999998,29.690590000000043]]]},"properties":{"ESRI_OID":47163,"MSI_UID":47163,"ATU":8,"TITLE":"Houston Ship Channel - Cedar Bayou Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385182,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha:cedbaycha","WATERWAY_NAME":"Cedar Bayou Channel","CREATE_DATE":1782394116000,"MODIFIED_DATE":1784565562000,"BEGIN_DATE":1782345600000,"END_DATE":1798847999000,"DESCRIPTION":"Cedar Bayou Channel - Marine Construction --- From: 2026-06-26 To: 2026-12-31 --- The Dredge GENERAL EISENHOWER will be digging two floatation access channels from the Cedar Bayou Channel to the berm construction and shore protection sites near Atkinson Island.  Work will take place 24-hours a day, 7-days a week.  Pile driving, dredging, and offloading will be conducted throughout the project area.  The dredge will pump discharged material inside the berm perimeter.  A temporary sheet pile wall will be installed in the first floatation access point to provide equipment access for shore protection work at the berm.  Additional on-scene vessels will include the Anchor Barge CAL2002, T/Vs IWO JIMA and CORREGIDOR, a 140 ft x 40 ft crane barge, two standard excavators, a long reach excavator, material barges, and bulldozers.  Barges and equipment will be staged within the project limits.  Mariners are urged to transit the area with caution and at their slowest safe speed to minimize wake.  VHF-FM Channels: 11, 13 and 16, POC: (307) 256-2558 or (850) 714-4311","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.96511,29.69059],[-94.97575,29.68743],[-94.96869,29.67687],[-94.95765,29.66998],[-94.94769,29.67018],[-94.93426,29.67404],[-94.93907,29.67867],[-94.96511,29.69059]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":47165,"geometry":{"type":"Polygon","coordinates":[[[-117.69282999999996,33.45885000000004],[-117.69297999999998,33.45706000000007],[-117.69017999999994,33.45700000000005],[-117.69014999999996,33.45878000000005],[-117.69282999999996,33.45885000000004]]]},"properties":{"ESRI_OID":47165,"MSI_UID":47165,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea - Sector Los Angeles, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385490,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact","WATERWAY_NAME":"Sector Los Angeles, Submerged Land Act (SLA)","CREATE_DATE":1782398190000,"MODIFIED_DATE":1784578854000,"BEGIN_DATE":1782345600000,"END_DATE":1788479999000,"DESCRIPTION":"Curtin Maritime (CMC) will conduct dredging operations for the West Breakwater Repair Project within Dana Point Harbor and adjacent waters near the West Breakwater and harbor entrance, Orange County, California, as depicted on NOAA Chart 18746. Operations are anticipated to commence on or about August 3, 2026, and continue through on or about September 02, 2026. Work will be will be conducted 12 hours per day, 6 days per week (Monday through Saturday).\n\nMechanical dredging will be conducted by the DB Ironbound (150’ x 50’), with dredged material transported via split-hull dump scows Long Point and Arrow Point (each with a 1,450 cubic yard capacity) to the approved nearshore placement site, centered at 33.45680, -117.68055. Support tugs for the operation include Kelly C, Sarah C, and Emma C. All manned equipment will monitor VHF-FM channels 11, 13, 16, and 87 or 01A (working channels).\n\nMariners are requested to transit the area with caution, reduce wake, maintain a safe distance from the equipment, and comply with all instructions provided by on-site marine personnel. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. For more information, contact Alexandro Rodriguez, Project Manager, at (562) 241-2350. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.69283,33.45885],[-117.69298,33.45706],[-117.69018,33.457],[-117.69015,33.45878],[-117.69283,33.45885]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":47180,"geometry":{"type":"Polygon","coordinates":[[[-89.67049999999995,40.55707000000007],[-89.67127999999997,40.55645000000004],[-89.67216999999994,40.55588000000006],[-89.67334999999997,40.55519000000004],[-89.67256999999995,40.55462000000006],[-89.67168999999996,40.55522000000008],[-89.67028999999997,40.55618000000004],[-89.66950999999995,40.55668000000003],[-89.67049999999995,40.55707000000007]]]},"properties":{"ESRI_OID":47180,"MSI_UID":47180,"ATU":2,"TITLE":"Lower Mississippi River - Illinois River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381277,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:illriv","WATERWAY_NAME":"Illinois River","CREATE_DATE":1782403077000,"MODIFIED_DATE":1782403632000,"BEGIN_DATE":1782345600000,"END_DATE":1793663999000,"DESCRIPTION":"Continuing through November 1, 2026, J.F. Brennan Company, Inc., will be conducting construction operations along the LDB at the Alto Pekin Grain Dock, Mile 151.4.  Operations will take place from 7:00 a.m. to 5:30 p.m., Monday through Friday. The marine construction plant will be 80 feet wide off the dock during operations and lighted after-hours.  Mariners should contact M/V ROBERT CALVEY on VHF-FM Channel 13 or 16 with any questions.  After-hours calls can be made to the project point of contact at (608) 519-5273. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-89.6705,40.55707],[-89.67128,40.55645],[-89.67217,40.55588],[-89.67335,40.55519],[-89.67257,40.55462],[-89.67169,40.55522],[-89.67029,40.55618],[-89.66951,40.55668],[-89.6705,40.55707]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":47303,"geometry":{"type":"Polygon","coordinates":[[[-74.87571999999994,38.952210000000036],[-74.88063999999997,38.95211000000006],[-74.88733999999994,38.95163000000008],[-74.89824999999996,38.949730000000045],[-74.89782999999994,38.948480000000075],[-74.88295999999997,38.95093000000003],[-74.87728999999996,38.95071000000007],[-74.87493999999998,38.94876000000005],[-74.87278999999995,38.94951000000003],[-74.87571999999994,38.952210000000036]]]},"properties":{"ESRI_OID":47303,"MSI_UID":47303,"ATU":5,"TITLE":"Cape May Inlet - Cape May Harbor/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382832,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:capmayhar","WATERWAY_NAME":"Cape May Harbor","CREATE_DATE":1782489481000,"MODIFIED_DATE":1782489524000,"BEGIN_DATE":1782432000000,"END_DATE":1788825599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-26 To: 2026-09-07\n\nLocation:\n38-57-07.956N/074-52-32.592W\n38-56-58.236N/074-52-22.044W\n38-56-55.536N/074-52-29.784W\n38-57-02.556N/074-52-38.244W\n38-57-03.348N/074-52-58.656W\n38-56-54.528N/074-53-52.188W\n38-56-59.028N/074-53-53.700W\n38-57-05.868N/074-53-14.424W\n38-57-07.596N/074-52-50.304W\n38-57-07.956N/074-52-32.592W\n\nThe Dredge FULLERTON will be performing dredging operations, in Cape May Harbor near Cape May, NJ beginning on July 1, 2026, and continue until September 5, 2026. Dredging will be conducted between Cape May Harbor Light 14 (Light List # 36765) Cape May Harbor Lighted Buoy 2 (Light List # 1465). There will be floating dredge pipeline utilized and will be positioned outside of the navigation channel. All Mariners are requested to contact Dredge FULLERTON prior to transiting the area, to make passing arrangements. The Dredge FULLERTON can be contacted via VHF radio channel 11, 13, and 16. Mariners are urged to maintain a safe distance from dredging equipment and transit the area with extreme caution. MSI # 47303.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.87572,38.95221],[-74.88064,38.95211],[-74.88734,38.95163],[-74.89825,38.94973],[-74.89783,38.94848],[-74.88296,38.95093],[-74.87729,38.95071],[-74.87494,38.94876],[-74.87279,38.94951],[-74.87572,38.95221]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":47380,"geometry":{"type":"Polygon","coordinates":[[[-83.14433999999994,42.21412000000004],[-83.18827999999996,42.10486000000003],[-83.23496999999998,41.968180000000075],[-83.19377999999995,41.637860000000046],[-82.58769999999998,41.452860000000044],[-82.61698999999999,41.67617000000007],[-82.68473999999998,41.683010000000024],[-83.08390999999995,41.87008000000003],[-83.11686999999995,42.21141000000006],[-83.14433999999994,42.21412000000004]]]},"properties":{"ESRI_OID":47380,"MSI_UID":47380,"ATU":9,"TITLE":"Lake Erie - WEST END OF LAKE ERIE/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116386006,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri","WATERWAY_NAME":"WEST END OF LAKE ERIE","CREATE_DATE":1782733773000,"MODIFIED_DATE":1783349931000,"BEGIN_DATE":1780876800000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-06-08 To: 2026-10-31\n\nHydrographic Survey for Nautical Chart Update\n\nOcean Surveys is expecting to conduct a Hydrographic Survey for NOAA to collect data for a nautical charting update in a portion of Western Lake Erie. There will be three vessels participating in the survey with operations being conducted 7 days a week. The survey vessels will make frequent 90-180 degree turns so other vessels in the area should maintain a sharp lookout and communicate early with the survey vessels. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-83.14434,42.21412],[-83.18828,42.10486],[-83.23497,41.96818],[-83.19378,41.63786],[-82.5877,41.45286],[-82.61699,41.67617],[-82.68474,41.68301],[-83.08391,41.87008],[-83.11687,42.21141],[-83.14434,42.21412]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":47561,"geometry":{"type":"Polygon","coordinates":[[[-93.68542999999994,29.43852000000004],[-93.68580999999995,29.37372000000005],[-93.64702999999997,29.374430000000075],[-93.64754999999997,29.438150000000064],[-93.68542999999994,29.43852000000004]]]},"properties":{"ESRI_OID":47561,"MSI_UID":47561,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Sabine Bank Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385188,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:sabbancha","WATERWAY_NAME":"Sabine Bank Channel","CREATE_DATE":1782831311000,"MODIFIED_DATE":1787837994000,"BEGIN_DATE":1776988800000,"END_DATE":1801439999000,"DESCRIPTION":"Sabine Bank Channel - Drag Operation --- From: 2026-04-24 To: Until Further Notice --- The M/Vs ANNAMARIA ROSE, MR. TOMMY, SIMPLE MAN, and SMITH INVADER are conducting trawling/drag operations near the Sabine Bank Channel, south of Sabine Bank Channel Lighted Buoy SB (LLNR-1085).  Additional on-scene vessels include the Survey Vessels JONATHAN WOODWARD, LADY BECKY, FM BROWN, and OHIO RIVER, and the Dredge ELLIS ISLAND and GALVESTON ISLAND.  Mariners are urged to transit the area with caution after passing arrangements have been made.  VHF-FM Channel: 16","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.68543,29.43852],[-93.68581,29.37372],[-93.64703,29.37443],[-93.64755,29.43815],[-93.68543,29.43852]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":47583,"geometry":{"type":"Polygon","coordinates":[[[-80.66012999999998,40.22354000000007],[-80.66083999999995,40.219040000000064],[-80.66009999999994,40.21893000000006],[-80.65928999999994,40.22350000000006],[-80.66012999999998,40.22354000000007]]]},"properties":{"ESRI_OID":47583,"MSI_UID":47583,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1782832692000,"MODIFIED_DATE":1782834344000,"BEGIN_DATE":1782777600000,"END_DATE":1797465599000,"DESCRIPTION":"Commencing July 20, 2026, and continuing until December 15, 2026, Expand Water Resources Company LLC., will be installing 2 piles and attaching water withdrawals and pumps to them, along LDB, in the vicinity of Mile 78.8.  High visibility buoys will be secured at the withdrawal locations.  Mariners are advised to keep a sharp lookout and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.66013,40.22354],[-80.66084,40.21904],[-80.6601,40.21893],[-80.65929,40.2235],[-80.66013,40.22354]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48002,"geometry":{"type":"Polygon","coordinates":[[[-92.48166999999995,29.388060000000053],[-92.48166999999995,28.888060000000053],[-90.97582999999997,28.888060000000053],[-90.97582999999997,29.388060000000053],[-92.48166999999995,29.388060000000053]]]},"properties":{"ESRI_OID":48002,"MSI_UID":48002,"ATU":8,"TITLE":"Sector New Orleans, Territorial Sea - Sector New Orleans, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116384639,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact","WATERWAY_NAME":"Sector New Orleans, Submerged Land Act (SLA)","CREATE_DATE":1783345836000,"MODIFIED_DATE":1783346387000,"BEGIN_DATE":1783296000000,"END_DATE":1793663999000,"DESCRIPTION":"Gulf of America - Survey Operation --- From: 2026-07-08 To: 2026-11-02 --- The M/V BLAKE will be conducting offshore surveys in the Gulf of America within two project areas, approximately 2 to 5 nautical miles south of Trinity Shoal and in the vicinity of Point Aufer Island.  The survey corridor will be bound by the following approximate positions: \n29-23-17N 092-28-54W,\n29-23-17N 090-58-33W,\n28-53-17N 092-28-54W and\n28-53-17N 090-58-33W.\nOperations will be conducted 24-hours a day, 7-days a week.  The survey vessel will be restricted in maneuverability for the duration of the operation.  Mariners are requested to maintain a wide berth from the M/V BLAKE to minimize the risk of entanglement with towed equipment and to avoid disrupting survey operations.  VHF-FM Channels: 13 and 16","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-92.48167,29.38806],[-92.48167,28.88806],[-90.97583,28.88806],[-90.97583,29.38806],[-92.48167,29.38806]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48026,"geometry":{"type":"Polygon","coordinates":[[[-80.73617999999999,39.983690000000024],[-80.73705999999999,39.97786000000008],[-80.73541999999998,39.97777000000008],[-80.73476999999997,39.98362000000003],[-80.73617999999999,39.983690000000024]]]},"properties":{"ESRI_OID":48026,"MSI_UID":48026,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1783348039000,"MODIFIED_DATE":1783353392000,"BEGIN_DATE":1783296000000,"END_DATE":1797465599000,"DESCRIPTION":"Commencing July 8, 2026, and continuing until December 15, 2026, Expand Water Resources LLC., will be installing pilings for a permanent dock along the LDB, in the vicinity of Mile 97.1.  One barge and crane will be on-scene to set the pilings.  Mariners may contact Randy Work at (724) 494-5889, for further information.  Mariners are urged to transit the area with caution. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.73618,39.98369],[-80.73706,39.97786],[-80.73542,39.97777],[-80.73477,39.98362],[-80.73618,39.98369]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48039,"geometry":{"type":"Polygon","coordinates":[[[-93.32474999999994,30.072370000000035],[-93.32858999999996,30.072250000000054],[-93.33147999999994,30.04517000000004],[-93.33183999999994,30.04179000000005],[-93.33439999999996,30.040350000000046],[-93.33443999999997,30.037950000000023],[-93.33189999999996,30.035480000000064],[-93.33436999999998,30.018080000000054],[-93.33028999999999,30.017930000000035],[-93.32474999999994,30.072370000000035]]]},"properties":{"ESRI_OID":48039,"MSI_UID":48039,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Calcasieu Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384877,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:calcha","WATERWAY_NAME":"Calcasieu Channel","CREATE_DATE":1783354452000,"MODIFIED_DATE":1783355231000,"BEGIN_DATE":1783296000000,"END_DATE":1792195199000,"DESCRIPTION":"Calcasieu Channel – Dredge Operation --- From: 2026-07-30 To: 2026-10-15 --- The Dredges CROSBY 2 and CAPT VINTON J. CROSBY will be working in the Calcasieu Channel between Miles 17.3 and 21.1.  Operations will be conducted 24-hours a day, 7-days a week.  On-scene equipment may include the Crane Barge KS-1354, Supply Barge R 8889, Barge B61, a pipe raft, a crew boat, and the T/Vs BEAU ANDREW, LOUIS MARIE and WECK DUNLAP.  Vessels should coordinate passing arrangements at least 2-hours in advance.  Mariners are requested to transit at their slowest safe speed to minimize wake and proceed with caution.  VHF-FM Channel: 78","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.32475,30.07237],[-93.32859,30.07225],[-93.33148,30.04517],[-93.33184,30.04179],[-93.3344,30.04035],[-93.33444,30.03795],[-93.3319,30.03548],[-93.33437,30.01808],[-93.33029,30.01793],[-93.32475,30.07237]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48044,"geometry":{"type":"Polygon","coordinates":[[[-93.35002999999995,30.062870000000032],[-93.35443999999995,30.05950000000007],[-93.42553999999996,30.059060000000045],[-93.42685999999998,30.015700000000038],[-93.33600999999999,30.01320000000004],[-93.35002999999995,30.062870000000032]]]},"properties":{"ESRI_OID":48044,"MSI_UID":48044,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384754,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact","WATERWAY_NAME":"Sector Houston-Galveston, Submerged Land Act (SLA)","CREATE_DATE":1783355288000,"MODIFIED_DATE":1783355943000,"BEGIN_DATE":1783296000000,"END_DATE":1792195199000,"DESCRIPTION":"Black Lake - Brown Lake - Dredge Disposal Area --- From: 2026-07-06 To: 2026-10-15 --- Dredging operations along the Calcasieu Channel will use a disposal site located west of the Calcasieu Channel, bound by approximate positions:\n30-03-32.61N 093-25-31.95W,\n30-00-56.51N 093-25-36.69W,\n30-00-47.51N 093-20-09.65W and \n30-03-46.34N 093-21-00.12W.\nOperations will be conducted 12-hours a day, 7-days a week, from July 6, 2026 through August 8, 2026.  Operations will shift to 24-hours a day, 7-days a week, from August 9, 2026 through October 15, 2026.  On-scene equipment may include dredge pipe, marsh buggies, a spud barge with an excavator, the Crane Barge KS-1354,  the Barge B61, an airboat, two tender tugs and an assist vessel.  Mariners are requested to transit at their slowest safe speed to minimize wake and proceed with caution.  VHF-FM Channel: 78","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.35003,30.06287],[-93.35444,30.0595],[-93.42554,30.05906],[-93.42686,30.0157],[-93.33601,30.0132],[-93.35003,30.06287]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48046,"geometry":{"type":"Polygon","coordinates":[[[-122.23042999999996,38.06653000000006],[-122.23058999999995,38.06615000000005],[-122.22998999999999,38.065890000000024],[-122.22980999999999,38.066160000000025],[-122.23042999999996,38.06653000000006]]]},"properties":{"ESRI_OID":48046,"MSI_UID":48046,"ATU":11,"TITLE":"San Pablo Bay - Carquinez Strait/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385512,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:sanpabbay:carstr","WATERWAY_NAME":"Carquinez Strait","CREATE_DATE":1783356253000,"MODIFIED_DATE":1783456532000,"BEGIN_DATE":1783296000000,"END_DATE":1790899199000,"DESCRIPTION":"The Dutra Group will conduct continuous, 24-hour dredging and disposal operations at the Cal Maritime Boat Basin in the Carquinez Strait from July 6, 2026, through approximately September 30, 2026. Dredging will be performed by the clamshell dredges \"DB 24\" and/or \"DB Beaver,\" supported by a fleet of four split-hull scows, the tender tug \"Becky T,\" and the tow tug \"Sarah Reed\" (Call Sign: KX7468) or a similar vessel. Maintenance sediment from the Legacy Dredge Area (LDA) will be transported for disposal at the SF-09 site, while sediment from the New Dredge Area (NDA) will be disposed of at the MWRP site. All working vessels will actively monitor VHF-FM channels 13, 14, and 80. Mariners are advised to exercise extreme caution, maintain a safe distance from all working equipment, and proceed at a safe speed when transiting the Carquinez Strait. For operational questions or passing arrangements, contact the dredge superintendent, Mr. Dennis Salyers, at (415) 497-5289, or the project office at (415) 218-6739.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.23043,38.06653],[-122.23059,38.06615],[-122.22999,38.06589],[-122.22981,38.06616],[-122.23043,38.06653]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48070,"geometry":{"type":"Polygon","coordinates":[[[-121.52868999999998,38.517990000000054],[-121.53760999999997,38.51745000000005],[-121.54533999999995,38.51645000000008],[-121.55297999999999,38.51437000000004],[-121.55949999999996,38.504020000000025],[-121.56009999999998,38.498380000000054],[-121.55897999999996,38.49556000000007],[-121.54610999999994,38.478090000000066],[-121.54232999999999,38.47520000000003],[-121.53752999999995,38.473190000000045],[-121.53271999999998,38.472980000000064],[-121.52086999999995,38.473520000000065],[-121.51340999999996,38.472980000000064],[-121.50687999999997,38.47043000000008],[-121.50542999999999,38.46882000000005],[-121.50413999999995,38.46942000000007],[-121.50687999999997,38.472920000000045],[-121.51185999999996,38.47453000000007],[-121.51580999999999,38.47520000000003],[-121.53434999999996,38.47440000000006],[-121.54164999999995,38.47648000000004],[-121.55812999999995,38.49764000000005],[-121.55820999999997,38.50093000000004],[-121.55348999999995,38.511010000000056],[-121.55108999999999,38.51289000000003],[-121.54352999999998,38.515310000000056],[-121.53760999999997,38.51651000000004],[-121.52868999999998,38.517120000000034],[-121.52868999999998,38.517990000000054]]]},"properties":{"ESRI_OID":48070,"MSI_UID":48070,"ATU":11,"TITLE":"Sacramento River Deep Water Ship Channel - Sacramento River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385523,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:sanpabbay:carstr:suibay:sacrivdeewatshicha:sacriv","WATERWAY_NAME":"Sacramento River","CREATE_DATE":1783364854000,"MODIFIED_DATE":1783456502000,"BEGIN_DATE":1783296000000,"END_DATE":1796169599000,"DESCRIPTION":"Contractors for the U.S. Army Corps of Engineers will conduct marine operations for levee rehabilitation along the Sacramento River between River Miles 47.3 and 53.5 . Waterside work is scheduled to begin July 6, 2026, and will continue through approximately November 30, 2026. Operations will involve up to three crane barges (including Crane Barge #12, measuring approximately 140' x 50'), a tugboat, two workboats, and a rotation of flat deck barges. Work will occur during daylight hours; however, barge maneuvering outside the construction area may occur 24 hours a day. Flat deck barges will transit between the job site and the San Rafael Rock Quarry, utilizing pre-existing moorings along the Sacramento River, including locations at River Miles 26 and 27 near Walnut Grove, CA. At the end of each shift, barges will be spudded in place and marked with steady burning white lights on all corners. Mariners are advised to use extreme caution, transit at their slowest safe speed to minimize wake, and maintain a safe distance. Project vessels will monitor VHF-FM channels 9, 16, and 68A, and can be contacted directly at (707) 333-5029.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-121.52869,38.51799],[-121.53761,38.51745],[-121.54534,38.51645],[-121.55298,38.51437],[-121.5595,38.50402],[-121.5601,38.49838],[-121.55898,38.49556],[-121.54611,38.47809],[-121.54233,38.4752],[-121.53753,38.47319],[-121.53272,38.47298],[-121.52087,38.47352],[-121.51341,38.47298],[-121.50688,38.47043],[-121.50543,38.46882],[-121.50414,38.46942],[-121.50688,38.47292],[-121.51186,38.47453],[-121.51581,38.4752],[-121.53435,38.4744],[-121.54165,38.47648],[-121.55813,38.49764],[-121.55821,38.50093],[-121.55349,38.51101],[-121.55109,38.51289],[-121.54353,38.51531],[-121.53761,38.51651],[-121.52869,38.51712],[-121.52869,38.51799]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48081,"geometry":{"type":"Polygon","coordinates":[[[-69.05877999999996,44.156660000000045],[-69.06400999999994,44.156600000000026],[-69.06418999999994,44.15223000000003],[-69.05885999999998,44.15198000000004],[-69.05877999999996,44.156660000000045]]]},"properties":{"ESRI_OID":48081,"MSI_UID":48081,"ATU":1,"TITLE":"Sector Northern New England, Submerged Lands Act (SLA) - West Penobscot Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381722,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact:wespenbay","WATERWAY_NAME":"West Penobscot Bay","CREATE_DATE":1783418248000,"MODIFIED_DATE":1783418253000,"BEGIN_DATE":1783382400000,"END_DATE":1815004799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-20 To: 2027-07-07\n\nThe attached Local Notice to Mariners (LNM) Information Form outlines upcoming maintenance work on the Porterfield Ledge Daybeacon (LLNR 4270), located in Rockport Harbor, Maine at latitude 44°09'14.6\"N and longitude 69°03'41.3\"W. Fuller Marine Services Inc., led by Sam and Chuck Fuller, will conduct activities to replace the steel structure, cap the granite superstructure, and stabilize the stone base. The project is scheduled to begin August 20, 2026, and will continue until completion, with daily operations from 7:00 AM to 6:00 PM. The vessel Enzo Charles will be present, monitoring VHF-FM Channels 16 and 13 for navigational safety, with secondary contact available on Channels 09 and 22A. To ensure safe passage, the Enzo Charles will maintain a clear fairway and reposition as needed within 30 minutes of notification, weather and safety permitting. Mariners should coordinate passing arrangements via VHF Channel 13","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-69.05878,44.15666],[-69.06401,44.1566],[-69.06419,44.15223],[-69.05886,44.15198],[-69.05878,44.15666]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48082,"geometry":{"type":"Polygon","coordinates":[[[-67.56547999999998,44.529300000000035],[-67.56625999999994,44.52929000000006],[-67.56619999999998,44.52872000000008],[-67.56543999999997,44.52869000000004],[-67.56547999999998,44.529300000000035]]]},"properties":{"ESRI_OID":48082,"MSI_UID":48082,"ATU":1,"TITLE":"Sector Northern New England, Submerged Lands Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381693,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact","WATERWAY_NAME":"Sector Northern New England, Submerged Lands Act (SLA)","CREATE_DATE":1783418722000,"MODIFIED_DATE":1783418728000,"BEGIN_DATE":1783382400000,"END_DATE":1815004799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-07-20 To: 2027-07-07\n\nThe attached Local Notice to Mariners (LNM) Information Form announces upcoming maintenance on Emms Rock Light 9 (LLNR 1305) in Englishman Bay, Maine, located at latitude 44.52899°N and longitude -67.56581°W. Fuller Marine Services Inc., represented by Chuck and Sam Fuller, will replace the steel structure and concrete cap, stabilize the stone foundation, and remove the lights. The project is scheduled to begin on July 20, 2026, and will continue until completion, with daily operations from 7:00 AM to 6:00 PM. The vessel Enzo Charles will be on site, monitoring VHF-FM Channels 16 and 13 for navigational safety, with additional contact available on Channels 09 and 22A. The Enzo Charles will ensure a clear fairway for marine traffic and will reposition as needed within 30 minutes of notification, weather and safety permitting. Mariners should coordinate passing arrangements via VHF Channel 13.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-67.56548,44.5293],[-67.56626,44.52929],[-67.5662,44.52872],[-67.56544,44.52869],[-67.56548,44.5293]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48158,"geometry":{"type":"Polygon","coordinates":[[[-82.59523999999999,38.41584000000006],[-82.59611999999998,38.415760000000034],[-82.59662999999995,38.41355000000004],[-82.59691999999995,38.410960000000046],[-82.59549999999996,38.40443000000005],[-82.59439999999995,38.40093000000007],[-82.59448999999995,38.399020000000064],[-82.59557999999998,38.39728000000008],[-82.59811999999994,38.39491000000004],[-82.59915999999998,38.392490000000066],[-82.59957999999995,38.391230000000064],[-82.59919999999994,38.38910000000004],[-82.59791999999999,38.38719000000003],[-82.59496999999999,38.383080000000064],[-82.59337999999997,38.38037000000003],[-82.59264999999994,38.37796000000003],[-82.59253999999999,38.376040000000046],[-82.59288999999995,38.37426000000005],[-82.59514999999999,38.36985000000004],[-82.59700999999995,38.36645000000004],[-82.59789999999998,38.36149000000006],[-82.59831999999994,38.35448000000008],[-82.59833999999995,38.350820000000056],[-82.59808999999996,38.34597000000008],[-82.59732999999994,38.34421000000003],[-82.59568999999999,38.34288000000004],[-82.59322999999995,38.342160000000035],[-82.59145999999998,38.341630000000066],[-82.58932999999996,38.34056000000004],[-82.58853999999997,38.33955000000003],[-82.58731999999998,38.337680000000034],[-82.58505999999994,38.334580000000074],[-82.57980999999995,38.33092000000005],[-82.57679999999993,38.32869000000005],[-82.57616999999999,38.32788000000005],[-82.57566999999995,38.32416000000006],[-82.57397999999995,38.321570000000065],[-82.57174999999995,38.31752000000006],[-82.57131999999996,38.31443000000007],[-82.57158999999996,38.313450000000046],[-82.57271999999995,38.31206000000003],[-82.57548999999995,38.30916000000008],[-82.57690999999994,38.30741000000006],[-82.57837999999998,38.30542000000003],[-82.57977999999997,38.30329000000006],[-82.58177999999998,38.30001000000004],[-82.58121999999997,38.299840000000074],[-82.57919999999996,38.30326000000008],[-82.57780999999994,38.30538000000007],[-82.57594999999998,38.30777000000006],[-82.57399999999996,38.309840000000065],[-82.57158999999996,38.312560000000076],[-82.57099999999997,38.31375000000003],[-82.57089999999994,38.31556000000006],[-82.57126999999997,38.31755000000004],[-82.57321999999994,38.32136000000003],[-82.57516999999996,38.32454000000007],[-82.57556999999997,38.327960000000076],[-82.57642999999996,38.32897000000003],[-82.57758999999999,38.329810000000066],[-82.58273999999994,38.33351000000005],[-82.58520999999996,38.33547000000004],[-82.58780999999999,38.339510000000075],[-82.58884999999998,38.340670000000046],[-82.59100999999998,38.34201000000007],[-82.59555999999998,38.343480000000056],[-82.59710999999999,38.344610000000046],[-82.59765999999996,38.34677000000005],[-82.59757999999994,38.35445000000004],[-82.59709999999995,38.36146000000008],[-82.59687999999994,38.36387000000008],[-82.59637999999995,38.366100000000074],[-82.59483999999998,38.36922000000004],[-82.59312999999997,38.37224000000003],[-82.59204999999997,38.37494000000004],[-82.59194999999994,38.377920000000074],[-82.59337999999997,38.38173000000006],[-82.59520999999995,38.38457000000005],[-82.59703999999994,38.387410000000045],[-82.59798999999998,38.38876000000005],[-82.59863999999999,38.389760000000024],[-82.59880999999996,38.391530000000046],[-82.59833999999995,38.39346000000006],[-82.59710999999999,38.39527000000004],[-82.59585999999996,38.39639000000005],[-82.59398999999996,38.398180000000025],[-82.59367999999995,38.400540000000035],[-82.59434999999996,38.40294000000006],[-82.59502999999995,38.40638000000007],[-82.59596999999997,38.41088000000008],[-82.59588999999994,38.413410000000056],[-82.59523999999999,38.41584000000006]]]},"properties":{"ESRI_OID":48158,"MSI_UID":48158,"ATU":2,"TITLE":"Ohio River - Big Sandy River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381239,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv:bigsanriv","WATERWAY_NAME":"Big Sandy River","CREATE_DATE":1783443092000,"MODIFIED_DATE":1783443460000,"BEGIN_DATE":1783382400000,"END_DATE":1788652799000,"DESCRIPTION":"Commencing July 16, 2026, and continuing until September 4, 2026, channel maintenance dredging is being conducted from Mile 9.0 to Mile 0.0.  Dredging will begin at the mouth, Mile 0.0, and proceed to upstream locations ending at Mile 9.0.  Operations will take place from 6:00 a.m. to midnight, Monday through Saturday.  Disposal operations will take place at an approved site located on the Ohio River, between approximate Mile 321.0 and Mile 322.0, RDB.  The contractor’s floating plant consists of the M/V’S RELIANT and BUS BROWN, two barge mounted cranes and six material barges.  During non-working hours, the contractor’s floating plant will be moored at the worksite and lighted accordingly.  The M/V BUS BROWN will be used to transport material barges between the dredge site and the disposal area.  The M/V RELIANT will operate in the vicinity of the dredge site and should be contacted for passing arrangements.  On-scene vessels will monitor VHF-FM Channel 13.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.59524,38.41584],[-82.59612,38.41576],[-82.59663,38.41355],[-82.59692,38.41096],[-82.5955,38.40443],[-82.5944,38.40093],[-82.59449,38.39902],[-82.59558,38.39728],[-82.59812,38.39491],[-82.59916,38.39249],[-82.59958,38.39123],[-82.5992,38.3891],[-82.59792,38.38719],[-82.59497,38.38308],[-82.59338,38.38037],[-82.59265,38.37796],[-82.59254,38.37604],[-82.59289,38.37426],[-82.59515,38.36985],[-82.59701,38.36645],[-82.5979,38.36149],[-82.59832,38.35448],[-82.59834,38.35082],[-82.59809,38.34597],[-82.59733,38.34421],[-82.59569,38.34288],[-82.59323,38.34216],[-82.59146,38.34163],[-82.58933,38.34056],[-82.58854,38.33955],[-82.58732,38.33768],[-82.58506,38.33458],[-82.57981,38.33092],[-82.5768,38.32869],[-82.57617,38.32788],[-82.57567,38.32416],[-82.57398,38.32157],[-82.57175,38.31752],[-82.57132,38.31443],[-82.57159,38.31345],[-82.57272,38.31206],[-82.57549,38.30916],[-82.57691,38.30741],[-82.57838,38.30542],[-82.57978,38.30329],[-82.58178,38.30001],[-82.58122,38.29984],[-82.5792,38.30326],[-82.57781,38.30538],[-82.57595,38.30777],[-82.574,38.30984],[-82.57159,38.31256],[-82.571,38.31375],[-82.5709,38.31556],[-82.57127,38.31755],[-82.57322,38.32136],[-82.57517,38.32454],[-82.57557,38.32796],[-82.57643,38.32897],[-82.57759,38.32981],[-82.58274,38.33351],[-82.58521,38.33547],[-82.58781,38.33951],[-82.58885,38.34067],[-82.59101,38.34201],[-82.59556,38.34348],[-82.59711,38.34461],[-82.59766,38.34677],[-82.59758,38.35445],[-82.5971,38.36146],[-82.59688,38.36387],[-82.59638,38.3661],[-82.59484,38.36922],[-82.59313,38.37224],[-82.59205,38.37494],[-82.59195,38.37792],[-82.59338,38.38173],[-82.59521,38.38457],[-82.59704,38.38741],[-82.59799,38.38876],[-82.59864,38.38976],[-82.59881,38.39153],[-82.59834,38.39346],[-82.59711,38.39527],[-82.59586,38.39639],[-82.59399,38.39818],[-82.59368,38.40054],[-82.59435,38.40294],[-82.59503,38.40638],[-82.59597,38.41088],[-82.59589,38.41341],[-82.59524,38.41584]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48204,"geometry":{"type":"Polygon","coordinates":[[[-75.49636999999996,39.57239000000004],[-75.50356999999997,39.570550000000026],[-75.50980999999996,39.57018000000005],[-75.51589999999999,39.57086000000004],[-75.51877999999994,39.56962000000004],[-75.52939999999995,39.55331000000007],[-75.53813999999994,39.54472000000004],[-75.53740999999997,39.544340000000034],[-75.52846999999997,39.55306000000007],[-75.51861999999994,39.568350000000066],[-75.51622999999995,39.56960000000004],[-75.51460999999995,39.569920000000025],[-75.50671999999997,39.569000000000074],[-75.49630999999994,39.57171000000005],[-75.49636999999996,39.57239000000004]]]},"properties":{"ESRI_OID":48204,"MSI_UID":48204,"ATU":5,"TITLE":"Delaware River Main Channel - Salem River Entrance/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382794,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:delbay:delbaymaicha:lisran:delriv:delrivmaicha:salrivent","WATERWAY_NAME":"Salem River Entrance","CREATE_DATE":1783508460000,"MODIFIED_DATE":1784038965000,"BEGIN_DATE":1783468800000,"END_DATE":1791849599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-07-08 To: 2026-10-12\n\nLocation:\n39-34-20.604N/075-29-46.932W\n39-34-18.156N/075-29-46.716W\n39-34-08.400N/075-30-24.192W\n39-34-11.712N/075-30-52.596W\n39-34-10.560N/075-30-58.428W\n39-34-06.060N/075-31-07.032W\n39-33-11.016N/075-31-42.492W\n39-32-39.624N/075-32-14.676W\n39-32-40.992N/075-32-17.304W\n39-33-11.916N/075-31-45.840W\n39-34-10.632N/075-31-07.608W\n39-34-15.096N/075-30-57.240W\n39-34-12.648N/075-30-35.316W\n39-34-13.980N/075-30-12.852W\n39-34-20.604N/075-29-46.932W\n\nCottrell Contracting Corporation's, Dredge Rockbridge, will be performing dredging operations within the Salem River, New Jersey, adjacent to New Castel Range. Operations are expected to begin on July 19, 2026, and be completed by October 12, 2026. Dredging of the Salem River will take place between Salem River Entrance Channel Lighted Buoy 2 (LLNR 2645) and Salem River Channel Light 13 (LLNR 2713). The submerged pipeline will run directly from the Salem River to Supawna Meadows National Wildlife Refuge. All vessel traffic is requested to contact the dredge on VHF channel 13 or 16 prior to passage. For emergencies the Dredge Rockbridge can be reached at (757) 635-2576.\nAll mariners are requested to stay clear of the dredge, pipelines, barge, derricks and operating wires about the dredge. All operators should be aware that the dredge and pontoon lines are held in place by cables, which are attached to anchors some distance from the dredge and pontoons. Buoys are attached to the anchors so that they may be moved as the dredge moves. Submerged lines should be avoided. Mariners are requested to exercise extreme caution when approaching, passing, and leaving the dredging plant. The dredge Rockbridge monitors VHF channels 13 and 16. Mariners are cautioned to strictly comply with the Inland Rules of the Road when approaching, passing and leaving the area of operations, and remain a safe distance away from the dredge, booster, buoys, cables, pipeline, barges, derricks, wires and related equipment.\nOwners and lessees of fishnets, crabpots and other structures that may be in the vicinity and that may hinder the free navigation of attending vessels and equipment must remove these from the area where tugs, tenderboats and other attendant equipment will be navigating. Dredging operations will be conducted twenty-four (24) hours a day seven (7) days a week, all fishnets, crabpots and structures in the general area must be removed prior to commencement of any work, a slow NO WAKE speed is requested of transiting vessels. All vessels are requested to contact the dredge prior to passing.\nMSI # 48204.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.49637,39.57239],[-75.50357,39.57055],[-75.50981,39.57018],[-75.5159,39.57086],[-75.51878,39.56962],[-75.5294,39.55331],[-75.53814,39.54472],[-75.53741,39.54434],[-75.52847,39.55306],[-75.51862,39.56835],[-75.51623,39.5696],[-75.51461,39.56992],[-75.50672,39.569],[-75.49631,39.57171],[-75.49637,39.57239]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48449,"geometry":{"type":"Polygon","coordinates":[[[-117.19975999999997,32.72849000000008],[-117.21564999999998,32.728260000000034],[-117.21701999999999,32.722240000000056],[-117.21994999999998,32.71831000000003],[-117.22699999999998,32.71262000000007],[-117.21947999999998,32.70877000000007],[-117.21592999999996,32.711430000000064],[-117.20754999999997,32.714500000000044],[-117.19204999999994,32.714960000000076],[-117.18143999999995,32.70768000000004],[-117.17205999999999,32.707970000000046],[-117.17360999999994,32.71228000000008],[-117.17419999999998,32.72575000000006],[-117.19975999999997,32.72849000000008]]]},"properties":{"ESRI_OID":48449,"MSI_UID":48449,"ATU":11,"TITLE":"Approaches To San Diego Bay - San Diego Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385494,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:apptosandiebay:sandiebay","WATERWAY_NAME":"San Diego Bay","CREATE_DATE":1783626791000,"MODIFIED_DATE":1783626835000,"BEGIN_DATE":1783468800000,"END_DATE":1790899199000,"DESCRIPTION":"Port of San Diego will be coordinating in-water construction along the channel side of Harbor Island from July 15 to September 30, 2026. The project involves removal of existing rock revetment and installation of an interlocking ECOncrete tidepool system to provide structural protection and improve local habitat biodiversity. Operations will occur at position 32.724722°N, -117.207511°W and will utilize a floating barge with crane operation to shore and small support vessels. For more information, please contact Zeke Coleman, Port of San Diego Engineering Department, at 619-942-2966. Mariners are urged to transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.19976,32.72849],[-117.21565,32.72826],[-117.21702,32.72224],[-117.21995,32.71831],[-117.227,32.71262],[-117.21948,32.70877],[-117.21593,32.71143],[-117.20755,32.7145],[-117.19205,32.71496],[-117.18144,32.70768],[-117.17206,32.70797],[-117.17361,32.71228],[-117.1742,32.72575],[-117.19976,32.72849]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48504,"geometry":{"type":"Polygon","coordinates":[[[-88.04173999999995,30.735640000000046],[-88.04392999999999,30.735610000000065],[-88.04349999999994,30.72368000000006],[-88.04049999999995,30.713720000000023],[-88.04086999999998,30.712750000000028],[-88.03700999999995,30.690750000000037],[-88.03813999999994,30.67834000000005],[-88.03716999999995,30.675340000000062],[-88.03217999999998,30.665470000000028],[-88.03196999999994,30.66288000000003],[-88.03282999999999,30.645020000000045],[-88.03384999999997,30.618250000000046],[-88.02992999999998,30.583710000000053],[-88.01482999999996,30.444990000000075],[-88.01236999999998,30.444990000000075],[-88.02310999999997,30.53965000000005],[-88.03028999999998,30.604270000000042],[-88.03146999999996,30.615860000000055],[-88.03124999999994,30.639970000000062],[-88.03027999999995,30.649610000000052],[-88.02990999999997,30.660160000000076],[-88.02850999999998,30.662510000000054],[-88.02652999999998,30.663230000000055],[-88.02649999999994,30.666390000000035],[-88.02963999999997,30.667800000000057],[-88.03347999999994,30.674390000000074],[-88.03542999999996,30.680160000000058],[-88.03467999999998,30.69079000000005],[-88.03701999999998,30.704750000000047],[-88.03660999999994,30.706110000000024],[-88.03733999999997,30.713670000000036],[-88.03870999999998,30.71512000000007],[-88.04012999999998,30.720870000000048],[-88.04031999999995,30.724650000000054],[-88.03963999999996,30.725160000000074],[-88.03982999999994,30.729630000000043],[-88.04146999999995,30.730920000000026],[-88.04173999999995,30.735640000000046]]]},"properties":{"ESRI_OID":48504,"MSI_UID":48504,"ATU":8,"TITLE":"Mobile Channel - Mobile River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385077,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:mobbay:mobbar:mobcha:mobriv","WATERWAY_NAME":"Mobile River","CREATE_DATE":1783686862000,"MODIFIED_DATE":1786973737000,"BEGIN_DATE":1783641600000,"END_DATE":1807660799000,"DESCRIPTION":"Mobile River - Mobile Channel - Dredge Operation --- From: 2026-08-17 To: 2027-04-12 --- The Dredge VIRGINIAN will conduct maintenance dredging operations in the Mobile River and Mobile Channel starting approximately 900 ft south of the Cochrane Bridge in the Mobile Harbor to Mobile Channel Light 49 (LLNR-6510).  Operations will be conducted 24-hours a day, 7-days a week.  Dredged material will be hauled offshore to the Ocean Dredge Material Disposal Site (ODMDS) located south of Dauphin Island, AL.  On-scene equipment and vessels will include dredge pipe, the Scows 4002, 6001, 6002, 6003, 6004, and BR8, the T/Vs ELIZABETH ANN, PATRICIA JEAN, AMY HERBERT, and COLONEL, the M/Vs MISS TAMI JO and MISS CATE, a fuel barge, a 200 ft by 60 ft crane barge, the Crew Boat SEA SUB, and the Survey Vessel MITCHELL.  The dredge will operate on four anchors and on spuds, which will limit the dredge's maneuverability.  Portions of the channel will be obstructed during dredging.  Vessels should coordinate passing arrangements at least 1-hour in advance to allow equipment to be moved.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13, 16, and 88, POC: (251) 957-6019\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.04174,30.73564],[-88.04393,30.73561],[-88.0435,30.72368],[-88.0405,30.71372],[-88.04087,30.71275],[-88.03701,30.69075],[-88.03814,30.67834],[-88.03717,30.67534],[-88.03218,30.66547],[-88.03197,30.66288],[-88.03283,30.64502],[-88.03385,30.61825],[-88.02993,30.58371],[-88.01483,30.44499],[-88.01237,30.44499],[-88.02311,30.53965],[-88.03029,30.60427],[-88.03147,30.61586],[-88.03125,30.63997],[-88.03028,30.64961],[-88.02991,30.66016],[-88.02851,30.66251],[-88.02653,30.66323],[-88.0265,30.66639],[-88.02964,30.6678],[-88.03348,30.67439],[-88.03543,30.68016],[-88.03468,30.69079],[-88.03702,30.70475],[-88.03661,30.70611],[-88.03734,30.71367],[-88.03871,30.71512],[-88.04013,30.72087],[-88.04032,30.72465],[-88.03964,30.72516],[-88.03983,30.72963],[-88.04147,30.73092],[-88.04174,30.73564]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48542,"geometry":{"type":"Polygon","coordinates":[[[-117.17521999999997,32.71407000000005],[-117.18964999999997,32.707010000000025],[-117.16485999999998,32.69765000000007],[-117.16289999999998,32.686500000000024],[-117.14692999999994,32.67859000000004],[-117.14643999999998,32.693790000000035],[-117.17521999999997,32.71407000000005]]]},"properties":{"ESRI_OID":48542,"MSI_UID":48542,"ATU":11,"TITLE":"Approaches To San Diego Bay - San Diego Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385494,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:apptosandiebay:sandiebay","WATERWAY_NAME":"San Diego Bay","CREATE_DATE":1783705503000,"MODIFIED_DATE":1783707663000,"BEGIN_DATE":1783641600000,"END_DATE":1814399999000,"DESCRIPTION":"Continental Maritime of San Diego (CMSD), LLC, in partnership with R.E. Staite Engineering, Inc., will be conducting the Pier 4 Replacement Project in San Diego Bay at the CMSD waterfront facility (1995 Bay Front St., San Diego, CA 92113) from July 16, 2026, through June 30, 2027. Operations will occur at position 32.693333°N, -117.150556°W and will involve crane barges RES 180 and RES 150, Derrick Barge DB Palomar, floating barges RES 110 and YC Barge, RES Heavy Lift, small skiffs, tug boat Killeen, and push boat Mighty Sue C. All vessels will monitor radio channel 16. For more information, please contact Trevor Jones at 619-520-4240 or Ryan Albin at 619-772-8410. All mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.17522,32.71407],[-117.18965,32.70701],[-117.16486,32.69765],[-117.1629,32.6865],[-117.14693,32.67859],[-117.14644,32.69379],[-117.17522,32.71407]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48632,"geometry":{"type":"Polygon","coordinates":[[[-79.72563999999994,32.805030000000045],[-79.77035999999998,32.79140000000007],[-79.80477999999994,32.77603000000005],[-79.73782999999997,32.763180000000034],[-79.72563999999994,32.805030000000045]]]},"properties":{"ESRI_OID":48632,"MSI_UID":48632,"ATU":7,"TITLE":"Sector Charleston, Territorial Sea - Sector Charleston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384376,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact","WATERWAY_NAME":"Sector Charleston, Submerged Land Act (SLA)","CREATE_DATE":1783956305000,"MODIFIED_DATE":1783956501000,"BEGIN_DATE":1783900800000,"END_DATE":1802735999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-07-13\n48632\n\nLocation:\n32-48-18.108N/079-43-32.304W\n32-45-47.448N/079-44-16.188W\n32-46-33.708N/079-48-17.208W\n32-47-29.040N/079-46-13.296W\n32-48-18.108N/079-43-32.304W\n\nMarinex Construction, Inc. will perform dredging and beach renourishment for Isle of Palms with a borrow site located approximately 1.5 miles offshore of Isle of Palms in the area around WGS84 coordinates (32-45.57148N, 079-45.359447W). Two pipeline corridors will be utilized. The Dredge Wadmalaw will mobilize beginning July 7, 2026 through January 15, 2027 and may make use of a marine staging area from approximately Fort Johnson and Melton Peter Demetre Park. The Dredge Wadmalaw will operate 24-7 and monitor VHF-FM channels 13 and 16. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.72564,32.80503],[-79.77036,32.7914],[-79.80478,32.77603],[-79.73783,32.76318],[-79.72564,32.80503]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48636,"geometry":{"type":"Polygon","coordinates":[[[-89.97906999999998,29.25171000000006],[-89.99002999999999,29.24473000000006],[-89.99623999999994,29.241460000000075],[-90.00341999999995,29.243640000000028],[-90.00597999999997,29.242230000000063],[-90.01030999999995,29.24051000000003],[-90.02695999999997,29.227250000000026],[-90.02845999999994,29.219580000000065],[-90.04785999999996,29.210210000000075],[-90.04012999999998,29.205340000000035],[-90.03055999999998,29.213960000000043],[-90.02360999999996,29.21965000000006],[-90.01995999999997,29.225870000000043],[-90.01755999999995,29.228080000000034],[-90.01545999999996,29.23070000000007],[-90.00708999999995,29.234330000000057],[-90.00648999999999,29.23703000000006],[-90.00257999999997,29.23894000000007],[-89.99547999999999,29.241260000000068],[-89.98914999999994,29.244500000000073],[-89.98350999999997,29.247960000000035],[-89.98288999999994,29.249070000000074],[-89.97850999999997,29.25138000000004],[-89.97906999999998,29.25171000000006]]]},"properties":{"ESRI_OID":48636,"MSI_UID":48636,"ATU":8,"TITLE":"Barataria Pass - Bayou Rigaud/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384933,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:barpas:bayrig","WATERWAY_NAME":"Bayou Rigaud","CREATE_DATE":1783959089000,"MODIFIED_DATE":1783959685000,"BEGIN_DATE":1783900800000,"END_DATE":1790899199000,"DESCRIPTION":"Bayou Rigaud - Breakwater Construction --- From: 2026-07-20 To: 2026-09-30 --- Breakwater construction and rehabilitation will be conducted along Bayou Rigaud, from Bayou Rigaud Daybeacon 18 (LLNR-16020) to the Highway 1 Bridge.  Work will consist of rock placement and the recapping of existing breakwater structures.  Operations will be conducted 12-hours a day, 7-days a week.  A fleet for rock barges will be set up on the south side of the channel across from Bayou Rigaud Daybeacon 12 (LLNR-16005) and a lite loading operation will be set up on the south side of the channel across from Bayou Rigaud Daybeacon 16 (LLNR-16015).  On-scene vessels will include barges and the M/Vs SLYE JOSEPH and RANDY N.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution.  VHF-FM Channels: 13 and 72, POC: (504) 628-0846","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-89.97907,29.25171],[-89.99003,29.24473],[-89.99624,29.24146],[-90.00342,29.24364],[-90.00598,29.24223],[-90.01031,29.24051],[-90.02696,29.22725],[-90.02846,29.21958],[-90.04786,29.21021],[-90.04013,29.20534],[-90.03056,29.21396],[-90.02361,29.21965],[-90.01996,29.22587],[-90.01756,29.22808],[-90.01546,29.2307],[-90.00709,29.23433],[-90.00649,29.23703],[-90.00258,29.23894],[-89.99548,29.24126],[-89.98915,29.2445],[-89.98351,29.24796],[-89.98289,29.24907],[-89.97851,29.25138],[-89.97907,29.25171]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48710,"geometry":{"type":"Polygon","coordinates":[[[-78.96412999999995,33.61269000000004],[-79.01026999999993,33.56201000000004],[-78.98921999999999,33.55925000000008],[-78.97699999999998,33.54816000000005],[-78.93882999999994,33.52252000000004],[-78.91512999999998,33.54889000000003],[-78.95336999999995,33.57335000000006],[-78.96412999999995,33.61269000000004]]]},"properties":{"ESRI_OID":48710,"MSI_UID":48710,"ATU":7,"TITLE":"Sector Charleston, Territorial Sea - Sector Charleston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384376,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact","WATERWAY_NAME":"Sector Charleston, Submerged Land Act (SLA)","CREATE_DATE":1784039574000,"MODIFIED_DATE":1788260607000,"BEGIN_DATE":1783987200000,"END_DATE":1792195199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-07-14 \n48710\n\nGreat Lakes Dredge &amp;amp; Dock Company, LLC (GLDD) has completed dredging activities for the next phase of FY24 Myrtle Beach Emergency Renourishment Project in Surfside and Garden City, SC. The dredges, submerged dredge pipelines (subline), booster pump and pump-out assemblies have\nbeen removed from the beach areas.\nVarious sections of subline have been anchored off south of Little River Inlet. See attached\ndrawing. The sections of subline will all be floated, rafted and towed off site by the end of\nSeptember 2026. The pipeline is marked per U.S.C.G. regulations. Boaters should avoid these\nareas.\n\nEquipment: Tug Bayou Brave\nTug Evergreen State\nTug Cape Hatteras\nDerrick Barge 64\nAnchor Barge\nCrew/Survey Vessel St Johns River &amp;amp; Miami River\nTrailing Suction Hopper Dredges Amelia Island\nBooster Platform Jack\nLocations:\nA. Submerged Dredge Pipe 3-1\nOffshore – 33-35.95123N, 078-57.25453W; Inshore – 33-36.53762N, 078-58.03521W\nB. Submerged Dredge Pipe 3-2\nOffshore – 33-34.51684N, 078-58.73770W; Inshore – 33-34.97945N, 078-59.50451W\nC. Submerged Dredge Pipe 3-3\nOffshore – 33-33.55514N, 078-59.35334W; Inshore – 33-34.13119N, 079-00.28532W\nD. Borrow Area\nSW 33-32.88950N, 078-58.62019W\nSE 33-31.35121N, 078-56.33010W\nNE 33-32.93328N, 078-54.90790W\nNW 33-34.40101N, 078-57.20237W\nVHF-FM channels 13 and 16. Mariners are urged to use extreme caution in the area for dredging and placement operations, and to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-78.96413,33.61269],[-79.01027,33.56201],[-78.98922,33.55925],[-78.977,33.54816],[-78.93883,33.52252],[-78.91513,33.54889],[-78.95337,33.57335],[-78.96413,33.61269]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48725,"geometry":{"type":"Polygon","coordinates":[[[-81.95739999999995,26.45312000000007],[-81.95861999999994,26.45138000000003],[-81.95655999999997,26.45034000000004],[-81.95563999999996,26.452150000000074],[-81.95739999999995,26.45312000000007]]]},"properties":{"ESRI_OID":48725,"MSI_UID":48725,"ATU":7,"TITLE":"Sector St. Petersburg, Territorial Sea - Sector St. Petersburg, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383296,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipeterseala","WATERWAY_NAME":"Sector St. Petersburg, Submerged Land Act (SLA)","CREATE_DATE":1784046618000,"MODIFIED_DATE":1784046960000,"BEGIN_DATE":1783987200000,"END_DATE":1830297599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-07-14 \n48725\n\nRJ Gorman Contracting, will be completing demo and construction of the Ft Myers Fishing Pier (10 Old San Carlos Blvd., Fort Myers Beach, FL )\nThe project will consist of demolition of existing pier, installation of concrete piles, crane barge operations, and pier reconstruction.\n\nOperations are expected to begin on or about august 15, 2026 with an estimated completion date of November 1, 2027. Daily work hours will be from 7 a.m. to 6 p.m.\nEquipment used will be: 2 crane barges, spud barge, tug/workboat, work skiffs, vibratory hammer, impact hammer, floating turbidity curtain\n\nMariners are requested to transit with caution and maintain safe distances from construction equipment and floating turbidity barriers. No closure of the federal navigation channel is anticipated unless separately announced.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.9574,26.45312],[-81.95862,26.45138],[-81.95656,26.45034],[-81.95564,26.45215],[-81.9574,26.45312]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48780,"geometry":{"type":"Polygon","coordinates":[[[-122.88371999999998,48.10259000000008],[-122.88450999999998,48.10224000000005],[-122.88344999999998,48.10121000000004],[-122.88246999999996,48.10147000000006],[-122.88371999999998,48.10259000000008]]]},"properties":{"ESRI_OID":48780,"MSI_UID":48780,"ATU":13,"TITLE":"NAVAREA XII/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100117271030,"MRN":"urn:mrn:iala:wwy:us:navXII","WATERWAY_NAME":"NAVAREA XII","CREATE_DATE":1784082546000,"MODIFIED_DATE":1784082557000,"BEGIN_DATE":1783987200000,"END_DATE":1800143999000,"DESCRIPTION":"Cape George Colony Club Marina will be conducting dredging activities in Discovery Bay, Cape George Colony Club Marina Entrance, WA from 15 July 2026 through 15 January 2027. A (8’4” by 12’6”) marina barge with suction dredging onboard will be on station and will monitoring VHF-FM channels 13 &amp;amp; 16 during working hours. Mariners are requested to reduce speed and avoid working area. For additional information or concerned traffic, contact the dredge operator, Mike Thorwick at 360-643-9063 or Colleen Brady at 206-932-7300. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.88372,48.10259],[-122.88451,48.10224],[-122.88345,48.10121],[-122.88247,48.10147],[-122.88372,48.10259]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48857,"geometry":{"type":"Polygon","coordinates":[[[-74.74159999999995,40.18131000000005],[-74.74344999999994,40.17954000000003],[-74.73909999999995,40.17799000000008],[-74.72372999999999,40.160720000000026],[-74.72344999999996,40.150460000000066],[-74.72011999999995,40.150180000000034],[-74.72076999999996,40.16101000000003],[-74.73687999999999,40.17933000000005],[-74.74159999999995,40.18131000000005]]]},"properties":{"ESRI_OID":48857,"MSI_UID":48857,"ATU":5,"TITLE":"Delaware River - Upper Delaware River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382818,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:delbay:delbaymaicha:lisran:delriv:delrivmaicha:mifran:eagpoi:delriv:uppdelriv","WATERWAY_NAME":"Upper Delaware River","CREATE_DATE":1784141553000,"MODIFIED_DATE":1784142303000,"BEGIN_DATE":1784073600000,"END_DATE":1789948799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-07-15 To: 2026-09-20\n\nLocation:\n40-10-52.716N/074-44-29.760W\n40-10-45.588N/074-44-12.768W\n40-09-39.636N/074-43-14.772W\n40-09-00.648N/074-43-12.432W\n40-09-01.656N/074-43-24.420W\n40-09-38.592N/074-43-25.428W\n40-10-40.764N/074-44-20.760W\n40-10-46.344N/074-44-36.420W\n40-10-52.716N/074-44-29.760W\n\nCurtin Marine will conduct dredge operations from Upper Delaware River Buoy 88 (LLNR 4245) to Upper Delaware River Buoy 97 (LLNR 4305). Active dredging operations commencing on or about July 20, 2026, and concluding on or about September 20, 2026.\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.7416,40.18131],[-74.74345,40.17954],[-74.7391,40.17799],[-74.72373,40.16072],[-74.72345,40.15046],[-74.72012,40.15018],[-74.72077,40.16101],[-74.73688,40.17933],[-74.7416,40.18131]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48943,"geometry":{"type":"Polygon","coordinates":[[[-75.88567999999998,36.889380000000074],[-75.89151999999996,36.88641000000007],[-75.87262999999996,36.86933000000005],[-75.84750999999994,36.857020000000034],[-75.84418999999997,36.86137000000008],[-75.86707999999999,36.87345000000005],[-75.88567999999998,36.889380000000074]]]},"properties":{"ESRI_OID":48943,"MSI_UID":48943,"ATU":5,"TITLE":"Sector Virginia, Exclusive Economic Zone (EEZ) - Sector Virginia, Territorial Sea/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383169,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea","WATERWAY_NAME":"Sector Virginia, Territorial Sea","CREATE_DATE":1784226412000,"MODIFIED_DATE":1785352257000,"BEGIN_DATE":1784160000000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-07-16 To: 2026-09-01\n\nLocation:\n36-53-21.768N/075-53-08.448W\n36-52-24.420N/075-52-01.488W\n36-51-40.932N/075-50-39.084W\n36-51-25.272N/075-50-51.036W\n36-52-09.588N/075-52-21.468W\n36-53-11.076N/075-53-29.472W\n36-53-21.768N/075-53-08.448W\n\nThe hopper dredge “Stuyvesant” will perform all dredging offshore between Chesapeake Bay Southern Approach Lighted Buoys 7 an 8 (LLNR 445 and 450) and Chesapeake Bay Southern Approach Lighted Buoys 11 an 12 (LLNR 465 and 470). Dredging will start the week of July 20th, 2026 and continue through September 30, 2026.\nThe Stuyvesant will use DNODS for offshore disposal utilizing Cell 5 and /or The Stuyvesant will be hydraulically placing material at Craney Island south of Dredged Material Management Area. Offloading within the vicinity of the below coordinates, next to Elizabeth River Light Buoy14 9540 with the assistance of tugboats Tug Delta, Tender Kimberly S, and the CB Harry S.\nNorth (Y) East(X)\nA 3,501,251.05 12,113,597.41\nB 3,498,288.99 12,114,073.03\nC 3,498,209.72 12,113,579.35\nD 3,501,171.78 12,113,103.73 ALL VESSEL SHIP TRAFFIC PASSING HOPPER DREDGE STUYVESANT WHILE ANCHORED FOR OFFLOAD ADJACENT TO THE NORFOLK CHANNEL/CRANEY ISLAND, REQUEST MAXIMUM SPEED OF 5 KNOTS.\nMSI # 48943.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.88568,36.88938],[-75.89152,36.88641],[-75.87263,36.86933],[-75.84751,36.85702],[-75.84419,36.86137],[-75.86708,36.87345],[-75.88568,36.88938]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":48988,"geometry":{"type":"Polygon","coordinates":[[[-82.91343999999998,38.752830000000074],[-82.91639999999995,38.75206000000003],[-82.91855999999996,38.75157000000007],[-82.92113999999998,38.75060000000008],[-82.92064999999997,38.74758000000003],[-82.91727999999995,38.74812000000003],[-82.91263999999995,38.74959000000007],[-82.91343999999998,38.752830000000074]]]},"properties":{"ESRI_OID":48988,"MSI_UID":48988,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1784291536000,"MODIFIED_DATE":1784291800000,"BEGIN_DATE":1784246400000,"END_DATE":1790985599000,"DESCRIPTION":"Commencing August 1, 2026, and continuing until October 1, 2026, cofferdam construction will be conducted to install a new municipal intake along the right descending bank of the Ohio River, Mile 350.7.  Work will be performed from 7:00 a.m. through 3:30 p.m., Monday through Friday.  The contractor's floating plant will consist of the M/V MARY JANE, one barge mounted crane, and two material barges.  During non-working hours the contractor's floating plant will be moored at the worksite and lighted accordingly.  The M/V MARY JANE will be monitoring VHF-FM Channels 13 and 16.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.91344,38.75283],[-82.9164,38.75206],[-82.91856,38.75157],[-82.92114,38.7506],[-82.92065,38.74758],[-82.91728,38.74812],[-82.91264,38.74959],[-82.91344,38.75283]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49003,"geometry":{"type":"Polygon","coordinates":[[[-95.27916999999997,29.739520000000027],[-95.27962999999994,29.739430000000027],[-95.27805999999998,29.736410000000035],[-95.27771999999999,29.736560000000054],[-95.27916999999997,29.739520000000027]]]},"properties":{"ESRI_OID":49003,"MSI_UID":49003,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1784299425000,"MODIFIED_DATE":1784299458000,"BEGIN_DATE":1784246400000,"END_DATE":1800143999000,"DESCRIPTION":"Houston Ship Channel - Dock Construction --- From: 2026-07-17 To: January 2027 --- Dock construction is being conducted along the Houston Ship Channel at City Docks 20 and 21.  Work will take place from shore and waterside with divers and crews working under the docks at various times.  Mariners should transit the area with caution and at their slowest safe speed to minimize wake.  POC: (832) 926-2215 or (346) 341-4518","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-95.27917,29.73952],[-95.27963,29.73943],[-95.27806,29.73641],[-95.27772,29.73656],[-95.27917,29.73952]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49102,"geometry":{"type":"Polygon","coordinates":[[[-87.01770999999997,37.91616000000005],[-87.02570999999995,37.911500000000046],[-87.02489999999995,37.910570000000064],[-87.01615999999996,37.91543000000007],[-87.01770999999997,37.91616000000005]]]},"properties":{"ESRI_OID":49102,"MSI_UID":49102,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1784550513000,"MODIFIED_DATE":1787156274000,"BEGIN_DATE":1784505600000,"END_DATE":1806623999000,"DESCRIPTION":"Continuing until March 31, 2027, Underwater Construction Corporation, dredging and mooring cell repairs are being conducted along the RDB, at the AEP Rockport Power Plant, in the vicinity of Mile 744.8.  Work will be conducted from 7:00 a.m. until 7:00 p.m., 7-days a week.  The contractors floating plant will consist of one crane barge and one material barge.  Mariners are requested to transit the area at their slowest safe speed to minimize their wake and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-87.01771,37.91616],[-87.02571,37.9115],[-87.0249,37.91057],[-87.01616,37.91543],[-87.01771,37.91616]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49123,"geometry":{"type":"Polygon","coordinates":[[[-88.10175999999996,30.462750000000028],[-88.10162999999994,30.46076000000005],[-88.10340999999994,30.457980000000077],[-88.10402999999997,30.45718000000005],[-88.10372999999998,30.456680000000063],[-88.10447999999997,30.456150000000036],[-88.10497999999995,30.456080000000043],[-88.10561999999999,30.455520000000035],[-88.10538999999994,30.455200000000048],[-88.10368999999997,30.455340000000035],[-88.10265999999996,30.457800000000077],[-88.10120999999998,30.45989000000003],[-88.10063999999994,30.462620000000072],[-88.10175999999996,30.462750000000028]]]},"properties":{"ESRI_OID":49123,"MSI_UID":49123,"ATU":8,"TITLE":"Mobile Channel - Fowl River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384526,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:mobbay:mobbar:mobcha:fowriv","WATERWAY_NAME":"Fowl River","CREATE_DATE":1784564649000,"MODIFIED_DATE":1785335618000,"BEGIN_DATE":1784505600000,"END_DATE":1796169599000,"DESCRIPTION":"Mobile Bay – Fowl River – Dredge Operation --- From: 2026-07-27 To: 2026-11-30 --- Hydraulic dredging and marsh placement will be conducted south of the Fowl River Access Channel.  Work will take place 24-hours a day, Monday through Friday.  On-scene equipment and vessels will include 8,500 feet of dredge pipe, the Dredge BLACKHAWK and Tender Boats PIN OAK and TODD MICHAEL.  Mariners should watch for signs designating the 16 inch submerged plastic pipeline.  Vessels are urged to transit with extreme caution, as underwater dredged material will be present and used to remediate and shape the marsh.  Mariners are requested to coordinate passing arrangements in advance, maintain a safe distance from all project equipment, and transit the work area with caution.  VHF-FM Channels: 13, 16 and 77, POC: (832) 217-0541","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.10176,30.46275],[-88.10163,30.46076],[-88.10341,30.45798],[-88.10403,30.45718],[-88.10373,30.45668],[-88.10448,30.45615],[-88.10498,30.45608],[-88.10562,30.45552],[-88.10539,30.4552],[-88.10369,30.45534],[-88.10266,30.4578],[-88.10121,30.45989],[-88.10064,30.46262],[-88.10176,30.46275]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49258,"geometry":{"type":"Polygon","coordinates":[[[-120.52073999999999,33.783420000000035],[-120.53023999999999,33.66219000000007],[-120.42884999999995,33.480030000000056],[-119.87414999999999,33.52502000000004],[-119.77837999999997,33.54606000000007],[-119.80772999999999,33.68601000000007],[-120.52073999999999,33.783420000000035]]]},"properties":{"ESRI_OID":49258,"MSI_UID":49258,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116385454,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea","WATERWAY_NAME":"Sector Los Angeles, Territorial Sea","CREATE_DATE":1784645035000,"MODIFIED_DATE":1784754211000,"BEGIN_DATE":1784592000000,"END_DATE":1788393599000,"DESCRIPTION":"The Scripps Institution of Oceanography research vessel ROBERT GORDON SPROUL (Call Sign WSQ-2674) will conduct surface to floor oceanographic operations from August 2 to September 1, 2026, in the vicinity of the following waypoints:\n\nLatitude\tLongitude\n33.568366\t-120.038864\n33.480030\t-120.428854\n33.662193\t-120.530245\n33.783421\t-120.520739\n33.627902\t-120.403503\n33.525017\t-119.874146\n33.566328\t-119.852017\n33.610988\t-119.853270\n33.686011\t-119.807731\n33.546059\t-119.778376\n33.562872\t-119.925586\nThe exact timing and location of each station will depend on operational concerns and weather conditions. During over-the-side operations, the vessel will be restricted in its ability to maneuver; all traffic is requested to give ROBERT GORDON SPROUL a wide berth. The vessel will monitor VHF-FM channels 16 and 13. Mariners are advised to use caution when transiting the area. For further comments or details, contact Heather Galiher at 858-226-8761. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-120.52074,33.78342],[-120.53024,33.66219],[-120.42885,33.48003],[-119.87415,33.52502],[-119.77838,33.54606],[-119.80773,33.68601],[-120.52074,33.78342]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49259,"geometry":{"type":"Polygon","coordinates":[[[-117.17349999999999,32.718270000000075],[-117.17724999999996,32.71824000000004],[-117.17718999999994,32.716530000000034],[-117.17342999999994,32.71655000000004],[-117.17349999999999,32.718270000000075]]]},"properties":{"ESRI_OID":49259,"MSI_UID":49259,"ATU":11,"TITLE":"Approaches To San Diego Bay - San Diego Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385494,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:apptosandiebay:sandiebay","WATERWAY_NAME":"San Diego Bay","CREATE_DATE":1784645446000,"MODIFIED_DATE":1784754181000,"BEGIN_DATE":1784592000000,"END_DATE":1788479999000,"DESCRIPTION":"The Port of San Diego will conduct maintenance dredging of approximately 34,000 cubic yards from the north and south berths of the B Street Cruise Ship Terminal to restore the authorized depth of -33 feet MLLW. Dredged material will be side-cast to designated placement areas to achieve the required elevations. Operations will take place at the Port of San Diego Cruise Ship Terminal, 1140 N Harbor Dr, San Diego, CA 92101, centered at 32.71746, -117.17499 (NAD 83), from August 3, 2026, to September 21, 2026. Vessels involved in the operation include PDC 180 (180’ dredge vessel with 2 spuds) and Harbor Cadet (25’ tug), both monitoring VHF Channel 16. Silt curtains will be located on the perimeter of the project area north and south of B Street Cruise Ship Terminal, presenting potential hazards to navigation. For more information, contact the Duty Wharfinger at 619-400-4744. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.1735,32.71827],[-117.17725,32.71824],[-117.17719,32.71653],[-117.17343,32.71655],[-117.1735,32.71827]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49314,"geometry":{"type":"Polygon","coordinates":[[[-94.50219999999996,29.52422000000007],[-94.50955999999996,29.521790000000067],[-94.50805999999994,29.518730000000062],[-94.50114999999994,29.52117000000004],[-94.50219999999996,29.52422000000007]]]},"properties":{"ESRI_OID":49314,"MSI_UID":49314,"ATU":8,"TITLE":"Bolivar Peninsula - Rollover Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384813,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:galbay:bolpen:rolbay","WATERWAY_NAME":"Rollover Bay","CREATE_DATE":1784664161000,"MODIFIED_DATE":1784718539000,"BEGIN_DATE":1784592000000,"END_DATE":1794441599000,"DESCRIPTION":"GIWW – Island Restoration --- From: 2026-07-20 To: 2026-11-10 --- Island restoration construction will be conducted on Bird Rookery Island, in Rollover Bay, in the vicinity of GIWW Mile 329.0, WHL.  Construction will consist of the placement of sand and rock in the area.  On-scene vessels and equipment will include T/Vs MR. TIM and CHRIS N., crew boats, spud barges with excavators and rock barges.  Mariners are urged to transit the area with caution and at their slowest safe speed to minimize wake.  VHF-FM Channel: 16","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.5022,29.52422],[-94.50956,29.52179],[-94.50806,29.51873],[-94.50115,29.52117],[-94.5022,29.52422]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49419,"geometry":{"type":"Polygon","coordinates":[[[-73.81671999999998,40.42710000000005],[-73.89739999999995,40.42684000000003],[-73.89893999999998,40.36448000000007],[-73.87438999999995,40.36408000000006],[-73.87456999999995,40.35558000000003],[-73.81516999999997,40.355450000000076],[-73.81671999999998,40.42710000000005]]]},"properties":{"ESRI_OID":49419,"MSI_UID":49419,"ATU":1,"TITLE":"NAVAREA IV/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382366,"MRN":"urn:mrn:iala:wwy:us:navIV","WATERWAY_NAME":"NAVAREA IV","CREATE_DATE":1784813196000,"MODIFIED_DATE":1784813201000,"BEGIN_DATE":1784764800000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-01 To: 2026-10-01\n\nCurtin Maritime Corporation will begin maintenance dredging operations in the New York and New Jersey Channels—specifically the Seguine, Ward, and Outerbridge reaches—on or about August 1, 2026, with completion expected by October 1, 2026. The project, conducted under USACE contract W912DS25CA011, involves 24/7 dredging within existing federal navigation channels to maintain safe passage for maritime traffic. Dredged material will be transported offshore and placed as remediation material at the Historic Area Remediation Site (HARS) in the Atlantic Ocean. The operation will utilize one mechanical dredge (DB Avalon) and three split hull scows, supported by four towing vessels. All manned equipment will monitor VHF-FM Channels 13 and 16 for maritime safety. Mariners are advised to proceed with caution and coordinate passing arrangements. The project site plan, coordinates, and operational notes are provided, with specific restrictions on dredging activities in certain shoaled areas from October 1 to November 30. The survey and mapping data meet US Army Corps of Engineers standards and are referenced to the US State Plane Coordinate System (NAD 1983). For further information, Project Manager Robert Collaro is the point of contact. \n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-73.81672,40.4271],[-73.8974,40.42684],[-73.89894,40.36448],[-73.87439,40.36408],[-73.87457,40.35558],[-73.81517,40.35545],[-73.81672,40.4271]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49421,"geometry":{"type":"Polygon","coordinates":[[[-74.24836999999997,40.52421000000004],[-74.26235999999994,40.50457000000006],[-74.25806999999998,40.500060000000076],[-74.24690999999996,40.484860000000026],[-74.24253999999996,40.48342000000008],[-74.23815999999994,40.48381000000006],[-74.20982999999995,40.50457000000006],[-74.20261999999997,40.50705000000005],[-74.19515999999999,40.50711000000007],[-74.18133999999998,40.50568000000004],[-74.18090999999998,40.50718000000006],[-74.19171999999998,40.50946000000005],[-74.20691999999997,40.509070000000065],[-74.23163999999997,40.490860000000055],[-74.23909999999995,40.48975000000007],[-74.24974999999995,40.49249000000003],[-74.25240999999994,40.49517000000003],[-74.25703999999996,40.50672000000003],[-74.25600999999995,40.51168000000007],[-74.24622999999997,40.520880000000034],[-74.24630999999994,40.52395000000007],[-74.24836999999997,40.52421000000004]]]},"properties":{"ESRI_OID":49421,"MSI_UID":49421,"ATU":1,"TITLE":"Swash Channel - Raritan Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382318,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:swacha:rarbay","WATERWAY_NAME":"Raritan Bay","CREATE_DATE":1784814196000,"MODIFIED_DATE":1784814212000,"BEGIN_DATE":1784764800000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-01 To: 2026-10-01\n\nCurtin Maritime, represented by Project Manager Robert Collaro, will conduct mechanical clamshell dredging in the New York and New Jersey Channels—specifically the Seguine, Ward, and Outerbridge reaches—from August 1, 2026, to October 1, 2026. Operations will run continuously, 24 hours per day, seven days a week. The equipment on scene will include the DB Avalon dredge, three scows (Crown Point, Rincon Point, and Stony Point), three towing tugs, and one assist tug. All vessels will monitor VHF-FM Channels 13 and 16 for communications. Mariners are advised that passing arrangements require a “Slow Bell” request and one hour’s notice to move vessels out of the channel to avoid impeding navigation. For further information, Robert Collaro can be contacted at 772-643-0784 or rcollaro@curtinmaritime.com. The Local Notice to Mariners should be submitted to the U.S. Coast Guard First District two weeks prior to the start of operations, and publication does not constitute project approval. Coordination with the appropriate Coast Guard Sector is required before publication.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.24837,40.52421],[-74.26236,40.50457],[-74.25807,40.50006],[-74.24691,40.48486],[-74.24254,40.48342],[-74.23816,40.48381],[-74.20983,40.50457],[-74.20262,40.50705],[-74.19516,40.50711],[-74.18134,40.50568],[-74.18091,40.50718],[-74.19172,40.50946],[-74.20692,40.50907],[-74.23164,40.49086],[-74.2391,40.48975],[-74.24975,40.49249],[-74.25241,40.49517],[-74.25704,40.50672],[-74.25601,40.51168],[-74.24623,40.52088],[-74.24631,40.52395],[-74.24837,40.52421]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49748,"geometry":{"type":"Polygon","coordinates":[[[-117.17345999999998,32.71824000000004],[-117.17703999999998,32.71822000000003],[-117.17705999999998,32.71652000000006],[-117.17349999999999,32.71656000000007],[-117.17345999999998,32.71824000000004]]]},"properties":{"ESRI_OID":49748,"MSI_UID":49748,"ATU":11,"TITLE":"Approaches To San Diego Bay - San Diego Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385494,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:apptosandiebay:sandiebay","WATERWAY_NAME":"San Diego Bay","CREATE_DATE":1785163768000,"MODIFIED_DATE":1785181558000,"BEGIN_DATE":1785110400000,"END_DATE":1790207999000,"DESCRIPTION":"Pacific Dredge &amp;amp; Construction, under a permit with the U.S. Army Corps of Engineers, will conduct dredging operations around the B Street Pier Cruise Ship Terminal in the Port of San Diego. Mobilization and operations are expected to run from August 3, 2026, through September 22, 2026. The 180-foot crane barge \"PDC180\" will be mobilized around the work area by the 25-foot tugboat \"Harbor Cadet,\" supported by work skiffs. Working hours are from 0700 to 1900 (12 hours/day), Monday through Friday, excluding holidays. The PDC180 and Harbor Cadet will actively monitor VHF-FM channels 6 and 16. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. Point of Contact: Raul Madera, Project Superintendent, 24-hour cell phone: (619) 992-2894.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.17346,32.71824],[-117.17704,32.71822],[-117.17706,32.71652],[-117.1735,32.71656],[-117.17346,32.71824]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49765,"geometry":{"type":"Polygon","coordinates":[[[-78.92964999999998,42.88277000000005],[-78.93445999999994,42.88163000000003],[-78.91857999999996,42.87591000000003],[-78.90638999999999,42.87459000000007],[-78.89908999999994,42.87773000000004],[-78.90149999999994,42.87862000000007],[-78.90629999999999,42.87711000000007],[-78.91642999999993,42.87799000000007],[-78.92964999999998,42.88277000000005]]]},"properties":{"ESRI_OID":49765,"MSI_UID":49765,"ATU":9,"TITLE":"Niagara River - Lake Erie/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386091,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri","WATERWAY_NAME":"Lake Erie","CREATE_DATE":1785168157000,"MODIFIED_DATE":1785168388000,"BEGIN_DATE":1783900800000,"END_DATE":1799452799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-07-13 To: 2027-01-08\n\nThere will be maintenance performed on ice boom anchor cables by a tug and crane barge on Lake Erie between Buffalo Outer Harbor and Fort Erie from July 13, 2026 to August 2, 2026. Mariners are advised to use caution when transiting near the work area and remain 100 yards from the barge when possible. For further information, please contact  716-243-6617.\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-78.92965,42.88277],[-78.93446,42.88163],[-78.91858,42.87591],[-78.90639,42.87459],[-78.89909,42.87773],[-78.9015,42.87862],[-78.9063,42.87711],[-78.91643,42.87799],[-78.92965,42.88277]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49768,"geometry":{"type":"Polygon","coordinates":[[[-93.37866999999994,30.034730000000025],[-93.37881999999996,30.03385000000003],[-93.37843999999996,30.033830000000023],[-93.37793999999997,30.03377000000006],[-93.37708999999995,30.03377000000006],[-93.37692999999996,30.03451000000007],[-93.37789999999995,30.03457000000003],[-93.37833999999998,30.034650000000056],[-93.37866999999994,30.034730000000025]]]},"properties":{"ESRI_OID":49768,"MSI_UID":49768,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384754,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact","WATERWAY_NAME":"Sector Houston-Galveston, Submerged Land Act (SLA)","CREATE_DATE":1785169337000,"MODIFIED_DATE":1785344129000,"BEGIN_DATE":1785110400000,"END_DATE":1792195199000,"DESCRIPTION":"Brown Lake - Black Lake - Subline Installation --- From: 2026-07-28 To: 2026-10-16 --- A subline has been installed in the area and will be utilized for the Cameron LNG dredge operation.  The subline will remain in the area for the duration of the dredge project.  Mariners are urged to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.37867,30.03473],[-93.37882,30.03385],[-93.37844,30.03383],[-93.37794,30.03377],[-93.37709,30.03377],[-93.37693,30.03451],[-93.3779,30.03457],[-93.37834,30.03465],[-93.37867,30.03473]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49885,"geometry":{"type":"Polygon","coordinates":[[[-94.99187999999998,29.613140000000044],[-94.99761999999998,29.613000000000056],[-94.99758999999995,29.612480000000062],[-94.99755999999996,29.61230000000006],[-94.99618999999996,29.61190000000005],[-94.99503999999996,29.611920000000055],[-94.99433999999997,29.612060000000042],[-94.99297999999999,29.612130000000036],[-94.99181999999996,29.612040000000036],[-94.99187999999998,29.613140000000044]]]},"properties":{"ESRI_OID":49885,"MSI_UID":49885,"ATU":8,"TITLE":"Houston Ship Channel - Bayport Ship Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385163,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha:bayshicha","WATERWAY_NAME":"Bayport Ship Channel","CREATE_DATE":1785249718000,"MODIFIED_DATE":1786545290000,"BEGIN_DATE":1785196800000,"END_DATE":1800835199000,"DESCRIPTION":"Bayport Ship Channel - Dock Construction --- From: 2026-07-27 To: Until Further Notice --- Dock construction is being conducted outside the Bayport Ship Channel between the Bayport Land Cut and Bayport Terminal 1.  Crews and equipment will be working waterside on Wharf 1 during daylight hours only, from 6:30 a.m. to 7:30 p.m.  The T/V ALICE (no AIS) will be on-scene acting as an assist vessel.  Vessels, including harbor tugs, are requested to transit the area at their slowest safe speed to minimize wake.  VHF-FM Channel: 13,  POC: (310) 221-2427","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.99188,29.61314],[-94.99762,29.613],[-94.99759,29.61248],[-94.99756,29.6123],[-94.99619,29.6119],[-94.99504,29.61192],[-94.99434,29.61206],[-94.99298,29.61213],[-94.99182,29.61204],[-94.99188,29.61314]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":49888,"geometry":{"type":"Polygon","coordinates":[[[-81.51468999999997,30.392960000000073],[-81.53643999999997,30.389810000000068],[-81.53589999999997,30.383740000000046],[-81.53141999999997,30.386820000000057],[-81.51416999999998,30.389770000000055],[-81.51468999999997,30.392960000000073]]]},"properties":{"ESRI_OID":49888,"MSI_UID":49888,"ATU":7,"TITLE":"Sector Jacksonville, Submerged Land Act (SLA) - St Johns River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383440,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:stjohriv","WATERWAY_NAME":"St Johns River","CREATE_DATE":1785251195000,"MODIFIED_DATE":1785251716000,"BEGIN_DATE":1785196800000,"END_DATE":1807574399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-07-28 To: 2027-04-12\n49888\n\nJEA is raising the JEA transmission lines that cross the St. Johns River at the Fulton Cut. When completed, the lines will be 225 feet above high tide, giving Post-Panamax ships necessary operational clearance.\n\nThe project will be executed in five primary phases:\n1. Engineering, Design and Permitting June 2025\n2. Civil &amp;amp; Foundation Construction June 2025 to February 2026\n3. Structure Erection May 2026 to August 2026\n4. Conductor Installation August 2026 to December 2026\nRiver Portion August 2026 to September 2026\n5. Tower Demolition January 2027 to March 2027\n\nRiver Segment – The first segment will be stringing new wire over the river for all six circuits. The wire will be temporarily secured to structures on each side of the river. At no time will the new wire be at a lower elevation than the existing wires crossing the river.\nSimilar to structure erection, flight operations will occur in short bursts of approximately a few minutes per flight crossing the river. The flights will be coordinated with JaxPort and Harbor Pilots ensuring no impacts to maritime traffic. Other commercial and recreational watercraft will be minimally disrupted during short flights with river traffic being controlled by law enforcement vessels.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.51469,30.39296],[-81.53644,30.38981],[-81.5359,30.38374],[-81.53142,30.38682],[-81.51417,30.38977],[-81.51469,30.39296]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50197,"geometry":{"type":"Polygon","coordinates":[[[-71.06527999999997,42.36931000000004],[-71.06592999999998,42.36930000000007],[-71.06494999999995,42.368490000000065],[-71.06456999999995,42.36869000000007],[-71.06527999999997,42.36931000000004]]]},"properties":{"ESRI_OID":50197,"MSI_UID":50197,"ATU":1,"TITLE":"Boston North Channel - President Roads/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100119363597,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secbosexcecozon:secbostersea:secbossublanact:bossoucha:bosnorcha:preroa","WATERWAY_NAME":"President Roads","CREATE_DATE":1785500211000,"MODIFIED_DATE":1785500226000,"BEGIN_DATE":1786320000000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-08-10 To: 2026-09-30\n\nLocation:\n42-22-09.516N/071-03-55.008W\n42-22-07.284N/071-03-52.452W\n42-22-06.564N/071-03-53.820W\n42-22-09.480N/071-03-57.348W\n42-22-09.516N/071-03-55.008W\nMASSACHUSETTS – BOSTON INNER HARBOR – CHARLES RIVER – Boring Operations \n\nMariners are advised that Skanska Civil Northeast/Koch JV (Skanska) will be conducting boring operations in the vicinity of the MBTA Draw One Bridge over the Charles River. Operations will commence on August 10, 2026, and continue through September 25, 2026. Work will be conducted between 7:00 a.m. and 4:00 p.m. daily for the duration of the project.\n\nOn-scene equipment will consist of a 22' x 40' steel pontoon barge and one assist vessel. All boring operations will occur outside the navigational channel.\nFor additional information, mariners may contact Skanska representative Mr. Edward Breed at (617) 981-0215. The on-scene support vessel will monitor VHF-FM Channels 13 and 16.\n\nMariners are advised to exercise caution and proceed at a slow speed to minimize wake while transiting the area.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-71.06528,42.36931],[-71.06593,42.3693],[-71.06495,42.36849],[-71.06457,42.36869],[-71.06528,42.36931]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50220,"geometry":{"type":"Polygon","coordinates":[[[-82.40843999999998,27.948930000000075],[-82.46336999999994,27.94020000000006],[-82.43699999999995,27.82221000000004],[-82.54081999999994,27.804230000000075],[-82.54850999999996,27.868350000000078],[-82.56004999999999,27.86689000000007],[-82.56224999999995,27.800830000000076],[-82.54850999999996,27.75320000000005],[-82.66331999999994,27.632090000000062],[-82.73472999999996,27.608240000000023],[-82.77647999999994,27.619430000000023],[-83.06321999999994,27.588280000000054],[-83.06431999999995,27.572700000000054],[-82.77922999999998,27.605320000000063],[-82.73142999999999,27.594120000000032],[-82.65383999999995,27.62357000000003],[-82.56265999999994,27.641090000000077],[-82.57693999999998,27.692660000000046],[-82.49563999999998,27.784060000000068],[-82.40005999999994,27.821960000000047],[-82.40664999999996,27.896750000000054],[-82.40843999999998,27.948930000000075]]]},"properties":{"ESRI_OID":50220,"MSI_UID":50220,"ATU":7,"TITLE":"Paradise Bay Estates Channel - Tampa Bay/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116383309,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipetsublanact:soucha:parbayestcha:tambay","WATERWAY_NAME":"Tampa Bay","CREATE_DATE":1785507345000,"MODIFIED_DATE":1785508471000,"BEGIN_DATE":1785456000000,"END_DATE":1809129599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-07-31 To: 2027-04-30\n50220\n\nThe USACE will be conducting boring operations begining on or about August 17, 2026 with an estimated completion date of April 2, 2027. Operations will be conducted 7 days a week from 7 a.m. to 6 p.m. weather permitting. \nBarge Polly-L will be restricted in its ability to maneuver and if an emergency arises it will take 30-45 minutes to remove drill rods and casing. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.40844,27.94893],[-82.46337,27.9402],[-82.437,27.82221],[-82.54082,27.80423],[-82.54851,27.86835],[-82.56005,27.86689],[-82.56225,27.80083],[-82.54851,27.7532],[-82.66332,27.63209],[-82.73473,27.60824],[-82.77648,27.61943],[-83.06322,27.58828],[-83.06432,27.5727],[-82.77923,27.60532],[-82.73143,27.59412],[-82.65384,27.62357],[-82.56266,27.64109],[-82.57694,27.69266],[-82.49564,27.78406],[-82.40006,27.82196],[-82.40665,27.89675],[-82.40844,27.94893]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50252,"geometry":{"type":"Polygon","coordinates":[[[-82.69471999999996,27.453720000000033],[-82.70298999999994,27.437380000000076],[-82.70182999999997,27.43390000000005],[-82.69938999999994,27.432060000000035],[-82.58934999999997,27.327180000000055],[-82.58222999999998,27.33331000000004],[-82.58347999999995,27.33424000000008],[-82.58623999999998,27.332930000000033],[-82.58678999999995,27.33033000000006],[-82.58934999999997,27.327210000000036],[-82.69913999999994,27.432210000000055],[-82.69066999999995,27.43927000000008],[-82.69102999999996,27.444160000000068],[-82.68829999999997,27.44494000000003],[-82.68782999999996,27.446260000000052],[-82.68808999999999,27.44622000000004],[-82.68853999999999,27.44494000000003],[-82.69100999999995,27.444270000000074],[-82.69471999999996,27.453720000000033]]]},"properties":{"ESRI_OID":50252,"MSI_UID":50252,"ATU":7,"TITLE":"Sector St. Petersburg, Territorial Sea - Sector St. Petersburg, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383296,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipeterseala","WATERWAY_NAME":"Sector St. Petersburg, Submerged Land Act (SLA)","CREATE_DATE":1785514976000,"MODIFIED_DATE":1787842944000,"BEGIN_DATE":1785456000000,"END_DATE":1801094399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-07-31 To: 2027-01-27\n50252\nSea Hawk Maritime will be conducting operations for Manatee County oquina beach hurricane idalia storm damage repair. Operations are expected to begin on or about August 1, 2026 with an estimated completion date of October 26, 2026, and will be conducted 24/7. Dredge CLEARWATER will monitor VHF-FM channels 13 and 16. \n\nMariners are urged to use extreme caution in the area, transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made. Floating and submerged plastic and steel pipeline associated with the hydraulic dredging operations of the channel will be utilized. Pipeline, work vessels, dredge barge, booster pump barge(s), crane barges, tug boats, and buoys will be visibly lighted and marked according to Coast Guard regulations and will be in the area until all work is complete and can change configuration daily. Vessels and/or equipment will be in multiple locations at the same time.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.69472,27.45372],[-82.70299,27.43738],[-82.70183,27.4339],[-82.69939,27.43206],[-82.58935,27.32718],[-82.58223,27.33331],[-82.58348,27.33424],[-82.58624,27.33293],[-82.58679,27.33033],[-82.58935,27.32721],[-82.69914,27.43221],[-82.69067,27.43927],[-82.69103,27.44416],[-82.6883,27.44494],[-82.68783,27.44626],[-82.68809,27.44622],[-82.68854,27.44494],[-82.69101,27.44427],[-82.69472,27.45372]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50336,"geometry":{"type":"Polygon","coordinates":[[[-88.22587999999996,37.022560000000055],[-88.22624999999994,37.022500000000036],[-88.22394999999995,37.01679000000007],[-88.22354999999999,37.016860000000065],[-88.22587999999996,37.022560000000055]]]},"properties":{"ESRI_OID":50336,"MSI_UID":50336,"ATU":2,"TITLE":"Ohio River - Cumberland River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381248,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv:cumriv","WATERWAY_NAME":"Cumberland River","CREATE_DATE":1785766429000,"MODIFIED_DATE":1785767019000,"BEGIN_DATE":1785715200000,"END_DATE":1790899199000,"DESCRIPTION":"Commencing August 10, 2026, and continuing through September 30, 2026, the Barkley L/D, at Mile 30.6, will be closed to navigation for miter gate repairs.  During this period, vessels may utilize the Kentucky L/D and Barkley Canal.  Mariners can contact Barkley L/D on VHF-FM Channel 13 or 16, or at (270) 362-9131, for further information.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.22588,37.02256],[-88.22625,37.0225],[-88.22395,37.01679],[-88.22355,37.01686],[-88.22588,37.02256]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50367,"geometry":{"type":"Polygon","coordinates":[[[-80.62420999999995,28.14202000000006],[-80.62986999999998,28.14005000000003],[-80.62363999999997,28.126540000000034],[-80.63756999999998,28.124460000000056],[-80.62896999999998,28.117490000000032],[-80.62531999999999,28.12552000000005],[-80.62351999999998,28.123710000000074],[-80.62411999999995,28.122720000000072],[-80.62317999999993,28.12227000000007],[-80.62196999999998,28.12325000000004],[-80.61990999999995,28.11674000000005],[-80.61330999999996,28.117350000000044],[-80.61638999999997,28.12757000000005],[-80.59845999999999,28.13256000000007],[-80.60162999999994,28.136880000000076],[-80.61887999999999,28.13173000000006],[-80.62420999999995,28.14202000000006]]]},"properties":{"ESRI_OID":50367,"MSI_UID":50367,"ATU":7,"TITLE":"Eau Gallie Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383802,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:forpieinl:forpieinlinnhar:indrivsousec:eaugalcha","WATERWAY_NAME":"Eau Gallie Channel","CREATE_DATE":1785770824000,"MODIFIED_DATE":1785770856000,"BEGIN_DATE":1785715200000,"END_DATE":1789603199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-03 To: 2026-09-16\n50367\n\nInstallation of Anchorage Limitation Area (ALA) Navigation Markers – Indian River Lagoon and Eau Gallie River, Brevard County, Florida\nMariners are advised that Brevard County, through its contractor, In-Depth Services, Inc., will be installing navigation aids associated with the newly established Anchorage Limitation Areas (ALAs) in the Indian River Lagoon and Eau Gallie River.\nThe work includes the installation of eight (8) timber pile marker assemblies and twenty-three (23) regulatory buoys.\n\nInstallation locations include:\n•\tCrane Creek Anchorage Limitation Area: Installation of two (2) timber pile marker assemblies and five (5) regulatory buoys located north of Crane Creek.\n•\tEau Gallie River Anchorage Limitation Area: Installation of six (6) timber pile marker assemblies and eighteen (18) regulatory buoys within the Eau Gallie River and adjacent Indian River Lagoon.\n\nThe project is scheduled to occur July 26, 2026, through August 31, 2026. Construction activities will involve marine work vessels, pile-driving equipment, and personnel working in and adjacent to navigable waterways. Mariners are requested to exercise caution when transiting the work areas, proceed at a safe speed, maintain a proper lookout, and provide work vessels with a wide berth.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.62421,28.14202],[-80.62987,28.14005],[-80.62364,28.12654],[-80.63757,28.12446],[-80.62897,28.11749],[-80.62532,28.12552],[-80.62352,28.12371],[-80.62412,28.12272],[-80.62318,28.12227],[-80.62197,28.12325],[-80.61991,28.11674],[-80.61331,28.11735],[-80.61639,28.12757],[-80.59846,28.13256],[-80.60163,28.13688],[-80.61888,28.13173],[-80.62421,28.14202]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50435,"geometry":{"type":"Polygon","coordinates":[[[-90.05126999999999,29.961770000000058],[-90.05495999999994,29.960980000000063],[-90.05967999999996,29.958540000000028],[-90.06179999999995,29.956470000000024],[-90.06270999999998,29.954450000000065],[-90.06233999999995,29.94957000000005],[-90.06101999999998,29.940830000000062],[-90.06101999999998,29.935140000000047],[-90.06208999999996,29.93151000000006],[-90.06414999999998,29.927860000000067],[-90.06770999999998,29.924730000000068],[-90.07405999999997,29.920930000000055],[-90.09798999999998,29.913640000000044],[-90.10941999999994,29.911770000000047],[-90.12540999999999,29.913110000000074],[-90.13414999999998,29.91692000000006],[-90.13495999999998,29.920210000000054],[-90.14221999999995,29.917980000000057],[-90.13518999999997,29.910600000000045],[-90.12154999999996,29.905700000000024],[-90.11386999999996,29.904270000000054],[-90.10183999999998,29.90587000000005],[-90.07106999999996,29.91599000000008],[-90.06399999999996,29.920450000000073],[-90.05896999999999,29.92593000000005],[-90.05574999999999,29.931050000000027],[-90.05448999999999,29.93581000000006],[-90.05434999999994,29.94037000000003],[-90.05526999999995,29.943830000000048],[-90.05585999999994,29.953730000000064],[-90.05507999999998,29.955380000000048],[-90.05292999999995,29.955730000000074],[-90.05059999999997,29.956060000000036],[-90.05126999999999,29.961770000000058]]]},"properties":{"ESRI_OID":50435,"MSI_UID":50435,"ATU":8,"TITLE":"Head Of Passes To New Orleans - New Orleans Harbor/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385060,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar","WATERWAY_NAME":"New Orleans Harbor","CREATE_DATE":1785853505000,"MODIFIED_DATE":1787673818000,"BEGIN_DATE":1785801600000,"END_DATE":1788739199000,"DESCRIPTION":"Mississippi River – Dredge Operation --- From: 2026-08-11 To: 2026-09-05 --- The Dredge CAPTAIN FRANK and attendant plant will be dredging in the Mississippi River, LDB, between Miles 94.0 and 101.5, AHOP.   Operations will be conducted 24-hours a day, 7-days a week.  Dredged material will be transported through a floating pipeline and discharged beyond the channel contour into the Mississippi River.  A staging area for pipeline and equipment will be located on the LDB near Mile 96.5 and/or Mile 95.3, AHOP.  Mariners are urged to use extreme caution and transit the area at their slowest safe speed to create minimum wake after passing arrangements have been made.  VHF-FM Channels: 13, 16 and 67,  POC: (337) 852-4066 or (224) 221-3753","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.05127,29.96177],[-90.05496,29.96098],[-90.05968,29.95854],[-90.0618,29.95647],[-90.06271,29.95445],[-90.06234,29.94957],[-90.06102,29.94083],[-90.06102,29.93514],[-90.06209,29.93151],[-90.06415,29.92786],[-90.06771,29.92473],[-90.07406,29.92093],[-90.09799,29.91364],[-90.10942,29.91177],[-90.12541,29.91311],[-90.13415,29.91692],[-90.13496,29.92021],[-90.14222,29.91798],[-90.13519,29.9106],[-90.12155,29.9057],[-90.11387,29.90427],[-90.10184,29.90587],[-90.07107,29.91599],[-90.064,29.92045],[-90.05897,29.92593],[-90.05575,29.93105],[-90.05449,29.93581],[-90.05435,29.94037],[-90.05527,29.94383],[-90.05586,29.95373],[-90.05508,29.95538],[-90.05293,29.95573],[-90.0506,29.95606],[-90.05127,29.96177]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50514,"geometry":{"type":"Polygon","coordinates":[[[-82.56119999999999,38.404630000000054],[-82.56174999999996,38.403500000000065],[-82.55209999999994,38.402100000000075],[-82.55173999999994,38.40340000000003],[-82.56119999999999,38.404630000000054]]]},"properties":{"ESRI_OID":50514,"MSI_UID":50514,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1785935205000,"MODIFIED_DATE":1785951565000,"BEGIN_DATE":1785888000000,"END_DATE":1788393599000,"DESCRIPTION":"Continuing until approximately September 1, 2026, Superior Marine Ways, Inc., will be conducting facility maintenance dredging, at Mile 314.7, RDB.  The floating plant will consist of the M/V TAYLOR RENEE, one barge mounted crane, and one material barge.  Work will be conducted from 7:00 a.m. until 5:00 p.m., Monday through Friday.  M/V TAYLOR RENEE will be monitoring VHF-FM Channels 13 and 16.  During non-working hours, the floating plant will be moored at the permitted fleeting area, at Superior Marine, and lighted accordingly.  Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.5612,38.40463],[-82.56175,38.4035],[-82.5521,38.4021],[-82.55174,38.4034],[-82.5612,38.40463]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50574,"geometry":{"type":"Polygon","coordinates":[[[-118.33093999999994,33.71945000000005],[-118.37556999999998,33.69273000000004],[-118.32333999999997,33.66397000000006],[-118.29033999999996,33.68701000000004],[-118.31217999999996,33.71249000000006],[-118.33093999999994,33.71945000000005]]]},"properties":{"ESRI_OID":50574,"MSI_UID":50574,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea - Sector Los Angeles, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385490,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact","WATERWAY_NAME":"Sector Los Angeles, Submerged Land Act (SLA)","CREATE_DATE":1785953019000,"MODIFIED_DATE":1785967236000,"BEGIN_DATE":1786406400000,"END_DATE":1789775999000,"DESCRIPTION":"Aqueos Corporation will be conducting underwater inspection and maintenance work off of Whites Point from August 18 to September 17, 2026. The operations will involve the Offshore Supply Vessel Loren C using an underwater remote operated vehicle (ROV) and will be conducted on a 24-hour basis. The vessel will be in a \"live boat mode\" and not anchored.\n\nThe work will be conducted within the area bounded by the following coordinates:\n\n33.71945, -118.33094;\n\n33.71249, -118.31218;\n\n33.69098, -118.30628;\n\n33.68075, -118.31639; and\n\n33.70149, -118.34799.\n\nThe vessel will monitor VHF Channel 16.\n\nFor more details or comments, contact Greg Garnett at (808) 476-1556 or the vessel at (805) 895-9005. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-118.33094,33.71945],[-118.37557,33.69273],[-118.32334,33.66397],[-118.29034,33.68701],[-118.31218,33.71249],[-118.33094,33.71945]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50580,"geometry":{"type":"Polygon","coordinates":[[[-117.10529999999994,32.65104000000002],[-117.11975999999999,32.64790000000005],[-117.13206999999994,32.64775000000003],[-117.12358999999998,32.639170000000036],[-117.11602999999997,32.64645000000007],[-117.10454999999996,32.65022000000005],[-117.10529999999994,32.65104000000002]]]},"properties":{"ESRI_OID":50580,"MSI_UID":50580,"ATU":11,"TITLE":"Approaches To San Diego Bay - San Diego Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385494,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:apptosandiebay:sandiebay","WATERWAY_NAME":"San Diego Bay","CREATE_DATE":1785953661000,"MODIFIED_DATE":1785967249000,"BEGIN_DATE":1786924800000,"END_DATE":1795737599000,"DESCRIPTION":"The Port of San Diego will be coordinating in-water construction along the south shoreline of Sweetwater Channel in San Diego Bay from August 24, 2026, intermittently through November 25, 2026. Operations are dependent on tidal conditions.\n\nThe project consists of the removal of existing rock revetment and the installation of interlocking ECOncrete tidepool shoreline units. In-water work will include the use of a floating barge with crane operations and small support vessels at approximately 32.65006, -117.10867.\n\nMariners are urged to transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made.\n\nFor more details or comments, contact Zeke Coleman at the Port of San Diego Engineering Department at 619-942-2966. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.1053,32.65104],[-117.11976,32.6479],[-117.13207,32.64775],[-117.12359,32.63917],[-117.11603,32.64645],[-117.10455,32.65022],[-117.1053,32.65104]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50585,"geometry":{"type":"Polygon","coordinates":[[[-122.36115999999998,37.753540000000044],[-122.37591999999995,37.752260000000035],[-122.37555999999995,37.74867000000006],[-122.38587999999999,37.74810000000008],[-122.38577999999995,37.74700000000007],[-122.37605999999994,37.74717000000004],[-122.37248999999997,37.74550000000005],[-122.36760999999996,37.74022000000008],[-122.35583999999994,37.746530000000064],[-122.36115999999998,37.753540000000044]]]},"properties":{"ESRI_OID":50585,"MSI_UID":50585,"ATU":11,"TITLE":"San Francisco Oakland Bay Bridge West Crossing - San Francisco Bay North Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385434,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:sanfraoakbaybriwescro:sanfrabaynorcha","WATERWAY_NAME":"San Francisco Bay North Channel","CREATE_DATE":1785955905000,"MODIFIED_DATE":1785967263000,"BEGIN_DATE":1785888000000,"END_DATE":1790899199000,"DESCRIPTION":"Silverado Contractors, Inc. will be conducting wharf demolition operations at Pier 90 in San Francisco from August 12 to September 30, 2026. \n\nOperations will occur at approximately 37.74716, -122.38363.\n\nThe Crane Barge 2 (Call Sign: CB2), Zaccor I (Call Sign: Zaccor 1), and Zaccor VII (Call Sign: Zaccor 7) will be involved in the operations. On-scene vessels will monitor VHF-FM Channels 13 and 14 when near deep-draft traffic, and Channel 16 otherwise. Mariners are requested to use caution when transiting near the demolition site.\n\nFor more details or comments, contact Matt Bramlett at (925) 818-2324 or Mbramlett@silveradocontractors.com. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.36116,37.75354],[-122.37592,37.75226],[-122.37556,37.74867],[-122.38588,37.7481],[-122.38578,37.747],[-122.37606,37.74717],[-122.37249,37.7455],[-122.36761,37.74022],[-122.35584,37.74653],[-122.36116,37.75354]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50598,"geometry":{"type":"Polygon","coordinates":[[[-78.92724999999996,33.65075000000007],[-78.91856999999999,33.63802000000004],[-78.90031999999997,33.62262000000004],[-78.88597999999996,33.61163000000005],[-78.87229999999994,33.60149000000007],[-78.83431999999993,33.58238000000006],[-78.79492999999997,33.55627000000004],[-78.74449999999996,33.52538000000004],[-78.73931999999996,33.52286000000004],[-78.66838999999999,33.478440000000035],[-78.57291999999995,33.41310000000004],[-78.54675999999995,33.39975000000004],[-78.49147999999997,33.36514000000005],[-78.39295999999996,33.32301000000007],[-78.29021999999998,33.281030000000044],[-78.25789999999995,33.27896000000004],[-78.24054999999998,33.28276000000005],[-78.13309999999996,33.23514000000006],[-78.05548999999996,33.19589000000008],[-77.86420999999996,33.101710000000026],[-77.71708999999998,33.035660000000064],[-77.63281999999998,33.00001000000003],[-77.53647999999998,32.95807000000008],[-77.39907999999997,32.91386000000006],[-76.73032999999998,32.69011000000006],[-76.58003999999994,32.64957000000004],[-76.34018999999995,32.577780000000075],[-75.93550999999997,32.48651000000007],[-75.90374999999995,32.48336000000006],[-73.91781999999995,32.27786000000003],[-73.64970999999997,32.25840000000005],[-75.93505999999996,32.487270000000024],[-76.33996999999994,32.58553000000006],[-76.72699999999998,32.69566000000003],[-77.53589999999997,32.96249000000006],[-78.24255999999997,33.28985000000006],[-78.28936999999996,33.28792000000004],[-78.48855999999995,33.372330000000034],[-78.92724999999996,33.65075000000007]]]},"properties":{"ESRI_OID":50598,"MSI_UID":50598,"ATU":7,"TITLE":"Sector Charleston, Territorial Sea - Sector Charleston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116384376,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact","WATERWAY_NAME":"Sector Charleston, Submerged Land Act (SLA)","CREATE_DATE":1785971724000,"MODIFIED_DATE":1785972194000,"BEGIN_DATE":1785888000000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-05 To: 2026-10-31\n50598\n\nSubcom LLC will conduct submarine cable installation operations off South Carolina. Work comprises shore-end lay, plow and ROV burial, surface lay (armored and unarmored), initial and final cable splicing, cable-end buoying/recovery, and post-lay inspection and burial (PLIB), within US State waters, the Territorial Sea (TS), Contiguous Zone (CZ), and Exclusive Economic Zone (EEZ). The cable ship SUBCOM DURABLE will begin operations on or about August 10, 2026, with an estimated completion date of September 25, 2026. Vessel will be monitoring VHF-FM channels 13 and 16. While conducting operations the vessel will be restricted in their ability to maneuver and requests a 2 NM CPA. For further information contact: csdrmaster@subcom.com.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-78.92725,33.65075],[-78.91857,33.63802],[-78.90032,33.62262],[-78.88598,33.61163],[-78.8723,33.60149],[-78.83432,33.58238],[-78.79493,33.55627],[-78.7445,33.52538],[-78.73932,33.52286],[-78.66839,33.47844],[-78.57292,33.4131],[-78.54676,33.39975],[-78.49148,33.36514],[-78.39296,33.32301],[-78.29022,33.28103],[-78.2579,33.27896],[-78.24055,33.28276],[-78.1331,33.23514],[-78.05549,33.19589],[-77.86421,33.10171],[-77.71709,33.03566],[-77.63282,33.00001],[-77.53648,32.95807],[-77.39908,32.91386],[-76.73033,32.69011],[-76.58004,32.64957],[-76.34019,32.57778],[-75.93551,32.48651],[-75.90375,32.48336],[-73.91782,32.27786],[-73.64971,32.2584],[-75.93506,32.48727],[-76.33997,32.58553],[-76.727,32.69566],[-77.5359,32.96249],[-78.24256,33.28985],[-78.28937,33.28792],[-78.48856,33.37233],[-78.92725,33.65075]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50612,"geometry":{"type":"Polygon","coordinates":[[[-71.06523999999996,42.36928000000006],[-71.06588999999997,42.369200000000035],[-71.06534999999997,42.36872000000005],[-71.06490999999994,42.36888000000005],[-71.06523999999996,42.36928000000006]]]},"properties":{"ESRI_OID":50612,"MSI_UID":50612,"ATU":1,"TITLE":"NAVAREA IV/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116382366,"MRN":"urn:mrn:iala:wwy:us:navIV","WATERWAY_NAME":"NAVAREA IV","CREATE_DATE":1786020593000,"MODIFIED_DATE":1786020617000,"BEGIN_DATE":1786320000000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-08-10 To: 2026-09-30\n\nLocation:\n42-22-09.408N/071-03-54.864W\n42-22-07.968N/071-03-53.676W\n42-22-07.392N/071-03-55.260W\n42-22-09.120N/071-03-57.204W\n42-22-09.408N/071-03-54.864W\nMASSACHUSETTS – BOSTON INNER HARBOR – CHARLES RIVER – Boring Operations \n\nMariners are advised that Skanska Civil Northeast/Koch JV (Skanska) will be conducting boring operations in the vicinity of the MBTA Draw One Bridge over the Charles River. Operations will commence on August 10, 2026, and continue through September 25, 2026. Work will be conducted between 7:00 a.m. and 4:00 p.m. daily for the duration of the project.\n\nOn-scene equipment will consist of a 22' x 40' steel pontoon barge and one assist vessel. All boring operations will occur outside the navigational channel.\nFor additional information, mariners may contact Skanska representative Mr. Edward Breed at (617) 981-0215. The on-scene support vessel will monitor VHF-FM Channels 13 and 16. Mariners are advised to exercise caution and proceed at a slow speed to minimize wake while transiting the area.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-71.06524,42.36928],[-71.06589,42.3692],[-71.06535,42.36872],[-71.06491,42.36888],[-71.06524,42.36928]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50763,"geometry":{"type":"Polygon","coordinates":[[[-128.42541999999997,37.637920000000065],[-129.05142999999998,37.40596000000005],[-123.94081999999997,35.23364000000004],[-121.26344999999998,34.25479000000007],[-118.58607999999998,33.584610000000055],[-118.41861999999998,33.87143000000003],[-119.38388999999995,34.096430000000055],[-119.50684999999999,34.309600000000046],[-120.58303999999998,34.46991000000003],[-128.42541999999997,37.637920000000065]]]},"properties":{"ESRI_OID":50763,"MSI_UID":50763,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea - Sector Los Angeles, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385490,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact","WATERWAY_NAME":"Sector Los Angeles, Submerged Land Act (SLA)","CREATE_DATE":1786130132000,"MODIFIED_DATE":1786130144000,"BEGIN_DATE":1786924800000,"END_DATE":1790812799000,"DESCRIPTION":"Alcatel Submarine Networks Marine will be conducting submarine telecommunications cable installation activities for Segment 6 of the ORCA Project from Hermosa Beach, California, to the offshore end of Segment 6 from August 24 to September 29, 2026. Operations will include route clearance, shore-end cable landing, cable burial, surface cable laying, and ROV operations along the cable route, beginning at position 33.871435°N, -118.418618°W and ending at position 37.387200°N, -128.266290°W. The C/S Ile de Sein will be engaged in the operations and will maintain a continuous listening watch on VHF channel 16. The vessel may be restricted in its ability to maneuver during certain phases of the work. For more information, please contact the Master of C/S Ile de Sein at +47 23 67 48 00 or Luc Parkinson at +33 6 48 93 46 48. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-128.42542,37.63792],[-129.05143,37.40596],[-123.94082,35.23364],[-121.26345,34.25479],[-118.58608,33.58461],[-118.41862,33.87143],[-119.38389,34.09643],[-119.50685,34.3096],[-120.58304,34.46991],[-128.42542,37.63792]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50764,"geometry":{"type":"Polygon","coordinates":[[[-123.80664999999999,39.71185000000003],[-124.75022999999999,39.68698000000006],[-122.69970999999998,36.47104000000007],[-122.14602999999994,36.75098000000003],[-122.37671999999998,37.18787000000003],[-122.47226999999998,37.515120000000024],[-122.46281999999997,37.747690000000034],[-122.73600999999996,37.939490000000035],[-123.05132999999995,37.992530000000045],[-122.97134999999997,38.16021000000006],[-123.08604999999994,38.398790000000076],[-123.70344999999998,38.917710000000056],[-123.66087999999996,39.001990000000035],[-123.80351999999999,39.344340000000045],[-123.74404999999996,39.57372000000004],[-123.80664999999999,39.71185000000003]]]},"properties":{"ESRI_OID":50764,"MSI_UID":50764,"ATU":11,"TITLE":"Bodega Bay - Bodega Harbor/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385529,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:bodbay:bodhar","WATERWAY_NAME":"Bodega Harbor","CREATE_DATE":1786131321000,"MODIFIED_DATE":1787149835000,"BEGIN_DATE":1787184000000,"END_DATE":1792972799000,"DESCRIPTION":"Alcatel Submarine Networks Marine will be conducting submarine telecommunications cable installation activities for Segment 5 of the ORCA Project from Manchester, California, to the offshore end of Segment 5 from October 3 to October 24, 2026. Operations will include shore-end cable landing, cable burial, surface cable laying, and ROV operations along the cable route, beginning at position 39.013853°N, -123.706657°W and ending at position 37.387200°N, -128.266290°W. The C/S Ile de Sein will be engaged in the operations and will maintain a continuous listening watch on VHF channel 16. The vessel may be restricted in its ability to maneuver during certain phases of the work. For more information, please contact the Master of C/S Ile de Sein at +47 23 67 48 00 or Luc Parkinson at +33 6 48 93 46 48. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-123.80665,39.71185],[-124.75023,39.68698],[-122.69971,36.47104],[-122.14603,36.75098],[-122.37672,37.18787],[-122.47227,37.51512],[-122.46282,37.74769],[-122.73601,37.93949],[-123.05133,37.99253],[-122.97135,38.16021],[-123.08605,38.39879],[-123.70345,38.91771],[-123.66088,39.00199],[-123.80352,39.34434],[-123.74405,39.57372],[-123.80665,39.71185]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50821,"geometry":{"type":"Polygon","coordinates":[[[-88.03270999999995,30.65270000000004],[-88.03385999999995,30.618660000000034],[-88.02838999999994,30.56639000000007],[-88.01468999999997,30.445320000000038],[-88.01259999999996,30.44539000000003],[-88.01699999999994,30.484090000000037],[-88.02663999999999,30.573740000000043],[-88.03157999999996,30.618300000000033],[-88.03009999999995,30.65202000000005],[-88.03007999999994,30.652660000000026],[-88.03076999999996,30.652680000000032],[-88.03173999999996,30.652670000000057],[-88.03221999999994,30.65262000000007],[-88.03270999999995,30.65270000000004]]]},"properties":{"ESRI_OID":50821,"MSI_UID":50821,"ATU":8,"TITLE":"Mobile Bar - Mobile Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384527,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:mobbay:mobbar:mobcha","WATERWAY_NAME":"Mobile Channel","CREATE_DATE":1786368168000,"MODIFIED_DATE":1786974136000,"BEGIN_DATE":1783641600000,"END_DATE":1807660799000,"DESCRIPTION":"Mobile Channel - Dredge Operation --- From: 2026-07-19 To: 2027-04-12 --- The Dredge BALTIMORE will conduct maintenance dredging operations in the Mobile Channel from south of the McDuffie Coal Terminal to Mobile Channel Light 49 (LLNR-6510).  Operations will be conducted 24-hours a day, 7-days a week.  Dredged material will be hauled offshore to the Ocean Dredge Material Disposal Site (ODMDS) located south of Dauphin Island, AL.  On-scene equipment and vessels will be staged along the channel and include dredge pipe, the Scows 4002, 6001, 6002, 6003, 6004, and BR8, the T/Vs ELIZABETH ANN, PATRICIA JEAN, AMY HERBERT, and COLONEL, the M/Vs MISS TAMI JO and MISS CATE, a fuel barge, a 200 ft by 60 ft crane barge, the Crew Boat SEA SUB, and the Survey Vessel MITCHELL.  The dredge will operate on four anchors and on spuds, which will limit the dredge's maneuverability.  Portions of the channel will be obstructed during dredging.  Vessels should coordinate passing arrangements at least 1-hour in advance to allow equipment to be moved.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13, 16, and 88, POC: (251) 957-6019\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.03271,30.6527],[-88.03386,30.61866],[-88.02839,30.56639],[-88.01469,30.44532],[-88.0126,30.44539],[-88.017,30.48409],[-88.02664,30.57374],[-88.03158,30.6183],[-88.0301,30.65202],[-88.03008,30.65266],[-88.03077,30.65268],[-88.03174,30.65267],[-88.03222,30.65262],[-88.03271,30.6527]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50850,"geometry":{"type":"Polygon","coordinates":[[[-75.49710999999996,39.75543000000005],[-75.52581999999995,39.697610000000054],[-75.51899999999995,39.695820000000026],[-75.48860999999994,39.75335000000007],[-75.49710999999996,39.75543000000005]]]},"properties":{"ESRI_OID":50850,"MSI_UID":50850,"ATU":5,"TITLE":"Delaware River - Delaware River Main Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382796,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:delbay:delbaymaicha:lisran:delriv:delrivmaicha","WATERWAY_NAME":"Delaware River Main Channel","CREATE_DATE":1786377720000,"MODIFIED_DATE":1786389789000,"BEGIN_DATE":1781568000000,"END_DATE":1796169599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-16 To: 2026-12-01\n\nLocation:\n39-45-16.812N/075-29-39.156W\n39-45-00.036N/075-29-25.764W\n39-44-20.328N/075-29-49.740W\n39-44-23.784N/075-30-08.028W\n39-44-48.120N/075-29-58.668W\n39-45-16.812N/075-29-39.156W\n\nAll Mariners please be advised the Dredge RS WEEKS and Clamshell Dredge Weeks 506 will commence dredging operations near the Delaware Container Terminal, at approximate position 39°44'44.77\"N, 075°29'50.50\"W, beginning on or about July 1, 2026, and will continue until approximately November 30, 2026. Dredging will be conducted 24 hours a day, in 12-hour shifts, Monday through Sunday. A submerged pipeline will run from the dredging area to Wilmington Harbor South Disposal Area near Pigeon Point in New Castle, DE. A floating pipeline will connect the dredge to the submerged pipeline.\nAll vessels are requested to contact the Dredge RS WEEKS a minimum of 1-hour prior to transiting area to make passing arrangements. Mariners are advised to transit the area with caution and at a slow no-wake speed when passing the Dredge. The Dredge RS WEEKS can be contacted via VHF radio channels 13, 16, and 73 or via phone 640-466-8251.   \n\tAll mariners are requested to stay clear of the dredge, booster, floating (pontoon) and submerged pipelines, barges, derricks and operating wires about the dredge.  Operators of vessels of all types should be aware that the dredge and floating pipelines are held in place by cables, attached to anchors some distance away from the equipment.  Buoys are attached to the anchors so that the anchors may be moved as the dredge advances and the location of the submerged pipelines are marked by buoys on each side of the channel.  Mariners are cautioned to strictly comply with the Inland Rules of the Road when approaching, passing and leaving the area of operations, and remain a safe distance away from the dredge, booster, buoys, cables, pipelines, barges, derricks, wires and related equipment. \n\tOwners and lessees of fishnets, crab pots and other structures that may be in the vicinity and that may hinder the free navigation of attending vessels and equipment must remove these from the area where tugs, tender boats and other attendant equipment will be navigating.  Since the project will be conducted twenty –four (24) hours per day seven (7) days a week, all fishnets, crab pots and structures in the general area must be removed prior to the commencement of the work. MSI 50850.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.49711,39.75543],[-75.52582,39.69761],[-75.519,39.69582],[-75.48861,39.75335],[-75.49711,39.75543]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50873,"geometry":{"type":"Polygon","coordinates":[[[-118.54090999999994,34.027270000000044],[-118.80547999999999,33.99633000000006],[-118.73571999999996,33.56149000000005],[-118.27390999999994,33.36294000000004],[-118.02571999999998,33.32436000000007],[-117.93137999999999,33.54152000000005],[-117.89908999999994,33.59725000000003],[-118.16325999999998,33.74363000000005],[-118.28613999999999,33.69536000000005],[-118.44035999999994,33.76560000000006],[-118.40275999999994,33.85208000000006],[-118.54090999999994,34.027270000000044]]]},"properties":{"ESRI_OID":50873,"MSI_UID":50873,"ATU":11,"TITLE":"Los Angeles Main Channel - Los Angeles Outer Harbor/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116385483,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact:losangappcha:losangmaicha:losangouthar","WATERWAY_NAME":"Los Angeles Outer Harbor","CREATE_DATE":1786386160000,"MODIFIED_DATE":1786386170000,"BEGIN_DATE":1786665600000,"END_DATE":1788393599000,"DESCRIPTION":"S.T. Hudson Engineers, Inc. will be conducting hydrographic survey operations in the Pacific Ocean near White Point, San Pedro, California, from August 21 to September 1, 2026. One day of survey operations will be conducted during daylight hours only, between sunrise and sunset, within 0.5 nautical miles of position 33.713271°N, -118.324362°W. Operations will utilize R/V YETI, a 38-foot grey monohull cabin vessel with twin jet drive, AIS equipped, MMSI 338421904. The vessel will monitor VHF channels 13 and 16. For more information, please contact Joe Wozniak at 609-412-1242 or Vessel Captain Dave Morse at 562-619-6845. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-118.54091,34.02727],[-118.80548,33.99633],[-118.73572,33.56149],[-118.27391,33.36294],[-118.02572,33.32436],[-117.93138,33.54152],[-117.89909,33.59725],[-118.16326,33.74363],[-118.28614,33.69536],[-118.44036,33.7656],[-118.40276,33.85208],[-118.54091,34.02727]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50922,"geometry":{"type":"Polygon","coordinates":[[[-90.18694999999997,29.68551000000008],[-90.19018999999997,29.681320000000028],[-90.18949999999995,29.680940000000078],[-90.18925999999999,29.680590000000052],[-90.18752999999998,29.680250000000058],[-90.18376999999998,29.679710000000057],[-90.18282999999997,29.67992000000004],[-90.18228999999997,29.68023000000005],[-90.18376999999998,29.683110000000056],[-90.18694999999997,29.68551000000008]]]},"properties":{"ESRI_OID":50922,"MSI_UID":50922,"ATU":8,"TITLE":"Lake Salvador - Bayou Perot/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119174377,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:barpas:bayrig:barwat:dupcut:laksal:bayper","WATERWAY_NAME":"Bayou Perot","CREATE_DATE":1786454254000,"MODIFIED_DATE":1786454500000,"BEGIN_DATE":1786406400000,"END_DATE":1817078399000,"DESCRIPTION":"Bayou Perot - GIWW - Rock Barge Loading and Fleeting Area --- From: 2026-08-11 To: 2027-07-30 --- A rock barge fleeting area and light-loading operation will take place inside the entrance of Bayou Perot near GIWW Mile 20.0, WHL.  The fleet and light-loading operation will be set up on the south bank.  On-scene vessels will include the M/V LIL AL CENAC and barges.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13 and 72, POC: (504) 628-0846\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.18695,29.68551],[-90.19019,29.68132],[-90.1895,29.68094],[-90.18926,29.68059],[-90.18753,29.68025],[-90.18377,29.67971],[-90.18283,29.67992],[-90.18229,29.68023],[-90.18377,29.68311],[-90.18695,29.68551]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50925,"geometry":{"type":"Polygon","coordinates":[[[-94.95939999999996,29.688720000000046],[-94.95964999999995,29.688330000000065],[-94.95762999999994,29.687350000000038],[-94.95736999999997,29.687780000000032],[-94.95939999999996,29.688720000000046]]]},"properties":{"ESRI_OID":50925,"MSI_UID":50925,"ATU":8,"TITLE":"Houston Ship Channel - Cedar Bayou Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385182,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha:cedbaycha","WATERWAY_NAME":"Cedar Bayou Channel","CREATE_DATE":1786455794000,"MODIFIED_DATE":1786456364000,"BEGIN_DATE":1786406400000,"END_DATE":1803945599000,"DESCRIPTION":"Cedar Bayou Channel - Barge Mooring Area --- From: 2026-08-11 To: 2027-02-28 --- A temporary barge mooring area will be located along the Cedar Bayou Channel, between approximate positions 29-41-18.27N 094-57-33.67W and 29-41-15.70N 094-57-27.50W.  Six piles will be installed every 100 ft for the mooring and staging of loaded and empty deck barges.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.9594,29.68872],[-94.95965,29.68833],[-94.95763,29.68735],[-94.95737,29.68778],[-94.9594,29.68872]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50926,"geometry":{"type":"Polygon","coordinates":[[[-94.96077999999994,29.68662000000006],[-94.96142999999995,29.685770000000048],[-94.96094999999997,29.68551000000008],[-94.96028999999999,29.686450000000036],[-94.96077999999994,29.68662000000006]]]},"properties":{"ESRI_OID":50926,"MSI_UID":50926,"ATU":8,"TITLE":"Houston Ship Channel - Cedar Bayou Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385182,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha:cedbaycha","WATERWAY_NAME":"Cedar Bayou Channel","CREATE_DATE":1786455995000,"MODIFIED_DATE":1786456406000,"BEGIN_DATE":1786406400000,"END_DATE":1803945599000,"DESCRIPTION":"Cedar Bayou Channel - Barge Mooring Area --- From: 2026-08-11 To: 2027-02-28 --- A temporary barge mooring area will be located along the Cedar Bayou Channel, between approximate positions 29-41-11.41N 094-57-37.90W and 29-41-08.95N 094-57-39.53W.  Three piles will be installed every 100 ft for the mooring and staging of loaded and empty deck barges.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.96078,29.68662],[-94.96143,29.68577],[-94.96095,29.68551],[-94.96029,29.68645],[-94.96078,29.68662]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50929,"geometry":{"type":"Polygon","coordinates":[[[-96.96046999999999,28.08399000000003],[-96.98095999999998,28.057810000000075],[-96.96620999999999,28.05189000000007],[-96.95300999999995,28.066760000000045],[-96.96046999999999,28.08399000000003]]]},"properties":{"ESRI_OID":50929,"MSI_UID":50929,"ATU":8,"TITLE":"Aransas Bay Alternate Route - Aransas Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384795,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon:seccorchrtersea:seccorchrsublanact:arapastobafbay:arabayaltrou:arabay","WATERWAY_NAME":"Aransas Bay","CREATE_DATE":1786458727000,"MODIFIED_DATE":1786460466000,"BEGIN_DATE":1786406400000,"END_DATE":1796255999000,"DESCRIPTION":"Aransas Bay - GIWW - Breakwater and Shoreline Protection --- From: 2026-08-12 To: 2026-12-01 --- Shoreline protection work will be conducted in the vicinity of Deadman Island in Aransas Bay.  Work will take place 24-hours a day, 7-days a week, and will consist of the construction of riprap breakwater, the placement of imported sand fill material, and the installation of six daybeacons in and around Deadman Island.  Operations will take place in an area bound by approximate positions: 28-03-37.46N 096-58-43.19W, 28-04-59.34N  096-57-37.17W, 28-03-07.75N 096-58-01.02W, 28-03-59.53N  096-57-13.23W.  On-scene vessels will include a push boat, the M/V KEISHA, and the Crew Boats BO26, BO33, and MARINE.  Mariners are urged to transit the area at their slowest safe speed to minimize wake.  VHF-FM Channel: 16, POC: (469) 964-7804","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-96.96047,28.08399],[-96.98096,28.05781],[-96.96621,28.05189],[-96.95301,28.06676],[-96.96047,28.08399]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50956,"geometry":{"type":"Polygon","coordinates":[[[-122.36126999999999,37.80356000000006],[-122.36134999999996,37.80200000000008],[-122.33104999999995,37.797450000000026],[-122.29783999999995,37.79047000000003],[-122.28787999999997,37.792430000000024],[-122.28066999999999,37.79264000000006],[-122.28023999999999,37.79433000000006],[-122.28967999999998,37.795150000000035],[-122.29542999999995,37.793450000000064],[-122.30632999999995,37.793990000000065],[-122.33079999999995,37.79949000000005],[-122.36126999999999,37.80356000000006]]]},"properties":{"ESRI_OID":50956,"MSI_UID":50956,"ATU":11,"TITLE":"San Francisco Oakland Bay Bridge West Crossing - Oakland Inner Harbor/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385443,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:sanfraoakbaybriwescro:oakinnhar","WATERWAY_NAME":"Oakland Inner Harbor","CREATE_DATE":1786477485000,"MODIFIED_DATE":1786998406000,"BEGIN_DATE":1786406400000,"END_DATE":1799798399000,"DESCRIPTION":"Manson Construction Co., under contract with the US Army Corps of Engineers, San Francisco District, will conduct clamshell dredging of the Oakland Inner and Outer Harbor Channels with upland disposal at Montezuma Wetlands via unloader. \n\nDredging will occur in the Oakland Inner Harbor Channel from station 0+00 to 244+00, between 37.80096, -122.36230 and 37.79338, -122.28096, \n\nand in the Oakland Outer Harbor Channel from station 0+00 to 134+00, between 37.80460, -122.35000 and 37.82186, -122.31158. \n\nPlacement will occur at the Montezuma Unloader in Collinsville, CA. Operations are expected to begin on or about August 24, 2026, and continue through approximately January 11, 2027, 24 hours a day, 7 days a week. Vessels involved include dredge DB Njord (Call Sign WCZ5435), tugboat Jeffery M (Call Sign WSX6846), survey boat Wahoo (Call Sign WAB4086), crew boat Grace (Call Sign WDN9911), and tugboat Sagittarian (Call Sign WCY5210). Vessels will monitor VHF channels 13, 14, 16, and 67. For more information, contact Project Manager Alex Kolessar at 904-568-0213. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.36127,37.80356],[-122.36135,37.802],[-122.33105,37.79745],[-122.29784,37.79047],[-122.28788,37.79243],[-122.28067,37.79264],[-122.28024,37.79433],[-122.28968,37.79515],[-122.29543,37.79345],[-122.30633,37.79399],[-122.3308,37.79949],[-122.36127,37.80356]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50957,"geometry":{"type":"Polygon","coordinates":[[[-122.31461999999999,37.82173000000006],[-122.31830999999994,37.81908000000004],[-122.34758,37.80762000000004],[-122.34551999999996,37.80559000000005],[-122.33332999999999,37.81129000000004],[-122.31358999999998,37.81949000000003],[-122.31461999999999,37.82173000000006]]]},"properties":{"ESRI_OID":50957,"MSI_UID":50957,"ATU":11,"TITLE":"San Francisco Bay - Oakland Outer Harbor/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385428,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:oakouthar","WATERWAY_NAME":"Oakland Outer Harbor","CREATE_DATE":1786477746000,"MODIFIED_DATE":1786998386000,"BEGIN_DATE":1786406400000,"END_DATE":1799798399000,"DESCRIPTION":"Manson Construction Co., under contract with the US Army Corps of Engineers, San Francisco District, will conduct clamshell dredging of the Oakland Inner and Outer Harbor Channels with upland disposal at Montezuma Wetlands via unloader. \n\nDredging will occur in the Oakland Inner Harbor Channel from station 0+00 to 244+00, between 37.80096, -122.36230 and 37.79338, -122.28096, \n\nand in the Oakland Outer Harbor Channel from station 0+00 to 134+00, between 37.80460, -122.35000 and 37.82186, -122.31158.\n\n Placement will occur at the Montezuma Unloader in Collinsville, CA. Operations are expected to begin on or about August 24, 2026, and continue through approximately January 11, 2027, 24 hours a day, 7 days a week. Vessels involved include dredge DB Njord (Call Sign WCZ5435), tugboat Jeffery M (Call Sign WSX6846), survey boat Wahoo (Call Sign WAB4086), crew boat Grace (Call Sign WDN9911), and tugboat Sagittarian (Call Sign WCY5210). Vessels will monitor VHF channels 13, 14, 16, and 67. For more information, contact Project Manager Alex Kolessar at 904-568-0213. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.31462,37.82173],[-122.31831,37.81908],[-122.34758,37.80762],[-122.34552,37.80559],[-122.33333,37.81129],[-122.31359,37.81949],[-122.31462,37.82173]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":50991,"geometry":{"type":"Polygon","coordinates":[[[-77.03759999999994,38.87861000000004],[-77.04313999999994,38.872870000000034],[-77.04093999999998,38.871210000000076],[-77.03582999999998,38.87695000000008],[-77.03759999999994,38.87861000000004]]]},"properties":{"ESRI_OID":50991,"MSI_UID":50991,"ATU":5,"TITLE":"Alexandria Channel - Georgetown Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383087,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:potriv:upppotriv:alecha:geocha","WATERWAY_NAME":"Georgetown Channel","CREATE_DATE":1786535977000,"MODIFIED_DATE":1786536100000,"BEGIN_DATE":1786492800000,"END_DATE":1901404799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-12 To: 2030-04-02\n\nLocation:\n38-52-42.996N/077-02-15.360W\n38-52-37.020N/077-02-08.988W\n38-52-16.356N/077-02-27.384W\n38-52-22.332N/077-02-35.304W\n38-52-42.996N/077-02-15.360W\nLong Bridge Rail Partners will begin construction of a new railroad and bike/pedestrian bridge in the Upper Potomac River between the existing WMATA Metro – Yellow Line Bridge and existing CSX Long Bridge Washington, DC in approximate position: 38-52-26N, 077-02-23W. Work includes pile driving, concrete pier construction, and span erection across the full width of the river. Other activities include fender reconstruction, seawall reconstruction, temporary mooring pile installation and temporary bulkhead and trestle construction. Work will take place from August 15, 2026, through April 1, 2030. All marine traffic should use extreme caution when transiting through the work area. Temporary Aids to Navigation will be in place for the duration of the project and tugboats will monitor VHF Channel 13.\nFor more information, please contact me at 215-808-1911 or nicole.baionnno@lbrpjv.com. MSI #50991\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-77.0376,38.87861],[-77.04314,38.87287],[-77.04094,38.87121],[-77.03583,38.87695],[-77.0376,38.87861]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51027,"geometry":{"type":"Polygon","coordinates":[[[-70.96589999999998,42.44549000000006],[-70.96686999999997,42.44249000000008],[-70.96630999999996,42.44238000000007],[-70.96513999999996,42.44538000000006],[-70.96589999999998,42.44549000000006]]]},"properties":{"ESRI_OID":51027,"MSI_UID":51027,"ATU":1,"TITLE":"Nahant Harbor - Saugus River Approach Channel/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116382032,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secbosexcecozon:secbostersea:secbossublanact:nahhar:saurivappcha","WATERWAY_NAME":"Saugus River Approach Channel","CREATE_DATE":1786543828000,"MODIFIED_DATE":1786543843000,"BEGIN_DATE":1787529600000,"END_DATE":1792886399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-08-24 To: 2026-10-24\n\nLocation:\n42-26-43.764N/070-57-57.240W\n42-26-43.368N/070-57-54.504W\n42-26-32.568N/070-57-58.716W\n42-26-32.964N/070-58-00.732W\n42-26-43.764N/070-57-57.240W\nMASSACHUSETTS – LYNN/REVERE - SAUGUS RIVER – GENERAL EDWARDS BRIDGE – Boring Operations \n\n\nMariners are advised that New England Boring Contractors will be conducting boring operations in the vicinity of the General Edwards Bridge Rt 1A Lynn/Revere. Operations will commence on Monday August 24, 2026, and continue through Friday October 23, 2026. Hours of operations are 7:00 a.m. to 3:00 p.m. for the duration of the operations. On scene equipment will consist of the 18’x35’ jack-up barge Seismic Princess #7. All proposed boring locations are located outside of the navigable channel. For more information mariners may contact New England Boring Representative at (603) 828-6115 or (774) 259-2978. On scene vessel will be monitoring VHF-FM Ch 13/16.  Mariners are advised to use caution and transit at slow speed to minimize wake when transiting the area.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-70.9659,42.44549],[-70.96687,42.44249],[-70.96631,42.44238],[-70.96514,42.44538],[-70.9659,42.44549]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51041,"geometry":{"type":"Polygon","coordinates":[[[-93.69659999999999,29.509460000000047],[-93.69891999999999,29.50729000000007],[-93.68808999999999,29.49792000000008],[-93.68037999999996,29.491630000000043],[-93.67407999999995,29.48613000000006],[-93.67153999999994,29.488800000000026],[-93.68154999999996,29.49718000000007],[-93.69659999999999,29.509460000000047]]]},"properties":{"ESRI_OID":51041,"MSI_UID":51041,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Sabine Bank Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385188,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:sabbancha","WATERWAY_NAME":"Sabine Bank Channel","CREATE_DATE":1786548852000,"MODIFIED_DATE":1787837578000,"BEGIN_DATE":1786492800000,"END_DATE":1801439999000,"DESCRIPTION":"Sabine Bank Channel - Dragging and Dredging Operation --- From: 2026-08-12 To: Until Further Notice --- The M/V MR. TOMMY, JESSICA MARIE, M/V SMITH HUNTER, and Dredge DODGE ISLAND will be conducting dragging and dredging operations in Sabine Bank Channel between Sabine Bank Channel Lighted Buoy 11 (LLNR-22350) and Sabine Bank Channel Lighted Buoy 14 (LLNR-22365).  Additional on-scene vessels may include the Survey Vessels JONATHAN WOODWARD, LADY BECKY, FM BROWN, and OHIO RIVER.  Mariners are urged to transit the area with caution after passing arrangements have been made.  VHF-FM Channel: 16","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.6966,29.50946],[-93.69892,29.50729],[-93.68809,29.49792],[-93.68038,29.49163],[-93.67408,29.48613],[-93.67154,29.4888],[-93.68155,29.49718],[-93.6966,29.50946]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51082,"geometry":{"type":"Polygon","coordinates":[[[-118.21323999999998,33.72896000000003],[-118.22224999999997,33.72867000000008],[-118.22199999999998,33.72317000000004],[-118.21280999999999,33.72332000000006],[-118.21323999999998,33.72896000000003]]]},"properties":{"ESRI_OID":51082,"MSI_UID":51082,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea - Sector Los Angeles, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385490,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact","WATERWAY_NAME":"Sector Los Angeles, Submerged Land Act (SLA)","CREATE_DATE":1786559980000,"MODIFIED_DATE":1787156634000,"BEGIN_DATE":1786492800000,"END_DATE":1789862399000,"DESCRIPTION":"Manson Construction Co., under contract with the Port of Long Beach, will conduct clamshell dredging of the Western Anchorage Sediment Storage Site (WASSS), with offloading at Channel 2 between Berths B82 and B83 via dredge bucket. Operations will take place at approximately 33.7248308, -118.2194517 and are expected to begin on or about September 8, 2026, and continue through approximately September 18, 2026, 24 hours a day, 7 days a week. Vessels involved include dredge DB Vulcan (Call Sign WDE5434), survey boat Bayou Bengal (Call Sign WDP5413), and scows Southport and Eastport. Vessels will monitor VHF-FM channels 13, 16, and 67. For more information, contact Project Manager Jack Fernandez at (904) 495-4835, Superintendent Jon Denison at (904) 896-8216, or Lead Engineer Will Ferrell at (904) 477-2060. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-118.21324,33.72896],[-118.22225,33.72867],[-118.222,33.72317],[-118.21281,33.72332],[-118.21324,33.72896]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51086,"geometry":{"type":"Polygon","coordinates":[[[-117.40356999999995,33.211100000000044],[-117.40356999999995,33.208980000000054],[-117.40030999999999,33.208930000000066],[-117.40036999999995,33.21105000000006],[-117.40356999999995,33.211100000000044]]]},"properties":{"ESRI_OID":51086,"MSI_UID":51086,"ATU":11,"TITLE":"Sector San Diego, Submerged Lands Act (SLA) - Oceanside/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385451,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:oce","WATERWAY_NAME":"Oceanside","CREATE_DATE":1786561205000,"MODIFIED_DATE":1786644629000,"BEGIN_DATE":1786492800000,"END_DATE":1792195199000,"DESCRIPTION":"Manson Construction Co. will conduct hydraulic maintenance dredging of Oceanside Harbor using the cutter suction dredge HR Morris. Operations will take place in the Oceanside Harbor Main Channel and Entrance Channel at approximately 33.20990, -117.40203 (NOAA Chart 18758). Work is expected to begin on or about September 8, 2026, and finish on or prior to October 15, 2026, with operations conducted 24 hours a day, 7 days a week. Vessels involved include dredge HR Morris (Call Sign WCZ5434, phone 562-762-5449), DB Freya (Call Sign WDA4208), dredge tender Pup (Call Sign WAB4086), dredge tender Cub (Call Sign WCZ5656), and survey boat Rustler (Call Sign WAB4086). Vessels will monitor VHF-FM channels 16 and 67. Material will be transported through floating pipeline, submerged pipeline, and shore pipeline to the disposal areas at North Coast Village, Surfrider Way, and Oceanside Pier. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. Extreme caution and radio contact are requested when passing the dredge HR Morris. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.40357,33.2111],[-117.40357,33.20898],[-117.40031,33.20893],[-117.40037,33.21105],[-117.40357,33.2111]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51089,"geometry":{"type":"Polygon","coordinates":[[[-91.46650999999997,29.28028000000006],[-91.55147999999997,29.184330000000045],[-91.54943999999995,29.182830000000024],[-91.46403999999995,29.27893000000006],[-91.46650999999997,29.28028000000006]]]},"properties":{"ESRI_OID":51089,"MSI_UID":51089,"ATU":8,"TITLE":"Sector New Orleans, Submerged Land Act (SLA) - Atchafalaya Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384918,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:atccha","WATERWAY_NAME":"Atchafalaya Channel","CREATE_DATE":1786561946000,"MODIFIED_DATE":1786562050000,"BEGIN_DATE":1786492800000,"END_DATE":1790035199000,"DESCRIPTION":"Atchafalaya Bar Channel - Dredge Operation --- From: 2026-08-17 To: 2026-09-20 --- The U.S. Government Contract Hopper Dredge NEWPORT will be working between Mile 152.0 and Mile 167.0 of the Atchafalaya Bar Channel.  Operations will be conducted 24-hours a day, 7-days a week.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 13 and 16, POC: USACE (504) 862-2360 or (504) 862-2153","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-91.46651,29.28028],[-91.55148,29.18433],[-91.54944,29.18283],[-91.46404,29.27893],[-91.46651,29.28028]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51172,"geometry":{"type":"Polygon","coordinates":[[[-121.51797999999997,38.23975000000007],[-121.51853999999997,38.23967000000005],[-121.51844999999997,38.23941000000008],[-121.51788999999997,38.23950000000008],[-121.51797999999997,38.23975000000007]]]},"properties":{"ESRI_OID":51172,"MSI_UID":51172,"ATU":11,"TITLE":"Sacramento River Deep Water Ship Channel - Sacramento River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385523,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:sanpabbay:carstr:suibay:sacrivdeewatshicha:sacriv","WATERWAY_NAME":"Sacramento River","CREATE_DATE":1786634102000,"MODIFIED_DATE":1786644668000,"BEGIN_DATE":1786579200000,"END_DATE":1791676799000,"DESCRIPTION":"CAL-NEVA Construction Services will conduct marine operations to install the Bio-Acoustic Fish Fence (BAFF) at position 38.239444, -121.518333 from October 5, 2026, through October 9, 2026. Operations will be conducted using the derrick barge “DB Steadfast” along with an accompanying flat barge. The barges will be either spudded down or anchored using a four-point mooring system marked with 5-foot crown buoys, which will be lighted at night with flashing white strobes. Mariners are requested to transit the area with caution. All vessels and equipment on-scene will monitor VHF-FM channels 8, 13, and 14. For more details or comments, contact Mohammed (Shahid) Anwar at 916-288-2129.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-121.51798,38.23975],[-121.51854,38.23967],[-121.51845,38.23941],[-121.51789,38.2395],[-121.51798,38.23975]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51173,"geometry":{"type":"Polygon","coordinates":[[[-119.68272999999999,34.40889000000004],[-119.68268999999998,34.40774000000005],[-119.68082999999996,34.40773000000007],[-119.68082999999996,34.40888000000007],[-119.68272999999999,34.40889000000004]]]},"properties":{"ESRI_OID":51173,"MSI_UID":51173,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea - Sector Los Angeles, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385490,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact","WATERWAY_NAME":"Sector Los Angeles, Submerged Land Act (SLA)","CREATE_DATE":1786634792000,"MODIFIED_DATE":1786644719000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"The City of Santa Barbara’s Water Resources Department, with support from IDE America Inc. and Danny C of Castagnola Tug Services, will conduct nearshore marine construction operations using divers and a crane to replace two offshore intake pumps for the Desalination Plant in Santa Barbara, CA. Operations will take place at approximately 34.408167, -119.681503. Work will occur during daylight hours between August 26, 2026, and September 30, 2026. Mariners are requested to transit the area with extreme caution at a minimum safe speed to minimize wake, and maintain a minimum of 500 feet of clearance from all project vessels (abiding by the USCG 500-meter Safety Zone if possible).","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-119.68273,34.40889],[-119.68269,34.40774],[-119.68083,34.40773],[-119.68083,34.40888],[-119.68273,34.40889]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51253,"geometry":{"type":"Polygon","coordinates":[[[-90.30348999999995,29.125330000000076],[-90.31724999999994,29.04759000000007],[-90.21170999999998,29.036200000000065],[-90.20660999999996,29.116750000000025],[-90.30348999999995,29.125330000000076]]]},"properties":{"ESRI_OID":51253,"MSI_UID":51253,"ATU":8,"TITLE":"Houma Navigation Canal - Timbalier Terrebonne Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384835,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:catislpas:hounavcan:timterbay","WATERWAY_NAME":"Timbalier Terrebonne Bay","CREATE_DATE":1786710233000,"MODIFIED_DATE":1786711198000,"BEGIN_DATE":1786665600000,"END_DATE":1798847999000,"DESCRIPTION":"Timbalier Bay - Port Fourchon - Dredge Operation --- From: 2026-09-01 To: 2026-12-31 --- Dredge pipeline and equipment will be mobilized to a staging area located in the vicinity of Timbalier Bay, near Port Fourchon, for the West Bell Headland repair project.  Operations will be conducted 24-hours a day, 7-days a week.  Commencing September 13, 2026, the Dredges C.R. McCASKILL and MAGDALEN or R.B. WEEKS will conduct dredging operations offshore, approximately 7.5 nm south of Whiskey Pass.  Dredged material will be transported via scow barges inshore and pumped into the designated fill placement area using a combination of 30-inch diameter submerged, floating and shore pipelines.  Pipeline corridors, equipment and fill placement areas will be bound by approximate positions: \n29-07-31.20N 090-18-12.56W,\n29-07-00.29N 090-12-23.81W,\n29-02-10.32N 090-12-42.14W and\n29-02-51.32N 090-19-02.11W.\nMariners are urged to use extreme caution and transit the project areas at their slowest safe speed to create minimum wake after passing arrangements have been made.  VHF-FM Channels: 13, 16 and 72, POC: (224) 563-4367, (336) 473-4060, or (224) 221-9834","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.30349,29.12533],[-90.31725,29.04759],[-90.21171,29.0362],[-90.20661,29.11675],[-90.30349,29.12533]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51255,"geometry":{"type":"Polygon","coordinates":[[[-90.93470999999994,28.931500000000028],[-90.93493999999998,28.900510000000054],[-90.66596999999996,28.89483000000007],[-90.66524999999996,28.92091000000005],[-90.93470999999994,28.931500000000028]]]},"properties":{"ESRI_OID":51255,"MSI_UID":51255,"ATU":8,"TITLE":"Sector New Orleans, Exclusive Economic Zone (EEZ) - Sector New Orleans, Territorial Sea/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384637,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea","WATERWAY_NAME":"Sector New Orleans, Territorial Sea","CREATE_DATE":1786710506000,"MODIFIED_DATE":1786711232000,"BEGIN_DATE":1786665600000,"END_DATE":1798847999000,"DESCRIPTION":"Gulf of America - Timbalier Bay - Dredge Operation --- From: 2026-09-13 To: 2026-12-31 --- The Dredges C.R. McCASKILL and MAGDALEN or R.B. WEEKS will conduct dredging operations offshore, approximately 7.5 nm south of Whiskey Pass, for the West Bell Headland repair project.  Operations will be conducted 24-hours a day, 7-days a week.  The dredges will operate in an area bound by approximate positions:\n28-55-53.40N 090-56-04.96W,\n28-55-15.28N 090-39-54.91W,\n28-53-41.38N 090-39-57.50W and\n28-54-01.83N 090-56-05.77W.\nDredged material will be transported via scow barges inshore and pumped into the designated fill placement area near Timbalier Bay using a combination of 30-inch diameter submerged, floating and shore pipelines.  Mariners are urged to use extreme caution and transit the project areas at their slowest safe speed to create minimum wake after passing arrangements have been made.  VHF-FM Channels: 13, 16 and 72, POC: (224) 563-4367, (336) 473-4060, or (224) 221-9834","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.93471,28.9315],[-90.93494,28.90051],[-90.66597,28.89483],[-90.66525,28.92091],[-90.93471,28.9315]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51284,"geometry":{"type":"Polygon","coordinates":[[[-88.50921999999997,30.21923000000004],[-88.51473999999996,30.20760000000007],[-88.52943999999997,30.191550000000063],[-88.56838999999997,30.15292000000005],[-88.57883999999996,30.14273000000003],[-88.57625999999999,30.14106000000004],[-88.51151999999996,30.205970000000036],[-88.50593999999995,30.21849000000003],[-88.50921999999997,30.21923000000004]]]},"properties":{"ESRI_OID":51284,"MSI_UID":51284,"ATU":8,"TITLE":"Sector Mobile, Territorial Sea - Sector Mobile, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384736,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact","WATERWAY_NAME":"Sector Mobile, Submerged Land Act (SLA)","CREATE_DATE":1786721175000,"MODIFIED_DATE":1786721276000,"BEGIN_DATE":1786665600000,"END_DATE":1788825599000,"DESCRIPTION":"Horn Island Pass - Dredge Operation --- From: 2026-08-16 To: 2026-09-06 --- The Dredge E. STROUD will conduct maintenance dredging operations in Horn Island Pass.  Work will take place 24-hours a day, 7-days a week.  Dredged material will be pumped into a deep scoured area within the channel just north of the dredge cut.  Passing arrangements should be coordinated with the dredge at least 1-hour in advance.  Mariners are urged to transit the area with caution. VHF-FM Channels: 13 and 16, POC: (251) 957-6019","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.50922,30.21923],[-88.51474,30.2076],[-88.52944,30.19155],[-88.56839,30.15292],[-88.57884,30.14273],[-88.57626,30.14106],[-88.51152,30.20597],[-88.50594,30.21849],[-88.50922,30.21923]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51384,"geometry":{"type":"Polygon","coordinates":[[[-118.42738999999995,33.842490000000055],[-119.53700999999995,32.65731000000005],[-119.44361999999995,32.611050000000034],[-118.42738999999995,33.71007000000003],[-118.42738999999995,33.842490000000055]]]},"properties":{"ESRI_OID":51384,"MSI_UID":51384,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea - Sector Los Angeles, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116385490,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact","WATERWAY_NAME":"Sector Los Angeles, Submerged Land Act (SLA)","CREATE_DATE":1786977271000,"MODIFIED_DATE":1786998338000,"BEGIN_DATE":1786924800000,"END_DATE":1789862399000,"DESCRIPTION":"Global Marine will conduct an ROV survey (video only) of the SX Next fibre optic cable in California using the Cable Innovator (Call Sign MVEP 4). Survey operations are estimated to occur between 31.93169, -119.42170 and 33.86603, -118.41611. Operations are expected from August 21 to September 18, 2026, with the vessel actively engaged in 24/7 survey operations between August 22 and September 13, 2026. Dates may change slightly depending on weather and other operational conditions. The Cable Innovator will monitor VHF Channel 16. For more information or to contact the on-scene supervisor, call +44 7563 026117. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-118.42739,33.84249],[-119.53701,32.65731],[-119.44362,32.61105],[-118.42739,33.71007],[-118.42739,33.84249]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51416,"geometry":{"type":"Polygon","coordinates":[[[-82.75693999999999,27.53000000000003],[-82.76193999999998,27.52389000000005],[-82.75777999999997,27.520830000000046],[-82.75332999999995,27.527780000000064],[-82.75693999999999,27.53000000000003]]]},"properties":{"ESRI_OID":51416,"MSI_UID":51416,"ATU":7,"TITLE":"Sector St. Petersburg, Territorial Sea - Sector St. Petersburg, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116383296,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipeterseala","WATERWAY_NAME":"Sector St. Petersburg, Submerged Land Act (SLA)","CREATE_DATE":1786984993000,"MODIFIED_DATE":1787575058000,"BEGIN_DATE":1786924800000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-17 To: 2026-09-30\n\n51416\n\nLocation:\n27-31-48.000N/082-45-24.984W\n27-31-40.008N/082-45-11.988W\n27-31-14.988N/082-45-28.008W\n27-31-26.004N/082-45-42.984W\n27-31-48.000N/082-45-24.984W\n\nAPTIM Environmental and Infrastructure, LLC will be conducting geophysical and diving survey in state waters off of Manatee County, FL.\n\n\nSurvey operations are expected to begin on or about August 18, 2026, with an estimated completion date of September 18, 2026. Operations will be conducted during daylight hours only.\nR/V Parker will be monitoring VHF-FM channel 16 and will be restricted in ability to maneuver. They are expecting to have divers in the was August 22, to August 25, 2026.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.75694,27.53],[-82.76194,27.52389],[-82.75778,27.52083],[-82.75333,27.52778],[-82.75694,27.53]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51511,"geometry":{"type":"Polygon","coordinates":[[[-84.17899999999997,38.79871000000003],[-84.17942999999997,38.798200000000065],[-84.16581999999994,38.79601000000008],[-84.16567999999995,38.79654000000005],[-84.17899999999997,38.79871000000003]]]},"properties":{"ESRI_OID":51511,"MSI_UID":51511,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1787053791000,"MODIFIED_DATE":1787055347000,"BEGIN_DATE":1787011200000,"END_DATE":1799366399000,"DESCRIPTION":"Commencing August 24, 2026, and continuing until January 6, 2027, the Main Chamber at the Captain Anthony Meldahl L/D will be closed for repairs.  During this closure, the Auxiliary Chamber will remain open and available to pass traffic.  Mariners should be alert for and abide by any special instructions issued by the lockmaster.  Mariners may contact the Lockmaster via VHF-FM Channel 13, or at (513) 876-2921, for further information.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-84.179,38.79871],[-84.17943,38.7982],[-84.16582,38.79601],[-84.16568,38.79654],[-84.179,38.79871]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51512,"geometry":{"type":"Polygon","coordinates":[[[-76.21666999999997,38.35328000000004],[-76.27376999999996,38.35298000000006],[-76.27473999999995,38.343180000000075],[-76.21512999999999,38.34298000000007],[-76.21666999999997,38.35328000000004]]]},"properties":{"ESRI_OID":51512,"MSI_UID":51512,"ATU":5,"TITLE":"Chesapeake Channel - Tar Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382393,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:tarbay","WATERWAY_NAME":"Tar Bay","CREATE_DATE":1787054311000,"MODIFIED_DATE":1787054330000,"BEGIN_DATE":1787011200000,"END_DATE":1792195199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-18 To: 2026-10-16\nB3 Enterprises, LLC will perform demolition and removal of the following aids to navigation under a USCG contract.\n(LLNR 24577) Tar Bay Warning Buoy A (Wreck Marker), 38-21-06.921N, 076-16-20.110W.\n(LLNR 24580) Tar Bay Warning Daybeacon B, 38-20-58.226N, 076-16-18.044W.\n(LLNR 24585) Tar Bay Warning Daybeacon C, 38-20-53.302N, 076-15-51.260W.\n(LLNR 24590) Tar Bay Warning Daybeacon D, 38-20-50.335N, 076-15-26.741W.\n(LLNR 24595) Tar Bay Warning Daybeacon E, 38-20-45.164N, 076-15-01.257W.\n(LLNR 24601) Tar Bay Warning Daybeacon F, 38-20-48.736N, 076-14-50.744W.\n(LLNR 24600) Tar Bay Warning Daybeacon G, 38-20-42.916N, 076-14-36.992W.\n(LLNR 24605) Tar Bay Warning Daybeacon H, 38-20-35.940N, 076-14-22.938W.\n(LLNR 24610) Tar Bay Warning Daybeacon J, 38-20-38.619N, 076-14-08.992W.\n(LLNR 24615) Tar Bay Warning Daybeacon K, 38-20-46.410N, 076-14-01.544W.\n(LLNR 24620) Tyler Cove Warning Daybeacon A, 38-20-56.953N, 076-13-47.275W.\n(LLNR 24625) Tyler Cove Warning Daybeacon B, 38-20-59.553N, 076-13-46.033W.\n(LLNR 24550) Honga River Warning Daybeacon A, 38-21-05.892N, 076-13-04.534W.\nProject will begin on or about August 31, 2026 and continue till October 01, 2026. The work will consist of demolition and removal of the identified structures and associated wreckage using marine construction equipment, barges, and support vessels and will be operating at each location during demolition activities. MSI #  51512.\n\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-76.21667,38.35328],[-76.27377,38.35298],[-76.27474,38.34318],[-76.21513,38.34298],[-76.21667,38.35328]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51513,"geometry":{"type":"Polygon","coordinates":[[[-76.19531999999998,38.303570000000036],[-76.21774999999997,38.29552000000007],[-76.21572999999995,38.292260000000056],[-76.19293999999996,38.30075000000005],[-76.19531999999998,38.303570000000036]]]},"properties":{"ESRI_OID":51513,"MSI_UID":51513,"ATU":5,"TITLE":"Chesapeake Channel - Honga River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382401,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:honriv","WATERWAY_NAME":"Honga River","CREATE_DATE":1787054822000,"MODIFIED_DATE":1787054840000,"BEGIN_DATE":1787011200000,"END_DATE":1792195199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-18 To: 2026-10-16\nB3 Enterprises, LLC will perform demolition and removal of the following aids to navigation under a USCG contract.\n(LLNR 24515) Middle Island Bridge West Channel Wreck Daybeacon WR1W, 38-17-42.546N, 076-12-46.579W.\n(LLNR 24520) Middle Island Bridge East Channel Daybeacon 1E, 38-18-01.150N, 076-11-59.041W.\nProject will begin on or about August 31, 2026 and continue till October 01, 2026. The work will consist of demolition and removal of the identified structures and associated wreckage using marine construction equipment, barges, and support vessels and will be operating at each location during demolition activities. MSI #  51513.\n\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-76.19532,38.30357],[-76.21775,38.29552],[-76.21573,38.29226],[-76.19294,38.30075],[-76.19532,38.30357]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51514,"geometry":{"type":"Polygon","coordinates":[[[-75.86799999999994,38.093720000000076],[-75.86911999999995,38.092520000000036],[-75.86292999999995,38.08983000000006],[-75.85857999999996,38.09239000000008],[-75.85970999999995,38.09328000000005],[-75.86277999999999,38.091530000000034],[-75.86799999999994,38.093720000000076]]]},"properties":{"ESRI_OID":51514,"MSI_UID":51514,"ATU":5,"TITLE":"Manokin River - Goose Creek Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382545,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:tansou:manriv:goocrecha","WATERWAY_NAME":"Goose Creek Channel","CREATE_DATE":1787055034000,"MODIFIED_DATE":1787055053000,"BEGIN_DATE":1787011200000,"END_DATE":1792195199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-18 To: 2026-10-16\nB3 Enterprises, LLC will perform demolition and removal of the following aids to navigation under a USCG contract.\n(LLNR 23400) Goose Creek Channel Daybeacon 2, 38-05-33.501N, 075-52-01.749W.\n(LLNR 23405) Goose Creek Channel Daybeacon 4, 38-05-26.965N, 075-51-45.719W.\n(LLNR 23410) Goose Creek Channel Lighted Wreck Buoy WR6, 38-05-34.224N, 075-51-35.560W.\nProject will begin on or about August 31, 2026 and continue till October 01, 2026. The work will consist of demolition and removal of the identified structures and associated wreckage using marine construction equipment, barges, and support vessels and will be operating at each location during demolition activities. MSI #  51514.\n\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.868,38.09372],[-75.86912,38.09252],[-75.86293,38.08983],[-75.85858,38.09239],[-75.85971,38.09328],[-75.86278,38.09153],[-75.868,38.09372]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51547,"geometry":{"type":"Polygon","coordinates":[[[-70.31567999999999,41.612370000000055],[-70.35533999999996,41.59838000000008],[-70.35000999999994,41.59183000000007],[-70.31018999999998,41.606850000000065],[-70.31567999999999,41.612370000000055]]]},"properties":{"ESRI_OID":51547,"MSI_UID":51547,"ATU":1,"TITLE":"Sector Southeastern New England, Territorial Sea - Sector Southeastern New England, Submerged Lands Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116987495,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secsounewengexcecozon:secsounewengtersea:secsounewengsublanact","WATERWAY_NAME":"Sector Southeastern New England, Submerged Lands Act (SLA)","CREATE_DATE":1787063555000,"MODIFIED_DATE":1787063562000,"BEGIN_DATE":1779148800000,"END_DATE":1810684799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-05-19 To: 2027-05-18\n\nAGM Marine Contractors, Inc. is currently working on the removal of Collier Ledge and Southwest Rock rock pile rubble in Nantucket Sound, Massachusetts, in position 41° 35' 44.4\" N, 70°21' 08.2\" W and 41°36' 26.6\" N, 70° 19' 10.8\" W, for the U.S. Coast Guard. The operation is scheduled to take place between June 16, 2026 and May 2027, utilizing the dredge \"PRONCKAI,\" deck barge \"THING 2,\" and tug \"SITKA.\" Work will occur daily from 6 AM to 8 PM, weather permitting. The rock pile rubble will be deposited in the Yarmouth Offshore Reef Site in position 41-36-24.4N, 70-11-7.46W. All vessels will be monitoring VHF channels 13/16 and operating on channel 68. No passing arrangements are required.\n\n\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-70.31568,41.61237],[-70.35534,41.59838],[-70.35001,41.59183],[-70.31019,41.60685],[-70.31568,41.61237]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51549,"geometry":{"type":"Polygon","coordinates":[[[-96.09782999999999,28.628550000000075],[-96.09996999999998,28.627140000000054],[-96.10179999999997,28.626480000000072],[-96.10334999999998,28.626570000000072],[-96.10720999999995,28.626900000000035],[-96.11053999999996,28.62671000000006],[-96.11863999999997,28.624690000000044],[-96.13156999999995,28.621250000000032],[-96.13349999999997,28.620360000000062],[-96.16530999999998,28.611790000000042],[-96.17163999999997,28.607830000000035],[-96.17742999999996,28.60039000000006],[-96.20484999999996,28.56397000000004],[-96.20301999999998,28.56308000000007],[-96.17887999999994,28.59549000000004],[-96.16906999999998,28.607500000000073],[-96.16525999999999,28.60990000000004],[-96.10785999999996,28.625540000000058],[-96.10227999999995,28.625060000000076],[-96.09696999999994,28.626760000000047],[-96.09782999999999,28.628550000000075]]]},"properties":{"ESRI_OID":51549,"MSI_UID":51549,"ATU":8,"TITLE":"Matagorda Ship Channel - Matagorda Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384787,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon:seccorchrtersea:seccorchrsublanact:matshicha:matbay","WATERWAY_NAME":"Matagorda Bay","CREATE_DATE":1787064021000,"MODIFIED_DATE":1787064632000,"BEGIN_DATE":1787011200000,"END_DATE":1790899199000,"DESCRIPTION":"GIWW - Matagorda Bay - Breakwater Construction --- From: 2026-08-18 To: 2026-09-30 --- Breakwater construction will be conducted along the GIWW, between Miles 450.0 and 458.0, WHL.   Intermittent pile driving will take place in the area as permanent markers are established.  Work will be conducted during daylight hours, daily.  On-scene vessels will include barges, fleeted outside of the channel in the work area, and the M/V BILLY GENE.  Mariners are urged to transit the project area at their slowest safe speed to minimize wake and avoid shallow water in the area due to riprap placement.  VHF-FM Channels: 13 and 72","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-96.09783,28.62855],[-96.09997,28.62714],[-96.1018,28.62648],[-96.10335,28.62657],[-96.10721,28.6269],[-96.11054,28.62671],[-96.11864,28.62469],[-96.13157,28.62125],[-96.1335,28.62036],[-96.16531,28.61179],[-96.17164,28.60783],[-96.17743,28.60039],[-96.20485,28.56397],[-96.20302,28.56308],[-96.17888,28.59549],[-96.16907,28.6075],[-96.16526,28.6099],[-96.10786,28.62554],[-96.10228,28.62506],[-96.09697,28.62676],[-96.09783,28.62855]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51612,"geometry":{"type":"Polygon","coordinates":[[[-92.26731999999998,29.758880000000033],[-92.26778999999999,29.75720000000007],[-92.26722999999998,29.75738000000007],[-92.26675999999998,29.75735000000003],[-92.26512999999994,29.757240000000024],[-92.26400999999998,29.757010000000037],[-92.26100999999994,29.756530000000055],[-92.26095999999995,29.757420000000025],[-92.26254999999998,29.75828000000007],[-92.26731999999998,29.758880000000033]]]},"properties":{"ESRI_OID":51612,"MSI_UID":51612,"ATU":8,"TITLE":"Sector New Orleans, Territorial Sea - Sector New Orleans, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384639,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact","WATERWAY_NAME":"Sector New Orleans, Submerged Land Act (SLA)","CREATE_DATE":1787077560000,"MODIFIED_DATE":1787078795000,"BEGIN_DATE":1772755200000,"END_DATE":1796169599000,"DESCRIPTION":"Schooner Bayou Control Structure - Transit Instructions --- From: 2026-03-06 To: 2026-11-30 --- From 6:00 a.m. until 6:00 p.m., each day, mariners are urged to take extra precautions when locking through the Schooner Bayou Control Structure, due to a contractor removing existing and installing new timber guidewalls.  All vessels should contact the Schooner Bayou Control Structure on VHF-FM Channel 14 to make arrangements on which side of the channel to navigate when locking through the structure.  Leland Bowman Lock can be used as an alternate route.  For up-to-date information, the Lockmaster can be reached at (337) 737-2470 or (337) 316-3662. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-92.26732,29.75888],[-92.26779,29.7572],[-92.26723,29.75738],[-92.26676,29.75735],[-92.26513,29.75724],[-92.26401,29.75701],[-92.26101,29.75653],[-92.26096,29.75742],[-92.26255,29.75828],[-92.26732,29.75888]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51644,"geometry":{"type":"Polygon","coordinates":[[[-75.22688999999997,39.29418000000004],[-75.25313999999997,39.28749000000005],[-75.24727999999999,39.27627000000007],[-75.22205999999994,39.28258000000005],[-75.22688999999997,39.29418000000004]]]},"properties":{"ESRI_OID":51644,"MSI_UID":51644,"ATU":5,"TITLE":"Delaware Bay Main Channel - Delaware Bay East Side/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382938,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:delbay:delbaymaicha:delbayeassid","WATERWAY_NAME":"Delaware Bay East Side","CREATE_DATE":1787138675000,"MODIFIED_DATE":1787138711000,"BEGIN_DATE":1787097600000,"END_DATE":1791244799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-19 To: 2026-10-05\n\nLocation:\n39-17-39.048N/075-13-36.804W\n39-16-57.288N/075-13-19.416W\n39-16-34.572N/075-14-50.208W\n39-17-14.964N/075-15-11.304W\n39-17-39.048N/075-13-36.804W\n\nMariners are advised that H&amp;amp;L Contracting will be conducting dredging operations in Nantuxent Creek from September 7, 2026, through September 30, 2026. Work will be conducted 24 hours a day, 7 days a week. Dredging operations will be performed using the cutter-suction dredge “Scout,” with a pipeline attached at the stern extending to the disposal site. Multiple tugboats, an excavator barge, and an unnamed skiff will also be operating in the area. The channel will remain open during dredging; however, channel width will be reduced, and occasional channel crossings may occur. All mariners are advised to reduce speed to the minimum required for safe steerage while transiting the vicinity of the dredging operations.\nThe dredge pipeline will be marked with regulatory buoys and flashing yellow lights. The dredge and associated work vessels will monitor VHF-FM Channels 65 and 16. Mariners are advised to proceed with caution when transiting the area and to contact the dredge 30 minutes in advance for any special arrangements.\n\nOn-site Superintendent: Keith Johnson\nPhone: 631-553-1034\nDredge Starting Coordinate:\n39°16′52.9″N, 75°15′10.5″W\nEnding Coordinate (inside the creek):\n39°17′06.4″N, 75°13′52.2″W\nBeach Placement Location:\n39°16′54.7″N, 75°14′24.8″W \nMSI #51644","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.22689,39.29418],[-75.25314,39.28749],[-75.24728,39.27627],[-75.22206,39.28258],[-75.22689,39.29418]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51707,"geometry":{"type":"Polygon","coordinates":[[[-95.96833999999996,28.685740000000067],[-95.98428999999999,28.678350000000023],[-95.98419999999999,28.67811000000006],[-95.96831999999995,28.68542000000008],[-95.96833999999996,28.685740000000067]]]},"properties":{"ESRI_OID":51707,"MSI_UID":51707,"ATU":8,"TITLE":"GIWW West mm440-441/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385120,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:giwwes:mm440mm441","WATERWAY_NAME":"GIWW West mm440-441","CREATE_DATE":1787160162000,"MODIFIED_DATE":1787161982000,"BEGIN_DATE":1787097600000,"END_DATE":1789862399000,"DESCRIPTION":"Colorado River - GIWW - Lock Closure --- From: 2026-08-18 To: 2026-09-18 --- The Colorado River Locks on the GIWW, Miles 441.0 and 442.0, WHL, will be closed to marine traffic for repairs to the west lock south riverside sector gate.  The closure will take place from 8:00 a.m. to 6:00 p.m., Monday through Friday, excluding federal holidays.  Mariners should confirm closure times prior to transiting the area to avoid delays.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  POC: Lockmaster (979) 482-7321","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-95.96834,28.68574],[-95.98429,28.67835],[-95.9842,28.67811],[-95.96832,28.68542],[-95.96834,28.68574]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51771,"geometry":{"type":"Polygon","coordinates":[[[-80.11037999999996,32.78441000000004],[-80.11645999999996,32.78136000000006],[-80.11899999999997,32.780790000000025],[-80.12063999999998,32.780520000000024],[-80.12335999999993,32.779900000000055],[-80.12456999999995,32.77944000000008],[-80.12400999999994,32.77838000000003],[-80.12242999999995,32.779040000000066],[-80.12085999999994,32.77946000000003],[-80.11916999999994,32.77960000000007],[-80.11549999999994,32.78093000000007],[-80.11325999999997,32.78191000000004],[-80.11241999999999,32.78203000000008],[-80.10982999999999,32.78291000000007],[-80.10889999999995,32.78359000000006],[-80.11037999999996,32.78441000000004]]]},"properties":{"ESRI_OID":51771,"MSI_UID":51771,"ATU":7,"TITLE":"Folly River - Stono River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384372,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:folriv:storiv","WATERWAY_NAME":"Stono River","CREATE_DATE":1787234212000,"MODIFIED_DATE":1787234402000,"BEGIN_DATE":1787184000000,"END_DATE":1792799999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-20 To: 2026-10-23\n\nLocation:\n32-47-03.876N/080-06-37.368W\n32-47-00.924N/080-06-32.040W\n32-46-58.476N/080-06-35.388W\n32-46-55.308N/080-06-44.712W\n32-46-54.876N/080-06-47.736W\n32-46-51.348N/080-06-55.800W\n32-46-46.560N/080-07-09.012W\n32-46-46.056N/080-07-15.096W\n32-46-44.544N/080-07-20.748W\n32-46-42.168N/080-07-26.436W\n32-46-45.984N/080-07-28.452W\n32-46-47.640N/080-07-24.096W\n32-46-49.872N/080-07-14.304W\n32-46-50.844N/080-07-08.400W\n32-46-52.896N/080-06-59.256W\n32-47-03.876N/080-06-37.368W\n\nCottrell Contracting Corporation of Chesapeake, Virginia advises that the DREDGE NEWMARKET will be conducting dredging operations in the Atlantic Intracoastal Waterway (AIWW) in the vicinity of Rantowles Creek, Johns Island, SC. The dredge will be working from approximately coordinates 32-46.982N / 08O-06.721W, which is approximately 1,000 feet Northeast of the Stono River Light 39, to the Stono River Daybeacon 41 (32-46. 760N / 080-07 .319W). The work will be ongoing from August 26, 2026, through September 30, 2026.\nAll mariners are requested to stay clear of the dredge, pipelines, barge, derricks and operating wires about the dredge. All operators should be aware that the dredge and pontoon lines are held in place by cables, which are attached to anchors some distance from the dredge and pontoons. Buoys are attached to the anchors so that they may be moved as the dredge moves. Submerged lines should be avoided. Mariners are requested to exercise extreme caution when approaching, passing, and leaving the dredging plant. The dredge Newmarket monitors VHF-FM channels 13 and 16. Mariners are cautioned to strictly comply with the Inland Rules of the Road when approaching, passing and leaving the area of operations, and remain a safe distance away from the dredge, booster, buoys, cables, pipeline, barges, derricks, wires and related equipment.\nOwners and lessees of fishnets, crab pots and other structures that may be in the vicinity and that may hinder the free navigation of attending vessels and equipment must remove these from the area where tugs, tender boats and other attendant equipment will be navigating. Dredging operations will be conducted twenty-four (24) hours a day seven (7) days a week, all fishnets, crab pots and structures in the general area must be removed prior to commencement of any work, a slow NO WAKE speed is requested of transiting vessels. All vessels are requested to contact the dredge prior to passing.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-80.11038,32.78441],[-80.11646,32.78136],[-80.119,32.78079],[-80.12064,32.78052],[-80.12336,32.7799],[-80.12457,32.77944],[-80.12401,32.77838],[-80.12243,32.77904],[-80.12086,32.77946],[-80.11917,32.7796],[-80.1155,32.78093],[-80.11326,32.78191],[-80.11242,32.78203],[-80.10983,32.78291],[-80.1089,32.78359],[-80.11038,32.78441]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51783,"geometry":{"type":"Polygon","coordinates":[[[-91.47887999999995,40.31005000000005],[-91.48040999999995,40.30795000000006],[-91.48301999999995,40.30650000000003],[-91.48346999999995,40.30436000000003],[-91.48226999999997,40.304070000000024],[-91.48127999999997,40.30587000000003],[-91.47982999999994,40.30729000000008],[-91.47698999999994,40.30895000000004],[-91.47887999999995,40.31005000000005]]]},"properties":{"ESRI_OID":51783,"MSI_UID":51783,"ATU":2,"TITLE":"Lower Mississippi River - Upper Mississippi River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381438,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:uppmisriv","WATERWAY_NAME":"Upper Mississippi River","CREATE_DATE":1787242704000,"MODIFIED_DATE":1787246825000,"BEGIN_DATE":1787184000000,"END_DATE":1789084799000,"DESCRIPTION":"Continuing until further notice, the M/V SCARLETT RIVER or M/V PERSEVERE is conducting dredging operations between approximate Miles 355.4 and 355.1.  Work will be conducted from 6:00 a.m. until 6:30 p.m., Monday through Friday.  The M/V SCARLETT RIVER or M/V PERSEVERE will monitor VHF-FM Channels 16 and 68, and requests 30-minutes advance notice of passage.  Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution after passing arrangements have been made. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-91.47888,40.31005],[-91.48041,40.30795],[-91.48302,40.3065],[-91.48347,40.30436],[-91.48227,40.30407],[-91.48128,40.30587],[-91.47983,40.30729],[-91.47699,40.30895],[-91.47888,40.31005]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51842,"geometry":{"type":"Polygon","coordinates":[[[-94.80085999999994,29.462680000000034],[-94.82468999999998,29.458530000000053],[-94.82069999999999,29.445200000000057],[-94.79750999999999,29.44945000000007],[-94.80085999999994,29.462680000000034]]]},"properties":{"ESRI_OID":51842,"MSI_UID":51842,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Galveston Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385102,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:galbay","WATERWAY_NAME":"Galveston Bay","CREATE_DATE":1787329075000,"MODIFIED_DATE":1787585647000,"BEGIN_DATE":1787270400000,"END_DATE":1804031999000,"DESCRIPTION":"Galveston Bay – Houston Ship Channel – Pipeline Operation --- From: 2026-08-21 To: 2027-03-01 --- Pipeline is being installed in Galveston Bay from Beach City to Texas City.  Current work is taking place east of Houston Ship Channel Light 42 (LLNR-24085).  Crew and vessels will be on-site 24-hrs a day, with drilling conducted during daylight hours only, between approximately 6:00 a.m. and 6:00 p.m.  Operations, including pipe laying and dredging, are expected to move closer to the channel with equipment working within 1,800 ft on both the red and green sides of the channel by November 1, 2026.  On-scene vessels may include some or all of the following vessels, depending on the stage of the project: Barges BB-90, BB-60, BB-80, BB-70 and BB-40, and the M/Vs MISS ANNE, MISS MICHELLE, GRACIE CLAIRE, CAPT TIMMY, VANESSA RAE, LINDA C, LA SUNSET, JACKIE, JACOB MATTHEWS, SEA TIGER, and MILA KATE.  Mariners are requested to transit the area at their slowest safe speed to minimize wake.  POC: (337) 303-8878 and (337) 600-4655","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-94.80086,29.46268],[-94.82469,29.45853],[-94.8207,29.4452],[-94.79751,29.44945],[-94.80086,29.46268]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51867,"geometry":{"type":"Polygon","coordinates":[[[-121.09236999999996,35.50578000000007],[-121.13711999999998,35.476590000000044],[-121.00260999999995,35.269580000000076],[-120.75831999999997,34.83535000000006],[-120.71430999999995,34.832490000000064],[-120.68265999999994,34.947430000000054],[-120.65693999999996,35.146480000000054],[-120.74644999999998,35.17792000000003],[-120.75584999999995,35.17098000000004],[-120.75213999999994,35.14219000000003],[-120.82260999999994,35.10606000000007],[-120.93881999999996,35.258350000000064],[-120.89925999999997,35.32695000000007],[-120.89727999999997,35.40697000000006],[-120.90592999999996,35.41718000000003],[-121.01027999999997,35.409830000000056],[-121.09236999999996,35.50578000000007]]]},"properties":{"ESRI_OID":51867,"MSI_UID":51867,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116385454,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea","WATERWAY_NAME":"Sector Los Angeles, Territorial Sea","CREATE_DATE":1787340407000,"MODIFIED_DATE":1787344394000,"BEGIN_DATE":1787270400000,"END_DATE":1791676799000,"DESCRIPTION":"The USGS Pacific Coastal and Marine Science Center (PCMSC) will conduct geophysical surveys in the San Luis Bay region under California State Lands Permit #9967 from September 26 to October 9, 2026. Operations will include high-resolution acoustic sub-bottom surveys using a Chirp 512 on the M/V Bold Horizon, a 170-foot research vessel owned and operated by the Eclipse Group. The survey area is bounded by the coordinates listed below. For more information, contact Tim Elfers, Marine Operations Manager, USGS Pacific Coastal Marine Science Center, at 831-332-9665 or 831-460-7479.\n\nCoordinates:\n\nLatitude\tLongitude\n35.505784\t-121.092370\n35.409833\t-121.010279\n35.417182\t-120.905934\n35.406975\t-120.897280\n35.326948\t-120.899258\n35.258353\t-120.938820\n35.106057\t-120.822607\n35.142191\t-120.752137\n35.170976\t-120.755846\n35.177918\t-120.746450\n35.146478\t-120.656942\n34.947431\t-120.682657\n34.832494\t-120.714306\n34.835353\t-120.758319\n35.269581\t-121.002614\n35.476590\t-121.137124\n35.505784\t-121.092370\n\nAll mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-121.09237,35.50578],[-121.13712,35.47659],[-121.00261,35.26958],[-120.75832,34.83535],[-120.71431,34.83249],[-120.68266,34.94743],[-120.65694,35.14648],[-120.74645,35.17792],[-120.75585,35.17098],[-120.75214,35.14219],[-120.82261,35.10606],[-120.93882,35.25835],[-120.89926,35.32695],[-120.89728,35.40697],[-120.90593,35.41718],[-121.01028,35.40983],[-121.09237,35.50578]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51870,"geometry":{"type":"Polygon","coordinates":[[[-122.26367999999997,38.09972000000005],[-122.26470999999998,38.09918000000005],[-122.26332999999994,38.097830000000044],[-122.26221999999996,38.09857000000005],[-122.26367999999997,38.09972000000005]]]},"properties":{"ESRI_OID":51870,"MSI_UID":51870,"ATU":11,"TITLE":"Carquinez Strait - Mare Island Strait/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116385503,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact:enttosanfrabay:golgatbri:sanfrabay:sanpabbay:carstr:marislstr","WATERWAY_NAME":"Mare Island Strait","CREATE_DATE":1787345224000,"MODIFIED_DATE":1787345328000,"BEGIN_DATE":1787270400000,"END_DATE":1788652799000,"DESCRIPTION":"The San Francisco Bay Water Emergency Transportation Authority (WETA) will conduct two geotechnical soil borings at and near the Vallejo Ferry Terminal on the Napa River, in the vicinity of 38.09947, -122.26356. Operations will be conducted using the spud barge CSM 39, a 34-foot by 110-foot drill barge, along with an attending tugboat, during the nights of September 3 and September 4, 2026. To avoid impacts to the Vallejo Ferry schedule, drilling operations will be performed overnight. The spud barge will be mobilized to the project site at approximately 9:15 p.m. each evening and demobilized the following morning upon completion of work. During drilling operations, the spud barge will be moored and maintained on station using two spuds. The attending tugboat will remain on station throughout each night’s drilling operation and will return the spud barge to CS Marine’s Yard on Mare Island following completion of the nightly work period. Both the spud barge and tugboat will display appropriate navigation lights during nighttime operations and will monitor VHF-FM channels 13 and 16. Mariners are requested to transit the area with caution and minimize wake when passing the work site. For more details or comments, contact CS Marine Superintendent at 707-246-9770. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.26368,38.09972],[-122.26471,38.09918],[-122.26333,38.09783],[-122.26222,38.09857],[-122.26368,38.09972]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51875,"geometry":{"type":"Polygon","coordinates":[[[-75.15609999999998,38.787420000000054],[-75.16034999999994,38.78361000000007],[-75.12790999999999,38.77006000000006],[-75.09391999999997,38.74285000000003],[-75.08618999999999,38.731400000000065],[-75.09069999999997,38.72577000000007],[-75.09442999999999,38.71503000000007],[-75.09520999999995,38.70016000000004],[-75.10073999999997,38.68689000000006],[-75.09661999999997,38.68599000000006],[-75.09172999999998,38.69915000000003],[-75.09069999999997,38.71372000000008],[-75.08168999999998,38.73040000000003],[-75.08760999999998,38.742650000000026],[-75.12674999999996,38.77297000000004],[-75.15609999999998,38.787420000000054]]]},"properties":{"ESRI_OID":51875,"MSI_UID":51875,"ATU":5,"TITLE":"Indian River Inlet - Rehoboth Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100117653883,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:indrivinl:rehbay","WATERWAY_NAME":"Rehoboth Bay","CREATE_DATE":1787567202000,"MODIFIED_DATE":1787567233000,"BEGIN_DATE":1787529600000,"END_DATE":1804809599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-24 To: 2027-03-11\n\nCottrell Contracting Corporation of Chesapeake, Virginia, advises that the Dredge Rockbridge will be performing dredging operations within the Lewes and Rehoboth Canal, Delaware. Operations are expected to begin on August 26, 2026, and be completed by March 10, 2027. Dredging and pipeline placement within the Lewes and Rehoboth Canal will begin approximately 2,650 feet (0.5 miles) southwest of the Roosevelt Inlet entrance to the canal, beginning at coordinates 38D 47.0S0'N, 75D 9.337'W, and continue through the entire length of the Lewes and Rehoboth Canal, terminating at the Lewes and Rehoboth Canal Jetty Warning Light in Rehoboth Bay. All vessel traffic is requested to contact the dredge on VHF channel 13 or 16 prior to passage. For emergencies, the Dredge Rockbridge can be reached at (757) 635-2576.\nAll mariners are requested to stay clear of the dredge, pipelines, barge, derricks, and operating wires about the dredge. All operators should be aware that the dredge and pontoon lines are held in place by cables, which are attached to anchors some distance from the dredge and pontoons. Buoys are attached to the anchors so that they may be moved as the dredge moves. Submerged lines should be avoided. Mariners are requested to exercise extreme caution when approaching, passing, and leaving the dredging plant. The Dredge Rockbridge monitors VHF channels 13 and 16. Mariners are cautioned to strictly comply with the Inland Rules of the Road when approaching, passing, and leaving the area of operations, and remain a safe distance away from the dredge, booster, buoys, cables, pipeline, barges, derricks, wires, and related equipment. MSI # 51875.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.1561,38.78742],[-75.16035,38.78361],[-75.12791,38.77006],[-75.09392,38.74285],[-75.08619,38.7314],[-75.0907,38.72577],[-75.09443,38.71503],[-75.09521,38.70016],[-75.10074,38.68689],[-75.09662,38.68599],[-75.09173,38.69915],[-75.0907,38.71372],[-75.08169,38.7304],[-75.08761,38.74265],[-75.12675,38.77297],[-75.1561,38.78742]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51915,"geometry":{"type":"Polygon","coordinates":[[[-90.57048999999995,39.893440000000055],[-90.57256999999998,39.89259000000004],[-90.57426999999996,39.89165000000003],[-90.57355999999999,39.890990000000045],[-90.56960999999995,39.89288000000005],[-90.57048999999995,39.893440000000055]]]},"properties":{"ESRI_OID":51915,"MSI_UID":51915,"ATU":2,"TITLE":"Lower Mississippi River - Illinois River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381277,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:illriv","WATERWAY_NAME":"Illinois River","CREATE_DATE":1787575900000,"MODIFIED_DATE":1787578450000,"BEGIN_DATE":1787529600000,"END_DATE":1789430399000,"DESCRIPTION":"Continuing until further notice, the Dredge GOETZ is conducting dredging operations in the vicinity of Mile 76.0.  Operations will be conducted 24-hours a day, 7-days a week.  Dredge GOETZ will monitor VHF-FM Channel 13, 16 or 82, and requests 30-minutes advance notice of passage.  Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.57049,39.89344],[-90.57257,39.89259],[-90.57427,39.89165],[-90.57356,39.89099],[-90.56961,39.89288],[-90.57049,39.89344]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51922,"geometry":{"type":"Polygon","coordinates":[[[-82.73105999999996,41.512230000000045],[-82.73695999999995,41.511330000000044],[-82.73334999999997,41.50220000000007],[-82.73042999999996,41.503570000000025],[-82.72934999999995,41.50383000000005],[-82.72831999999994,41.50272000000007],[-82.72728999999998,41.502500000000055],[-82.72178999999994,41.50267000000008],[-82.72035999999997,41.50824000000006],[-82.72155999999995,41.50923000000006],[-82.72373999999996,41.50936000000007],[-82.72556999999995,41.50927000000007],[-82.72670999999997,41.51189000000005],[-82.73105999999996,41.512230000000045]]]},"properties":{"ESRI_OID":51922,"MSI_UID":51922,"ATU":9,"TITLE":"WEST END OF LAKE ERIE - SanduskyBay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386047,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:sanbay","WATERWAY_NAME":"SanduskyBay","CREATE_DATE":1787576352000,"MODIFIED_DATE":1787576358000,"BEGIN_DATE":1790553600000,"END_DATE":1798847999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-09-28 To: 2027-01-01 Monday through Friday from 0700 to 1530.\n\nShoreline contractors will be installing a 12\" water main. During the construction a 12\" water line floating in the bay, on the east side of the causeway. The bay will be unnavigable. Warren Jackie can be contacted on VHF channels 6 and 16.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-82.73106,41.51223],[-82.73696,41.51133],[-82.73335,41.5022],[-82.73043,41.50357],[-82.72935,41.50383],[-82.72832,41.50272],[-82.72729,41.5025],[-82.72179,41.50267],[-82.72036,41.50824],[-82.72156,41.50923],[-82.72374,41.50936],[-82.72557,41.50927],[-82.72671,41.51189],[-82.73106,41.51223]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51935,"geometry":{"type":"Polygon","coordinates":[[[-92.10082999999997,27.913830000000075],[-89.90849999999995,26.40483000000006],[-89.86766999999998,27.88083000000006],[-92.10082999999997,27.913830000000075]]]},"properties":{"ESRI_OID":51935,"MSI_UID":51935,"ATU":8,"TITLE":"Sector New Orleans, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116384641,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon","WATERWAY_NAME":"Sector New Orleans, Exclusive Economic Zone (EEZ)","CREATE_DATE":1787578223000,"MODIFIED_DATE":1787579428000,"BEGIN_DATE":1787529600000,"END_DATE":1798847999000,"DESCRIPTION":"Gulf of America - Survey Operation --- From: 2026-08-24 To: 2026-12-31 --- Survey operations will be taking place in the Gulf of America by the M/V ISLAND FRONTIER with M/V REM ANDES and M/V SANCO SWORD.  Each vessel will be towing 400 meter long cables in area bound by approximate positions:\n27-54-49.8N 092-06-03.0W, \n27-52-51.0N 089-52-03.6W and\n26-24-17.4N 089-54-30.6W.\nVessels are requested to maintain a wide berth from the survey vessels to avoid entanglement and interfering with survey data collection.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-92.10083,27.91383],[-89.9085,26.40483],[-89.86767,27.88083],[-92.10083,27.91383]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51937,"geometry":{"type":"Polygon","coordinates":[[[-81.94893999999994,26.449160000000063],[-81.95033999999998,26.447510000000023],[-81.91439999999994,26.427350000000047],[-81.91274999999996,26.42873000000003],[-81.92124999999999,26.435340000000053],[-81.93248999999997,26.442570000000046],[-81.94893999999994,26.449160000000063]]]},"properties":{"ESRI_OID":51937,"MSI_UID":51937,"ATU":7,"TITLE":"Sector St. Petersburg, Territorial Sea - Sector St. Petersburg, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383296,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secsaipetexcecozon:secsaipettersea:secsaipeterseala","WATERWAY_NAME":"Sector St. Petersburg, Submerged Land Act (SLA)","CREATE_DATE":1787579072000,"MODIFIED_DATE":1787579106000,"BEGIN_DATE":1787529600000,"END_DATE":1803167999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-24 To: 2027-02-20\n\n51937\n\nAtlantic and Gulf Dredging and Marine, LLC. will commence maintenance dredging operations within the Federal Navigational Channel at Fort Myers Beach from San Carlos Pass inland to the Turning Basin adjacent to the Estero Bay Aquatic Preserve as indicated below.  Specifically, the channel dredging will occur from “Cut 1”, inbound, through “Cut-10”, and include the “Turning Basin” adjacent to “Cut-10”, however the dredge(s) and/or dredging equipment may be in operation or moored in the general vicinity(s) of the work area(s).  The dredged material will be transported by pipeline, and placed within the “Nearshore Placement Area” beginning approximately 1,200 feet south of the Pass at “R-186”, southeast to “R-198”.  \n\nThere will be obstructions associated with the ongoing construction including submerged and floating dredge pipelines, barge(s), tug boat(s), crew boats(s), or other construction equipment operating in the Areas.\n\nType of Operation: \nDredging within the borrow area(s) will be via hydraulic cutter suction dredge with floating and submerged high-density polyethylene pipeline.  DREDGING EQUIPMENT AND FLOATING/SUBMERGED PIPELINE MAY BE IN THE AREAS LISTED AND SHOWN while construction operations are underway.  The pipeline will be marked in accordance with USCG and EM-385-1-1 requirements for the safety of mariners.  \n\nOperations are expected to begin on or about September 1, 2026, with an estimated completion date of January 1, 2027. Operations will be conducting 24/7.\n\nDREDGE COMMODORE will be monitoring VHF-FM channel 13 and 16.\n\nMariners are urged to use extreme caution in and near the areas listed and shown, transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements (via VHF-FM  channel 13) have been made.  Floating and submerged polyethylene pipeline associated with the operation will be utilized.  Pipeline, vessels, and buoys will be visibly lighted in accordance with USCG and EM-385-1-1 regulations.  Up to approximately 800 feet of floating pipeline may be utilized directly behind the dredge, and submerged pipeline may be inside of the listed areas while construction operations are underway.  The submerged pipeline will extend from the mouth of San Carlos Pass offshore southeast to the “Nearshore Placement Area”.\n\nRecreational pleasure craft shall attempt to avoid the immediate area of operations and comply with posted signage/day shapes.  All traffic requiring passage through the worksite(s) shall make passing arrangements allowing sufficient time for accommodations to be made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.94894,26.44916],[-81.95034,26.44751],[-81.9144,26.42735],[-81.91275,26.42873],[-81.92125,26.43534],[-81.93249,26.44257],[-81.94894,26.44916]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51938,"geometry":{"type":"Polygon","coordinates":[[[-81.51540999999997,30.404270000000054],[-81.51532999999995,30.403650000000027],[-81.51383999999996,30.40244000000007],[-81.51319999999998,30.40253000000007],[-81.51540999999997,30.404270000000054]]]},"properties":{"ESRI_OID":51938,"MSI_UID":51938,"ATU":7,"TITLE":"Sector Jacksonville, Submerged Land Act (SLA) - St Johns River/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116383440,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:stjohriv","WATERWAY_NAME":"St Johns River","CREATE_DATE":1787579148000,"MODIFIED_DATE":1787579174000,"BEGIN_DATE":1787529600000,"END_DATE":1793577599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-08-24 To: 2026-11-01\n\n51938\n\nA geotechnical investigation will be conducted on the St Johns River adjacent to the eastern shoreline of MCSF Blount Island. Operations will consist of using a drill rig mounted on a 12 ft x 32 ft barge anchored in place during hours of operation with spuds to drill 4 shallow borings near the shoreline to collect sediment samples. The barge is motorized and a tender boat will be accompanying the operation. Operations are expected to begin on or about September 14, 2026, with an estimated completion date of October 2, 2026. Sampling will be conducted during daylight hours from 7 a.m. to 7 p.m. Vessels will be monitoring VHF-FM channel 13 and 16. \n\n\nPositions for geotechnical borings:\n30.403647N / -81.515325W\n30.404177N / -81.514925W\n30.402435N / -81.513854W\n30.402765N / -81.513245W","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.51541,30.40427],[-81.51533,30.40365],[-81.51384,30.40244],[-81.5132,30.40253],[-81.51541,30.40427]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":51942,"geometry":{"type":"Polygon","coordinates":[[[-87.10350999999997,37.45477000000005],[-87.10368999999997,37.45477000000005],[-87.10363999999998,37.453500000000076],[-87.10347999999999,37.453490000000045],[-87.10337999999996,37.453730000000064],[-87.10322999999994,37.45416000000006],[-87.10325999999998,37.45443000000006],[-87.10341999999997,37.45455000000004],[-87.10346999999996,37.45464000000004],[-87.10350999999997,37.45477000000005]]]},"properties":{"ESRI_OID":51942,"MSI_UID":51942,"ATU":2,"TITLE":"Ohio River - Green River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381266,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv:greriv","WATERWAY_NAME":"Green River","CREATE_DATE":1787581195000,"MODIFIED_DATE":1787584163000,"BEGIN_DATE":1787529600000,"END_DATE":1789862399000,"DESCRIPTION":"Continuing until September 18, 2026, dredge operations will be conducted at the Big Rivers Electric Corp. D.B. Wilson Station, in the vicinity of Mile 74.5.  Work will be conducted from 7:00 a.m. until 5:00 p.m., Monday through Friday.  Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-87.10351,37.45477],[-87.10369,37.45477],[-87.10364,37.4535],[-87.10348,37.45349],[-87.10338,37.45373],[-87.10323,37.45416],[-87.10326,37.45443],[-87.10342,37.45455],[-87.10347,37.45464],[-87.10351,37.45477]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52031,"geometry":{"type":"Polygon","coordinates":[[[-118.22096999999997,33.73160000000007],[-118.22096999999997,33.72738000000004],[-118.21134999999998,33.727310000000045],[-118.21151999999995,33.73160000000007],[-118.22096999999997,33.73160000000007]]]},"properties":{"ESRI_OID":52031,"MSI_UID":52031,"ATU":11,"TITLE":"Sector Los Angeles, Territorial Sea - Sector Los Angeles, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116385490,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:seclosangexcecozon:seclosangtersea:seclosangsublanact","WATERWAY_NAME":"Sector Los Angeles, Submerged Land Act (SLA)","CREATE_DATE":1787602191000,"MODIFIED_DATE":1787606055000,"BEGIN_DATE":1787529600000,"END_DATE":1791763199000,"DESCRIPTION":"Gregg Drilling and Testing will conduct drilling operations from August 31 through October 10, 2026, in the vicinity of Long Beach Outer Harbor Anchorage B at approximately 33.72940, -118.21522. The R/V QUIN DELTA will be on scene monitoring VHF-FM channels 16, 13, and 74. Mariners are advised to use caution when transiting the area. For further comments or details, contact Captain Tim O’Donnell at (949) 254-5190 or by email at BEARatSEA@gmail.com. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-118.22097,33.7316],[-118.22097,33.72738],[-118.21135,33.72731],[-118.21152,33.7316],[-118.22097,33.7316]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52093,"geometry":{"type":"Polygon","coordinates":[[[-76.24865999999997,36.72449000000006],[-76.24912999999998,36.72367000000003],[-76.24624999999997,36.722840000000076],[-76.24588999999997,36.72357000000005],[-76.24865999999997,36.72449000000006]]]},"properties":{"ESRI_OID":52093,"MSI_UID":52093,"ATU":5,"TITLE":"Great Bridge To Albemarle Sound/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382887,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirsecnorcarexcecozon:secvirsecnorcartersea:secvirsecnorcarexcecozon:oreinl:pamsou:crosou:albsou:grebritoalbsou","WATERWAY_NAME":"Great Bridge To Albemarle Sound","CREATE_DATE":1787657592000,"MODIFIED_DATE":1787657719000,"BEGIN_DATE":1787616000000,"END_DATE":1789689599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-25 To: 2026-09-17\n\nLocation:\n36-43-28.164N/076-14-55.176W\n36-43-24.852N/076-14-45.204W\n36-43-22.224N/076-14-46.500W\n36-43-25.212N/076-14-56.868W\n36-43-28.164N/076-14-55.176W\n\nThe Great Bridge Lock will undergo repairs in the month of September to improve the performance of the lock gates. The facility will be closed between the hours of 6pm – 6am on the following dates:\n• September 2, 2026\n• September 9, 2026\n• September 16, 2026\nOutside of those closures, the lock will be fully open for navigation. Those planning to use the Great Bridge Lock to transit the Albemarle and Chesapeake Canal are advised to plan accordingly. MSI #52093\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-76.24866,36.72449],[-76.24913,36.72367],[-76.24625,36.72284],[-76.24589,36.72357],[-76.24866,36.72449]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52159,"geometry":{"type":"Polygon","coordinates":[[[-97.06419999999997,27.84391000000005],[-97.10201999999998,27.83708000000007],[-97.19605999999999,27.819480000000055],[-97.23590999999999,27.81293000000005],[-97.23821999999996,27.81260000000003],[-97.29027999999994,27.81251000000003],[-97.37624999999997,27.811870000000056],[-97.37940999999995,27.811240000000055],[-97.37994999999995,27.811000000000035],[-97.38187999999997,27.81117000000006],[-97.39171999999996,27.812680000000057],[-97.39269999999999,27.812740000000076],[-97.39310999999998,27.81170000000003],[-97.39234999999996,27.811480000000074],[-97.37625999999995,27.808380000000056],[-97.33060999999998,27.80848000000003],[-97.23828999999995,27.80890000000005],[-97.23447999999996,27.809380000000033],[-97.22219999999999,27.81251000000003],[-97.17064999999997,27.82209000000006],[-97.12273999999996,27.831060000000036],[-97.08223999999996,27.838510000000042],[-97.06357999999994,27.842020000000048],[-97.06419999999997,27.84391000000005]]]},"properties":{"ESRI_OID":52159,"MSI_UID":52159,"ATU":8,"TITLE":"Aransas Pass To Baffin Bay - Corpus Christi Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385152,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon:seccorchrtersea:seccorchrsublanact:arapastobafbay:corchrcha","WATERWAY_NAME":"Corpus Christi Channel","CREATE_DATE":1787671832000,"MODIFIED_DATE":1787672067000,"BEGIN_DATE":1787616000000,"END_DATE":1809302399000,"DESCRIPTION":"Corpus Christi Channel - Dredge Operation --- From: 2026-08-28 To: 2027-05-01 --- The Dredge LORRAINE HOOKS and attendant plant will be dredging in the Corpus Christi Channel, from Port Aransas to the Corpus Christi Harbor Entrance.  Operations will be conducted 24-hours a day, 7-days a week.  Floating and submerged pipeline connecting and leading to multiple disposal areas will be present in and along the project area.  The dredge requests all vessels requiring the majority of the channel to navigate safely coordinate passing arrangements at least 1-hour in advance.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution.  VHF-FM Channels: 13 and 16, POC: (337) 794-7046 or (229) 254-4900 ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-97.0642,27.84391],[-97.10202,27.83708],[-97.19606,27.81948],[-97.23591,27.81293],[-97.23822,27.8126],[-97.29028,27.81251],[-97.37625,27.81187],[-97.37941,27.81124],[-97.37995,27.811],[-97.38188,27.81117],[-97.39172,27.81268],[-97.3927,27.81274],[-97.39311,27.8117],[-97.39235,27.81148],[-97.37626,27.80838],[-97.33061,27.80848],[-97.23829,27.8089],[-97.23448,27.80938],[-97.2222,27.81251],[-97.17065,27.82209],[-97.12274,27.83106],[-97.08224,27.83851],[-97.06358,27.84202],[-97.0642,27.84391]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52188,"geometry":{"type":"Polygon","coordinates":[[[-97.32814999999994,26.36851000000007],[-97.33485999999999,26.36152000000004],[-97.42068999999998,26.345530000000053],[-97.43064999999996,26.342640000000074],[-97.44240999999994,26.33322000000004],[-97.44699999999995,26.32603000000006],[-97.45154999999994,26.32522000000006],[-97.45433999999995,26.325990000000047],[-97.45480999999995,26.328800000000058],[-97.45913999999999,26.333070000000077],[-97.47046999999998,26.33137000000005],[-97.47682999999995,26.336140000000057],[-97.48669999999998,26.338260000000048],[-97.49497999999994,26.33699000000007],[-97.51308999999998,26.32818000000003],[-97.51668999999998,26.32818000000003],[-97.52394999999996,26.325600000000065],[-97.52778999999998,26.31806000000006],[-97.52718999999996,26.302020000000027],[-97.52975999999995,26.298350000000028],[-97.53928999999994,26.296700000000044],[-97.54627999999997,26.294120000000078],[-97.55112999999994,26.290270000000078],[-97.55499999999995,26.283460000000048],[-97.55752999999999,26.281610000000057],[-97.56022999999999,26.28177000000005],[-97.56301999999994,26.28562000000005],[-97.56443999999999,26.288350000000037],[-97.56850999999995,26.288460000000043],[-97.57322999999997,26.28550000000007],[-97.57606999999996,26.28496000000007],[-97.58134999999999,26.28350000000006],[-97.58498999999995,26.280310000000043],[-97.58541999999994,26.277770000000032],[-97.58464999999995,26.275770000000023],[-97.58185999999995,26.27257000000003],[-97.58357999999998,26.26768000000004],[-97.58400999999998,26.264530000000036],[-97.58258999999998,26.264680000000055],[-97.58134999999999,26.267300000000034],[-97.58052999999995,26.272420000000068],[-97.58142999999995,26.27553000000006],[-97.58374999999995,26.27669000000003],[-97.58361999999994,26.27988000000005],[-97.57919999999996,26.282880000000034],[-97.57301999999999,26.284580000000062],[-97.56928999999997,26.286420000000078],[-97.56666999999999,26.286770000000047],[-97.56430999999998,26.284890000000075],[-97.56181999999995,26.281190000000038],[-97.55829999999997,26.28000000000003],[-97.55473999999998,26.281690000000026],[-97.55172999999996,26.28708000000006],[-97.54730999999998,26.291660000000036],[-97.54027999999994,26.29493000000008],[-97.52821999999998,26.297660000000064],[-97.52572999999995,26.301580000000058],[-97.52507999999995,26.30555000000004],[-97.52628999999996,26.316860000000077],[-97.52374999999995,26.322430000000054],[-97.52061999999995,26.32540000000006],[-97.51400999999998,26.32647000000003],[-97.49362999999994,26.336050000000057],[-97.48400999999996,26.336510000000033],[-97.47671999999994,26.334050000000047],[-97.47263999999996,26.33036000000004],[-97.46980999999994,26.32970000000006],[-97.46632999999997,26.330820000000074],[-97.46164999999996,26.331320000000062],[-97.45860999999996,26.330700000000036],[-97.45658999999995,26.325930000000028],[-97.45345999999995,26.323630000000037],[-97.44774999999998,26.323930000000075],[-97.44409999999999,26.32609000000008],[-97.44293999999996,26.329900000000066],[-97.43723999999997,26.335900000000038],[-97.43002999999999,26.341510000000028],[-97.42216999999994,26.344160000000045],[-97.38165999999995,26.351660000000038],[-97.34092999999996,26.358820000000037],[-97.32989999999995,26.36062000000004],[-97.32573999999994,26.35916000000003],[-97.32281999999998,26.35659000000004],[-97.32814999999994,26.36851000000007]]]},"properties":{"ESRI_OID":52188,"MSI_UID":52188,"ATU":8,"TITLE":"Harlingen-Port Isabel - Arroyo Colorado Cutoff Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384828,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon:seccorchrtersea:seccorchrsublanact:brasanpas:harisa:arrcolcutcha","WATERWAY_NAME":"Arroyo Colorado Cutoff Channel","CREATE_DATE":1787683250000,"MODIFIED_DATE":1787684381000,"BEGIN_DATE":1787616000000,"END_DATE":1801526399000,"DESCRIPTION":"Arroyo Colorado River - Dredge Operation --- From: 2026-09-04 To: 2027-01-31 --- The Dredge RANGER will conduct dredging operations from the mouth of the Arroyo Colorado River Cutoff Channel to Rio Hondo, approximate Mile 20.0. Dredging will start near the mouth of the river and proceed west towards the Port of Harlingen.  Operation will take place 24-hours a day, 7-days a week.  On-scene vessels and equipment will include approximately 15,000 linear ft of pipe, two supply barges, one anchor barge, one crane barge, a fuel barge, and three tender boats.  The Dredge RANGER requests vessels transiting this stretch of the river coordinate passing arrangements at least 45-minutes in advance.  Mariners are requested to avoid meeting or overtaking in the area and should transit at their slowest safe speed to minimize wake.  VHF-FM Channels; 13 and 16,  POC: (713) 913-7205","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-97.32815,26.36851],[-97.33486,26.36152],[-97.42069,26.34553],[-97.43065,26.34264],[-97.44241,26.33322],[-97.447,26.32603],[-97.45155,26.32522],[-97.45434,26.32599],[-97.45481,26.3288],[-97.45914,26.33307],[-97.47047,26.33137],[-97.47683,26.33614],[-97.4867,26.33826],[-97.49498,26.33699],[-97.51309,26.32818],[-97.51669,26.32818],[-97.52395,26.3256],[-97.52779,26.31806],[-97.52719,26.30202],[-97.52976,26.29835],[-97.53929,26.2967],[-97.54628,26.29412],[-97.55113,26.29027],[-97.555,26.28346],[-97.55753,26.28161],[-97.56023,26.28177],[-97.56302,26.28562],[-97.56444,26.28835],[-97.56851,26.28846],[-97.57323,26.2855],[-97.57607,26.28496],[-97.58135,26.2835],[-97.58499,26.28031],[-97.58542,26.27777],[-97.58465,26.27577],[-97.58186,26.27257],[-97.58358,26.26768],[-97.58401,26.26453],[-97.58259,26.26468],[-97.58135,26.2673],[-97.58053,26.27242],[-97.58143,26.27553],[-97.58375,26.27669],[-97.58362,26.27988],[-97.5792,26.28288],[-97.57302,26.28458],[-97.56929,26.28642],[-97.56667,26.28677],[-97.56431,26.28489],[-97.56182,26.28119],[-97.5583,26.28],[-97.55474,26.28169],[-97.55173,26.28708],[-97.54731,26.29166],[-97.54028,26.29493],[-97.52822,26.29766],[-97.52573,26.30158],[-97.52508,26.30555],[-97.52629,26.31686],[-97.52375,26.32243],[-97.52062,26.3254],[-97.51401,26.32647],[-97.49363,26.33605],[-97.48401,26.33651],[-97.47672,26.33405],[-97.47264,26.33036],[-97.46981,26.3297],[-97.46633,26.33082],[-97.46165,26.33132],[-97.45861,26.3307],[-97.45659,26.32593],[-97.45346,26.32363],[-97.44775,26.32393],[-97.4441,26.32609],[-97.44294,26.3299],[-97.43724,26.3359],[-97.43003,26.34151],[-97.42217,26.34416],[-97.38166,26.35166],[-97.34093,26.35882],[-97.3299,26.36062],[-97.32574,26.35916],[-97.32282,26.35659],[-97.32815,26.36851]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52287,"geometry":{"type":"Polygon","coordinates":[[[-91.20820999999995,30.527150000000063],[-91.20683999999994,30.518860000000075],[-91.20188999999993,30.459460000000036],[-91.20161999999999,30.431040000000053],[-91.20655999999997,30.416600000000074],[-91.19557999999995,30.414230000000032],[-91.19090999999997,30.431040000000053],[-91.19200999999998,30.487630000000024],[-91.19364999999999,30.508930000000078],[-91.19694999999996,30.519570000000044],[-91.20820999999995,30.527150000000063]]]},"properties":{"ESRI_OID":52287,"MSI_UID":52287,"ATU":8,"TITLE":"New Orleans Harbor - New Orleans To Baton Rouge/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100119138784,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou","WATERWAY_NAME":"New Orleans To Baton Rouge","CREATE_DATE":1787760802000,"MODIFIED_DATE":1787760950000,"BEGIN_DATE":1787702400000,"END_DATE":1788393599000,"DESCRIPTION":"Mississippi River - Baton Rouge Harbor - Dredge Operation --- From: 2026-08-29 To: 2026-09-01 --- The U.S. Government Dustpan Dredge JADWIN will be conducting dredging operations in the Baton Rouge Harbor.  The dredge will work 24-hours a day, 7-days a week.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.  VHF-FM Channels: 16 and 67, POC: (504) 862-2360 and (504) 862-2153","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-91.20821,30.52715],[-91.20684,30.51886],[-91.20189,30.45946],[-91.20162,30.43104],[-91.20656,30.4166],[-91.19558,30.41423],[-91.19091,30.43104],[-91.19201,30.48763],[-91.19365,30.50893],[-91.19695,30.51957],[-91.20821,30.52715]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52296,"geometry":{"type":"Polygon","coordinates":[[[-122.49824999999998,37.634070000000065],[-122.49820999999997,37.63298000000003],[-122.49468999999999,37.63297000000006],[-122.49464999999998,37.633980000000065],[-122.49824999999998,37.634070000000065]]]},"properties":{"ESRI_OID":52296,"MSI_UID":52296,"ATU":11,"TITLE":"Sector San Francisco, Territorial Sea - Sector San Francisco, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385458,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsanfraexcecozon:secsanfratersea:secsanfrasublanact","WATERWAY_NAME":"Sector San Francisco, Submerged Land Act (SLA)","CREATE_DATE":1787765184000,"MODIFIED_DATE":1787775999000,"BEGIN_DATE":1787702400000,"END_DATE":1819324799000,"DESCRIPTION":"The City of Pacifica has indefinitely closed the Pacifica Municipal Pier, located approximately 0.80 nautical miles north of Mori Point and 2.33 nautical miles north of Point San Pedro at coordinates 37.633389, -122.496198, due to a recent structural damage event at the pier abutment and first span. Effective immediately as of July 31, 2026, falling debris and material entering the water present a significant hazard to navigation. Mariners and the public are strongly advised to remain clear of the pier structure, maintain a safe distance, and exercise extreme caution when operating in the vicinity. For further information or updates, contact City of Pacifica Public Works Engineering at (650) 738-3767 or via email at engineering@pacifica.gov.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.49825,37.63407],[-122.49821,37.63298],[-122.49469,37.63297],[-122.49465,37.63398],[-122.49825,37.63407]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52319,"geometry":{"type":"Polygon","coordinates":[[[-122.73256999999995,45.64418000000006],[-122.73314999999997,45.64291000000003],[-122.72277999999994,45.640750000000025],[-122.71649999999994,45.63866000000007],[-122.71096999999997,45.63618000000008],[-122.70218999999997,45.631650000000036],[-122.70060999999998,45.629530000000045],[-122.69586999999996,45.627230000000054],[-122.69421999999997,45.62718000000007],[-122.69167999999996,45.626630000000034],[-122.69102999999996,45.62733000000003],[-122.69658999999996,45.63064000000003],[-122.69641999999999,45.63095000000004],[-122.70523999999995,45.63539000000003],[-122.71313999999995,45.63885000000005],[-122.72150999999997,45.641710000000046],[-122.73256999999995,45.64418000000006]]]},"properties":{"ESRI_OID":52319,"MSI_UID":52319,"ATU":13,"TITLE":"Sector Columbia River, Submerged Land Act (SLA) - Columbia/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100118152930,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:col","WATERWAY_NAME":"Columbia","CREATE_DATE":1787788079000,"MODIFIED_DATE":1787788124000,"BEGIN_DATE":1787616000000,"END_DATE":1788393599000,"DESCRIPTION":"The M/V YAQUINA may be conducting dredging activities on the Upper Vancouver Bar and Turning Basin, RM 103+00 to 105+19, between 26 Aug – 03 Sep.  USACE requests mariners transit at their slowest safe speed to minimize wake when in the vicinity of a dredge and proceed with caution after passing arrangements have been made on VHF-FM channel 13. Vessel(s) and/or equipment may encroach into the channel. Mariners are advised that the start and ending dates for dredging activities may vary due to unforeseen on-site conditions, such as gill net fishing, weather and other factors.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.73257,45.64418],[-122.73315,45.64291],[-122.72278,45.64075],[-122.7165,45.63866],[-122.71097,45.63618],[-122.70219,45.63165],[-122.70061,45.62953],[-122.69587,45.62723],[-122.69422,45.62718],[-122.69168,45.62663],[-122.69103,45.62733],[-122.69659,45.63064],[-122.69642,45.63095],[-122.70524,45.63539],[-122.71314,45.63885],[-122.72151,45.64171],[-122.73257,45.64418]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52322,"geometry":{"type":"Polygon","coordinates":[[[-122.85244999999998,46.01165000000003],[-122.85553999999996,46.01136000000008],[-122.85429999999997,46.00931000000003],[-122.84241999999995,45.982120000000066],[-122.81488999999999,45.96132000000006],[-122.81138999999996,45.95688000000007],[-122.80678999999998,45.94489000000004],[-122.80685999999997,45.92808000000008],[-122.81124999999997,45.91280000000006],[-122.80643999999995,45.895790000000034],[-122.80382999999995,45.89617000000004],[-122.80822999999998,45.91074000000003],[-122.80760999999995,45.91624000000007],[-122.80588999999998,45.92202000000003],[-122.80314999999996,45.93157000000008],[-122.80492999999996,45.94843000000003],[-122.81117999999998,45.96103000000005],[-122.82593999999995,45.97205000000008],[-122.83864999999997,45.98260000000005],[-122.84173999999996,45.98694000000006],[-122.85244999999998,46.01165000000003]]]},"properties":{"ESRI_OID":52322,"MSI_UID":52322,"ATU":13,"TITLE":"Crims Island To St Helens - Kalama/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385615,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:colriv:criisltosthel:kal","WATERWAY_NAME":"Kalama","CREATE_DATE":1787788543000,"MODIFIED_DATE":1787788551000,"BEGIN_DATE":1787616000000,"END_DATE":1788393599000,"DESCRIPTION":"The M/V YAQUINA will be conducting dredging activities on Kalama Ranges, RM 73+18 – 77+30, from 25 AUG to 02 SEP 2026.  USACE requests mariners’ transit at their slowest safe speed to minimize wake when in the vicinity of a dredge and proceed with caution after passing arrangements have been made on VHF-FM channel 13. Vessel(s) and/or equipment may encroach into the channel. Mariners are advised that the start and ending dates for dredging activities may vary due to unforeseen on-site conditions, such as gill net fishing, weather and other factors.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-122.85245,46.01165],[-122.85554,46.01136],[-122.8543,46.00931],[-122.84242,45.98212],[-122.81489,45.96132],[-122.81139,45.95688],[-122.80679,45.94489],[-122.80686,45.92808],[-122.81125,45.9128],[-122.80644,45.89579],[-122.80383,45.89617],[-122.80823,45.91074],[-122.80761,45.91624],[-122.80589,45.92202],[-122.80315,45.93157],[-122.80493,45.94843],[-122.81118,45.96103],[-122.82594,45.97205],[-122.83865,45.9826],[-122.84174,45.98694],[-122.85245,46.01165]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52336,"geometry":{"type":"Polygon","coordinates":[[[-74.00853999999998,40.187560000000076],[-74.00891999999999,40.186840000000075],[-74.00541999999996,40.18619000000007],[-74.00526999999994,40.18697000000003],[-74.00853999999998,40.187560000000076]]]},"properties":{"ESRI_OID":52336,"MSI_UID":52336,"ATU":5,"TITLE":"Sector Delaware Bay, Submerged Land Act (SLA) - Fire Island To Sea Girt/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116383157,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:firisltoseagir","WATERWAY_NAME":"Fire Island To Sea Girt","CREATE_DATE":1787826461000,"MODIFIED_DATE":1787826734000,"BEGIN_DATE":1787788800000,"END_DATE":1789430399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-27 To: 2026-09-14\n\nAll mariners please be advised that the Dredge MURDEN of the U.S. Army Corps of Engineers will be performing maintenance dredging of the navigational channel in Shark River Inlet beginning on or about August 30, 2026, and continue until September 9, 2026. Dredging operations will be conducted in the channel, approximately 450 feet seaward of Shark River Inlet South Breakwater Light 1 (Light List# 872), which is located on the south jetty, and ending approximately 150 feet landward of Shark River Inlet North Breakwater Light 2 (Light List# 873), which is located on the north jetty. The dredged sand will be placed north of the second rock groin, approximately 1,600 feet north of the Shark River Inlet North Breakwater Light 2 in 14 feet of water to create a temporary near shore, 2-foot to 4-foot-high underwater berm. The dredge will be monitoring VHF radio channels 13 and 16 and can be contacted via phone (910) 620-2075. Mariners are requested to use extreme caution when transiting the area at their slowest safe speed to minimize wake. MSI #52336\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.00854,40.18756],[-74.00892,40.18684],[-74.00542,40.18619],[-74.00527,40.18697],[-74.00854,40.18756]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52360,"geometry":{"type":"Polygon","coordinates":[[[-71.42841999999996,41.449880000000064],[-71.46174999999994,41.37290000000007],[-71.42982999999998,41.35612000000003],[-71.39646999999997,41.44210000000004],[-71.42841999999996,41.449880000000064]]]},"properties":{"ESRI_OID":52360,"MSI_UID":52360,"ATU":1,"TITLE":"Sector Southeastern New England, Submerged Lands Act (SLA) - West Passage/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382337,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secsounewengexcecozon:secsounewengtersea:secsounewengsublanact:wespas","WATERWAY_NAME":"West Passage","CREATE_DATE":1787830703000,"MODIFIED_DATE":1787830707000,"BEGIN_DATE":1787788800000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-27 To: 2026-10-01\n\nAnduril Industries will be conducting autonomous underwater vehicle testing in Rhode Island Sound, Rhode Island. The work is scheduled to occur from September 2 through September 30, 2026, during daily operating hours of 0600 to 1800. The testing area is defined by four latitude/longitude points in Rhode Island Sound and is associated with chart number US3RI1AA.\nThe operation will involve a 19-foot autonomous underwater vehicle and the support vessel F/V Voyager. Vessels on scene may be contacted on VHF Channels 16 and 13. The form notes that once the AUV is submerged and conducting its mission, it will have restricted ability to maneuver until it reaches its pre-set destination.\n\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-71.42842,41.44988],[-71.46175,41.3729],[-71.42983,41.35612],[-71.39647,41.4421],[-71.42842,41.44988]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52385,"geometry":{"type":"Polygon","coordinates":[[[-93.05049999999994,44.937280000000044],[-93.05156999999997,44.937100000000044],[-93.05061999999998,44.93455000000006],[-93.04939999999999,44.93472000000003],[-93.05049999999994,44.937280000000044]]]},"properties":{"ESRI_OID":52385,"MSI_UID":52385,"ATU":2,"TITLE":"Lower Mississippi River - Upper Mississippi River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381438,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:uppmisriv","WATERWAY_NAME":"Upper Mississippi River","CREATE_DATE":1787834429000,"MODIFIED_DATE":1787834778000,"BEGIN_DATE":1787788800000,"END_DATE":1789689599000,"DESCRIPTION":"Continuing until further notice, the Dredge BRAND MARIE will be conducting dredging operations in the vicinity of Mile 837.0.  Work will be conducted from 7:00 a.m. to 7:00 p.m., Monday through Friday.  The Dredge BRAND MARIE will monitor VHF-FM Channels 12, and requests 30-minutes advance notice of passage.  Mariners are urged to transit the area at their slowest safe speed and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-93.0505,44.93728],[-93.05157,44.9371],[-93.05062,44.93455],[-93.0494,44.93472],[-93.0505,44.93728]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52390,"geometry":{"type":"Polygon","coordinates":[[[-85.80376999999999,38.28174000000007],[-85.80421999999999,38.280430000000024],[-85.79726999999997,38.278770000000065],[-85.79690999999997,38.27973000000003],[-85.80079999999998,38.28054000000003],[-85.80376999999999,38.28174000000007]]]},"properties":{"ESRI_OID":52390,"MSI_UID":52390,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1787835326000,"MODIFIED_DATE":1787836759000,"BEGIN_DATE":1787788800000,"END_DATE":1788739199000,"DESCRIPTION":"Continuing through September 5, 2026, Luhr Bros. Inc., will conduct dredging operations at the McAlpine Lower Approach, in the vicinity of Mile 607.5.  The contractor’s floating plant will consist of the Dredge BILL HOLMAN, M/Vs LENARD, BUDDY, and ROBERT T., a shop barge, a spill barge, and floating pipeline sections.  Work will be conducted 24-hours a day, 7-days a week.  While dredging, the dredge pipeline may cross the navigation channel, requiring the pipeline to be opened to pass traffic.  The dredge will be blocking one of the lock chambers for the duration of the operation.  On September 2, 2026, both chambers will be closed for up to 12-hours.  All mariners shall take direction from the McAlpine L/D regarding which chamber to use.  Dredge BILL HOLMAN and M/Vs LENARD and BUDDY will monitor VHF-FM Channel 13.  Mariners are urged to transit the area at their slowest safe speed and proceed with caution after passing arrangements have been made.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-85.80377,38.28174],[-85.80422,38.28043],[-85.79727,38.27877],[-85.79691,38.27973],[-85.8008,38.28054],[-85.80377,38.28174]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52404,"geometry":{"type":"Polygon","coordinates":[[[-95.28001999999998,29.738630000000057],[-95.28047999999995,29.738540000000057],[-95.27890999999994,29.735520000000065],[-95.27856999999995,29.735670000000027],[-95.28001999999998,29.738630000000057]]]},"properties":{"ESRI_OID":52404,"MSI_UID":52404,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1787838768000,"MODIFIED_DATE":1788200650000,"BEGIN_DATE":1787788800000,"END_DATE":1790035199000,"DESCRIPTION":"Houston Ship Channel - Pipeline Operation --- From: 2026-09-01 To: 2026-09-20 --- Pipeline removal will be conducted along the Houston Ship Channel at City Dock 45.  Work will take place with crews working under the docks at various times during daylight hours.  Mariners should transit the area with caution and at their slowest safe speed to minimize wake.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-95.28002,29.73863],[-95.28048,29.73854],[-95.27891,29.73552],[-95.27857,29.73567],[-95.28002,29.73863]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52453,"geometry":{"type":"Polygon","coordinates":[[[-124.22491999999994,40.75515000000007],[-124.22848999999997,40.75497000000007],[-124.23089999999996,40.75317000000007],[-124.22851999999995,40.75121000000007],[-124.22586999999999,40.75013000000007],[-124.22336999999999,40.75100000000003],[-124.22358999999994,40.753900000000044],[-124.22491999999994,40.75515000000007]]]},"properties":{"ESRI_OID":52453,"MSI_UID":52453,"ATU":11,"TITLE":"Sector Humboldt Bay, Submerged Land Act (SLA) - Humboldt Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385569,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:sechumbayexcecozon:sechumbaytersea:sechumbaysublanact:humbay","WATERWAY_NAME":"Humboldt Bay","CREATE_DATE":1787866451000,"MODIFIED_DATE":1787936431000,"BEGIN_DATE":1785196800000,"END_DATE":1789084799000,"DESCRIPTION":"West Coast Contractors will be conducting work on Humboldt Bay Entrance Range (Front Light), LLNR 8165, via a jack barge close to shore. Work is expected to be conducted between July 28th, 2026 until September 9th, 2026. Work will consist of removing the existing structure, installing new piles, and attaching safety climb devices. The jack barge can be contacted via marine radio channels 8 and 16. All vessels are requested to transit the area with caution.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-124.22492,40.75515],[-124.22849,40.75497],[-124.2309,40.75317],[-124.22852,40.75121],[-124.22587,40.75013],[-124.22337,40.751],[-124.22359,40.7539],[-124.22492,40.75515]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52454,"geometry":{"type":"Polygon","coordinates":[[[-117.10632999999996,32.65073000000007],[-117.11269999999996,32.64948000000004],[-117.11230999999998,32.648270000000025],[-117.10578999999996,32.64979000000005],[-117.10632999999996,32.65073000000007]]]},"properties":{"ESRI_OID":52454,"MSI_UID":52454,"ATU":11,"TITLE":"Approaches To San Diego Bay - San Diego Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385494,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:apptosandiebay:sandiebay","WATERWAY_NAME":"San Diego Bay","CREATE_DATE":1787866985000,"MODIFIED_DATE":1787867244000,"BEGIN_DATE":1788134400000,"END_DATE":1793577599000,"DESCRIPTION":"Power Engineering Construction will conduct crane barge operations from August 31 through October 31, 2026, in the vicinity of Pepper Park, San Diego at 32.64868, -117.11061. Work will be conducted Monday through Friday. Operations will utilize a 110-ton crane on a 60’ x 100’ Flexi-float barge and a 60’ x 80’ material barge, with the barges spudded down. All vessels and equipment on site will monitor VHF-FM channels 9, 12, and 16. Mariners are urged to transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made. For further comments or details, contact Juan Apodaca at (925) 234-8339. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.10633,32.65073],[-117.1127,32.64948],[-117.11231,32.64827],[-117.10579,32.64979],[-117.10633,32.65073]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52455,"geometry":{"type":"Polygon","coordinates":[[[-117.20824999999996,32.72860000000003],[-117.20809999999994,32.72667000000007],[-117.20054999999996,32.72691000000003],[-117.20045999999996,32.72860000000003],[-117.20824999999996,32.72860000000003]]]},"properties":{"ESRI_OID":52455,"MSI_UID":52455,"ATU":11,"TITLE":"Approaches To San Diego Bay - San Diego Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385494,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:secsandieexcecozon:secsandietersea:secsandiesublanact:apptosandiebay:sandiebay","WATERWAY_NAME":"San Diego Bay","CREATE_DATE":1787867139000,"MODIFIED_DATE":1787867247000,"BEGIN_DATE":1788134400000,"END_DATE":1793577599000,"DESCRIPTION":"Power Engineering Construction will conduct crane barge operations from August 31 through October 31, 2026, in the vicinity of Spanish Landing Park, San Diego at 32.72808, -117.212221. Work will be conducted Monday through Friday. Operations will utilize a 110-ton crane on a 60’ x 100’ Flexi-float barge and a 60’ x 80’ material barge, with the barges spudded down. All vessels and equipment on site will monitor VHF-FM channels 9, 12, and 16. Mariners are urged to transit at their slowest safe speed to minimize wake, and proceed with caution after passing arrangements have been made. For further comments or details, contact Juan Apodaca at (925) 234-8339. All mariners are advised to transit the area with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-117.20825,32.7286],[-117.2081,32.72667],[-117.20055,32.72691],[-117.20046,32.7286],[-117.20825,32.7286]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52483,"geometry":{"type":"Polygon","coordinates":[[[-81.51061999999996,39.369020000000035],[-81.52044999999998,39.36384000000004],[-81.51864999999998,39.36205000000007],[-81.50945999999999,39.367360000000076],[-81.51061999999996,39.369020000000035]]]},"properties":{"ESRI_OID":52483,"MSI_UID":52483,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1787918995000,"MODIFIED_DATE":1787919156000,"BEGIN_DATE":1787875200000,"END_DATE":1789862399000,"DESCRIPTION":"Commencing September 8, 2026, and continuing until September 18, 2026, M.I.E. Inc., will conduct dredging operations in the vicinity of Mile 176.6.  The contractor’s floating plant will consist of the M/V B. MCCOY, two barge mounted cranes and one material barge.  Work will be conducted from 7:00 a.m. until 3:00 p.m., Monday through Friday.  Dredge spoils will be placed in an upland disposal area, above Winfield L/D, in the vicinity of Mile 31.2.  During non-working hours, the contractor's floating plant will be moored at the worksite and lighted accordingly.  The M/V B. MCCOY will monitor VHF-FM Channels 13 and 16.  Mariners are requested to transit the area at their slowest safe speed to minimize their wake and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-81.51062,39.36902],[-81.52045,39.36384],[-81.51865,39.36205],[-81.50946,39.36736],[-81.51062,39.36902]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52527,"geometry":{"type":"Polygon","coordinates":[[[-124.25424999999996,40.77846000000005],[-124.25625999999994,40.77389000000005],[-124.25856999999996,40.76819000000006],[-124.24550999999997,40.76798000000008],[-124.24082999999996,40.763180000000034],[-124.23756999999995,40.76058000000006],[-124.23498999999998,40.76210000000003],[-124.23186999999996,40.76347000000004],[-124.23532999999998,40.766500000000065],[-124.23206999999996,40.76893000000007],[-124.23785999999996,40.77417000000003],[-124.25424999999996,40.77846000000005]]]},"properties":{"ESRI_OID":52527,"MSI_UID":52527,"ATU":11,"TITLE":"Sector Humboldt Bay, Submerged Land Act (SLA) - Humboldt Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385569,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:sechumbayexcecozon:sechumbaytersea:sechumbaysublanact:humbay","WATERWAY_NAME":"Humboldt Bay","CREATE_DATE":1787935302000,"MODIFIED_DATE":1787946628000,"BEGIN_DATE":1789689600000,"END_DATE":1791676799000,"DESCRIPTION":"West Coast Contractors will be conducting work on Humboldt Bay Entrance light 3: LLNR 8150, via a jack barge close to shore. Work is expected to be conducted between October 1st, 2026 until October 9th, 2026. Work will consist of removing the existing Light, Dayboards, repair structure and attaching safety climb devices. The jack barge can be contacted via marine radio channels 8 and 16. All vessels are requested to transit the area with caution.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-124.25425,40.77846],[-124.25626,40.77389],[-124.25857,40.76819],[-124.24551,40.76798],[-124.24083,40.76318],[-124.23757,40.76058],[-124.23499,40.7621],[-124.23187,40.76347],[-124.23533,40.7665],[-124.23207,40.76893],[-124.23786,40.77417],[-124.25425,40.77846]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52528,"geometry":{"type":"Polygon","coordinates":[[[-124.25723999999997,40.773600000000044],[-124.25951999999995,40.767900000000054],[-124.24844999999999,40.763730000000066],[-124.24221999999997,40.75890000000004],[-124.23927999999995,40.76115000000004],[-124.23513999999994,40.75782000000004],[-124.22847999999999,40.76126000000005],[-124.23509999999999,40.765270000000044],[-124.24456999999995,40.769220000000075],[-124.25723999999997,40.773600000000044]]]},"properties":{"ESRI_OID":52528,"MSI_UID":52528,"ATU":11,"TITLE":"Sector Humboldt Bay, Submerged Land Act (SLA) - Humboldt Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385569,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:sechumbayexcecozon:sechumbaytersea:sechumbaysublanact:humbay","WATERWAY_NAME":"Humboldt Bay","CREATE_DATE":1787935786000,"MODIFIED_DATE":1787946613000,"BEGIN_DATE":1788998400000,"END_DATE":1790985599000,"DESCRIPTION":"West Coast Contractors will be conducting work on Humboldt Bay Entrance light 4: LLNR 8155, via a jack barge close to shore. Work is expected to be conducted between September 24th, 2026 until October 1st, 2026. Work will consist of removing the existing Light, Dayboards, repair structure and attaching safety climb devices. The jack barge can be contacted via marine radio channels 8 and 16. All vessels are requested to transit the area with caution.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-124.25724,40.7736],[-124.25952,40.7679],[-124.24845,40.76373],[-124.24222,40.7589],[-124.23928,40.76115],[-124.23514,40.75782],[-124.22848,40.76126],[-124.2351,40.76527],[-124.24457,40.76922],[-124.25724,40.7736]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52531,"geometry":{"type":"Polygon","coordinates":[[[-124.22144999999995,40.753540000000044],[-124.22827999999998,40.75011000000006],[-124.22578999999996,40.748110000000054],[-124.22610999999995,40.74464000000006],[-124.22289999999998,40.743840000000034],[-124.21695999999997,40.74706000000003],[-124.22144999999995,40.753540000000044]]]},"properties":{"ESRI_OID":52531,"MSI_UID":52531,"ATU":11,"TITLE":"Sector Humboldt Bay, Submerged Land Act (SLA) - Humboldt Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385569,"MRN":"urn:mrn:iala:wwy:us:navXII:dis11:sechumbayexcecozon:sechumbaytersea:sechumbaysublanact:humbay","WATERWAY_NAME":"Humboldt Bay","CREATE_DATE":1787936249000,"MODIFIED_DATE":1787946650000,"BEGIN_DATE":1787875200000,"END_DATE":1789775999000,"DESCRIPTION":"West Coast Contractors will be conducting work on Humboldt Bay Entrance Range (Rear Light), LLNR 8170, via a jack barge close to shore. Work is expected to be conducted between September 10th, 2026 until September 17th, 2026. Work will consist of removing the existing structure, installing new piles, and attaching safety climb devices. The jack barge can be contacted via marine radio channels 8 and 16. All vessels are requested to transit the area with caution.  ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-124.22145,40.75354],[-124.22828,40.75011],[-124.22579,40.74811],[-124.22611,40.74464],[-124.2229,40.74384],[-124.21696,40.74706],[-124.22145,40.75354]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52564,"geometry":{"type":"Polygon","coordinates":[[[-74.42583999999994,39.378120000000024],[-74.42784999999998,39.37781000000007],[-74.42742999999996,39.375530000000026],[-74.42554999999999,39.375680000000045],[-74.42583999999994,39.378120000000024]]]},"properties":{"ESRI_OID":52564,"MSI_UID":52564,"ATU":5,"TITLE":"Absecon Inlet - Clam Creek/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382909,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:absinl:clacre","WATERWAY_NAME":"Clam Creek","CREATE_DATE":1788173529000,"MODIFIED_DATE":1788173742000,"BEGIN_DATE":1788134400000,"END_DATE":1799452799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-31 To: 2027-01-08\n\nMariners are advised that Sea Coast Marine Construction will conduct dredging operations in Clam Creek from September 10, 2026, through December 31, 2026. Operations will be conducted continuously, 24 hours a day, 7 days a week. Dredging operations will be conducted using the cutter-suction dredge SCROD, with a dredge pipeline extending from the stern of the dredge to the designated disposal site. Additional equipment operating in the area will include multiple tugboats, an excavator barge, and an unnamed skiff. The channel will remain open for navigation during the dredging operations; however, the navigable channel width will be reduced. Submerged pipeline crossings will be present and will be marked with red/green buoys.\nAll mariners transiting the vicinity of the dredging operations are advised to proceed at the minimum speed necessary for safe steerage and exercise extreme caution when meeting, overtaking, or passing dredging equipment and associated work vessels.\n\nThe dredge pipeline will be marked with regulatory buoys and flashing yellow lights. The dredge and associated work vessels will monitor VHF-FM Channels 65 and 16. Mariners requiring special arrangements are advised to contact the dredge at least 30 minutes in advance of transiting the area.\nOn-site Superintendent: Keith Johnson\nPhone: 631-553-1034\n\nDredge Starting Coordinate:\n39°22′39.57″N, 74°25′19.49″W\n\nEnding Coordinate (inside the creek):\n39°22′32.40″N, 74°25′37.71″W\nMSI #52564.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-74.42584,39.37812],[-74.42785,39.37781],[-74.42743,39.37553],[-74.42555,39.37568],[-74.42584,39.37812]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52575,"geometry":{"type":"Polygon","coordinates":[[[-70.63445999999993,42.30627000000004],[-70.60458999999997,42.26182000000006],[-70.54415999999998,42.25166000000007],[-70.54724999999996,42.30272000000008],[-70.63445999999993,42.30627000000004]]]},"properties":{"ESRI_OID":52575,"MSI_UID":52575,"ATU":1,"TITLE":"NAVAREA IV/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382366,"MRN":"urn:mrn:iala:wwy:us:navIV","WATERWAY_NAME":"NAVAREA IV","CREATE_DATE":1788176257000,"MODIFIED_DATE":1788176272000,"BEGIN_DATE":1788134400000,"END_DATE":1789430399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-31 To: 2026-09-14\n\nLocation:\n42-18-22.572N/070-38-04.056W\n42-18-09.792N/070-32-50.100W\n42-15-05.976N/070-32-38.976W\n42-15-42.552N/070-36-16.524W\n42-18-22.572N/070-38-04.056W\nMASSACHUSETTS – MASS BAY –\nAutonomous Underwater Vehicle Operations\nMariners are advised that Anduril Maritime intends to deploy an Autonomous Underwater Vehicle (UAV) for sensor testing in a grid pattern five NM East of Minots Ledge Light bound by the following positions. 42°.304335N / 070°.616692W 42.304335N 070 .551359W/ 42 .252982N / 070 .551359W / 42 .269020N /070 .616692W. The vehicle will be deployed daily from August 31, 2026, through September 14, 2026. The UAV will be deployed, recovered daily, and monitored via the on-scene support vessels M/V Encourager, and Quincy Harbor Master. Mariners may contact the on-scene support vessels via VHF-FM CH 13/16. For more information, mariners may contact Mr. Steve Torpey at (949) 486-1263 or Ms. Kami Bucholz at (949) 392-9216. Mariners are advised to use caution when transiting the area.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-70.63446,42.30627],[-70.60459,42.26182],[-70.54416,42.25166],[-70.54725,42.30272],[-70.63446,42.30627]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52579,"geometry":{"type":"Polygon","coordinates":[[[-75.38943999999998,39.81986000000006],[-75.42841999999996,39.80061000000006],[-75.42673999999994,39.79857000000004],[-75.38775999999996,39.817810000000065],[-75.38943999999998,39.81986000000006]]]},"properties":{"ESRI_OID":52579,"MSI_UID":52579,"ATU":5,"TITLE":"Delaware River - Delaware River Main Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382796,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:delbay:delbaymaicha:lisran:delriv:delrivmaicha","WATERWAY_NAME":"Delaware River Main Channel","CREATE_DATE":1788178219000,"MODIFIED_DATE":1788178515000,"BEGIN_DATE":1788134400000,"END_DATE":1796083199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-31 To: 2026-11-30\n\nLocation:\n39-49-11.496N/075-23-21.984W\n39-49-04.116N/075-23-15.936W\n39-47-54.852N/075-25-36.264W\n39-48-02.196N/075-25-42.312W\n39-49-11.496N/075-23-21.984W\nDredge CHARLESTON will commence pipeline placement operations in the Marcus Hook Anchorage of the Delaware River on or about Friday, August 28, 2026.  A submerged pipeline will be placed from the dredging area to the Pedricktown North Disposal area on the New Jersey side of the river.  The submerged pipeline will enter the Marcus Hook anchorage from the east and will end in the anchorage a few hundred feet outside the red side of the main channel. A floating pipeline will be attached to the submerged pipeline. The submerged pipeline will need to be moved occasionally as the dredge progresses. The project will continue until approximately November 20, 2026.\n\tAll vessels are requested to contact the Dredge CHARLESTON a minimum of 30 minutes prior to transiting Marcus Hook Range and Anchorage, to make passing arrangements. The Dredge CHARLESTON can be contacted via VHF radio channels 13 and 5 or via phone at (757) 508-2326. \n\tAll mariners are requested to stay clear of the dredge, booster, floating (pontoon) and submerged pipelines, barges, derricks and operating wires about the dredge.  Operators of vessels of all types should be aware that the dredge and floating pipelines are held in place by cables, attached to anchors some distance away from the equipment.  Buoys are attached to the anchors so that the anchors may be moved as the dredge advances and the location of the submerged pipelines are marked by buoys on each side of the channel.  Mariners are cautioned to strictly comply with the Inland Rules of the Road when approaching, passing and leaving the area of operations, and remain a safe distance away from the dredge, booster, buoys, cables, pipelines, barges, derricks, wires and related equipment. \n\tOwners and lessees of fishnets, crabpots and other structures that may be in the vicinity and that may hinder the free navigation of attending vessels and equipment must remove these from the area where tugs, tenderboats and other attendant equipment will be navigating.  Since the project will be conducted twenty –four (24) hours per day seven (7) days a week, all fishnets, crabpots and structures in the general area must be removed prior to the commencement of the work. MSI #52579.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-75.38944,39.81986],[-75.42842,39.80061],[-75.42674,39.79857],[-75.38776,39.81781],[-75.38944,39.81986]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52586,"geometry":{"type":"Polygon","coordinates":[[[-85.42119999999994,38.73548000000005],[-85.42511999999994,38.733960000000025],[-85.42476999999997,38.73311000000007],[-85.42070999999999,38.73437000000007],[-85.42119999999994,38.73548000000005]]]},"properties":{"ESRI_OID":52586,"MSI_UID":52586,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1788179522000,"MODIFIED_DATE":1788180023000,"BEGIN_DATE":1788134400000,"END_DATE":1788393599000,"DESCRIPTION":"Continuing until September 1, 2026, salvage operations are being conducted at Big Clifty Creek, in the vicinity of Mile 560.0.  The M/V BRUCE D., will be on-scene and will monitor VHF-FM Channel 16.  Mariners are urged to transit the area at their slowest safe speed to minimize vessel wake and proceed with caution.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-85.4212,38.73548],[-85.42512,38.73396],[-85.42477,38.73311],[-85.42071,38.73437],[-85.4212,38.73548]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52588,"geometry":{"type":"Polygon","coordinates":[[[-90.25676999999996,38.53597000000008],[-90.26024999999998,38.53075000000007],[-90.25867999999997,38.52998000000008],[-90.25511999999998,38.53540000000004],[-90.25676999999996,38.53597000000008]]]},"properties":{"ESRI_OID":52588,"MSI_UID":52588,"ATU":2,"TITLE":"Lower Mississippi River - Upper Mississippi River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381438,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:uppmisriv","WATERWAY_NAME":"Upper Mississippi River","CREATE_DATE":1788179930000,"MODIFIED_DATE":1788179996000,"BEGIN_DATE":1788134400000,"END_DATE":1790812799000,"DESCRIPTION":"Continuing until further notice, the Dredge POTTER will be conducting dredging operations in the vicinity of Mile 172.0.  The dredge and attendant plant will include tender boats, small boats, barges and pipeline.  Work will be conducted 24-hours a day, 7-days a week.  Dredged material will be pumped through a pontoon pipeline or self-floating pipeline, which may cross the channel and will be placed outside of the navigation channel.  Mariners should be on the lookout for tender boats, barges, small survey boats, and pipeline when transiting the dredge project area.  The Dredge POTTER will monitor VHF-FM Channel 13 or 16, and requests 30-minutes advance notice of passage.  Vessels are urged to transit the area at their slowest safe speed and proceed with caution after passing arrangements have been made. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-90.25677,38.53597],[-90.26025,38.53075],[-90.25868,38.52998],[-90.25512,38.5354],[-90.25677,38.53597]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52598,"geometry":{"type":"Polygon","coordinates":[[[-88.22270999999995,30.32570000000004],[-88.22485999999998,30.325500000000034],[-88.22628999999995,30.324690000000032],[-88.22734999999994,30.323480000000075],[-88.22787999999997,30.32224000000008],[-88.22751999999997,30.320800000000077],[-88.22650999999996,30.32137000000006],[-88.22635999999994,30.322130000000072],[-88.22611999999998,30.323060000000055],[-88.22540999999995,30.32391000000007],[-88.22422999999998,30.32433000000003],[-88.22317999999996,30.324460000000045],[-88.22180999999995,30.324430000000064],[-88.22086999999999,30.324110000000076],[-88.22017999999997,30.323590000000024],[-88.21918999999997,30.324500000000057],[-88.22111999999998,30.325410000000034],[-88.22270999999995,30.32570000000004]]]},"properties":{"ESRI_OID":52598,"MSI_UID":52598,"ATU":8,"TITLE":"Sector Mobile, Submerged Land Act (SLA) - Mississippi Sound/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384544,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:missou","WATERWAY_NAME":"Mississippi Sound","CREATE_DATE":1788182841000,"MODIFIED_DATE":1788183056000,"BEGIN_DATE":1788134400000,"END_DATE":1806969599000,"DESCRIPTION":"Portersville Bay - Mississippi Sound - Marine Construction --- From: 2026-09-04 To: 2027-04-04 --- Breakwater structures will be constructed along the northwest side of Marsh Island in Portersville Bay, near approximate position 30-19-25.35N 088-13-34.10W.  The breakwaters will be installed via shallow draft barge and will be identical to the existing structures located on the southern half of the island.  On-scene vessels will include, but are not limited to, pushboats, barges, material handlers, and transport vessels.  Mariners are requested to transit the area at no-wake speed.  VHF-FM Channels: 12 and 16, POC: (251) 751-4127 and 251-895-6378","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-88.22271,30.3257],[-88.22486,30.3255],[-88.22629,30.32469],[-88.22735,30.32348],[-88.22788,30.32224],[-88.22752,30.3208],[-88.22651,30.32137],[-88.22636,30.32213],[-88.22612,30.32306],[-88.22541,30.32391],[-88.22423,30.32433],[-88.22318,30.32446],[-88.22181,30.32443],[-88.22087,30.32411],[-88.22018,30.32359],[-88.21919,30.3245],[-88.22112,30.32541],[-88.22271,30.3257]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52622,"geometry":{"type":"Polygon","coordinates":[[[-87.58742999999998,37.97584000000006],[-87.58765999999997,37.97548000000006],[-87.58535999999998,37.97448000000003],[-87.58133999999995,37.973020000000076],[-87.58121999999997,37.97333000000003],[-87.58166999999997,37.97344000000004],[-87.58299999999997,37.97394000000003],[-87.58393999999998,37.97438000000005],[-87.58478999999994,37.97461000000004],[-87.58547999999996,37.974860000000035],[-87.58552999999995,37.975040000000035],[-87.58543999999995,37.97523000000007],[-87.58742999999998,37.97584000000006]]]},"properties":{"ESRI_OID":52622,"MSI_UID":52622,"ATU":2,"TITLE":"Lower Mississippi River - Ohio River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381306,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:ohiriv","WATERWAY_NAME":"Ohio River","CREATE_DATE":1788185996000,"MODIFIED_DATE":1788186213000,"BEGIN_DATE":1788134400000,"END_DATE":1789257599000,"DESCRIPTION":"Commencing September 8, 2026, and continuing until September 11, 2026, Mulzer Crushed stone Inc., will be conducting dredging operations immediately upstream of Pigeon Creek, in the vicinity of Mile 792.7.  The contractor’s floating plant will consist of a crane barge and a material barge.  Work will be conducted from 7:00 a.m. until 4:00 p.m., daily.  The floating plant will monitor VHF-FM Channel 74.  Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-87.58743,37.97584],[-87.58766,37.97548],[-87.58536,37.97448],[-87.58134,37.97302],[-87.58122,37.97333],[-87.58167,37.97344],[-87.583,37.97394],[-87.58394,37.97438],[-87.58479,37.97461],[-87.58548,37.97486],[-87.58553,37.97504],[-87.58544,37.97523],[-87.58743,37.97584]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52624,"geometry":{"type":"Polygon","coordinates":[[[-79.91989999999998,32.991570000000024],[-80.11984999999999,32.85970000000003],[-79.88418999999999,32.717930000000024],[-79.62875999999994,32.89107000000007],[-79.91989999999998,32.991570000000024]]]},"properties":{"ESRI_OID":52624,"MSI_UID":52624,"ATU":7,"TITLE":"Charleston Harbor - Charleston Harbor South Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384361,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:chahar:chaharsoucha","WATERWAY_NAME":"Charleston Harbor South Channel","CREATE_DATE":1788186739000,"MODIFIED_DATE":1788186746000,"BEGIN_DATE":1788134400000,"END_DATE":1825027199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nDredging operations are scheduled to commence in the Lower Charleston Harbor on or around August 27, 2026, and will continue through September 12, 2027. The Derrick Barge (DB) Paula Lee and Crane Barge (CB) Harry S along with 4 bottom dumps scows will perform dig and dump dredging in 14 Reaches: \n\n1. Shoal 1 – Hog Island Reach\n2. Shoal 2 – Lower Town Creek Reach\n3. Shoal 2A – Customs House Reach\n4. Shoal 4 – Town Creek Reach\n5. Shoal 4A – Town Creek Turning Basin\n6. Shoal 5 – Meyers Bend\n7. Shoal 5A – Meyers Bend West\n8. Shoal 6 – Drum Island Reach\n9. Shoal 7 – Lower Wando Rech\n10. Shoal 8 – Wando Turning Basin\n11. Shoal 9 – Upper Wando Turning Basin\n12. Shoal 11 – Daniel Island Reach\n13. Shoal 12 – HLT Turning Basin\n14. Shipyard River\n\nDredging will begin in Shoals 8 and 9, Upper Wando and Wando Turning Basins with the DB Paula Lee. The CB Harry S is anticipated to arrive December 1, 2026. For any questions or concerns regarding the dredging operations, please contact the project manager at (415) 717-7214, or the USCG Sector Charleston Command Center at (833) 453-1261. ","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.9199,32.99157],[-80.11985,32.8597],[-79.88419,32.71793],[-79.62876,32.89107],[-79.9199,32.99157]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52625,"geometry":{"type":"Polygon","coordinates":[[[-91.34539999999998,43.91127000000006],[-91.34750999999994,43.91097000000008],[-91.34661999999997,43.90927000000005],[-91.34543999999994,43.906150000000025],[-91.34395999999998,43.906220000000076],[-91.34491999999995,43.90940000000006],[-91.34539999999998,43.91127000000006]]]},"properties":{"ESRI_OID":52625,"MSI_UID":52625,"ATU":2,"TITLE":"Lower Mississippi River - Upper Mississippi River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381438,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou:lowmisriv:uppmisriv","WATERWAY_NAME":"Upper Mississippi River","CREATE_DATE":1788186811000,"MODIFIED_DATE":1788192201000,"BEGIN_DATE":1788134400000,"END_DATE":1790639999000,"DESCRIPTION":"Continuing until further notice, the M/V ANGELA K., is conducting dredging operations in the vicinity of Mile 706.2.  Work will be conducted from 7:00 a.m. until 7:00 p.m., Monday through Friday.  The M/V ANGELA K., will monitor VHF-FM Channel 12 or 13 and requests 30-minutes advance notice of passage.  Mariners are urged to transit the area at their slowest safe speed and proceed with caution after passing arrangements have been made.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-91.3454,43.91127],[-91.34751,43.91097],[-91.34662,43.90927],[-91.34544,43.90615],[-91.34396,43.90622],[-91.34492,43.9094],[-91.3454,43.91127]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52629,"geometry":{"type":"Polygon","coordinates":[[[-71.33860999999996,41.72598000000005],[-71.36332999999996,41.71778000000006],[-71.36813999999998,41.714710000000025],[-71.36847999999998,41.691130000000044],[-71.37637999999998,41.682150000000036],[-71.37877999999995,41.66933000000006],[-71.39113999999995,41.67318000000006],[-71.41070999999994,41.68574000000007],[-71.42890999999997,41.67241000000007],[-71.40967999999998,41.65163000000007],[-71.40486999999996,41.627000000000066],[-71.40383999999995,41.60339000000005],[-71.40109999999999,41.59260000000006],[-71.42958999999996,41.585930000000076],[-71.43885999999998,41.574110000000076],[-71.44332999999995,41.56744000000003],[-71.41619999999995,41.52941000000004],[-71.41482999999994,41.51219000000003],[-71.42100999999997,41.49959000000007],[-71.41963999999996,41.48261000000008],[-71.41928999999993,41.47001000000006],[-71.40040999999997,41.45998000000003],[-71.39285999999998,41.46692000000007],[-71.39868999999999,41.489040000000045],[-71.39800999999994,41.492650000000026],[-71.38632999999999,41.49290000000008],[-71.37671999999998,41.50782000000004],[-71.39147999999994,41.51630000000006],[-71.38564999999994,41.537630000000036],[-71.38735999999994,41.554080000000056],[-71.37225999999998,41.569750000000056],[-71.32899999999995,41.574880000000064],[-71.33860999999996,41.58336000000003],[-71.34032999999994,41.59851000000003],[-71.32796999999994,41.623410000000035],[-71.33242999999999,41.630850000000066],[-71.34993999999995,41.635980000000075],[-71.35440999999997,41.649320000000046],[-71.34856999999994,41.66984000000008],[-71.33860999999996,41.72598000000005]]]},"properties":{"ESRI_OID":52629,"MSI_UID":52629,"ATU":1,"TITLE":"Sector Southeastern New England, Submerged Lands Act (SLA) - West Passage/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382337,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secsounewengexcecozon:secsounewengtersea:secsounewengsublanact:wespas","WATERWAY_NAME":"West Passage","CREATE_DATE":1788188742000,"MODIFIED_DATE":1788188750000,"BEGIN_DATE":1788134400000,"END_DATE":1790985599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-31 To: 2026-10-02\n\nFrom August 31 to October 1, 2026, sunrise to sunset, manned and unmanned wing-in-ground effect vehicles will conduct surface and ground-effect testing in the West Passage of Narragansett Bay. The vehicles will launch from the Port of Davisville and may operate at speeds up to 60 knots. Mariners should transit the area with extreme caution. REGENT support vessel SEABEE will monitor VHF Channel 16 for concerned traffic. Additional testing dates will be announced.\n\n","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-71.33861,41.72598],[-71.36333,41.71778],[-71.36814,41.71471],[-71.36848,41.69113],[-71.37638,41.68215],[-71.37878,41.66933],[-71.39114,41.67318],[-71.41071,41.68574],[-71.42891,41.67241],[-71.40968,41.65163],[-71.40487,41.627],[-71.40384,41.60339],[-71.4011,41.5926],[-71.42959,41.58593],[-71.43886,41.57411],[-71.44333,41.56744],[-71.4162,41.52941],[-71.41483,41.51219],[-71.42101,41.49959],[-71.41964,41.48261],[-71.41929,41.47001],[-71.40041,41.45998],[-71.39286,41.46692],[-71.39869,41.48904],[-71.39801,41.49265],[-71.38633,41.4929],[-71.37672,41.50782],[-71.39148,41.5163],[-71.38565,41.53763],[-71.38736,41.55408],[-71.37226,41.56975],[-71.329,41.57488],[-71.33861,41.58336],[-71.34033,41.59851],[-71.32797,41.62341],[-71.33243,41.63085],[-71.34994,41.63598],[-71.35441,41.64932],[-71.34857,41.66984],[-71.33861,41.72598]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52665,"geometry":{"type":"Polygon","coordinates":[[[-95.03092999999996,29.731580000000065],[-95.03188999999998,29.729070000000036],[-95.02834999999999,29.728470000000073],[-95.02312999999998,29.723930000000053],[-95.02222999999998,29.721840000000043],[-95.02203999999995,29.720000000000027],[-95.01940999999994,29.72001000000006],[-95.02008999999998,29.72389000000004],[-95.02527999999995,29.729810000000043],[-95.02657999999997,29.730720000000076],[-95.03092999999996,29.731580000000065]]]},"properties":{"ESRI_OID":52665,"MSI_UID":52665,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1788200986000,"MODIFIED_DATE":1788265514000,"BEGIN_DATE":1786320000000,"END_DATE":1789603199000,"DESCRIPTION":"Houston Ship Channel - Dredge Operation --- From: 2026-08-10 To: Until Further Notice --- The Dredge DB CATALINA and T/V EVERLINE are working in the Houston Ship Channel between Houston Ship Channel Light 109 (LLNR-25250) and Houston Ship Channel Light 114 (LLNR-25360).  Operations will be conducted 24-hours a day, 7-days a week.  U.S. Coast Guard VTS Houston-Galveston directs no meeting or overtaking of ships, and wake and surge considerations from ships near the dredge.  The dredge requests 30-minutes notice for passing arrangements.  Mariners are urged to transit at their slowest safest speed to minimize wake and proceed with caution.  VHF-FM Channels: 13, POC: (321) 474-5633","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-95.03093,29.73158],[-95.03189,29.72907],[-95.02835,29.72847],[-95.02313,29.72393],[-95.02223,29.72184],[-95.02204,29.72],[-95.01941,29.72001],[-95.02009,29.72389],[-95.02528,29.72981],[-95.02658,29.73072],[-95.03093,29.73158]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}},{"type":"Feature","id":52675,"geometry":{"type":"Polygon","coordinates":[[[-79.06408999999996,33.66608000000008],[-79.06634999999994,33.66492000000005],[-79.06607999999994,33.66474000000005],[-79.06468999999998,33.66556000000003],[-79.06433999999996,33.665590000000066],[-79.06381999999996,33.66582000000005],[-79.06408999999996,33.66608000000008]]]},"properties":{"ESRI_OID":52675,"MSI_UID":52675,"ATU":7,"TITLE":"Winyah Bay Channel - Little River Winyah Bay/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384275,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:winbaycha:litrivwinbay","WATERWAY_NAME":"Little River Winyah Bay","CREATE_DATE":1788219515000,"MODIFIED_DATE":1788220132000,"BEGIN_DATE":1788134400000,"END_DATE":1789430399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nBeginning on or about September 1, 2026 and until approximately September 7, 2026, Coastal Dredging LLC will begin mechanical maintenance dredging activities in the vicinity of 380 Chamberlin Rd., located at 33-39-54.684N, 79-03-53.892W, adjacent to the AIWW on the Wacamaw River in Myrtle Beach, South Carolina and will be transporting sediment via containment barge approximately 1,550 feet to a landing located on the Wacamaw River. Hours of operation will be approximately 7 a.m. to 7 p.m., Monday to Sunday.\nDuring this period all vessels operating in the vicinity of this area need to keep a sharp lookout for containment barges transporting material and operate their vessels at a safe speed. All vessels in this vicinity should monitor VHF-FM channel 16 or channel 66 while approaching and passing dredge activity. If you need additional information you may call Billy Jordan captbillyjordan@gmail.com / (843)670-1209 or Jonathan Yopp coastaldredgingllc@yahoo.com / (910) 389-7604. Thank you for you cooperation.","COORDINATES_JSON":"{\"type\":\"Polygon\",\"coordinates\":[[[-79.06409,33.66608],[-79.06635,33.66492],[-79.06608,33.66474],[-79.06469,33.66556],[-79.06434,33.66559],[-79.06382,33.66582],[-79.06409,33.66608]]]}","COORDINATES_TYPE":"Polygon","DECIMAL_LONGITUDE":null,"DECIMAL_LATITUDE":null}}]}