{"type":"FeatureCollection","features":[{"type":"Feature","id":2786,"geometry":{"type":"Point","coordinates":[-79.94587999999999,32.85324000000003]},"properties":{"ESRI_OID":2786,"MSI_UID":2786,"ATU":7,"TITLE":"Charleston Harbor - Cooper River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384350,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact:chahar:cooriv","WATERWAY_NAME":"Cooper River","CREATE_DATE":1729453709000,"MODIFIED_DATE":1751553462000,"BEGIN_DATE":1729382400000,"END_DATE":1800057599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n2786\n\nLocation:\n32.85289° N / 79.94381° W\n\nThe USCG will be demolishing, rebuilding and dredging pier november in approximate position 32-51-09.7N/079-56-48.8W. The contractor is getting ready to remove the old Pier N “mega dolphin” which represents the old pier’s closest point to the Clouter Creek Reach Channel. Operations are expected to commence January 15, 2024, with an estimated completion date of December 31, 2026. During the construction phase operations will be conducted Monday-Friday 7 a.m. to 7 p.m., during dredging operations may be continuous 24 hours a day/ 7 days a week. For further information contact: LCDR John Houk at John.R.Houk@uscg.mil.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-79.94588,32.85324]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-79.94588,"DECIMAL_LATITUDE":32.85324}},{"type":"Feature","id":3214,"geometry":{"type":"Point","coordinates":[-72.08443999999997,41.444300000000055]},"properties":{"ESRI_OID":3214,"MSI_UID":3214,"ATU":1,"TITLE":"Thames River - Upper Thames River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381564,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:seclonislsouexcecozon:seclonislsoutersea:seclonislsousublanact:bloislsouandgarbay:lonislsoueaspar:newlonhar:thariv:uppthariv","WATERWAY_NAME":"Upper Thames River","CREATE_DATE":1729711205000,"MODIFIED_DATE":1777379508000,"BEGIN_DATE":1729641600000,"END_DATE":1811807999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2024-10-23 To: 2027-05-31\n\nLocation:\n41-26-39.480N/072-05-03.984W\n\nCT-THAMES RIVER-GALES FERRY\nSterling Equipment, Inc, will be storing rental fleet barges in position 41-26-39.5N 072-05-04.0W, until May 2027. Equipment on scene will be Spud Barges, Hopper Barge and Deck Barges, which will be outside the navigable channel and will not impede navigation. Point of contact for this operation is Mark Quinn, who can be reached at (617) 984-0022 or at mark@sterlingequipment.com. Mariners are requested to give adequate clearance to the equipment and transit at their slowest safe speed to minimize wake.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-72.08444,41.4443]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-72.08444,"DECIMAL_LATITUDE":41.444300000000005}},{"type":"Feature","id":18190,"geometry":{"type":"Point","coordinates":[-90.72991999999994,29.329620000000034]},"properties":{"ESRI_OID":18190,"MSI_UID":18190,"ATU":8,"TITLE":"Cat Island Pass - Houma Navigation Canal/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384874,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:catislpas:hounavcan","WATERWAY_NAME":"Houma Navigation Canal","CREATE_DATE":1746733069000,"MODIFIED_DATE":1776945332000,"BEGIN_DATE":1746662400000,"END_DATE":1843084799000,"DESCRIPTION":"Houma Navigation Canal - Bubba Dove Floodgate - Marine Construction --- From: 2025-05-08 To: 2028-05-26 --- Work for the Houma Navigation Canal Locks Complex project is underway.  Construction at the Bubba Dove Floodgates will take place 24-hours a day, 7-days a week.  Mariners are requested to transit the area at their slowest safe speed to minimize wake and proceed with caution.  VHF-FM Channels: 13 and 71","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-90.72992,29.32962]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-90.72991999999999,"DECIMAL_LATITUDE":29.32962}},{"type":"Feature","id":19760,"geometry":{"type":"Point","coordinates":[-80.16121999999996,33.448870000000056]},"properties":{"ESRI_OID":19760,"MSI_UID":19760,"ATU":7,"TITLE":"Sector Charleston, Territorial Sea - Sector Charleston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384376,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon:secchatersea:secchasublanact","WATERWAY_NAME":"Sector Charleston, Submerged Land Act (SLA)","CREATE_DATE":1748439553000,"MODIFIED_DATE":1748439845000,"BEGIN_DATE":1748390400000,"END_DATE":1800057599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n19760\n\nLocation:\n33.44887° N / 80.16122° W\n\nSouth Carolina Public Service Authority will be removing a land mass on the Santee River beginning May 1, 2025, until December 31, 2025, and May 1, 2026, until December 31, 2026. Hours of operation are Monday – Friday 6 a.m. to 6 p.m. Vessels will be monitoring VHF-FM channel 16.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-80.16122,33.44887]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-80.16122,"DECIMAL_LATITUDE":33.44887}},{"type":"Feature","id":20773,"geometry":{"type":"Point","coordinates":[-73.99840999999998,40.77075000000008]},"properties":{"ESRI_OID":20773,"MSI_UID":20773,"ATU":1,"TITLE":"Main Channel - Hudson River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:hudriv","WATERWAY_NAME":"Hudson River","CREATE_DATE":1749559317000,"MODIFIED_DATE":1749559395000,"BEGIN_DATE":1749513600000,"END_DATE":1813967999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-06-16 To: 2027-06-25\n\nLocation:\n40.77075° N / 73.99841° W\nReicon Group, LLC will be conducting pile repairs at Pier 94 from June 16, 2025, to June 25, 2027, Monday through Friday, between 7:00am to 3:30pm. Equipment on scene will be the RTC 330, monitoring VHF-FM CH 13 and will require a 24-hour notice for all vessel movement requests.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.99841,40.77075]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.99840999999999,"DECIMAL_LATITUDE":40.77075}},{"type":"Feature","id":30574,"geometry":{"type":"Point","coordinates":[-74.03364999999997,40.70697000000007]},"properties":{"ESRI_OID":30574,"MSI_UID":30574,"ATU":1,"TITLE":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:hudriv","WATERWAY_NAME":"Hudson River","CREATE_DATE":1760956926000,"MODIFIED_DATE":1760957227000,"BEGIN_DATE":1760918400000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-11-03 To: 2026-10-31\n\nLocation:\n40-42-06.984N/074-02-02.364W\n\nPKF-Mark III, Inc will be conducting marine construction operations on the Hudson River, at Liberty State Park, in position 40-42-7.000N, 074-02-02.370W, from November 3, 2025, to October 31, 2026, Monday through Friday from 6:00am to 5:00pm. Equipment on scene will be multiple floating barges, crane barges, and material barges.\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.03365,40.70697]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.03365,"DECIMAL_LATITUDE":40.70697}},{"type":"Feature","id":30675,"geometry":{"type":"Point","coordinates":[-93.32877999999994,29.797010000000057]},"properties":{"ESRI_OID":30675,"MSI_UID":30675,"ATU":8,"TITLE":"General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384877,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:calcha","WATERWAY_NAME":"Calcasieu Channel","CREATE_DATE":1761052919000,"MODIFIED_DATE":1761053146000,"BEGIN_DATE":1761004800000,"END_DATE":1803686399000,"DESCRIPTION":"Calcasieu Channel - Calcasieu Loop - Dredge Operation Booster Location --- From: 2025-10-21 To: 2027-02-25 --- The Double Barrel Booster 2109 will be staged in the Calcasieu Loop for the duration of the Monkey Island Dredge Project, in approximate position 29-47-49.2N 093-19-43.6W.  Mariners are urged to transit the area at their slowest safe speed to minimize wake.  VHF-FM Channel: 13, POC: (630) 207-5196 ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-93.32878,29.79701]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-93.32878,"DECIMAL_LATITUDE":29.79701}},{"type":"Feature","id":31194,"geometry":{"type":"Point","coordinates":[-121.52245999999997,45.72842000000003]},"properties":{"ESRI_OID":31194,"MSI_UID":31194,"ATU":13,"TITLE":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385628,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:colriv:bonpoo","WATERWAY_NAME":"Bonneville Pool","CREATE_DATE":1761755076000,"MODIFIED_DATE":1761755094000,"BEGIN_DATE":1761696000000,"END_DATE":1798761599000,"DESCRIPTION":"Advanced American Construction will be constructing a new railroad bridge on the Washington side of the Columbia River near RM 168.2. at the confluence of the White Salmon River &amp;amp; Columbia River. Work includes heavy marine assets, critical lifts, and pile driving operations. The Derrick Barge AAC Millennium will be on station from 10 Nov 25 through 31 Dec 26. Working days are planned for Monday through Friday, 0700 to 1700. Onsite equipment will monitor VHF-FM channels 13 &amp;amp; 16 during working hours. Mariners are requested to reduce speed and avoid the work area. During non-working hours, the derrick barge will remain on station with steady white lights on all four corners. Please call Kristian Hellberg at (703) 409-1614 or email at kristianh@callaac.com for more information.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-121.52246,45.72842]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-121.52246,"DECIMAL_LATITUDE":45.72842}},{"type":"Feature","id":31521,"geometry":{"type":"Point","coordinates":[-77.03190999999998,38.88219000000004]},"properties":{"ESRI_OID":31521,"MSI_UID":31521,"ATU":5,"TITLE":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383087,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:potriv:upppotriv:alecha:geocha","WATERWAY_NAME":"Georgetown Channel","CREATE_DATE":1762269204000,"MODIFIED_DATE":1762270295000,"BEGIN_DATE":1762214400000,"END_DATE":1893542399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-11-04 To: 2030-01-01\n\nLocation:\n38-52-55.884N/077-01-54.876W\n\nNorth Skanska Flatiron Joint Venture will be installing mooring anchors and buoys for the proposed Long Bridge and Pedestrian Bridge construction. Work will include driving 36” steel pile and building a trestle structure across the Washington Channel to a point approx. 200 LF from the existing bridge. The trestle will support the widening of the existing CSX Long Bridge Rail bridge. Mooring anchors will be located approximately 130 LF from the southeast shore of the Washington Channel extending between the CSX Long Bridge and the I-395 Bridge.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-77.03191,38.88219]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-77.03191,"DECIMAL_LATITUDE":38.88219}},{"type":"Feature","id":31712,"geometry":{"type":"Point","coordinates":[-90.98974999999996,30.109210000000076]},"properties":{"ESRI_OID":31712,"MSI_UID":31712,"ATU":8,"TITLE":"New Orleans Harbor - New Orleans To Baton Rouge/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119138784,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou","WATERWAY_NAME":"New Orleans To Baton Rouge","CREATE_DATE":1762542977000,"MODIFIED_DATE":1770226828000,"BEGIN_DATE":1762473600000,"END_DATE":1797292799000,"DESCRIPTION":"Mississippi River - Pump Station Construction --- From: 2025-11-28 To: 2026-12-13 --- Pump station construction will be conducted along the Mississippi River, Mile 175.5, RDB, AHOP, Smoke Bend Crossing.  Work will be conducted from 6:30 a.m. to 5:00 p.m., 6-days a week.  Operations will include pile driving, excavation, and pipe installation.  On-scene vessels will include a crane barge, a material barge, a towing vessel, and a crew boat.  Mariners are requested to transit the area at a slow bell so as not to interfere with ongoing construction and proceed with caution.  VHF-FM Channel: 67 ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-90.98975,30.10921]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-90.98975,"DECIMAL_LATITUDE":30.109209999999997}},{"type":"Feature","id":32591,"geometry":{"type":"Point","coordinates":[-76.41586999999998,36.971100000000035]},"properties":{"ESRI_OID":32591,"MSI_UID":32591,"ATU":5,"TITLE":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382762,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:jamriv:newnew","WATERWAY_NAME":"Newport News","CREATE_DATE":1763744709000,"MODIFIED_DATE":1763744732000,"BEGIN_DATE":1763683200000,"END_DATE":1806537599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-11-21 To: 2027-03-31\n\nLocation:\n36-58-15.960N/076-24-57.132W\nCrofton Construction Services, Incorporated (CCSI) will be conducting pier demolition and reconstruction in the following location: 36°58'16.63\"N 76°24'57.22\"W (Newport News Creek). Beginning December 1, 2025, and continuing until March 31, 2027, approximately 455 days or until complete from 7:00 AM – 3:30 PM, five days a week. Operations will include crane barge operations, material barges, tug boats, work floats, and smaller crafts consistent with general marine construction. Barge(s) &amp;amp; vessel(s) will be moored, on site with employees working over the side on small floats or crew boats. The equipment will be confined to the barges with crew boats working in the vicinity. The entire channel will not be closed, during any stage of dredging, or will not restrict marine traffic. Except for the last 200’ at the end of the channel where the construction will be taking place. Vessels are requested to proceed in this area with caution and no wake within 500' of the above coordinates. Crews will be monitoring the following radio frequencies: VHF channels 13 &amp;amp; 16. MSI # 32591.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.41587,36.9711]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.41587,"DECIMAL_LATITUDE":36.9711}},{"type":"Feature","id":32785,"geometry":{"type":"Point","coordinates":[-87.44929999999994,33.252860000000055]},"properties":{"ESRI_OID":32785,"MSI_UID":32785,"ATU":8,"TITLE":"Black Warrior River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385078,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:mobbay:mobbar:mobcha:mobriv:tomriv:blawarriv:mm224mm225","WATERWAY_NAME":"Black Warrior River","CREATE_DATE":1764086214000,"MODIFIED_DATE":1785173525000,"BEGIN_DATE":1764028800000,"END_DATE":1794095999000,"DESCRIPTION":"Black Warrior River, Mile 347.0 - Modified Lock Schedule --- From: 2026-01-12 To: 2026-11-06 --- The Holt Lock will be periodically closed and operate under a modified schedule to perform repairs on a damaged lock monolith. The tentative remaining lock operating schedule to accommodate repairs and major activities are as follows:\n• July 13, 2026 through September 10, 2026: 60-day lock closure. \n• September 11, 2026 through October 1, 2026: Open 24-hours a day, 7-days a week.\n• October 2, 2026 through October 26, 2026: 25-day lock closure.\n• October 27, 2026 through November 6, 2026: Closed to navigation, from 6:00 a.m., Mondays, to 6:00 a.m., Saturdays.  Open to navigation, from 6:00 a.m., Saturdays, to 6:00 a.m., Mondays.\nWaterway user calls will be held throughout the repair process to update stakeholders.  For further information regarding this work, mariners can contact Holt Lock at (251) 276-3293.  For additional details regarding the waterway users calls, mariners can access USACE Navigation Bulletins at: https://ndc.ops.usace.army.mil/ords/f?p=107:1","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-87.4493,33.25286]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-87.44930000000001,"DECIMAL_LATITUDE":33.25286}},{"type":"Feature","id":33331,"geometry":{"type":"Point","coordinates":[-76.52527999999995,39.21805000000006]},"properties":{"ESRI_OID":33331,"MSI_UID":33331,"ATU":5,"TITLE":"Patapsco River - Fort Mchenry Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119397247,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:cracha:patriv:formchcha","WATERWAY_NAME":"Fort Mchenry Channel","CREATE_DATE":1764943467000,"MODIFIED_DATE":1765201986000,"BEGIN_DATE":1764892800000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-12-05 To: 2026-12-31\n\nLocation:\n39°12’53”N, 076°31’46”W  and   39°13’05”N, 076°31’31”W\n\nFrancis Scott Key Bridge | On or around Monday December 15, Kiewit will begin construction of a temporary access Trestle, which will be used to support the replacement of the Francis Scott Key Bridge.  Vessels on scene shall include Weeks 575 Derrick barge and other material barges.  Additional construction activities will be occurring with cranes working overtop the trestle and barges moored alongside.  All cranes &amp;amp; barges will be positioned along the alignment of the new bridge up to the navigation channel but will not impede any vessel traffic within the channel.  The operation is scheduled for 12 hours a day, 6 days a week, and the barges shall remain on position 24-7.  This work is scheduled to be completed before 12/31/26. The four corners of the barges will be marked with steady white lights with visibility up to 2 miles.  The elevation of the trestle shall be +12ft above Mean Sea Level.  During and after construction, the trestle shall be marked and lit.  Boaters shall use extreme caution when transiting this area outside of the navigation channel.\nKiewit is requesting all vessels in the area to use their slowest safe working speed when navigating the area.\nThe barges will not be maneuverable when moored and will require a tugboat to shift the barges.\nContractor’s vessels will monitor VHF Channels 16 and 13. The Kiewit Infrastructure Co., on-site construction leads may be contacted at (201) 832-5004, (925) 324-6503, or (908) 463-9049. MSI # 33331.\n\n\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.52528,39.21805]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.52528,"DECIMAL_LATITUDE":39.21805}},{"type":"Feature","id":33428,"geometry":{"type":"Point","coordinates":[-76.52527999999995,39.21805000000006]},"properties":{"ESRI_OID":33428,"MSI_UID":33428,"ATU":5,"TITLE":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119397247,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:cracha:patriv:formchcha","WATERWAY_NAME":"Fort Mchenry Channel","CREATE_DATE":1765202205000,"MODIFIED_DATE":1765202237000,"BEGIN_DATE":1764892800000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-12-05 To: 2026-12-31\n\nLocation:\n39°12’53”N, 076°31’46”W  and   39°13’05”N, 076°31’31”W\n\nFrancis Scott Key Bridge | On or around Monday December 15, Kiewit will begin construction of a temporary access Trestle, which will be used to support the replacement of the Francis Scott Key Bridge.  Vessels on scene shall include Weeks 575 Derrick barge and other material barges.  Additional construction activities will be occurring with cranes working overtop the trestle and barges moored alongside.  All cranes &amp;amp; barges will be positioned along the alignment of the new bridge up to the navigation channel but will not impede any vessel traffic within the channel.  The operation is scheduled for 12 hours a day, 6 days a week, and the barges shall remain on position 24-7.  This work is scheduled to be completed before 12/31/26. The four corners of the barges will be marked with steady white lights with visibility up to 2 miles.  The elevation of the trestle shall be +12ft above Mean Sea Level.  During and after construction, the trestle shall be marked and lit.  Boaters shall use extreme caution when transiting this area outside of the navigation channel.\nKiewit is requesting all vessels in the area to use their slowest safe working speed when navigating the area.\nThe barges will not be maneuverable when moored and will require a tugboat to shift the barges.\nContractor’s vessels will monitor VHF Channels 16 and 13. The Kiewit Infrastructure Co., on-site construction leads may be contacted at (201) 832-5004, (925) 324-6503, or (908) 463-9049. MSI # 33428.\n\n\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.52528,39.21805]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.52528,"DECIMAL_LATITUDE":39.21805}},{"type":"Feature","id":35137,"geometry":{"type":"Point","coordinates":[-76.30697999999995,36.803390000000036]},"properties":{"ESRI_OID":35137,"MSI_UID":35137,"ATU":5,"TITLE":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382754,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:jamriv:eliriv:elirivsoubra","WATERWAY_NAME":"Elizabeth River Southern Branch","CREATE_DATE":1768332288000,"MODIFIED_DATE":1768332314000,"BEGIN_DATE":1768262400000,"END_DATE":1799884799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)\n\nFrom: 2026-01-13 To: 2027-01-13\n\nLocation:\n36-48-12.204N/076-18-25.128W\n\nSeaward Marine will conduct bridge replacement activities on the RTE 239 Bridge Spanning Paradise Creek. Project will run from March 15, 2026 to April 15, 2027. Multiple barges will be moored in the vicinity. Caution Buoys and turbidity curtains will be in the area. All manned vessels will monitor VHF 16, 13, and 03. MSI # 35137.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.30698,36.80339]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.30698,"DECIMAL_LATITUDE":36.80339}},{"type":"Feature","id":35540,"geometry":{"type":"Point","coordinates":[-81.51199999999994,30.396000000000072]},"properties":{"ESRI_OID":35540,"MSI_UID":35540,"ATU":7,"TITLE":"Sector Jacksonville, Submerged Land Act (SLA) - St Johns River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383440,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:stjohriv","WATERWAY_NAME":"St Johns River","CREATE_DATE":1769008087000,"MODIFIED_DATE":1769008293000,"BEGIN_DATE":1768953600000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-01-21 35540\n\nLocation:\n30-23-40.668N/081-30-25.344W\n\n\nBeginning on or about February 1, 2026, with an estimated completion date of August 30, 2027, Manson will be performing construction activities that could impact navigation including, but limited to:\n•\tCrane mounted spud barge mobilization\n•\tDeck/material barge mobilization and loading/unloading\n•\tRelocation of temporary lighterage docking structures\n•\tConstruction of a new lighterage wharf\n•\tConstruction of a new bulkhead (seawall)\n•\tShoreline protection work\nThis work is scheduled to occur at the unrestricted channel entrance at the Blount Island Marine Terminal on the St. Johns River.\n\nThe crane barges, material barges, and support vessels in the area will be assisting construction operations from 7 a.m. to 7 p.m. 7 days a week. These activities pose a hazard to vessels traveling within 500 feet from Marine Corps Support Facility - Blount Island. Mariners should exercise caution when transiting the area. Please stay clear of the construction area and away from any working equipment. Crews will be monitoring VHF-FM channel 61. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-81.512,30.396]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-81.512,"DECIMAL_LATITUDE":30.396}},{"type":"Feature","id":35641,"geometry":{"type":"Point","coordinates":[-76.39438999999999,39.13096000000007]},"properties":{"ESRI_OID":35641,"MSI_UID":35641,"ATU":5,"TITLE":"Chesapeake Channel - Sandy Point To Susquehanna River (Chart 12273)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382419,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:cracha","WATERWAY_NAME":"Sandy Point To Susquehanna River (Chart 12273)","CREATE_DATE":1769110555000,"MODIFIED_DATE":1769110622000,"BEGIN_DATE":1748476800000,"END_DATE":1798847999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-05-29 To: 2027-01-01\n\nLocation:\n39.13096° N / 76.39439° W\nThe construction of the New Craighill Range Front and Range Rear has begun. The new structure(s) will be marked with a slow flashing white light with a nominal range of 4nm and located in approximate position: \nCraighill Range Front: 39 07 51.489N—76 23 39.804W.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.39439,39.13096]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.39439,"DECIMAL_LATITUDE":39.13096}},{"type":"Feature","id":35642,"geometry":{"type":"Point","coordinates":[-76.39437999999996,39.13920000000007]},"properties":{"ESRI_OID":35642,"MSI_UID":35642,"ATU":5,"TITLE":"Chesapeake Channel - Sandy Point To Susquehanna River (Chart 12273)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382419,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:cracha","WATERWAY_NAME":"Sandy Point To Susquehanna River (Chart 12273)","CREATE_DATE":1769110604000,"MODIFIED_DATE":1769110613000,"BEGIN_DATE":1748476800000,"END_DATE":1798847999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-05-29 To: 2027-01-01\n\nLocation:\n39.1392° N / 76.39438° W\nThe construction of the New Craighill Range Front and Range Rear has begun. The new structure(s) will be marked with a slow flashing white light with a nominal range of 4nm and located in approximate position\nCraighill Range Rear: 39 08 21.143N—76 23 39.780W.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.39438,39.1392]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.39438,"DECIMAL_LATITUDE":39.1392}},{"type":"Feature","id":36019,"geometry":{"type":"Point","coordinates":[-74.06787999999995,40.665260000000046]},"properties":{"ESRI_OID":36019,"MSI_UID":36019,"ATU":1,"TITLE":"Main Channel - Port Jersey Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382309,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:porjercha","WATERWAY_NAME":"Port Jersey Channel","CREATE_DATE":1769706855000,"MODIFIED_DATE":1769707805000,"BEGIN_DATE":1769644800000,"END_DATE":1803945599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-01-29 To: 2027-03-01\n\nLocation:\n40-00-08.892N/074-04-30.288W\n\nTrevcon Construction Company, LLC. Will be conducting installation of Steel Pile Piles &amp;amp; Steel Beams / Structural Concrete Work / Concrete Pile Repair Work &amp;amp; Underdeck Concrete Repairs at the  Port Liberty Container Terminal, in position 40-40-8.900N, 074-4-30.313W, from March 1, 2026, to February 28, 2027, between 5:00am to 7:00pm. Equipment on scene will be Two Barge (180’ x 60’), Two Barges (140’ x 50’), One Barge (90’ x 30’), All moving of vessels to occur by tugboat; vessels will be moved at all times of day and night.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.06788,40.66526]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.06788,"DECIMAL_LATITUDE":40.665259999999996}},{"type":"Feature","id":36100,"geometry":{"type":"Point","coordinates":[-73.95177999999999,41.98369000000008]},"properties":{"ESRI_OID":36100,"MSI_UID":36100,"ATU":1,"TITLE":"Main Channel - Hudson River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:hudriv","WATERWAY_NAME":"Hudson River","CREATE_DATE":1769798577000,"MODIFIED_DATE":1769798584000,"BEGIN_DATE":1769731200000,"END_DATE":1927497599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-02-17 To: 2031-01-29\n\nLocation:\n41-59-01.284N/073-57-06.408W\n\nBank Stabilization operations will be conducted north of the Kingston Rhinecliff Bridge off the west side of the Hudson River in position 41-59-1.240N, 073-57-9.794W, from February 17, 2026, to January 28, 2031. Work will be conducted withing the Town of Ulster allowable work hours between 7:00 am to 10:00 pm.  Equipment on scene will be, Long reach excavators from upland at first and possibly on a barge if necessary. All work will be within the existing cove. The work will be within the existing cove off the Hudson River and will not interfere with the channel. The installation of a 44-foot by 8-foot floating pier, attached to a bulkhead by a 36-foot by 4-foot gangway. Three (3) finger piers, approximately 36-feet by 6-feet each, will extend\nfrom the main floating pier. The entire pier assembly will be held in place by five (5)\nplastic, 16-inch-diameter piles, each installed by vibratory hammer. The dredging of a total of approximately 1,429 cubic yards of material, over an area of approximately 12,500 square feet. All dredged material will be disposed of within a contained upland disposal area on the property.\n\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.95178,41.98369]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.95178,"DECIMAL_LATITUDE":41.983689999999996}},{"type":"Feature","id":36117,"geometry":{"type":"Point","coordinates":[-94.81590999999997,29.31206000000003]},"properties":{"ESRI_OID":36117,"MSI_UID":36117,"ATU":8,"TITLE":"Galveston Bay - Galveston Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384746,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:galbay:galcha","WATERWAY_NAME":"Galveston Channel","CREATE_DATE":1769807725000,"MODIFIED_DATE":1786546132000,"BEGIN_DATE":1769731200000,"END_DATE":1809215999000,"DESCRIPTION":"Galveston Channel - Marine Construction and Dredging --- From: 2026-02-26 To: 2027-04-30 --- Dredging and marine construction will take place at Texas A and M University at Galveston (TAMU-G) Dock No. 1, in the Galveston Harbor along the Galveston Channel.  Work will be conducted 10-hours a day, Monday through Saturday, unless otherwise directed. Operations will include dredging, the rehabilitation of approximately 300 ft of the main bulkhead and approximately 400 ft of return wall, and the construction of approximately 350 ft of a new concrete pier deck.  On-scene vessels will include approximately two crane barges, material barges, the T/V EVERLINE and an additional towing vessel, and ancillary support craft.  Dive operations may take place intermittently throughout the project.  Mariners are urged to transit the area at a safe distance and at their slowest safe speed, observe all day shapes and dive flags, and monitor bridge-to-bridge communications.  VHF-FM Channels: 05A and 12, POC: (346) 617-8019 or (832) 996-7135","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-94.81591,29.31206]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-94.81591,"DECIMAL_LATITUDE":29.31206}},{"type":"Feature","id":36151,"geometry":{"type":"Point","coordinates":[-76.52419999999995,39.220710000000054]},"properties":{"ESRI_OID":36151,"MSI_UID":36151,"ATU":5,"TITLE":"Patapsco River - Fort Mchenry Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119397247,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:cracha:patriv:formchcha","WATERWAY_NAME":"Fort Mchenry Channel","CREATE_DATE":1770031963000,"MODIFIED_DATE":1778611105000,"BEGIN_DATE":1757376000000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2025-09-09 To: 2026-10-01\n\nLocation:\n39.22071° N / 76.5242°\n\nKiewit will continue to install production piles for the main foundation piers.  Weeks 533 Derrick Crane, Weeks 531 Derrick Crane, &amp;amp; supply barges will be positioned east of the original Francis Scott Key Bridge. This work is scheduled to be completed on or about 10/1/26. All derrick cranes &amp;amp; barges will be positioned adjacent to the north and south sides of the navigable channel but will not impede any vessel traffic within the navigable channel. The operation is scheduled for 12 hours a day, 6 days a week, and the barges shall remain on position 24-7. Barge positioning and similar ancillary work may occur 24/7. The four corners of the barges will be marked with steady white lights with visibility up to 2 miles. A No Entry Safety Zone has been established and is delineated by white marker buoys with slow-flashing white lights. The limits of the zone are 500’ east/downstream and 500’ west/upstream of the original Francis Scott Key Bridge alignment between Hawkins Point and Sollers Point. A 6-Knot enforceable No Wake Zone has been established and is delineated by white marker buoys with slow flashing white lights. The limits of the zone are 1500’ east/downstream and 1500’ west/downstream from the original Francis Scott Key Bridge alignment between Hawkins Point and Sollers point. Vessels navigating the area shall use the Federal Channel and Buffer Zone. Kiewit is requesting all vessels in the area to use their slowest safe working speed when navigating the area. The barges will not be maneuverable when moored and will require a tugboat to shift the barges. Contractor’s vessels will monitor VHF Channels 16 and 13. The Kiewit Infrastructure Co., on-site construction leads may be contacted at (201) 832-5004, (925) 324-6503, or (908) 463-9049. MSI # 36151.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.5242,39.22071]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.52420000000001,"DECIMAL_LATITUDE":39.22071}},{"type":"Feature","id":36960,"geometry":{"type":"Point","coordinates":[-73.92562999999996,40.72022000000004]},"properties":{"ESRI_OID":36960,"MSI_UID":36960,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1770895487000,"MODIFIED_DATE":1770895543000,"BEGIN_DATE":1770854400000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-03-06 To: 2026-10-31\n\nLocation:\n40-43-12.792N/073-55-32.268W\n\nTrevcon Construction Company, LLC. Will be Removing an Existing Seawall; Removal of Timber Decking and Piles; Dredging, Installation of Scour Protection, in Newton Creek, NY, in position 40-43-12.8N, 073-55-32.3W, between March 6, 2026, to October 30, 2026, between 5:00am, to 7:00pm. Equipment on scene will be Two Barge mounted cranes (180’ x 60’), Two Barges (140’ x 50’), One Barge (195’ x 35’).\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.92563,40.72022]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.92563,"DECIMAL_LATITUDE":40.72022}},{"type":"Feature","id":37191,"geometry":{"type":"Point","coordinates":[-70.61355999999995,41.741930000000025]},"properties":{"ESRI_OID":37191,"MSI_UID":37191,"ATU":1,"TITLE":"Hog Island Channel - Cape Cod Canal Eastern Entrance/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381922,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secsounewengexcecozon:secsounewengtersea:secsounewengsublanact:buzbaymaicha:hogislcha:capcodcaneasent","WATERWAY_NAME":"Cape Cod Canal Eastern Entrance","CREATE_DATE":1771335174000,"MODIFIED_DATE":1771350087000,"BEGIN_DATE":1771286400000,"END_DATE":1798847999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-03-09 To: 2027-02-17\n\nLocation:\n41-44-30.948N/070-36-48.816W\n\nAtlas Painting and Sheeting Corp. will be conducting bridge sandblasting and painting operations on the Buzzards Bay Railroad Bridge over the Cape Cod Canal beginning 9 March 2026 through 31 December 2026. Scaffolding will reduce the vertical clearance from 135 feet to 130 feet MHW.  Questions concerning the project should be directed to the Duty Marine Traffic Controller, US Army Corps of Engineers, Cape Cod Canal Field Office at 978-318-8500 or VHF Channel 14.  Mariners should exercise caution while transiting the area.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-70.61356,41.74193]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-70.61355999999999,"DECIMAL_LATITUDE":41.741929999999996}},{"type":"Feature","id":37341,"geometry":{"type":"Point","coordinates":[-93.34695999999997,29.772350000000074]},"properties":{"ESRI_OID":37341,"MSI_UID":37341,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Calcasieu Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384877,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:calcha","WATERWAY_NAME":"Calcasieu Channel","CREATE_DATE":1771444301000,"MODIFIED_DATE":1771448435000,"BEGIN_DATE":1771372800000,"END_DATE":1805241599000,"DESCRIPTION":"Calcasieu Channel - Material Offloading --- From: 2026-03-15 To: 2027-03-15 --- Material offloading will be conducted along the west side of the Calcasieu Channel near Mile 0.3.  On-scene vessels will include hopper barges and towing vessels.  Mariners are urged to transit the area with caution and at their slowest safe speed to minimize wake.  POC: (337) 247-1071 or (337) 519-1163","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-93.34696,29.77235]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-93.34696,"DECIMAL_LATITUDE":29.77235}},{"type":"Feature","id":37938,"geometry":{"type":"Point","coordinates":[-87.62879999999996,30.298170000000027]},"properties":{"ESRI_OID":37938,"MSI_UID":37938,"ATU":8,"TITLE":"Pensacola Bay - Pensacola-Mobile/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116384689,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:penbay:pen","WATERWAY_NAME":"Pensacola-Mobile","CREATE_DATE":1772134582000,"MODIFIED_DATE":1772134890000,"BEGIN_DATE":1772064000000,"END_DATE":1805241599000,"DESCRIPTION":"GIWW - Marina Construction and Dredging --- From: 2026-03-16 To: 2027-03-15 --- A 43-slip marina will be constructed outside of the GIWW Channel, near Mile 159.0, EHL, in approximate position 30-17-53.67N 087-37-43.72W.  Work will be conducted from 7:00 a.m. to 4:30 p.m., Monday through Saturday.  Dredging from the GIWW Channel into the marina area will take place within the first 30-days of the project.  All other marina construction will be conducted for the remainder of the project timeline.  On-scene vessels will include a barge mounted dredge, towing vessels, and construction equipment.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and proceed with caution.  POC: (251) 689-8656","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-87.6288,30.29817]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-87.6288,"DECIMAL_LATITUDE":30.29817}},{"type":"Feature","id":38599,"geometry":{"type":"Point","coordinates":[-82.18961999999993,41.476260000000025]},"properties":{"ESRI_OID":38599,"MSI_UID":38599,"ATU":9,"TITLE":"Lake Erie - Lorain Harbor/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386028,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:lorhar","WATERWAY_NAME":"Lorain Harbor","CREATE_DATE":1773055781000,"MODIFIED_DATE":1773062945000,"BEGIN_DATE":1773014400000,"END_DATE":1794787199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)\n\nFrom: 2026-03-09 To: 2026-11-15\n\nLocation:\n41-28-34.536N/082-11-22.632W\n\nGreat Lakes Dock and Materials will be conducting break wall repair work at the West Break wall.24 hours a day 7 days a week. On scene vessels can be contacted on VHF channels 7 and 16. \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-82.18962,41.47626]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-82.18961999999999,"DECIMAL_LATITUDE":41.476259999999996}},{"type":"Feature","id":38883,"geometry":{"type":"Point","coordinates":[-86.24788999999998,43.058800000000076]},"properties":{"ESRI_OID":38883,"MSI_UID":38883,"ATU":9,"TITLE":"LAKE MICHIGAN - Grand River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386204,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:grariv","WATERWAY_NAME":"Grand River","CREATE_DATE":1773149621000,"MODIFIED_DATE":1774456261000,"BEGIN_DATE":1775001600000,"END_DATE":1796083199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-03-10 To: 2026-09-06\n\nGreat Lakes Dock &amp;amp; Materials, L.L.C.\n2. TYPE OF OPERATION: Pier Construction and Dredging\n3. LOCATION: Grand Haven North Pier, Michigan\n4. COMMENCE DATE: April 1, 2026 COMPLETE DATE: November 30, 2026\n5. HOURS OF OPERATION: 24 hours per day\n6. DAYS OF OPERATION: 7 days per week\n7. CONTACT VESSEL: Spud Barge “Justin Avery” and “Jacquelyn” and Tug “George F Bailey”\n8. VHF-FM CHANNELS MONITORED: 16 and 18\n\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-86.24789,43.0588]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-86.24789,"DECIMAL_LATITUDE":43.058800000000005}},{"type":"Feature","id":38884,"geometry":{"type":"Point","coordinates":[-87.64815999999996,44.09203000000008]},"properties":{"ESRI_OID":38884,"MSI_UID":38884,"ATU":9,"TITLE":"Manistee - Manitowoc Harbor of Refuge/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386214,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:man:manharofref","WATERWAY_NAME":"Manitowoc Harbor of Refuge","CREATE_DATE":1773149943000,"MODIFIED_DATE":1773149951000,"BEGIN_DATE":1781481600000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-06-15 To: 2026-10-31\nRoen Salvage Company\nTYPE OF OPERATION: Breakwater Repairs\nLOCATION: Manitowoc Harbor, Lake Michigan\nCOMMENCE DATE:6/15/2026\nCOMPLETE DATE:10/31/2026\nHOURS OF OPERATION:6 a.m.TO:6 p.m.\nDAYS OF OPERATION Sunday TO: Saturday\nNAME OF CONTACT VESSEL: Tug David R. Schanock\nVHF-FM CHANNELS MONITORED:7 &amp;amp; 16\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-87.64816,44.09203]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-87.64815999999999,"DECIMAL_LATITUDE":44.09203}},{"type":"Feature","id":39547,"geometry":{"type":"Point","coordinates":[-73.93054999999998,40.80419000000006]},"properties":{"ESRI_OID":39547,"MSI_UID":39547,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1774014831000,"MODIFIED_DATE":1774014872000,"BEGIN_DATE":1773964800000,"END_DATE":1819756799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-03-20 To: 2027-08-31\n\nLocation:\n40-48-15.084N/073-55-49.980W\n\nTrevcon Construction Company will be conducting demolition and reconstruction operations on the Harlem River, west shoreline from RFK Bridge(125th St.) to Metro North Rail Bridge (132nd St.)in position 40-48-15.1N, 073-55-50W, through August 2027, Monday through Friday, between 5:00am to 6:00pm. Equipment on scene will be multiple crane barges, and material barges, monitoring VHF-FM CH 13, 16, 65, &amp;amp;75. Floating Equipment will be positioned along the West shoreline of the Harlem River, vessel traffic will not be impeded.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.93055,40.80419]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.93055,"DECIMAL_LATITUDE":40.80419}},{"type":"Feature","id":39636,"geometry":{"type":"Point","coordinates":[-73.98482999999999,40.709520000000055]},"properties":{"ESRI_OID":39636,"MSI_UID":39636,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1774275244000,"MODIFIED_DATE":1774275261000,"BEGIN_DATE":1774224000000,"END_DATE":1856995199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-03-23 To: 2028-11-04\n\nLocation:\n40-42-34.272N/073-59-05.388W\n\nReicon will be conducting pile repair and rehabilitation operations at Pier 36, East River, New York, NY, in position 40-42-34.3N, 073-59-05.4W, from February 23, 2026, to November 3, 2028, Monday through Friday, between 6:00am to 2:00pm, local time. Equipment on scene will be a dive barge, monitoring VHF-FM Ch 13 and is requesting mariners to minimize their wake, while operations are being conducted.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.98483,40.70952]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.98483,"DECIMAL_LATITUDE":40.70952}},{"type":"Feature","id":40216,"geometry":{"type":"Point","coordinates":[-88.42598999999996,34.06484000000006]},"properties":{"ESRI_OID":40216,"MSI_UID":40216,"ATU":8,"TITLE":"Tennessee Tombigbee River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385074,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:mobbay:mobbar:mobcha:mobriv:tomriv:tentomriv:mm327mm328","WATERWAY_NAME":"Tennessee Tombigbee River","CREATE_DATE":1774880535000,"MODIFIED_DATE":1774880748000,"BEGIN_DATE":1774828800000,"END_DATE":1791763199000,"DESCRIPTION":"Tennessee-Tombigbee River - Lock Closure --- From: 2026-09-09 To: 2026-10-10 --- Routine maintenance closures have been scheduled for the Glover Wilkins Lock, on the Tennessee-Tombigbee River, Mile 376.3.  The Lock will be closed for 30 days, from 6:00 a.m., September 9, 2026, to 6:00 p.m., October 10, 2026, for critical maintenance activities.  If the lock re-opens prior to the scheduled date, an updated Notice to Mariners will be issued.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-88.42599,34.06484]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-88.42599,"DECIMAL_LATITUDE":34.06484}},{"type":"Feature","id":40217,"geometry":{"type":"Point","coordinates":[-88.48898999999994,34.01117000000005]},"properties":{"ESRI_OID":40217,"MSI_UID":40217,"ATU":8,"TITLE":"Tennessee Tombigbee River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385074,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:mobbay:mobbar:mobcha:mobriv:tomriv:tentomriv:mm327mm328","WATERWAY_NAME":"Tennessee Tombigbee River","CREATE_DATE":1774880720000,"MODIFIED_DATE":1787154073000,"BEGIN_DATE":1774828800000,"END_DATE":1791763199000,"DESCRIPTION":"Tennessee-Tombigbee River - Lock Closure --- From: 2026-09-10 To: 2026-10-10 --- Routine maintenance closures have been scheduled for the Thad Cochran (Armory) Lock, on the Tennessee-Tombigbee River, Mile 371.1.  The lock will be closed for 30 days, from 6:00 a.m., September 10, 2026, to 6:00 p.m., October 10, 2026, for critical maintenance activities.  If the lock re-opens prior to the scheduled date, an updated Notice to Mariners will be issued.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-88.48899,34.01117]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-88.48899,"DECIMAL_LATITUDE":34.01117}},{"type":"Feature","id":40547,"geometry":{"type":"Point","coordinates":[-88.23603999999995,47.18906000000004]},"properties":{"ESRI_OID":40547,"MSI_UID":40547,"ATU":9,"TITLE":"Lake Superior/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386336,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:saimarriv:laksup","WATERWAY_NAME":"Lake Superior","CREATE_DATE":1775303335000,"MODIFIED_DATE":1775476084000,"BEGIN_DATE":1775088000000,"END_DATE":1790639999000,"DESCRIPTION":"MI – GRAND TRAVERSE BAY HARBOR - LAKE SUPERIOR – Dredging will be taking place inside the Grand Traverse Bay Harbor channel. Work will occur daily from 7 a.m. to 7 p.m. starting approximately 15Apr2026, or whenever channel is clear from ice, and extending to approximately 15Jun2026. A mechanical dredge barge (30’x50’x5’) and two hopper barges (20’x26’x5’) will be engaged in the operation. Channel width will allow traffic to pass outside the marked turbidity curtain. Contact with the operator can be made on VHF channel 16 during operations. Questions can be directed to Bluelinesitesolutions@outlook.com (CGD-GL)","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-88.23604,47.18906]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-88.23604,"DECIMAL_LATITUDE":47.18906}},{"type":"Feature","id":41463,"geometry":{"type":"Point","coordinates":[-73.97593999999998,40.30322000000007]},"properties":{"ESRI_OID":41463,"MSI_UID":41463,"ATU":1,"TITLE":"Sector New York, Submerged Lands Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382294,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact","WATERWAY_NAME":"Sector New York, Submerged Lands Act (SLA)","CREATE_DATE":1776434428000,"MODIFIED_DATE":1787582950000,"BEGIN_DATE":1776384000000,"END_DATE":1809129599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-01 To: 2027-04-30\n\nLocation:\n40-18-11.592N/073-58-33.384W\n\nJ.T. Cleary Inc. will be conducting pile driving operations in Long Branch, NJ, in position 40-18-11.6N, 073-58-33.4W, from May 1, 2026, to April 30, 2027, Monday through Friday, between 5:00am to 6:00pm. Equipment on scene will be an offshore trestle extending 200 feet from shore, monitoring VHF-FM CH 16.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.97594,40.30322]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.97594,"DECIMAL_LATITUDE":40.303219999999996}},{"type":"Feature","id":42175,"geometry":{"type":"Point","coordinates":[-90.89289999999994,46.94765000000007]},"properties":{"ESRI_OID":42175,"MSI_UID":42175,"ATU":9,"TITLE":"Lake Superior - APOSTLE ISLANDS/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386377,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:saimarriv:laksup:apoisl","WATERWAY_NAME":"APOSTLE ISLANDS","CREATE_DATE":1777305574000,"MODIFIED_DATE":1777305580000,"BEGIN_DATE":1778371200000,"END_DATE":1790985599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-10 To: 2026-10-02\n\nKokosing Industrial will be conducting Stone Breakwall Construction at South End of Devils Island and at Little Sand Bay Marina in Wisconsin 0700-1900 7 days a week. Tug Nancy Anne can be contacted on VHF 13 and 16.  MM 142 barge and Sam II will be working on spuds with Tug Nancy Anne within 400' of Devil's Island.\nOperations primarily located on the south end of Devil's Island.\nPleasure craft and passing vessels should remain a distance of 500' from work at all times.MM 142 barge and Sam II will also be working on spuds with Tug Nancy Anne at Little Sand Bay Marina Operations primarily located within 500' of the Marina. Additional Barges may be moored on an anchor can buoy northwest of Little Sand Bay Marina. Anchor Buoy coordinates N 46°56'56.24\" W 90°53'40.21\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-90.8929,46.94765]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-90.8929,"DECIMAL_LATITUDE":46.947649999999996}},{"type":"Feature","id":42176,"geometry":{"type":"Point","coordinates":[-85.76777999999996,45.02526000000006]},"properties":{"ESRI_OID":42176,"MSI_UID":42176,"ATU":9,"TITLE":"LAKE HURON - LAKE MICHIGAN/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386256,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic","WATERWAY_NAME":"LAKE MICHIGAN","CREATE_DATE":1777305859000,"MODIFIED_DATE":1777305867000,"BEGIN_DATE":1777766400000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-05-03 To: 2026-12-31\n\nKokosing Industrial will be conducting Dock Construction and Dredging at NE Side of North Manitou Island, West of Leland, MI from 0700-1900 7 days a week. Tug WM Boyd can be contacted on vhf channels 13 and 16. Kokosing IV barge will be working on spuds with Tug WM Boyd within 750' of the island\nOperations primarily located on the NE side of North Manitou Island Pleasure craft and passing vessels should remain a safe distance from the work at all times. Additional barges will be moored on anchor buoys on the East side of the Island\nAnchor Buoy Coordinates N 45°07'4.98\" W 85°58'27.54\" and N 45°07'1.98\" W 85°58'27.12\"\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-85.76778,45.02526]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-85.76778,"DECIMAL_LATITUDE":45.025259999999996}},{"type":"Feature","id":42644,"geometry":{"type":"Point","coordinates":[-73.68610999999999,42.70111000000003]},"properties":{"ESRI_OID":42644,"MSI_UID":42644,"ATU":1,"TITLE":"Hudson River - Troy Dam/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381488,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:hudriv:trodam","WATERWAY_NAME":"Troy Dam","CREATE_DATE":1777556427000,"MODIFIED_DATE":1777556432000,"BEGIN_DATE":1777507200000,"END_DATE":1796083199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-11 To: 2026-11-30\n\nLocation:\n42-42-03.996N/073-41-09.996W\n\nCarteret Marine Services will be conducting marine construction operations at the Troy Locks, Hudson River, in position 42-45-04N, 073-41-10W, from May 11, 2026, to November 30, 2026, between 7:00am to 5:00pm. Equipment on scene will be a barge and vessel, monitoring VHF-FM CH 8 &amp;amp; 16.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.68611,42.70111]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.68611,"DECIMAL_LATITUDE":42.70111}},{"type":"Feature","id":43196,"geometry":{"type":"Point","coordinates":[-83.46058999999997,43.73613000000006]},"properties":{"ESRI_OID":43196,"MSI_UID":43196,"ATU":9,"TITLE":"LAKE HURON - SAGINAW BAY/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386126,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:sagbay","WATERWAY_NAME":"SAGINAW BAY","CREATE_DATE":1778083087000,"MODIFIED_DATE":1778083097000,"BEGIN_DATE":1778025600000,"END_DATE":1795823999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-06 To: 2026-11-27\n\nLocation:\n43-44-10.068N/083-27-38.124W\n\nHardman Construction is conducting steel sheet pile and embankment work along the south shore of the Sebewaing River in Sebewaing, MI. Operations are scheduled to conclude on November 27, 2026. Standard work hours are Monday through Friday from 7:00 AM to 5:00 PM, with Saturday operations occurring on an as-needed basis. The project does not employ any temporary aids to navigation or buoys, and no VHF channels are actively monitored by the work crews. Mariners are advised to use extra caution and transit at a slow speed when approaching the stretch of the Sebewaing River between the Sebewaing River Railroad Bridge and the N Center Street Bridge. For additional information, mariners may contact Dave DeClerck at 231-852-4011.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-83.46059,43.73613]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-83.46059,"DECIMAL_LATITUDE":43.736129999999996}},{"type":"Feature","id":43327,"geometry":{"type":"Point","coordinates":[-93.29321999999996,30.087890000000073]},"properties":{"ESRI_OID":43327,"MSI_UID":43327,"ATU":8,"TITLE":"New Orleans Port Arthur/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384625,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:sechouexcecozon:secneworltersea:sechoutersea:secneworlsublanact:sechousublanact:neworl","WATERWAY_NAME":"New Orleans Port Arthur","CREATE_DATE":1778244119000,"MODIFIED_DATE":1785170103000,"BEGIN_DATE":1778198400000,"END_DATE":1789862399000,"DESCRIPTION":"GIWW, Mile 238.5, WHL - Calcasieu Lock - Lock Closure --- From: 2026-05-18 To: 2026-09-18 --- The Calcasieu Lock will be closed to navigation from 7:00 a.m. until 7:00 p.m., Monday through Friday, for north chamber wall repairs.  Mariners should avoid contact with the northeast longwall dolphin due to continued degradation of the structural sheet pile that supports the dolphin.  For up-to-date information regarding the lock closure, mariners can contact the Lockmaster at (337) 477-1482.  POC: USACE (504) 862-2060, (504) 862-1061 and 504) 862-2630\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-93.29322,30.08789]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-93.29321999999999,"DECIMAL_LATITUDE":30.087889999999998}},{"type":"Feature","id":43379,"geometry":{"type":"Point","coordinates":[-91.07110999999998,30.206360000000075]},"properties":{"ESRI_OID":43379,"MSI_UID":43379,"ATU":8,"TITLE":"New Orleans Harbor - New Orleans To Baton Rouge/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119138784,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou","WATERWAY_NAME":"New Orleans To Baton Rouge","CREATE_DATE":1778260061000,"MODIFIED_DATE":1778504668000,"BEGIN_DATE":1778198400000,"END_DATE":1796169599000,"DESCRIPTION":"Mississippi River - Material Offloading --- From: 2026-05-08 To: 2026-11-30 --- Material offloading will be conducted along the Mississippi River, RDB, near Claiborne Landing, Mile 188.0, AHOP.  Work will take place 24-hours a day, 7-days a week.  On-scene vessels will include hopper barges, towing vessels and a crane spud barge.  Mariners are requested to transit the area at their slowest safe speed to minimize wake.  POC: (337) 772-8945 or (337) 323-9373","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-91.07111,30.20636]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-91.07110999999999,"DECIMAL_LATITUDE":30.20636}},{"type":"Feature","id":43395,"geometry":{"type":"Point","coordinates":[-91.20844999999997,30.430960000000027]},"properties":{"ESRI_OID":43395,"MSI_UID":43395,"ATU":8,"TITLE":"New Orleans Harbor - New Orleans To Baton Rouge/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385061,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou","WATERWAY_NAME":"New Orleans To Baton Rouge","CREATE_DATE":1778266386000,"MODIFIED_DATE":1778504735000,"BEGIN_DATE":1778198400000,"END_DATE":1830297599000,"DESCRIPTION":"Port Allen Canal - Port Allen Lock - Lock Restrictions/Special Instructions --- From: April 2021 To: Until Further Notice --- The following westbound restrictions are in place regarding the Port Allen Lock’s northeast floating guide wall:\n• All tows with more than one barge are required to use an assist vessel with a line attached at the head of the tow.\n• Single barge tows will be permitted to lock westbound without an assist vessel.\n• Vessels should not attempt to “pivot” on the guide wall; therefore, vessels must flatten-out before contacting the guide wall. \nFor additional information, mariners can contact the Port Allen Lockmaster at (225) 343-3752. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-91.20845,30.43096]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-91.20845,"DECIMAL_LATITUDE":30.43096}},{"type":"Feature","id":43712,"geometry":{"type":"Point","coordinates":[-70.70505999999995,41.74938000000003]},"properties":{"ESRI_OID":43712,"MSI_UID":43712,"ATU":1,"TITLE":"Buzzards Bay Main Channel - Weweantic River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100118362028,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secsounewengexcecozon:secsounewengtersea:secsounewengsublanact:buzbaymaicha:wewriv","WATERWAY_NAME":"Weweantic River","CREATE_DATE":1778773146000,"MODIFIED_DATE":1782318914000,"BEGIN_DATE":1781654400000,"END_DATE":1792022399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-17 To: 2026-10-01\n\nLocation:\n41-44-57.768N/070-42-18.216W\n\nAGM Marine Contractors, will be conducting dredging operations in the Wareham River, Wareham, Massachusetts, in position 41-44-57.75N, 070-42-18.21W. The project is scheduled to run from July 1, 2026, through September 31, 2026, and will operate continuously, seven days a week, 24 hours per day. The equipment involved includes the Dredge Triton, crane, scow, and tugs. To ensure safe navigation, vessels in the area can contact the operation on radio frequency 66 and are advised to provide a 15-minute notice for passing arrangements, with the dredging vessel remaining out of the channel when necessary.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-70.70506,41.74938]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-70.70506,"DECIMAL_LATITUDE":41.749379999999995}},{"type":"Feature","id":43769,"geometry":{"type":"Point","coordinates":[-156.67853999999997,20.871180000000038]},"properties":{"ESRI_OID":43769,"MSI_UID":43769,"ATU":14,"TITLE":"Sector Honolulu, Territorial Sea - Maui Island/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385705,"MRN":"urn:mrn:iala:wwy:us:navXII:dis14:sechonexcecozon:sechontersea:mauisl","WATERWAY_NAME":"Maui Island","CREATE_DATE":1778798721000,"MODIFIED_DATE":1778798728000,"BEGIN_DATE":1778716800000,"END_DATE":1790899199000,"DESCRIPTION":"LAHAINA SMALL BOAT HARBOR MAINT. DREDGING\nDredging operations within the Lahaina Small Boat Harbor entrance channel will start on or around June 1, 2026, anticipates completing operations by October 1, 2026. Working hours on the project will be 0700 to 1800 hours Monday through Friday, excluding\nholidays.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-156.67854,20.87118]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-156.67854,"DECIMAL_LATITUDE":20.87118}},{"type":"Feature","id":43910,"geometry":{"type":"Point","coordinates":[-95.57274999999998,28.793120000000044]},"properties":{"ESRI_OID":43910,"MSI_UID":43910,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384754,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact","WATERWAY_NAME":"Sector Houston-Galveston, Submerged Land Act (SLA)","CREATE_DATE":1779120189000,"MODIFIED_DATE":1779121077000,"BEGIN_DATE":1779062400000,"END_DATE":1789516799000,"DESCRIPTION":"GIWW - Vessel Staging and Rip Rap Loading/Offloading --- From: June 2026 To: September 2026 --- Onshore loading and offloading of rip rap onto barges will be conducted at the Sargent Park Pier, located along the GIWW in the vicinity of Mile 415.0, WHL.  Loading and offloading will be conducted daily, from sunrise to sunset.  A maximum of six hopper barges will be tied up at this location at any time.  All four corners of seaward barges will be lit with solar barge lights.  Barges will not protrude into channel and will stay inside the cut of the bulkhead.  Mariners are urged to transit the area at their slowest safe speed to minimize wake.  VHF-FM Channels: 13 and 16, POC:  (225) 347-4339","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-95.57275,28.79312]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-95.57275,"DECIMAL_LATITUDE":28.79312}},{"type":"Feature","id":44257,"geometry":{"type":"Point","coordinates":[-74.21853999999996,39.64471000000003]},"properties":{"ESRI_OID":44257,"MSI_UID":44257,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1779386567000,"MODIFIED_DATE":1779386665000,"BEGIN_DATE":1779321600000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-21 To: 2026-12-31\n\nLocation:\n39-38-40.956N/074-13-06.744W\n\nResilientSeas will conduct rock sill construction along the eastern edge of Popular Point. Dredging will occur on Mill Creek with placement of dredged material behind rock sill at Popular Point. Approximate position: 39° 38' 40.956\" N 74° 13' 06.744\" W from 6/8/26 to 12/31/26, 5 AM to 8 PM. Multiple barges with excavators, hopper barges and push boats will be in the vicinity. All maned equipment will monitor VHF FM 82 and 16. MSI # 44257.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.21854,39.64471]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.21853999999999,"DECIMAL_LATITUDE":39.644709999999996}},{"type":"Feature","id":44267,"geometry":{"type":"Point","coordinates":[-122.29266999999999,47.64626000000004]},"properties":{"ESRI_OID":44267,"MSI_UID":44267,"ATU":13,"TITLE":"Lake Union - Union Bay Reach/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385920,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:secpugsouexcecozon:secpugsoutersea:secpugsousublanact:strofjuadefuc:adminl:pugsou:shibay:lakuni:unibayrea","WATERWAY_NAME":"Union Bay Reach","CREATE_DATE":1779400124000,"MODIFIED_DATE":1779400132000,"BEGIN_DATE":1779321600000,"END_DATE":1793663999000,"DESCRIPTION":"Redside Construction, Inc. will be conducting marine demolition and float system installation at Foster Island, WA for the WA Park Arboretum Waterfront Trail Renovation, in approximate location 47-38.78’ N 122-17.551W, from 16 May 2026 through 01 Nov 2026.  A 40’ x 90’ barge and support vessels will be staged off the pier face and will be monitoring VHF-FM channels 13 and 16.  White flashing lights will be used to demarcate the barge. Mariners are requested to use caution and reduce wake when transiting the area.  For additional information, contact Jeremy Helser at (360) 250-4328 or Sam Berry at (206) 940-0564. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-122.29267,47.64626]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-122.29267,"DECIMAL_LATITUDE":47.64626}},{"type":"Feature","id":44288,"geometry":{"type":"Point","coordinates":[-88.40635999999995,47.187640000000044]},"properties":{"ESRI_OID":44288,"MSI_UID":44288,"ATU":9,"TITLE":"Keweenaw Waterway - Torch Lake Canal/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386376,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:saimarriv:laksup:kewuppent:kewwat:torlakcan","WATERWAY_NAME":"Torch Lake Canal","CREATE_DATE":1779450881000,"MODIFIED_DATE":1780447617000,"BEGIN_DATE":1780272000000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-01 To: 2026-10-31\n\nU.S. Environmental Protection Agency Great Lakes National Program Office (GLNPO) will commence on or about June 01, 2026, in Torch Lake adjacent to the Lake Linden Recreation Area in the Village of Lake Linden, Houghton County, Michigan. The work area is a 3.2-acre dredge footprint covering approximately 1,300 LF along the Northwestern shoreline of Torch Lake from approximately 47°11’20.7371”N 088°24’25.0909”W to 47°11’16.2637”N 088°24’20.8101”W and a sediment processing/unloading dock located at approximately 47°10’35.0189”N 088°25’10.1927”W. Loaded and unloaded hopper barges will be towed approximately 1.2 miles between the Dredging Area and Sediment Area Processing Dock as needed.\n\n\nThree turbidity monitoring buoys will be deployed in support of the work. Four (4) No Wake/No Entry buoys will be installed in the immediate vicinity of dredging work areas. Brennan will also install approximately 550 linear feet of temporary sheet piling along the western edge of the dredge area to facilitate near-shore dredge cuts. Buoys will be marked with navigation lights pursuant to 33 CFR 62.45 to indicate the work areas and project equipment. Inside the Dredging Area, Barge Lane, and Sediment Processing Dock Area, equipment consisting of the Tug Debra Mary, the JFB 4400 (Dean Barge), the BMI 102 and BMI 103 material barges, the JFB 4477 spud barge, the Alton Barge, four S-50 sectional barges, the JFB 7771 survey vessel, push boats, and small skiffs will operate from approximately 6:00 AM to 6:00 PM, Monday-Saturday. See the attached drawings to show the project location and operations areas.\n\n\nAll vessels and crew will monitor VHF channel 16 during the project execution. On-water operations are expected to commence June 1, 2026. Mechanical dredging is currently scheduled from approximately July 1, 2026 through August 19, 2026, with backfill and demobilization continuing through October 19, 2026 (on-site construction complete date) and final project close-out by December 31, 2026.\n\n Hours of operation are from 0600-1800 7 days a week.\n\nJFB Vessels – Dean Barge, Tug Debra Mary, JFB 7771 Channel 16 and 22a\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-88.40636,47.18764]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-88.40635999999999,"DECIMAL_LATITUDE":47.187639999999995}},{"type":"Feature","id":44433,"geometry":{"type":"Point","coordinates":[-81.62860999999998,30.31863000000004]},"properties":{"ESRI_OID":44433,"MSI_UID":44433,"ATU":7,"TITLE":"Sector Jacksonville, Submerged Land Act (SLA) - St Johns River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383440,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:stjohriv","WATERWAY_NAME":"St Johns River","CREATE_DATE":1779805612000,"MODIFIED_DATE":1779805628000,"BEGIN_DATE":1779753600000,"END_DATE":1809129599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-05-26 \n44433\n\nLocation:\n30-19-07.068N/081-37-42.996W\n\nBranch Diversified for the dredging and Hal Jones for construction will be conducting initial dredging and then construction of mooring dolphins. Operations will be ongoing until approximately February 28, 2027, during day light hours Monday to Friday. Entire work area will be within turbidity barrier attached to piles to hold them in position.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-81.62861,30.31863]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-81.62861,"DECIMAL_LATITUDE":30.31863}},{"type":"Feature","id":44465,"geometry":{"type":"Point","coordinates":[-73.98257999999998,40.70580000000007]},"properties":{"ESRI_OID":44465,"MSI_UID":44465,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1779817640000,"MODIFIED_DATE":1779817647000,"BEGIN_DATE":1783296000000,"END_DATE":1798761599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-07-20 To: 2026-12-31\n\nLocation:\n40-42-20.880N/073-58-57.288W\n\nThis Local Notice to Mariners (LNM) report, submitted to the U.S. Coast Guard First District, announces upcoming waterborne crane operations in support of building construction on the East River, New York. The project, managed by Grace Industries LLC, will take place at coordinates 40° 42.348'N, 073° 58.955'W, from July 20, 2026, through December 31, 2026. Operations are scheduled Monday through Saturday, 6:00 AM to 6:00 PM, with cranes and material barges present at the site. Mariners in the area are advised to use slow speed (“slowbell”) near the crane operations and may contact the operation via marine radio channels 16, 13, and 61A for coordination. \n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.98258,40.7058]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.98258,"DECIMAL_LATITUDE":40.7058}},{"type":"Feature","id":44735,"geometry":{"type":"Point","coordinates":[-96.62202999999994,28.620940000000076]},"properties":{"ESRI_OID":44735,"MSI_UID":44735,"ATU":8,"TITLE":"Matagorda Ship Channel - Port Lavaca Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385143,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon:seccorchrtersea:seccorchrsublanact:matshicha:porlavcha","WATERWAY_NAME":"Port Lavaca Channel","CREATE_DATE":1779981669000,"MODIFIED_DATE":1779982041000,"BEGIN_DATE":1779926400000,"END_DATE":1793145599000,"DESCRIPTION":"Lavaca Bay - Port Lavaca - Shoreline Protection Construction --- From: 2026-05-28 To: 2026-10-26 --- Construction of living shoreline protection consisting of a rock breakwater, a reef breakwater, and two marsh creation islands will be conducted in Lavaca Bay, near approximate position 28-37-15.46N 096-37-19.32W.  Operations will be conducted daily, during daylight hours.   On-scene vessels will include two crew boats and a towing vessel.  Mariners are requested to transit the area at their slowest safe speed to minimize wake.  VHF-FM Channel: 10, POC: (985) 992-6827","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-96.62203,28.62094]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-96.62203,"DECIMAL_LATITUDE":28.620939999999997}},{"type":"Feature","id":45091,"geometry":{"type":"Point","coordinates":[-66.98453999999998,44.91548000000006]},"properties":{"ESRI_OID":45091,"MSI_UID":45091,"ATU":1,"TITLE":"Sector Northern New England, Submerged Lands Act (SLA) - New Brunswick Grand Manan Channel Northern Part/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381823,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact:newbrugramanchanorpar","WATERWAY_NAME":"New Brunswick Grand Manan Channel Northern Part","CREATE_DATE":1780402932000,"MODIFIED_DATE":1780407531000,"BEGIN_DATE":1780358400000,"END_DATE":1811980799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-06-15 To: 2027-06-02\n\nLocation:\n44-54-55.728N/066-59-04.344W\n\nFuller Marine Services, Inc. submitted a Local Notice to Mariners (LNM) Information Form to the U.S. Coast Guard First District regarding the planned replacement of the Clark Ledge Daybeacon (LLNR 925) in the St. Croix River, Maine. The project involves replacing the aid in its entirety, with operations scheduled to begin on June 15, 2026, and continue until completion. Work will be conducted daily from 7:00 AM to 6:00 PM, utilizing the vessels Enzo Charles and Mary Louisa II. Vessels on-site will monitor VHF-FM Channels 16 and 13 for navigational safety and passing arrangements, with secondary contact available on Channel 09 or USCG working channel 22A. The crew will maintain a clear fairway for all traffic and will reposition within 30 minutes if additional channel breadth is required, subject to weather and safety conditions.\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-66.98454,44.91548]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-66.98454,"DECIMAL_LATITUDE":44.915479999999995}},{"type":"Feature","id":45171,"geometry":{"type":"Point","coordinates":[-70.37377999999995,43.460000000000036]},"properties":{"ESRI_OID":45171,"MSI_UID":45171,"ATU":1,"TITLE":"Sector Northern New England, Submerged Lands Act (SLA) - Saco River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381806,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact:sacriv","WATERWAY_NAME":"Saco River","CREATE_DATE":1780486176000,"MODIFIED_DATE":1780486213000,"BEGIN_DATE":1780444800000,"END_DATE":1819756799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-06-03 To: 2027-08-31\n\nLocation:\n43-27-36.000N/070-22-25.608W\n\nNorth Jetty Spur Construction project by Mohawk Northeast, scheduled to take place in Saco, Maine in position 43.464725° N, 70.373789° W, from June 2026 through August 2027. The project involves construction activities at Saco Bay and Saco River, with a haul route extending to Portland Harbor. Operations will occur Monday through Friday, with ten-hour workdays. The onsite equipment will include two tug boats, one push boat, one work skiff, two work barges, and two material barges. Vessel communications will be managed via VHF channels 13 and 16, with security calls made prior to vessel movements to ensure safe navigation and coordination with passing vessels. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-70.37378,43.46]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-70.37378,"DECIMAL_LATITUDE":43.46}},{"type":"Feature","id":45195,"geometry":{"type":"Point","coordinates":[-70.98582999999996,42.28083000000004]},"properties":{"ESRI_OID":45195,"MSI_UID":45195,"ATU":1,"TITLE":"Western Way - Wollaston Channel/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116381945,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secbosexcecozon:secbostersea:secbossublanact:nanroasouapp:pedislcha:wesway:wolcha","WATERWAY_NAME":"Wollaston Channel","CREATE_DATE":1780488457000,"MODIFIED_DATE":1780488464000,"BEGIN_DATE":1780444800000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-06-03 To: 2026-09-30\n\nLocation:\n42-16-50.988N/070-59-08.988W\n\n•\tAutonomous surface vessel (ASV) by Sedna Robotics in Quincy Bay, Massachusetts, from June 8 to September 30, 2026. The ASV, named \"Warden,\" is a 7-foot vessel with a yellow hull, marked \"Uncrewed / Research Vessel,\" and transmits as \"Uncrewed\" on AIS. Operations are scheduled to run 24 hours a day, seven days a week at coordinates 42º 16' 51\"N, 70° 59' 9\"W. It will operate within a 50-foot radius, station-keeping, and may transit at 2 knots during daytime hours. The vessel will display a flashing amber beacon at night and can be repositioned within 30 minutes upon request via the Sedna operations line, which is available 24/7 and displayed on the vessel. Launch and recovery will occur at Perry Beach, Quincy, MA. Operations are scheduled to run 24 hours a day, seven days a week at coordinates 42º 16' 51\"N, 70° 59' 9\"W autonomous surface vessel (ASV) by Sedna Robotics in Quincy Bay, Massachusetts, from June 8 to September 30, 2026. The ASV, named \"Warden,\" is a 7-foot vessel with a yellow hull, marked \"Uncrewed / Research Vessel,\" and transmits as \"Uncrewed\" on AIS. It will operate within a 50-foot radius, station-keeping, and may transit at 2 knots during daytime hours. The vessel will display a flashing amber beacon at night and can be repositioned within 30 minutes upon request via the Sedna operations line, which is available 24/7 and displayed on the vessel. Launch and recovery will occur at Perry Beach, Quincy, MA. \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-70.98583,42.28083]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-70.98582999999999,"DECIMAL_LATITUDE":42.280829999999995}},{"type":"Feature","id":45201,"geometry":{"type":"Point","coordinates":[-95.14113999999995,29.734560000000045]},"properties":{"ESRI_OID":45201,"MSI_UID":45201,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1780489039000,"MODIFIED_DATE":1784293427000,"BEGIN_DATE":1780444800000,"END_DATE":1800143999000,"DESCRIPTION":"Houston Ship Channel - Dock Construction --- From: 2026-06-03 To: January 2027 --- Construction for a new barge dock will take place along the Houston Ship Channel near Houston Ship Channel Lighted Buoy 145 (LLNR-25785.01).  Operations will be conducted 10-hours a day, 5-days a week.  On-scene vessels will include two 150 ft x 60 ft crane barges, two material barges, four towing vessels, and a work raft.  Mariners are urged to transit the area with caution.  VHF-FM Channel: 16","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-95.14114,29.73456]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-95.14114,"DECIMAL_LATITUDE":29.73456}},{"type":"Feature","id":45254,"geometry":{"type":"Point","coordinates":[-81.04113999999998,30.997290000000078]},"properties":{"ESRI_OID":45254,"MSI_UID":45254,"ATU":7,"TITLE":"District 7, Oceanic boundary to EEZ - Sector Charleston, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384309,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secchaexcecozon","WATERWAY_NAME":"Sector Charleston, Exclusive Economic Zone (EEZ)","CREATE_DATE":1780503167000,"MODIFIED_DATE":1780503317000,"BEGIN_DATE":1780444800000,"END_DATE":1796083199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-06-03\n45254\n\nLocation:\n30-59-50.244N/081-02-28.104W\n\nThe Georgia Department of Natural Resources (GADNR) intends to deploy the tug SEGA at SFC Reef between June 15 and July 15, 2026. The SEGA is 64.5' x 24.5' x 27' and is expected to land on her keel for a max height of 27’. SFC Reef is approximately 60’ deep at the proposed location and has an approved clearance of –28’ MLW. Material placements will not exceed this site’s approved clearance. All deployments are conducted in favorable weather conditions and during daylight hours. The proposed material deployment location is at 30.99729°N, 81.04114°W (30°59.837'N 81°2.468'W). \nThe Offshore Artificial Reef Program covers 111 square miles, consists of 20 offshore reefs, eight decommissioned Department of Defense Tactical Air Crew Training System Towers, and three beach reefs. This Program was established to develop long-term fisheries habitat to increase the availability of quality recreational fishing and diving sites in the Atlantic Ocean near Georgia. These artificial reefs provide habitat for both fishes and other marine life; act as attachment points for fouling and sessile organisms in search of hard substrates such as anemones, octocorals, sponges, algae, and others; and provide habitat for organisms to forage, shelter, and evade predators.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-81.04114,30.99729]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-81.04114,"DECIMAL_LATITUDE":30.99729}},{"type":"Feature","id":45432,"geometry":{"type":"Point","coordinates":[-76.33716999999996,38.52355000000006]},"properties":{"ESRI_OID":45432,"MSI_UID":45432,"ATU":5,"TITLE":"Chesapeake Channel - Little Choptank River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382449,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:litchoriv","WATERWAY_NAME":"Little Choptank River","CREATE_DATE":1780598131000,"MODIFIED_DATE":1780598142000,"BEGIN_DATE":1780531200000,"END_DATE":1789343999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-04 To: 2026-09-13\n\nLocation:\n38-31-59.900N/076-20-51.130W\n\nCottrell Contracting Corporation of Chesapeake, Virginia advises that the Dredge Lexington will be conducting dredging operations on the Chesapeake Bay in the vicinity of James Island and the Little Choptank River in Dorchester County, MD. Dredging operations will occur within a 3,000' radius of coordinates 38 31 59.9 N 076 20 51.13 W. Danger markers have been placed around the worksite and all mariners are requested to remain outside of the work area. Dredging activities are expected to begin on June 12, 2026 and continue through September 12, 2026.\nTransiting mariners can hail the dredge on VHF channels 16 &amp;amp;13. For emergencies the dredge can be reached at (757) 635-2578. A map has been provided below to show the area of work.\nAll mariners are requested to stay clear of the dredge, pipelines, barge, derricks and operating wires about the dredge. All operators should be aware that the dredge and pontoon lines are held in place by cables, which are attached to anchors some distance from the dredge and pontoons. Buoys are attached to the anchors so that they may be moved as the dredge moves. Submerged lines should be avoided. Mariners are requested to exercise extreme caution when approaching, passing, and leaving the dredging plant. Remain a safe distance away from the dredge, booster, buoys, cables, pipeline, barges, derricks, wires and related equipment.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.33717,38.52355]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.33717,"DECIMAL_LATITUDE":38.52355}},{"type":"Feature","id":47304,"geometry":{"type":"Point","coordinates":[-76.29590999999994,36.81271000000004]},"properties":{"ESRI_OID":47304,"MSI_UID":47304,"ATU":5,"TITLE":"Elizabeth River - Elizabeth River Southern Branch/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382754,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:jamriv:eliriv:elirivsoubra","WATERWAY_NAME":"Elizabeth River Southern Branch","CREATE_DATE":1782489817000,"MODIFIED_DATE":1782489835000,"BEGIN_DATE":1782432000000,"END_DATE":1792195199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-06-26 To: 2026-10-16\n\nLocation:\n36-48-45.756N/076-17-45.276W\nAECOM Construction, Inc. advises that McLean Contracting Company will be conducting mechanical dredging operations within the Norfolk Naval Shipyard in the Southern Branch of the Elizabeth River near Dry Doc 8 at: Lat 36°48’44.6”N, Long 76°17’48.6”W. Dredging operations will be performed within the secured perimeter of the Navy base, between the temporary containment wall and permanent bulkhead. Dredging is anticipated to begin on Wednesday July 15, 2026 and expected to last three months. Material loaded into hopper barges will be transported by tug to Port Weanack in Charles City, VA. Mariners should use caution when transiting the area. MSI # 47304.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.29591,36.81271]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.29590999999999,"DECIMAL_LATITUDE":36.812709999999996}},{"type":"Feature","id":47401,"geometry":{"type":"Point","coordinates":[-86.46002999999996,43.95216000000005]},"properties":{"ESRI_OID":47401,"MSI_UID":47401,"ATU":9,"TITLE":"LAKE MICHIGAN - Ludington/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386144,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:lud","WATERWAY_NAME":"Ludington","CREATE_DATE":1782741875000,"MODIFIED_DATE":1782741881000,"BEGIN_DATE":1783296000000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-07-06 To: 2026-09-30\n\nDredging the Ludington Harbor Federal channel. Submerged pipe lying on the lake floor marked by orange round buoys every 500 feet. (2) white buoys will be seen North and South of the dredge. The white buoys indicate winch anchor locations. The disposal area starts South of the South breakwater 5,500’ and goes an additional 5,000’ Southward. Placement will be between the 4’ depth contour to the 10’ depth contour. The disposal area will be marked with white ball buoys on each corner. The main contact will be Superintendent Rob Lister. Cell# listed below. During rough seas our pipe pontoon will be floating outside of the channel. It is bright yellow, 25’x8’x6’ and has (2) flashing amber lights on each end that come on at night. Another pipe pontoon that is bright yellow (25’x8’x6’) and has (2) flashing amber lights on each end will be in the disposal area. \n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-86.46003,43.95216]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-86.46002999999999,"DECIMAL_LATITUDE":43.95216}},{"type":"Feature","id":47533,"geometry":{"type":"Point","coordinates":[-73.99969999999996,40.69690000000003]},"properties":{"ESRI_OID":47533,"MSI_UID":47533,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1782826073000,"MODIFIED_DATE":1782826080000,"BEGIN_DATE":1782777600000,"END_DATE":1791244799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-03 To: 2026-10-05\n\nLocation:\n40-41-48.840N/073-59-58.920W\n\nTrevcon Construction Company LLC submitted a Local Notice to Mariners (LNM) Information Form to the U.S. Coast Guard First District for a marine construction project in New York’s East River/New York Bay. The project, scheduled from August 3 to October 5, 2026, involves the removal of the BBP Pier 4 Marine Transfer Bridge, including steel structure removal, timber pile removal, and diver operations. Work will occur daily from 5:00 AM to 6:00 PM at the coordinates 40°41'49\" N, 73°59'59\" W. Equipment on site will include a crane barge, material barge, and diving equipment. \n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.9997,40.6969]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.9997,"DECIMAL_LATITUDE":40.6969}},{"type":"Feature","id":47535,"geometry":{"type":"Point","coordinates":[-73.99996999999996,40.69698000000005]},"properties":{"ESRI_OID":47535,"MSI_UID":47535,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1782826691000,"MODIFIED_DATE":1782826696000,"BEGIN_DATE":1782777600000,"END_DATE":1791244799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-03 To: 2026-10-05\n\nLocation:\n40-41-49.128N/073-59-59.892W\n\n Trevcon Construction Company LLC submitted a Local Notice to Mariners (LNM) Information Form to the U.S. Coast Guard First District for a marine construction project in New York’s East River/New York Bay. The project, scheduled from August 3 to October 5, 2026, involves the removal of the BBP Pier 4 Marine Transfer Bridge, including steel structure removal, timber pile removal, and diver operations. Work will take place daily from 5:00 AM to 6:00 PM at the coordinates 40.6969° N, -73.9997° W. Equipment on site will include a crane barge, material barge, and diving equipment.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.99997,40.69698]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.99996999999999,"DECIMAL_LATITUDE":40.696979999999996}},{"type":"Feature","id":47599,"geometry":{"type":"Point","coordinates":[-67.38329999999996,44.352400000000046]},"properties":{"ESRI_OID":47599,"MSI_UID":47599,"ATU":1,"TITLE":"NAVAREA IV/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382366,"MRN":"urn:mrn:iala:wwy:us:navIV","WATERWAY_NAME":"NAVAREA IV","CREATE_DATE":1782837963000,"MODIFIED_DATE":1782837998000,"BEGIN_DATE":1782777600000,"END_DATE":1792540799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-03 To: 2026-10-20\n\nLocation:\n44-21-08.640N/067-22-59.880W\n\nWoods Hole Oceanographic Institution submitted a Local Notice to Mariners (LNM) Information Form to the U.S. Coast Guard First District for a project focused on harmful algal bloom surveillance in the Gulf of Maine. The operation will deploy sensors aboard a SeaTrac SP-48 uncrewed surface vehicle (USV) at the coordinates 44.3524° N, -67.3833° W. The project is scheduled to run continuously, 24 hours a day, seven days a week, from August 3rd to October 20th. The USV will operate in the designated area, and vessels are requested to provide two hours’ notice for passing arrangements to avoid navigation interference. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-67.3833,44.3524]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-67.3833,"DECIMAL_LATITUDE":44.3524}},{"type":"Feature","id":47772,"geometry":{"type":"Point","coordinates":[-74.14586999999995,40.64373000000006]},"properties":{"ESRI_OID":47772,"MSI_UID":47772,"ATU":1,"TITLE":"Main Channel - Kill Van Kull/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116382313,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:kilvankul","WATERWAY_NAME":"Kill Van Kull","CREATE_DATE":1783006390000,"MODIFIED_DATE":1783006398000,"BEGIN_DATE":1782950400000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-0-01 T8o: 2026-10-31\n\nLocation:\n40-38-37.428N/074-08-45.132W\n\nAmy Ruta of Parsons submitted a Local Notice to Mariners (LNM) Information Form for sediment core boring operations scheduled from August 1, 2026, to October 31, 2026, in Newark Bay and Kill Van Kull, New Jersey, near the Bayonne Bridge at coordinates 40°38'37.435\"N, 74°8'45.144\"W. The work will be conducted using barge-mounted sediment drilling equipment and samplers, operating five days per week from 7 am to 5 pm. Vessels involved can be contacted on VHF Channel 16, and passing arrangements require a 30-minute notice to move vessels located within the side slopes of the navigation channel, though no work will occur within the channel itself. \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.14587,40.64373]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.14587,"DECIMAL_LATITUDE":40.64373}},{"type":"Feature","id":47979,"geometry":{"type":"Point","coordinates":[-85.52411999999998,30.05746000000005]},"properties":{"ESRI_OID":47979,"MSI_UID":47979,"ATU":8,"TITLE":"East Bay To West Bay - East Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384638,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:standbayenttowesbay:easbay","WATERWAY_NAME":"East Bay","CREATE_DATE":1783343986000,"MODIFIED_DATE":1783344079000,"BEGIN_DATE":1783296000000,"END_DATE":1798847999000,"DESCRIPTION":"East Bay - Oyster Reef Installation --- From: 2026-07-13 To: 2026-12-31 --- Six oyster reef breakwater units will be installed in East Bay along Tyndall Air Force Base.  Work will take place Monday through Friday, during daylight hours.  The submerged breakwater structures will be installed at least 25 ft seaward of the existing grass meadow.  The oyster reef breakwater units will be submerged in water depths of 4 to 5 ft, with the top of each structure 0.56 ft below the current mean low water level.  Up to three navigation signs will be installed along the outer limits of the oyster reef sites.  On-scene vessels will include a crane barge, a deck barge, a spud barge, work skiffs, the T/Vs STORM CAT and LLOYD W, and the Crew Boat SWAMP ANGEL.  Mariners are urged to transit the area at their slowest safe speed to minimize wake and maintain a safe distance from the reef installation site.  VHF-FM Channel: 16, POC:  (850) 960-4839","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-85.52412,30.05746]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-85.52412,"DECIMAL_LATITUDE":30.05746}},{"type":"Feature","id":47993,"geometry":{"type":"Point","coordinates":[-86.91537999999997,41.72813000000008]},"properties":{"ESRI_OID":47993,"MSI_UID":47993,"ATU":9,"TITLE":"LAKE MICHIGAN - Michigan City/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386206,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:miccit","WATERWAY_NAME":"Michigan City","CREATE_DATE":1783344917000,"MODIFIED_DATE":1783344924000,"BEGIN_DATE":1785542400000,"END_DATE":1792108799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-01 To: 2026-10-15\n\nLocation:\n41-43-41.268N/086-54-55.368W\n\nStone and pier repair work on Detached Outer\nBreakwater\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-86.91538,41.72813]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-86.91538,"DECIMAL_LATITUDE":41.72813}},{"type":"Feature","id":48051,"geometry":{"type":"Point","coordinates":[-69.57562999999993,43.955820000000074]},"properties":{"ESRI_OID":48051,"MSI_UID":48051,"ATU":1,"TITLE":"Sector Northern New England, Submerged Lands Act (SLA) - Damariscotta River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381685,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact:damriv","WATERWAY_NAME":"Damariscotta River","CREATE_DATE":1783357193000,"MODIFIED_DATE":1783357200000,"BEGIN_DATE":1780358400000,"END_DATE":1811980799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-06-02 To: 2027-06-02\n\nLocation:\n43-57-20.952N/069-34-32.268W\n\\Fuller Marine Services, Inc. submitted a Local Notice to Mariners (LNM) Information Form to the U.S. Coast Guard First District for the full removal and replacement of Merry Island Daybeacon 15 (LLNR 5365) in the Damariscotta River, Maine. The project, The project will  replace the aid entirely, is scheduled to begin on June 15, 2026, and will continue until completion, with daily operations from 7:00 AM to 6:00 PM using the vessels Enzo Charles and Mary Louisa II. Vessels will monitor VHF-FM Channels 16 and 13 for navigational safety and passing arrangements, with secondary contact available on Channel 09 or USCG working channel 22A. The crew will maintain a clear fairway for all traffic and will reposition within 30 minutes if additional channel breadth is required, subject to weather and safety conditions. \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-69.57563,43.95582]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-69.57563,"DECIMAL_LATITUDE":43.955819999999996}},{"type":"Feature","id":48057,"geometry":{"type":"Point","coordinates":[-88.03244999999998,30.656750000000045]},"properties":{"ESRI_OID":48057,"MSI_UID":48057,"ATU":8,"TITLE":"Mobile Bar - Mobile Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384527,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:mobbay:mobbar:mobcha","WATERWAY_NAME":"Mobile Channel","CREATE_DATE":1783359089000,"MODIFIED_DATE":1783359986000,"BEGIN_DATE":1783296000000,"END_DATE":1861919999000,"DESCRIPTION":"Mobile Channel - Dock Construction --- From: 2026-08-01 To: December 2028 --- Dock construction will be conducted at the Choctaw Point Container Terminal located along the western edge of the Mobile Channel.  Work will consist of the demolition of existing structures, pile driving, and new wharf construction.  Operations will take place from approximately 7:00 a.m. to 5:30 p.m., Monday through Saturday.  Construction work will be performed from crane and deck barges adjacent to the McDuffie Coal Terminal.  All barges will be serviced by an on-scene push-boat.  Mariners are urged to use extreme caution when navigating the work area, maintain a minimum 50 ft clearance from all vessels, and transit at their slowest safe speed.  VHF-FM Channel: 16, POC: (813) 393-8184 or (904) 422-9964","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-88.03245,30.65675]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-88.03245,"DECIMAL_LATITUDE":30.65675}},{"type":"Feature","id":48540,"geometry":{"type":"Point","coordinates":[-94.78340999999995,29.365170000000035]},"properties":{"ESRI_OID":48540,"MSI_UID":48540,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1783704015000,"MODIFIED_DATE":1786545089000,"BEGIN_DATE":1783641600000,"END_DATE":1794095999000,"DESCRIPTION":"Point Bolivar - Houston Ship Channel - Demolition Operation --- From: 2026-07-10 To: 2026-11-06 --- Demolition activities will be conducted near the Bolivar Ferry Landing on a nearby derelict steel dry dock.  Work will take place during daylight hours only from 7:00 a.m. to 6:00 p.m., daily.  On-scene equipment and crews will include two material barges and the Spud Barge EMERGE IV.  Periodic dive operations will take place near the demolition site.  Mariners are urged to transit the area at their slowest safe speed to minimize wake.  VHF-FM Channels: 5, 12 and 13,  POC: (727) 361-4019","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-94.78341,29.36517]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-94.78340999999999,"DECIMAL_LATITUDE":29.36517}},{"type":"Feature","id":48779,"geometry":{"type":"Point","coordinates":[-124.02479999999997,46.256770000000074]},"properties":{"ESRI_OID":48779,"MSI_UID":48779,"ATU":13,"TITLE":"Sector Columbia River, Submerged Land Act (SLA) - Columbia River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385647,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:colriv","WATERWAY_NAME":"Columbia River","CREATE_DATE":1784079516000,"MODIFIED_DATE":1784079526000,"BEGIN_DATE":1783814400000,"END_DATE":1793663999000,"DESCRIPTION":"Mason Hopper Dredge Bayport will be conducting hopper dredging operations on the lower Columbia River from (RM 03+00 to 105+00) from 12 Jul through 01 Nov 2026. Specifically targeting Miller Sands and Pillar Rock at (RM 24+20 to 25+40). Disposal will be at various flow lane disposal sites. Hours of operation are 7 days per week, 24-hrs per day. M/V Dredge Bayport will serve at the Hopper Dredge with M/V John M and M/V Aggie serving as the crew/survey vessel. Working vessels may be hailed on VHF-FM channels 13, 16 and 66. Mariners are requested to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. For additional information, contact Paul Karscay/Paul Wittkopf, Dredge Bayport Captains at 562-762-5450, Taylor McRae, Project Manager at 904-228-5782, Rebecca Read, Project Engineer at 904-466-2564 or Juan Valdez, Operations Manager at 904-697-6099. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-124.0248,46.25677]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-124.0248,"DECIMAL_LATITUDE":46.256769999999996}},{"type":"Feature","id":48812,"geometry":{"type":"Point","coordinates":[-96.97995999999995,26.84215000000006]},"properties":{"ESRI_OID":48812,"MSI_UID":48812,"ATU":8,"TITLE":"Sector Corpus Christi, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119481163,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:seccorchrexcecozon","WATERWAY_NAME":"Sector Corpus Christi, Exclusive Economic Zone (EEZ)","CREATE_DATE":1784121277000,"MODIFIED_DATE":1785333690000,"BEGIN_DATE":1784073600000,"END_DATE":1789430399000,"DESCRIPTION":"Gulf of America - Platform Decommissioning/Removal --- 2026-08-28 To: 2026-09-13 --- Platform removal will take place in the Gulf of America at North Padre Island Area, Block 969, Platform JA (PN 969JA), in approximate position 26-50-31.62N 096-58-47.80W.  Operations will be conducted 24-hours a day, 7-days a week.  Decommissioning activities may include crane lifting operations, vessel mooring, and associated marine construction activities.  On-scene vessels will include the Derrick Barge DB-THOR and the Anchor Handling T/Vs CROSBY ENDEAVOR and CROSBY ADMIRAL.  Subsea hazards may be in the area until the platform has been completely removed.  The derrick barge will anchor near the platform using a 6-point anchor spread.  Mariners are urged to exercise caution when transiting the area, maintain a safe distance from the work site to avoid entanglement in anchor lines, and contact the project vessels prior to approaching the operation.  VHF-FM Channels: 16, 69 and 71, POC: (985) 746-3797","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-96.97996,26.84215]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-96.97995999999999,"DECIMAL_LATITUDE":26.84215}},{"type":"Feature","id":49090,"geometry":{"type":"Point","coordinates":[-74.17949999999996,40.64567000000005]},"properties":{"ESRI_OID":49090,"MSI_UID":49090,"ATU":1,"TITLE":"Main Channel - Kill Van Kull/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382313,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:kilvankul","WATERWAY_NAME":"Kill Van Kull","CREATE_DATE":1784549048000,"MODIFIED_DATE":1784549057000,"BEGIN_DATE":1784505600000,"END_DATE":1789430399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-07-27 To: 2026-09-14\n\nLocation:\n40-38-44.412N/074-10-46.200W\n\nThe U.S. Army Corps of Engineers (USACE) will conduct a maintenance dredging project in the Arthur Kill 35' Reach Channel, a vital federal navigation route between New York and New Jersey. The project, managed by Donjon Marine Co., LLC, is designed to maintain safe and efficient passage for commercial and maritime traffic in this busy waterway. Work is scheduled to begin on July 27, 2026, and conclude by September 14, 2026, with operations running seven days a week for twelve hours each day. The project site is located at latitude 40° 38' 44.2428\" N and longitude 74° 10' 46.2036\" W.\nOn-site equipment will include a dredge, a tending tug, hopper scows, a towing tug for loaded scows, and a crew boat. For safety and coordination, vessels involved in the project will operate on radio channel 78 and monitor channels 13 and 14. To minimize impacts on navigation, the project will follow a “move on demand” approach, with a tending tug available to relocate the dredge and scows as needed to avoid impeding other vessels. Mariners are encouraged to coordinate passing arrangements with the project team to ensure safe and efficient transit through the area.\nFor ongoing updates and guidance, the Local Notice to Mariners (LNM) will provide official information to the maritime community. Questions or concerns can be directed to Brian P. Henry at Donjon Marine Co., LLC via email at brian.henry@donjon.com or by phone at 908-413-3003.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.1795,40.64567]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.1795,"DECIMAL_LATITUDE":40.645669999999996}},{"type":"Feature","id":49773,"geometry":{"type":"Point","coordinates":[-90.02706999999998,29.965280000000064]},"properties":{"ESRI_OID":49773,"MSI_UID":49773,"ATU":8,"TITLE":"Head Of Passes To New Orleans - Inner Harbor Navigation Canal/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385063,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:innharnavcan","WATERWAY_NAME":"Inner Harbor Navigation Canal","CREATE_DATE":1785170396000,"MODIFIED_DATE":1785171139000,"BEGIN_DATE":1785110400000,"END_DATE":1861919999000,"DESCRIPTION":"Inner Harbor Navigation Canal - GIWW - Lock Special Instructions --- Reported: 2024-09-09 --- While entering and exiting the Inner Harbor Navigation Canal (IHNC) Lock, mariners shall use EXTREME CAUTION, especially when navigating along the long guide walls on the river and canal ends of the structure.  Tows are to approach the structure at a SLOW BELL SPEED.  For additional information, mariners can contact the USACE/Lockmaster. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-90.02707,29.96528]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-90.02707,"DECIMAL_LATITUDE":29.96528}},{"type":"Feature","id":50107,"geometry":{"type":"Point","coordinates":[-71.37423999999999,41.762060000000076]},"properties":{"ESRI_OID":50107,"MSI_UID":50107,"ATU":1,"TITLE":"Providence River Approach - Providence River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382348,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secsounewengexcecozon:secsounewengtersea:secsounewengsublanact:easapp:easpas:prorivapp:proriv","WATERWAY_NAME":"Providence River","CREATE_DATE":1785407115000,"MODIFIED_DATE":1785407171000,"BEGIN_DATE":1786924800000,"END_DATE":1790812799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-31 To: 2026-09-30\n\nLocation:\n41-45-43.416N/071-22-27.264W\n\nAGM Marine Contractors, Inc. is scheduled to perform an ATON (Aid to Navigation) removal operation for the U.S). Coast Guard, specifically removing Sabin Point Daybeacon SP (LLNR 18455) in position 41-45-43.389N 071-22-27.250W in Providence River, Rhode Island. The project is planned for August 31 to September 30, 2026, with work conducted Monday through Friday 12 hours per day, weather permitting. The operation will utilize the barge \"ZARENAI\" and will be monitoring radio frequencies 13/16 and working on 68.\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-71.37424,41.76206]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-71.37424,"DECIMAL_LATITUDE":41.76206}},{"type":"Feature","id":50192,"geometry":{"type":"Point","coordinates":[-69.06042999999994,44.15363000000008]},"properties":{"ESRI_OID":50192,"MSI_UID":50192,"ATU":1,"TITLE":"Sector Northern New England, Submerged Lands Act (SLA) - West Penobscot Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381722,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact:wespenbay","WATERWAY_NAME":"West Penobscot Bay","CREATE_DATE":1785498100000,"MODIFIED_DATE":1785498106000,"BEGIN_DATE":1785456000000,"END_DATE":1817078399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-07-31 To: 2027-07-31\n\nLocation:\n44-09-13.068N/069-03-37.548W\n\nFuller Marine Services Inc. plans to conduct work at Porterfield Ledge Daybeacon, Light List Number 4270, in Rockport Harbor, Maine, beginning on or about August 13, 2026, and continuing until complete. The work will include replacing the steel structure, capping the granite superstructure, and stabilizing the stone base. Operations are expected to occur daily from 4:00 a.m. to 8:00 p.m. using the vessel Enzo Charles. The vessel will monitor VHF-FM Channels 16 and 13 while underway or on site, with Channel 13 used for bridge-to-bridge navigational safety and passing arrangements. The work area is located at approximately 44°09'14.6\"N, 069°03'41.3\"W, on Chart 13305. The contractor will maintain a clear fairway for marine traffic and will reposition the vessel within 30 minutes of notification when necessary, weather and safety conditions permitting.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-69.06043,44.15363]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-69.06043,"DECIMAL_LATITUDE":44.15363}},{"type":"Feature","id":50390,"geometry":{"type":"Point","coordinates":[-86.91159999999996,41.72872000000007]},"properties":{"ESRI_OID":50390,"MSI_UID":50390,"ATU":9,"TITLE":"LAKE MICHIGAN - Michigan City/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386206,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:miccit","WATERWAY_NAME":"Michigan City","CREATE_DATE":1785777438000,"MODIFIED_DATE":1785777444000,"BEGIN_DATE":1785715200000,"END_DATE":1792108799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-03 To: 2026-10-15\n\nStone and pier repair work east pier head for\nMichigan City Harbor. Spud Barge “Justin Avery” and Tug “George F. Bailey” VHF-FM  16 &amp;amp; 7\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-86.9116,41.72872]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-86.9116,"DECIMAL_LATITUDE":41.728719999999996}},{"type":"Feature","id":50434,"geometry":{"type":"Point","coordinates":[-94.71832999999998,29.339710000000025]},"properties":{"ESRI_OID":50434,"MSI_UID":50434,"ATU":8,"TITLE":"Sector Houston-Galveston, Submerged Land Act (SLA) - Galveston Bay Entrance Channel/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100117416712,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha","WATERWAY_NAME":"Galveston Bay Entrance Channel","CREATE_DATE":1785853337000,"MODIFIED_DATE":1785854848000,"BEGIN_DATE":1785801600000,"END_DATE":1789257599000,"DESCRIPTION":"Galveston Bay Entrance Channel – Survey Operation --- From: 2026-08-17 To: 2026-09-11 --- A 25 ft survey vessel will be working along the Galveston Bay Entrance Channel near the south jetty conducting remote-sensing surveys.  Dive operations will be conducted on 12 magnetic anomalies identified in the area.  Operations will be conducted during daylight hours for 10-hours a day, 7-days a week.  Mariners are requested to transit the area at their slowest safe speed to minimize wake and provide a wide berth to avoid interfering with survey and dive operations. VHF-FM Channel: 16","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-94.71833,29.33971]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-94.71833,"DECIMAL_LATITUDE":29.33971}},{"type":"Feature","id":50465,"geometry":{"type":"Point","coordinates":[-74.14226999999994,40.68078000000003]},"properties":{"ESRI_OID":50465,"MSI_UID":50465,"ATU":1,"TITLE":"Newark Bay - Port Newark Pierhead Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382119,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:kilvankul:newbay:pornewpiecha","WATERWAY_NAME":"Port Newark Pierhead Channel","CREATE_DATE":1785860473000,"MODIFIED_DATE":1785860484000,"BEGIN_DATE":1785801600000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-04 To: 2026-10-31\n\nLocation:\n40-40-50.808N/074-08-32.172W\n\nJay Cashman, Inc. submitted a Local Notice to Mariners information form for maintenance dredging work at the Port Newark and Elizabeth Port Authority Marine Terminal in New Jersey. The work will support NY and NJ marine terminal maintenance dredging under Port Authority work orders and is scheduled to occur from August 3, 2026, through October 31, 2026. Operations are planned for Berths 8, 23, 25, 68, 70, 72, 96, and 98, near position 40°40'50.81\"N, 74°8'32.18\"W. Work hours are expected to be 6:00 a.m. to 6:00 p.m., Monday through Saturday, with Sunday operations as required. Equipment on scene will include the Clamshell Dredge Icarus, Tender Tug Ava Jude, Towing Tug Jay Michael, Crew Boat Capt. Joe Casey 2, and Survey 2. Vessels may be contacted on VHF channels 13 and 16. Passing arrangements indicate approximately 15 minutes may be needed to move vessels so as not to impede navigation. \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.14227,40.68078]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.14227,"DECIMAL_LATITUDE":40.68078}},{"type":"Feature","id":50549,"geometry":{"type":"Point","coordinates":[-89.79695999999996,29.784620000000075]},"properties":{"ESRI_OID":50549,"MSI_UID":50549,"ATU":8,"TITLE":"Sector New Orleans, Territorial Sea - Sector New Orleans, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384639,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact","WATERWAY_NAME":"Sector New Orleans, Submerged Land Act (SLA)","CREATE_DATE":1785949553000,"MODIFIED_DATE":1785956330000,"BEGIN_DATE":1785888000000,"END_DATE":1791935999000,"DESCRIPTION":"Lake Lery - Marine Construction --- From: 2026-08-12 To: 2026-10-12 --- Plugging and abandoning operations will be conducted on an oil and gas structure in Lake Lery, in approximate position 29-47-04.69N 089-47-49.04W.  Work will include pipeline removal, prop washing activities, and site clearance.  Operations will be conducted from 6:00 a.m. to 6:00 p.m., daily.  On-scene vessels will include the Crew Boat ISAAC, the Spud Barge BRENNAN, and Spud Barge KS366, and the T/V HUNTER A SETTOON.  Mariners are urged to maintain a wide berth from the worksite and transit the area at their slowest safe speed to minimize wake.  POC: (985) 688-6909","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-89.79696,29.78462]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-89.79696,"DECIMAL_LATITUDE":29.78462}},{"type":"Feature","id":50550,"geometry":{"type":"Point","coordinates":[-89.89986999999996,29.79731000000004]},"properties":{"ESRI_OID":50550,"MSI_UID":50550,"ATU":8,"TITLE":"Sector New Orleans, Territorial Sea - Sector New Orleans, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384639,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact","WATERWAY_NAME":"Sector New Orleans, Submerged Land Act (SLA)","CREATE_DATE":1785949613000,"MODIFIED_DATE":1785956353000,"BEGIN_DATE":1785888000000,"END_DATE":1791935999000,"DESCRIPTION":"Lake Lery - Marine Construction --- From: 2026-08-12 To: 2026-10-12 --- Plugging and abandoning operations will be conducted on an oil and gas structure in Lake Lery, in approximate position 29-47-50.42N 089-53-59.52W.  Work will include pipeline removal, prop washing activities, and site clearance.  Operations will be conducted from 6:00 a.m. to 6:00 p.m., daily.  On-scene vessels will include the Crew Boat ISAAC, the Spud Barge BRENNAN, and Spud Barge KS366, and the T/V HUNTER A SETTOON.  Mariners are urged to maintain a wide berth from the worksite and transit the area at their slowest safe speed to minimize wake.  POC: (985) 688-6909","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-89.89987,29.79731]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-89.89986999999999,"DECIMAL_LATITUDE":29.79731}},{"type":"Feature","id":50552,"geometry":{"type":"Point","coordinates":[-76.42779999999993,38.99496000000005]},"properties":{"ESRI_OID":50552,"MSI_UID":50552,"ATU":5,"TITLE":"Chesapeake Channel - Whitehall Creek/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382473,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:whicre","WATERWAY_NAME":"Whitehall Creek","CREATE_DATE":1785950458000,"MODIFIED_DATE":1785950464000,"BEGIN_DATE":1785888000000,"END_DATE":1796169599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-05 To: 2026-12-01\n\nLocation:\n38-59-41.856N/076-25-40.080W\n\nShoreline Design, LLC will begin construction of a shoreline erosion control project for St. Mary’s Church in Annapolis, MD on August 10, 2025. The project will require a temporary mooring in Whitehall Bay to allow transfer of material barges between Annapolis and the quarry in Havre de Grace.  \nVHF Radio Channel monitored: 16/80\n \n1 Date of start and date of completion?   \n8/10/26 thru 11/30/26\n \n2. Work days during the week and work hours during the day? \n7 days a week, 7am – 7 pm\n \n3. Name of the marine contractor companies and the identity/description of all their vessels/marine equipment located on site? \nPrimary Contractor: Shoreline Design, 637 Shore Drive, Edgewater, MD 21037\n \n                Vessels/Marine Equipment\n1 each 34’x130’ Deck Barge\n1 each 30’x110’ Deck Barge\n1 each 24’x60’ Spud Barge\n2 each 24’x50’ Spud Barge\n2 each 12’x25’ Tug Boats (Miss Lee Ann and Pusherman)\n1 each 12’x20’ Push Boat\n1 each 6’x24’ Crew Boat\n \n4. Will any vessels/marine equipment be using any form of anchoring system or attached to commercial mooring buoys? \nYes, one mooring buoy at each location will be installed for connecting line barges during construction of the project.\n \n5. Will there be any other buoys or structures established, such as \"no-wake\" warning signage, permitted by other agencies or entities?\nNo\n \n6. Your concurrence that all marine equipment will be marked and lighted in accordance with USCG Regulations. \nAll equipment will be marked and lighted in accordance with USCG Regulations\n \n7. Your intentions for equipment during heavy weather or other emergency, such as an approaching hurricane or ice conditions.\nDuring heavy weather all barges will be moved to a safe harbor within Severn River and/or White Hall Bay\n \n8. Emergency, 24-hour point of contact (name, title and phone number) for the project's duration.\n \nWes Matheu\nPresident\nShoreline Design, LLC\n443-336-0978\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.4278,38.99496]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.4278,"DECIMAL_LATITUDE":38.99496}},{"type":"Feature","id":50591,"geometry":{"type":"Point","coordinates":[-88.25215999999995,30.334510000000023]},"properties":{"ESRI_OID":50591,"MSI_UID":50591,"ATU":8,"TITLE":"Sector Mobile, Territorial Sea - Sector Mobile, Submerged Land Act (SLA)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384736,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact","WATERWAY_NAME":"Sector Mobile, Submerged Land Act (SLA)","CREATE_DATE":1785959443000,"MODIFIED_DATE":1786018037000,"BEGIN_DATE":1785888000000,"END_DATE":1809302399000,"DESCRIPTION":"Portersville Bay - Mississippi Sound - Marine Construction --- From: 2026-08-10 To: 2027-05-01--- The Coffee Island Living Shoreline Project will take place in Portersville Bay.  Operations will consist of the placement of riprap to create a 9,300 ft overlapping segmented breakwater on the southeast shoreline of Coffee Island (Isle aux Herbes).  On-scene vessels will include, but are not limited to, push boats, barges, material handlers, and transport vessels.  Mariners are requested to transit the area at no-wake speed.  VHF-FM Channels: 12 and 16, POC: (251) 751-4127 and 251-895-6378","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-88.25216,30.33451]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-88.25215999999999,"DECIMAL_LATITUDE":30.334509999999998}},{"type":"Feature","id":50714,"geometry":{"type":"Point","coordinates":[-81.49152999999995,30.779310000000066]},"properties":{"ESRI_OID":50714,"MSI_UID":50714,"ATU":7,"TITLE":"Kings Bay/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116383743,"MRN":"urn:mrn:iala:wwy:us:navIV:dis7:secjacexcecozon:secjactersea:secjacsublanact:stmarent:cumsou:kinbay","WATERWAY_NAME":"Kings Bay","CREATE_DATE":1786055452000,"MODIFIED_DATE":1786055457000,"BEGIN_DATE":1785974400000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-06 To: 2027-01-31\n\nLocation:\n30-46-45.516N/081-29-29.508W\n\nUMX Crew will performing underwater diving repairs work at MSF Facility (East River), Kings Bay Base, GA (30-46-45.5N / 81-29-29.5W). \nThe Crew will have a diving vessel on-site. No wake is requested near the job location. The project is scheduled is estimated to finish on December 31, 2026. For any questions or concerns, contact: Patrick Cooney (904) 318-8748.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-81.49153,30.77931]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-81.49153,"DECIMAL_LATITUDE":30.77931}},{"type":"Feature","id":50834,"geometry":{"type":"Point","coordinates":[-95.10012999999998,29.749600000000044]},"properties":{"ESRI_OID":50834,"MSI_UID":50834,"ATU":8,"TITLE":"Galveston Bay Entrance Channel - Houston Ship Channel/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:sechouexcecozon:sechoutersea:sechousublanact:galbayentcha:houshicha","WATERWAY_NAME":"Houston Ship Channel","CREATE_DATE":1786372815000,"MODIFIED_DATE":1787236041000,"BEGIN_DATE":1786320000000,"END_DATE":1789430399000,"DESCRIPTION":"Houston Ship Channel - Dredge Operation --- From: 2026-08-13 To: 2026-09-13 --- The Dredge MBI-08 will be conducting dredging operations along the Houston Ship Channel in the vicinity of the Energy Transfer Docks/Houston Fuel and Oil Ship Docks.  Dredged material will be loaded into regulation hopper barges and transported to an unloader barge located at Adloy along the San Jacinto River.  On-scene support vessels will include the T/Vs GRAND ANN, TOWNES JEFFERY and JACKSON FOSTER.  The dredge requests 30-minutes notice for ships transiting the area.  Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution.  VHF-FM Channels: 76 or 78,  POC: (228) 213-0600","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-95.10013,29.7496]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-95.10013,"DECIMAL_LATITUDE":29.7496}},{"type":"Feature","id":50845,"geometry":{"type":"Point","coordinates":[-90.08999999999997,28.844990000000053]},"properties":{"ESRI_OID":50845,"MSI_UID":50845,"ATU":8,"TITLE":"Sector New Orleans, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384641,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon","WATERWAY_NAME":"Sector New Orleans, Exclusive Economic Zone (EEZ)","CREATE_DATE":1786375180000,"MODIFIED_DATE":1786456993000,"BEGIN_DATE":1786320000000,"END_DATE":1788652799000,"DESCRIPTION":"Gulf of America - Dive Operations --- From: 2026-08-15 To: 2026-09-04 --- The M/V SEVAN LOUISIANA will be conducting offshore dive operations in the Gulf of America, Grand Isle Area, in approximate position 28-50-42N 090-05-24W.  Underwater inspections and maintenance activities will be conducted 24-hours a day, 7-days a week.  Mariners are urged to maintain a wide berth from the M/V SEVAN LOUISIANA and observe all day shapes and dive flags. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-90.09,28.84499]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-90.09,"DECIMAL_LATITUDE":28.84499}},{"type":"Feature","id":50849,"geometry":{"type":"Point","coordinates":[-76.29089999999997,36.79780000000005]},"properties":{"ESRI_OID":50849,"MSI_UID":50849,"ATU":5,"TITLE":"Elizabeth River - Elizabeth River Southern Branch/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382754,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:jamriv:eliriv:elirivsoubra","WATERWAY_NAME":"Elizabeth River Southern Branch","CREATE_DATE":1786377318000,"MODIFIED_DATE":1786377386000,"BEGIN_DATE":1786320000000,"END_DATE":1789257599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-10 To: 2026-09-12\n\nLocation:\n36-47-52.080N/076-17-27.240W\n\nCrofton Construction Services, Incorporated (CCSI) will be conducting demolition and reconstruction of a 19-pile dolphin at in the following location: 36°47'52.2\"N 76°17'27.3\"W\n\nBeginning August 20, 2026, and continuing until September 11, 2026, approximately 28 days or until complete from 7:00 AM- 3:30 PM, five days a week. Operations will include crane barge operations, material barges, tug boats, work floats, and smaller crafts consistent with general marine construction. Barge(s) and vessel(s) will be moored, on site with employees working over the side on small floats or crew boats. The equipment will be confined to the barges with crew boats working in the vicinity.\n\nVessels are requested to proceed in this area with caution and no wake within 500' of the above coordinates. Crews will be monitoring the following radio frequencies: VHF channels 13 and 16. MSI # 50849.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-76.2909,36.7978]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-76.29090000000001,"DECIMAL_LATITUDE":36.7978}},{"type":"Feature","id":50862,"geometry":{"type":"Point","coordinates":[-72.08415999999994,41.347500000000025]},"properties":{"ESRI_OID":50862,"MSI_UID":50862,"ATU":1,"TITLE":"Long Island Sound Eastern Part - New London Harbor/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381561,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:seclonislsouexcecozon:seclonislsoutersea:seclonislsousublanact:bloislsouandgarbay:lonislsoueaspar:newlonhar","WATERWAY_NAME":"New London Harbor","CREATE_DATE":1786383149000,"MODIFIED_DATE":1786383154000,"BEGIN_DATE":1786320000000,"END_DATE":1788393599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-10 To: 2026-09-01\n\nLocation:\n41-20-51.000N/072-05-02.976W\n\nConstruction operations on a floating work platform will take place from August 10, 2026 through September 1, 2026 from 7 a.m. to 2:30 p.m. each day in the Thames River at the approximate location 41° 20' 51N, 072° 05' 03W in New London, CT. Mariners are requested to maintain steerage and transit the area at a no wake, minimum safe speed. Mariners may contact personnel on the work platform on VHF Channel 8 for further information.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-72.08416,41.3475]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-72.08416,"DECIMAL_LATITUDE":41.347500000000004}},{"type":"Feature","id":50879,"geometry":{"type":"Point","coordinates":[-91.02200999999997,30.187740000000076]},"properties":{"ESRI_OID":50879,"MSI_UID":50879,"ATU":8,"TITLE":"New Orleans Harbor - New Orleans To Baton Rouge/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100119138784,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secneworlexcecozon:secneworltersea:secneworlsublanact:soupas:heaofpastoneworl:neworlhar:neworltobatrou","WATERWAY_NAME":"New Orleans To Baton Rouge","CREATE_DATE":1786388516000,"MODIFIED_DATE":1786445699000,"BEGIN_DATE":1786320000000,"END_DATE":1803945599000,"DESCRIPTION":"Mississippi River - Marine Construction --- From: 2026-08-12 To: 2027-02-28 --- Marine construction will be conducted at CF Industries Blue Point, near Mile 184.4, RDB, AHOP, for the construction of a heavy haul bridge.  Work will take place during daylight hours, 7-days a week.  On-scene vessels will include a Bo-Mac Crane Barge and multiple deck barges.  Mariners are requested to transit the area at their slowest safe speed to minimize wake.  VHF-FM Channel: 68,  POC: (985) 634-7031","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-91.02201,30.18774]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-91.02201,"DECIMAL_LATITUDE":30.187739999999998}},{"type":"Feature","id":51078,"geometry":{"type":"Point","coordinates":[-75.13229999999999,38.77270000000004]},"properties":{"ESRI_OID":51078,"MSI_UID":51078,"ATU":5,"TITLE":"Indian River Inlet - Rehoboth Bay/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100117653883,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:indrivinl:rehbay","WATERWAY_NAME":"Rehoboth Bay","CREATE_DATE":1786558896000,"MODIFIED_DATE":1786559014000,"BEGIN_DATE":1786492800000,"END_DATE":1790294399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-12 To: 2026-09-24\n\nLocation:\n38-46-21.720N/075-07-56.280W\nAll mariners please be advised that scientific velocity monitoring devices will be placed along the Lewes Rehoboth Canal beginning on or around August 12, 2026, and will continue until September 23, 2026. Devices will be placed in the following approximate GPS positions 38°46’21.7” N, 75°07’56.3” W, 38°45’54.4” N, 75°07’08.4” W, 38°45’01.4” N, 75°06’01.1” W. Devices will be 1.5 to 3 feet from the bottom of the mudline and marked with buoys. Mariners are advised to transit the area with caution. MSI # 51078\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-75.1323,38.7727]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-75.1323,"DECIMAL_LATITUDE":38.7727}},{"type":"Feature","id":51079,"geometry":{"type":"Point","coordinates":[-75.11899999999997,38.765100000000075]},"properties":{"ESRI_OID":51079,"MSI_UID":51079,"ATU":5,"TITLE":"Indian River Inlet - Rehoboth Bay/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100117653883,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:indrivinl:rehbay","WATERWAY_NAME":"Rehoboth Bay","CREATE_DATE":1786559112000,"MODIFIED_DATE":1786559252000,"BEGIN_DATE":1786492800000,"END_DATE":1790294399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-12 To: 2026-09-24\n\nLocation:\n38-46-21.720N/075-07-56.280W\nAll mariners please be advised that scientific velocity monitoring devices will be placed along the Lewes Rehoboth Canal beginning on or around August 12, 2026, and will continue until September 23, 2026. Devices will be placed in the following approximate GPS positions 38°46’21.7” N, 75°07’56.3” W, 38°45’54.4” N, 75°07’08.4” W, 38°45’01.4” N, 75°06’01.1” W. Devices will be 1.5 to 3 feet from the bottom of the mudline and marked with buoys. Mariners are advised to transit the area with caution. MSI # 51079\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-75.119,38.7651]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-75.119,"DECIMAL_LATITUDE":38.765100000000004}},{"type":"Feature","id":51080,"geometry":{"type":"Point","coordinates":[-75.10029999999995,38.75040000000007]},"properties":{"ESRI_OID":51080,"MSI_UID":51080,"ATU":5,"TITLE":"Indian River Inlet - Rehoboth Bay/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100117653883,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:indrivinl:rehbay","WATERWAY_NAME":"Rehoboth Bay","CREATE_DATE":1786559191000,"MODIFIED_DATE":1786559330000,"BEGIN_DATE":1786492800000,"END_DATE":1790294399000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-08-12 To: 2026-09-24\n\nLocation:\n38-46-21.720N/075-07-56.280W\nAll mariners please be advised that scientific velocity monitoring devices will be placed along the Lewes Rehoboth Canal beginning on or around August 12, 2026, and will continue until September 23, 2026. Devices will be placed in the following approximate GPS positions 38°46’21.7” N, 75°07’56.3” W, 38°45’54.4” N, 75°07’08.4” W, 38°45’01.4” N, 75°06’01.1” W. Devices will be 1.5 to 3 feet from the bottom of the mudline and marked with buoys. Mariners are advised to transit the area with caution. MSI # 51080\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-75.1003,38.7504]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-75.1003,"DECIMAL_LATITUDE":38.7504}},{"type":"Feature","id":51113,"geometry":{"type":"Point","coordinates":[-74.10986999999994,39.916120000000035]},"properties":{"ESRI_OID":51113,"MSI_UID":51113,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786622666000,"MODIFIED_DATE":1786622723000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 37 (LLNR 35110) and building New Jersey Intracoastal Waterway Daybeacon 37 (LLNR 35110) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51113","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.10987,39.91612]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.10987,"DECIMAL_LATITUDE":39.91612}},{"type":"Feature","id":51114,"geometry":{"type":"Point","coordinates":[-74.15224999999998,39.751640000000066]},"properties":{"ESRI_OID":51114,"MSI_UID":51114,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786623203000,"MODIFIED_DATE":1786623239000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 45 (LLNR 35165) and building New Jersey Intracoastal Waterway Daybeacon 45 (LLNR 35165) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51114\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.15225,39.75164]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.15225,"DECIMAL_LATITUDE":39.751639999999995}},{"type":"Feature","id":51115,"geometry":{"type":"Point","coordinates":[-74.15431999999998,39.693490000000054]},"properties":{"ESRI_OID":51115,"MSI_UID":51115,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786623497000,"MODIFIED_DATE":1786624099000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 54 (LLNR 35198) and building New Jersey Intracoastal Waterway Daybeacon 54 (LLNR 35198) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51115\n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.15432,39.69349]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.15432,"DECIMAL_LATITUDE":39.69349}},{"type":"Feature","id":51119,"geometry":{"type":"Point","coordinates":[-74.16227999999995,39.68968000000007]},"properties":{"ESRI_OID":51119,"MSI_UID":51119,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786624040000,"MODIFIED_DATE":1786624110000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Lighted Buoy 56 (LLNR 35205) and building New Jersey Intracoastal Waterway Light 56 (LLNR 35205) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51119\n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.16228,39.68968]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.16228,"DECIMAL_LATITUDE":39.689679999999996}},{"type":"Feature","id":51122,"geometry":{"type":"Point","coordinates":[-74.18462999999997,39.67004000000003]},"properties":{"ESRI_OID":51122,"MSI_UID":51122,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786624336000,"MODIFIED_DATE":1786624384000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 63 (LLNR 35235) and building New Jersey Intracoastal Waterway Daybeacon 63 (LLNR 35235) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51122\n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.18463,39.67004]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.18463,"DECIMAL_LATITUDE":39.67004}},{"type":"Feature","id":51125,"geometry":{"type":"Point","coordinates":[-74.21531999999996,39.60408000000007]},"properties":{"ESRI_OID":51125,"MSI_UID":51125,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786624776000,"MODIFIED_DATE":1786624802000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Lighted Buoy 86 (LLNR 35335) and building New Jersey Intracoastal Waterway Light 86 (LLNR 35335) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51125\n\n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.21532,39.60408]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.21531999999999,"DECIMAL_LATITUDE":39.604079999999996}},{"type":"Feature","id":51128,"geometry":{"type":"Point","coordinates":[-74.21633999999995,39.602820000000065]},"properties":{"ESRI_OID":51128,"MSI_UID":51128,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786625247000,"MODIFIED_DATE":1786625271000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 87 (LLNR 35340) and building New Jersey Intracoastal Waterway Daybeacon 87 (LLNR 35340) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51128\n\n\n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.21634,39.60282]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.21634,"DECIMAL_LATITUDE":39.60282}},{"type":"Feature","id":51131,"geometry":{"type":"Point","coordinates":[-74.22044999999997,39.59881000000007]},"properties":{"ESRI_OID":51131,"MSI_UID":51131,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786625573000,"MODIFIED_DATE":1786625612000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 88 (LLNR 35345) and building New Jersey Intracoastal Waterway Daybeacon 88 (LLNR 35345) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51131\n\n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.22045,39.59881]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.22045,"DECIMAL_LATITUDE":39.59881}},{"type":"Feature","id":51134,"geometry":{"type":"Point","coordinates":[-74.22435999999993,39.597240000000056]},"properties":{"ESRI_OID":51134,"MSI_UID":51134,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786626058000,"MODIFIED_DATE":1786626085000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 89 (LLNR 35350) and building New Jersey Intracoastal Waterway Daybeacon 89 (LLNR 35350) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51134\n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.22436,39.59724]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.22435999999999,"DECIMAL_LATITUDE":39.59724}},{"type":"Feature","id":51137,"geometry":{"type":"Point","coordinates":[-74.22640999999999,39.59666000000004]},"properties":{"ESRI_OID":51137,"MSI_UID":51137,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786626323000,"MODIFIED_DATE":1786626358000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Lighted Buoy 92 (LLNR 35360) and building New Jersey Intracoastal Waterway Light 92 (LLNR 35360) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51137\n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.22641,39.59666]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.22641,"DECIMAL_LATITUDE":39.59666}},{"type":"Feature","id":51139,"geometry":{"type":"Point","coordinates":[-74.23049999999995,39.59235000000007]},"properties":{"ESRI_OID":51139,"MSI_UID":51139,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786626901000,"MODIFIED_DATE":1786627295000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 94 (LLNR 35365) and building New Jersey Intracoastal Waterway Daybeacon 94 (LLNR 35365) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51139\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.2305,39.59235]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.2305,"DECIMAL_LATITUDE":39.592349999999996}},{"type":"Feature","id":51142,"geometry":{"type":"Point","coordinates":[-74.23662999999993,39.57544000000007]},"properties":{"ESRI_OID":51142,"MSI_UID":51142,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786627236000,"MODIFIED_DATE":1786627272000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 99 (LLNR 35390) and building New Jersey Intracoastal Waterway Daybeacon 99 (LLNR 35390) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51142\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.23663,39.57544]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.23662999999999,"DECIMAL_LATITUDE":39.57544}},{"type":"Feature","id":51144,"geometry":{"type":"Point","coordinates":[-74.23910999999998,39.572100000000034]},"properties":{"ESRI_OID":51144,"MSI_UID":51144,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786627597000,"MODIFIED_DATE":1786628855000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 101 (LLNR 35395) and building New Jersey Intracoastal Waterway Daybeacon 101 (LLNR 35395) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51144\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.23911,39.5721]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.23911,"DECIMAL_LATITUDE":39.5721}},{"type":"Feature","id":51148,"geometry":{"type":"Point","coordinates":[-74.24011999999993,39.57208000000003]},"properties":{"ESRI_OID":51148,"MSI_UID":51148,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786627895000,"MODIFIED_DATE":1786628863000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 102 (LLNR 35400) and building New Jersey Intracoastal Waterway Daybeacon 102 (LLNR 35400) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51148\n\n\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.24012,39.57208]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.24011999999999,"DECIMAL_LATITUDE":39.57208}},{"type":"Feature","id":51151,"geometry":{"type":"Point","coordinates":[-74.39413999999994,39.46569000000005]},"properties":{"ESRI_OID":51151,"MSI_UID":51151,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786628107000,"MODIFIED_DATE":1786628871000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 153 (LLNR 35620) and building New Jersey Intracoastal Waterway Daybeacon 153 (LLNR 35620) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51151\n \n\n\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.39414,39.46569]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.39414,"DECIMAL_LATITUDE":39.465689999999995}},{"type":"Feature","id":51153,"geometry":{"type":"Point","coordinates":[-74.43246999999997,39.39017000000007]},"properties":{"ESRI_OID":51153,"MSI_UID":51153,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786628459000,"MODIFIED_DATE":1786628877000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Lighted Buoy 182 (LLNR 35745) and building New Jersey Intracoastal Waterway Light 182 (LLNR 35745) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51153\n \n\n\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.43247,39.39017]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.43247,"DECIMAL_LATITUDE":39.39017}},{"type":"Feature","id":51154,"geometry":{"type":"Point","coordinates":[-74.45219999999995,39.38403000000005]},"properties":{"ESRI_OID":51154,"MSI_UID":51154,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786628819000,"MODIFIED_DATE":1786628843000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Lighted Buoy 189 (LLNR 35770) and building New Jersey Intracoastal Waterway Light 189 (LLNR 35770) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51154\n \n\n\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.4522,39.38403]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.4522,"DECIMAL_LATITUDE":39.384029999999996}},{"type":"Feature","id":51157,"geometry":{"type":"Point","coordinates":[-74.45871999999997,39.374250000000075]},"properties":{"ESRI_OID":51157,"MSI_UID":51157,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786629181000,"MODIFIED_DATE":1786629908000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 193 (LLNR 35790) and building New Jersey Intracoastal Waterway Daybeacon 193 (LLNR 35790) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51157\n \n \n\n\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.45872,39.37425]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.45872,"DECIMAL_LATITUDE":39.374249999999996}},{"type":"Feature","id":51158,"geometry":{"type":"Point","coordinates":[-74.45863999999995,39.372520000000065]},"properties":{"ESRI_OID":51158,"MSI_UID":51158,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786629387000,"MODIFIED_DATE":1786629894000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 197 (LLNR 35800) and building New Jersey Intracoastal Waterway Daybeacon 198 (LLNR 35800) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51158\n \n \n\n\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.45864,39.37252]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.45864,"DECIMAL_LATITUDE":39.37252}},{"type":"Feature","id":51159,"geometry":{"type":"Point","coordinates":[-74.45409999999998,39.36952000000008]},"properties":{"ESRI_OID":51159,"MSI_UID":51159,"ATU":5,"TITLE":"Cape May Inlet - New Jersey Intracoastal Waterway/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382911,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secdelbayexcecozon:secdelbaytersea:secdelbaysublanact:capmayinl:newjerintwat","WATERWAY_NAME":"New Jersey Intracoastal Waterway","CREATE_DATE":1786629629000,"MODIFIED_DATE":1786629900000,"BEGIN_DATE":1786579200000,"END_DATE":1790899199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-13 To: 2026-10-01\n\nLocation:\n39-54-58.032N/074-06-35.532W\n\nBallard Marine Construction will be removing New Jersey Intracoastal Waterway Buoy 199 (LLNR 35805) and building New Jersey Intracoastal Waterway Daybeacon 199 (LLNR 35805) some time between August 27, 2026 and September 21, 2026. All construction will take place M-F between the hours of 07:00 and 18:00. Ballard Marine will utilize two barges, Tug Pilgram, a small work boat, and will monitor VHF-FM Channel 13. MSI #51159\n \n\n\n\n\n \n \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.4541,39.36952]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.4541,"DECIMAL_LATITUDE":39.36952}},{"type":"Feature","id":51190,"geometry":{"type":"Point","coordinates":[-75.85902999999996,37.976870000000076]},"properties":{"ESRI_OID":51190,"MSI_UID":51190,"ATU":5,"TITLE":"Tangier Sound - Little Annemessex River/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116382543,"MRN":"urn:mrn:iala:wwy:us:navIV:dis5:secvirexcecozon:secvirtersea:secvirsublanact:checha:tansou:litannriv","WATERWAY_NAME":"Little Annemessex River","CREATE_DATE":1786642240000,"MODIFIED_DATE":1786642365000,"BEGIN_DATE":1786579200000,"END_DATE":1789171199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-08-13 To: 2026-09-11\n\nLocation:\n37-58-36.732N/075-51-32.508W\n\nGeotech conducting borings for future project beginning on 31AUG26. Borings can last up to 10 days with barges and small vessels operating in the area.  MSI #51190.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-75.85903,37.97687]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-75.85902999999999,"DECIMAL_LATITUDE":37.97687}},{"type":"Feature","id":51308,"geometry":{"type":"Point","coordinates":[-72.09639999999996,41.40047000000004]},"properties":{"ESRI_OID":51308,"MSI_UID":51308,"ATU":1,"TITLE":"New London Harbor - Thames River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116381565,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:seclonislsouexcecozon:seclonislsoutersea:seclonislsousublanact:bloislsouandgarbay:lonislsoueaspar:newlonhar:thariv","WATERWAY_NAME":"Thames River","CREATE_DATE":1786726672000,"MODIFIED_DATE":1786726675000,"BEGIN_DATE":1786665600000,"END_DATE":1801439999000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-10-01 To: 2027-01-31\n\nLocation:\n41-24-01.692N/072-05-47.040W\n\nCashman Dredging and Marine Contracting Co., LLC plans to begin dredging operations on or about October 1, 2026, for the Naval Submarine Base New London Pier 31 Extension project in Groton, Connecticut. Work will occur in the Thames River adjacent to Naval Submarine Base New London/Pier 31in position 41°24'01.720\"N, 72°05'47.050\"W and is expected to continue through January 31, 2027, operating 24 hours per day, seven days per week. The project is authorized under U.S. Army Corps of Engineers Permit No. NAE-2023-00668. Equipment may include the dredge Icarus, split-hull dump scows Joe V and Eddie C, a survey boat, tugboats, and other support equipment. Project vessels will monitor VHF Channels 16 and 13, with a working channel to be determined. Mariners transiting the area should proceed with caution, maintain a safe distance from dredging equipment, and coordinate passing arrangements by VHF radio. Dredged material will be transported to the U.S. Navy Confined Aquatic Disposal Cell Center. Mariners requiring passage through the work area are encouraged to provide advance notice when practicable, as clearing the navigation area may take approximately 30 minutes depending on conditions.\n\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-72.0964,41.40047]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-72.0964,"DECIMAL_LATITUDE":41.40047}},{"type":"Feature","id":51364,"geometry":{"type":"Point","coordinates":[-74.00161999999995,40.76720000000006]},"properties":{"ESRI_OID":51364,"MSI_UID":51364,"ATU":1,"TITLE":"Main Channel - Hudson River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:hudriv","WATERWAY_NAME":"Hudson River","CREATE_DATE":1786970082000,"MODIFIED_DATE":1786970092000,"BEGIN_DATE":1786924800000,"END_DATE":1791676799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-17 To: 2026-10-10\n\nLocation:\n40-46-01.920N/074-00-05.832W\n\nDonjon Marine Co., Inc. submitted a Local Notice to Mariners information form for FY27 maintenance dredging at the Manhattan Cruise Terminal berths in New York. Work is scheduled to begin on September 14, 2026, with an estimated completion date of October 10, 2026, and will occur 24 hours per day, seven days per week. The operation will take place inside the Manhattan Cruise Terminal berths near latitude 40°45'57.9384\"N and longitude 73°59'57.03\"W. Equipment on scene is expected to include one dredge, either Oyster Bay or Delaware Bay, three dump scows, one tending tug, and two towing-to-sea tugs. The project will operate as a “move on demand” dredging operation, with a tending tug maintained on site at all times to move vessels as needed to avoid impeding navigation. Vessels may be contacted on working channel 78 and will monitor channels 13 and 16.\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.00162,40.7672]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.00162,"DECIMAL_LATITUDE":40.7672}},{"type":"Feature","id":51521,"geometry":{"type":"Point","coordinates":[-74.00080999999994,40.66816000000006]},"properties":{"ESRI_OID":51521,"MSI_UID":51521,"ATU":1,"TITLE":"NAVAREA IV/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382366,"MRN":"urn:mrn:iala:wwy:us:navIV","WATERWAY_NAME":"NAVAREA IV","CREATE_DATE":1787057883000,"MODIFIED_DATE":1787571608000,"BEGIN_DATE":1787011200000,"END_DATE":1794873599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-18 To: 2026-11-16\n\nLocation:\n40-40-05.376N/074-00-02.916W\n\nCashman Dredging and Marine Contracting Co., will be conducting  work associated with the EPA Superfund Gowanus Canal Environmental Remediation Project in Brooklyn, New York. The operation involves transferring sediment and debris from smaller hopper barges to larger hopper barges for delivery to the Clean Earth Claremont Processing Facility in Jersey City, New Jersey, or directly loading material into trucks for over-the-road transport to an offsite disposal facility.\nThe work is planned for the Gowanus Canal approximately 100 feet south of the 659 Smith Street property, across the channel from the New York City Department of Sanitation facility. Operations are scheduled to begin August 31, 2026, and continue through November 15, 2027, with work hours from 0700 to 1800, Monday through Friday. Equipment expected on scene includes one 40-by-140-foot excavator deck barge, one 37-by-150-foot material barge, one 30-by-60-foot hopper barge, and one 600-horsepower tugboat. Vessels may be contacted on VHF channels 13 and 16.\nThe applicant states that passing arrangements can be made within approximately 30 minutes and that the barges will have a full-time tender available to move them on demand to avoid impeding navigation. The form identifies NOAA Chart US5NYCDG/12334 for the area and includes a site layout showing the temporary dock, containment boom, hopper barges, transloader, spill tarp, gangway, and water treatment system\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.00081,40.66816]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.00081,"DECIMAL_LATITUDE":40.66816}},{"type":"Feature","id":51613,"geometry":{"type":"Point","coordinates":[-88.95268999999996,30.41456000000005]},"properties":{"ESRI_OID":51613,"MSI_UID":51613,"ATU":8,"TITLE":"Biloxi East Channel - Back Bay Of Biloxi/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116385037,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon:secmobtersea:secmobsublanact:bileascha:bacbayofbil","WATERWAY_NAME":"Back Bay Of Biloxi","CREATE_DATE":1787078051000,"MODIFIED_DATE":1787078748000,"BEGIN_DATE":1787011200000,"END_DATE":1790899199000,"DESCRIPTION":"Back Bay of Biloxi - Marine Construction --- From: 2026-08-24 To: 2026-09-30--- The Hiller Park Living Shoreline Project will take place in the Back Bay of Biloxi, near approximate position 30-24-52.3N 088-57-09.7W.  Operations will consist of the placement of riprap to create a 4,100 ft segmented breakwater on the north shoreline of Hiller Park.  On-scene vessels will include, but are not limited to, push boats, barges, material handlers, and transport vessels.  Mariners are requested to transit the area at no-wake speed.  VHF-FM Channels: 12 and 16,  POC:(228) 697-4188","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-88.95269,30.41456]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-88.95268999999999,"DECIMAL_LATITUDE":30.414559999999998}},{"type":"Feature","id":51675,"geometry":{"type":"Point","coordinates":[-74.01287999999994,40.692060000000026]},"properties":{"ESRI_OID":51675,"MSI_UID":51675,"ATU":1,"TITLE":"Main Channel - East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116382291,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:easrivmaicha","WATERWAY_NAME":"East River Main Channel","CREATE_DATE":1787145740000,"MODIFIED_DATE":1787145744000,"BEGIN_DATE":1787097600000,"END_DATE":1796083199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-24 To: 2026-11-30\n\nLocation:\n40-41-31.416N/074-00-46.368W\n\nM&amp;amp;J LLC will be conducting  rehabilitation work at the Governors Island Pedestrian Bridge and Fender Wharf in New York. The work is scheduled to occur from August 24, 2026, through November 29, 2027, Monday through Friday from 7:30 a.m. to 3:00 p.m. The project location is listed at latitude 40° 41'31.4232\" N and longitude 74° 0'46.3896\" W. Equipment on scene will include an equipment barge supporting a Caterpillar 320 excavator fitted with a stone-handling attachment. The form does not list vessel radio frequencies, passing arrangements, chart numbers, or vessel movement times. \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-74.01288,40.69206]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-74.01288,"DECIMAL_LATITUDE":40.69206}},{"type":"Feature","id":51787,"geometry":{"type":"Point","coordinates":[-87.97216999999995,29.21300000000008]},"properties":{"ESRI_OID":51787,"MSI_UID":51787,"ATU":8,"TITLE":"Sector Mobile, Exclusive Economic Zone (EEZ)/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116384629,"MRN":"urn:mrn:iala:wwy:us:navIV:dis8:secmobexcecozon","WATERWAY_NAME":"Sector Mobile, Exclusive Economic Zone (EEZ)","CREATE_DATE":1787245945000,"MODIFIED_DATE":1787246712000,"BEGIN_DATE":1787184000000,"END_DATE":1788998399000,"DESCRIPTION":"Gulf of America - Cable Operation --- From: 2026-08-25 To: 2026-09-08 --- The Cable Ship WAVE SENTINEL will conduct cable laying operations in the Gulf of America in approximate position 29-12-46.8N 087-58-19.8W.  Operations will be conducted 24-hours a day, 7-days a week.  Mariners are requested to maintain a wide berth from the cable ship to avoid entanglement or interfering with the cable laying operations. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-87.97217,29.213]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-87.97216999999999,"DECIMAL_LATITUDE":29.213}},{"type":"Feature","id":51854,"geometry":{"type":"Point","coordinates":[-83.35969999999998,41.90035000000006]},"properties":{"ESRI_OID":51854,"MSI_UID":51854,"ATU":9,"TITLE":"WEST END OF LAKE ERIE - Monroe Harbor/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386078,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:monhar","WATERWAY_NAME":"Monroe Harbor","CREATE_DATE":1787332021000,"MODIFIED_DATE":1787332375000,"BEGIN_DATE":1787961600000,"END_DATE":1796083199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-29 To: 2026-11-30\n\nLocation:\nMonroe Harbor, MI turning basin to nav channel\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-83.3597,41.90035]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-83.3597,"DECIMAL_LATITUDE":41.900349999999996}},{"type":"Feature","id":51855,"geometry":{"type":"Point","coordinates":[-83.38258999999994,41.872960000000035]},"properties":{"ESRI_OID":51855,"MSI_UID":51855,"ATU":9,"TITLE":"WEST END OF LAKE ERIE - Bolles Harbor/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386074,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:bolhar","WATERWAY_NAME":"Bolles Harbor","CREATE_DATE":1787332354000,"MODIFIED_DATE":1787332370000,"BEGIN_DATE":1787875200000,"END_DATE":1796083199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-28 To: 2026-11-30\n\nLocation:\nBolles Harbor, MI (LaPlaisance Creek from turning basin to end of nav channel)\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-83.38259,41.87296]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-83.38259,"DECIMAL_LATITUDE":41.87296}},{"type":"Feature","id":51856,"geometry":{"type":"Point","coordinates":[-85.97136999999998,45.12164000000007]},"properties":{"ESRI_OID":51856,"MSI_UID":51856,"ATU":9,"TITLE":"LAKE MICHIGAN - PLATTE BAY TO LELAND/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386163,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:plabaytolel","WATERWAY_NAME":"PLATTE BAY TO LELAND","CREATE_DATE":1787332637000,"MODIFIED_DATE":1787332644000,"BEGIN_DATE":1787270400000,"END_DATE":1795219199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-21 To: 2026-11-20\n\nLocation:\n45-07-17.904N/085-58-16.932W\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-85.97137,45.12164]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-85.97137,"DECIMAL_LATITUDE":45.12164}},{"type":"Feature","id":51857,"geometry":{"type":"Point","coordinates":[-92.10019999999997,46.749520000000075]},"properties":{"ESRI_OID":51857,"MSI_UID":51857,"ATU":9,"TITLE":"Superior Front Channel - StLouisBay/General/Marine Construction (Excluding Bridges)/Boring and Core Samples","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Boring and Core Samples","WTRW_UID":100116386356,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:saimarriv:laksup:supent:supharbas:supfrocha:stloubay","WATERWAY_NAME":"StLouisBay","CREATE_DATE":1787333056000,"MODIFIED_DATE":1787333063000,"BEGIN_DATE":1787270400000,"END_DATE":1792627199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Boring and Core Samples\n\nFrom: 2026-08-21 To: 2026-10-21\n\nLocation:\nBlatnic bridge pier foundations. Soil borings located outside but adjacent to navigation channel.\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-92.1002,46.74952]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-92.1002,"DECIMAL_LATITUDE":46.74952}},{"type":"Feature","id":51858,"geometry":{"type":"Point","coordinates":[-86.24945999999994,45.94364000000007]},"properties":{"ESRI_OID":51858,"MSI_UID":51858,"ATU":9,"TITLE":"LAKE MICHIGAN - Manistique/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386239,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:manis","WATERWAY_NAME":"Manistique","CREATE_DATE":1787333228000,"MODIFIED_DATE":1787333233000,"BEGIN_DATE":1787270400000,"END_DATE":1796515199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-21 To: 2026-12-05\n\nDredging the Manistique Harbor Federal channel. Submerged pipe lying on the lake floor marked by orange round buoys every 1,000 feet. (2) white buoys will be seen North and South of the dredge. The white buoys indicate winch anchor locations. The disposal area starts right on the west side of the West breakwater and goes an additional 6,200’ westward. Placement will be between the 4’ depth contour to the 10’ depth contour. The disposal area will be marked with white ball buoys on each corner. The main contact will be Superintendent Rob Lister. Cell# listed below. During rough seas, our pipe pontoon will be floating outside of the channel. It is bright yellow, 25’x8’x6’ and has (2) flashing amber lights on each end that come on at night. Another pipe pontoon that is bright yellow 25’x8’x6’ and has (2) flashing amber lights on each end will be in the disposal area. \n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-86.24946,45.94364]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-86.24946,"DECIMAL_LATITUDE":45.943639999999995}},{"type":"Feature","id":51894,"geometry":{"type":"Point","coordinates":[-70.25357999999994,43.64922000000007]},"properties":{"ESRI_OID":51894,"MSI_UID":51894,"ATU":1,"TITLE":"Portland Harbor - Lighthouse Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116381869,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnornewengexcecozon:secnornewengtersea:secnornewengsublanact:porharapp:porhar:ligcha","WATERWAY_NAME":"Lighthouse Channel","CREATE_DATE":1787570668000,"MODIFIED_DATE":1787570675000,"BEGIN_DATE":1787529600000,"END_DATE":1792627199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-10-19 To: 2026-10-21\n\nLocation:\n43-38-57.192N/070-15-12.888W\n\nAGM Marine Contractors submitted a Local Notice to Mariners information form for obstruction removal work in Portland Harbor, Portland, Maine. The work is scheduled for October 19 through October 20, 2026, with operations planned Monday through Tuesday from 0600 to 1800. The work location is listed at 43°38'57.21\"N, 70°15'12.89\"W. Equipment on scene will include the dredge Pronckai and supporting tugs. Vessels may contact the project team on VHF radio channel 66, and passing arrangements require vessels to call on channel 66 and provide 15 minutes’ notice so equipment can move as needed to avoid impeding navigation. \n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-70.25358,43.64922]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-70.25358,"DECIMAL_LATITUDE":43.64922}},{"type":"Feature","id":52320,"geometry":{"type":"Point","coordinates":[-122.76042999999999,45.74061000000006]},"properties":{"ESRI_OID":52320,"MSI_UID":52320,"ATU":13,"TITLE":"Sector Columbia River, Submerged Land Act (SLA) - Columbia/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100118152930,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:col","WATERWAY_NAME":"Columbia","CREATE_DATE":1787788223000,"MODIFIED_DATE":1787788280000,"BEGIN_DATE":1787616000000,"END_DATE":1788393599000,"DESCRIPTION":"The M/V YAQUINA may be conducting dredging activities in the vicinity of Henrici Bar, Morgan Bar, and Willow Bar, RM 90+19 to 98+00, between 25 AUG -02 SEP 2026.  USACE requests mariners transit at their slowest safe speed to minimize wake when in the vicinity of a dredge and proceed with caution after passing arrangements have been made on VHF-FM channel 13. Vessel(s) and/or equipment may encroach into the channel. Mariners are advised that the start and ending dates for dredging activities may vary due to unforeseen on-site conditions, such as gill net fishing, weather and other factors. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-122.76043,45.74061]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-122.76043,"DECIMAL_LATITUDE":45.74061}},{"type":"Feature","id":52321,"geometry":{"type":"Point","coordinates":[-122.80920999999995,45.913410000000056]},"properties":{"ESRI_OID":52321,"MSI_UID":52321,"ATU":13,"TITLE":"Crims Island To St Helens - Martin Island/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385612,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:colriv:criisltosthel:marisl","WATERWAY_NAME":"Martin Island","CREATE_DATE":1787788400000,"MODIFIED_DATE":1787788408000,"BEGIN_DATE":1787616000000,"END_DATE":1788393599000,"DESCRIPTION":"The M/V YAQUINA may be conducting dredging activities on the Upper and Lower Martin Island Bar, RM 79+00 – 83+45, between 25 AUG – 02 SEP 2026.  USACE requests mariners transit at their slowest safe speed to minimize wake when in the vicinity of a dredge and proceed with caution after passing arrangements have been made on VHF-FM channel 13. Vessel(s) and/or equipment may encroach into the channel. Mariners are advised that the start and ending dates for dredging activities may vary due to unforeseen on-site conditions, such as gill net fishing, weather and other factors.","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-122.80921,45.91341]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-122.80921000000001,"DECIMAL_LATITUDE":45.91341}},{"type":"Feature","id":52323,"geometry":{"type":"Point","coordinates":[-122.88499999999999,46.06299000000007]},"properties":{"ESRI_OID":52323,"MSI_UID":52323,"ATU":13,"TITLE":"Columbia River - Crims Island To St Helens/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385611,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:colriv:criisltosthel","WATERWAY_NAME":"Crims Island To St Helens","CREATE_DATE":1787788954000,"MODIFIED_DATE":1787788964000,"BEGIN_DATE":1787616000000,"END_DATE":1788393599000,"DESCRIPTION":"The M/V YAQUINA will be conducting dredging activities on the Upper Dobelbower Bar, RM 69+50 – 72+00, between 25 AUG - 02 SEP 2026. Disposal will be at RM 73 OR Side. USACE requests mariners transit at their slowest safe speed to minimize wake when in the vicinity of a dredge and proceed with caution after passing arrangements have been made on VHF-FM channel 13. Vessel(s) and/or equipment may encroach into the channel. Mariners are advised that the start and ending dates for dredging activities may vary due to unforeseen on-site conditions, such as gill net fishing, weather and other factors. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-122.885,46.06299]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-122.885,"DECIMAL_LATITUDE":46.06299}},{"type":"Feature","id":52324,"geometry":{"type":"Point","coordinates":[-124.06790999999998,46.25690000000003]},"properties":{"ESRI_OID":52324,"MSI_UID":52324,"ATU":13,"TITLE":"Sector Columbia River, Submerged Land Act (SLA) - Columbia River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116385647,"MRN":"urn:mrn:iala:wwy:us:navXII:dis13:seccolrivexcecozon:seccolrivtersea:seccolrivsublanact:colriv","WATERWAY_NAME":"Columbia River","CREATE_DATE":1787789272000,"MODIFIED_DATE":1787789280000,"BEGIN_DATE":1787616000000,"END_DATE":1788393599000,"DESCRIPTION":"The M/V ESSAYONS will be conducting dredging activities near the mouth of the Columbia River, (RM -02+00 to RM 02+00), between 25 AUG – 02 SEP 2026. Disposal sites with be located at DWS (FWB). USACE requests mariners transit at their slowest safe speed to minimize wake when in the vicinity of a dredge and proceed with caution after passing arrangements have been made on VHF-FM channel 13. Vessel(s) and/or equipment may encroach into the channel. Mariners are advised that the start and ending dates for dredging activities may vary due to unforeseen on-site conditions, such as gill net fishing, weather and other factors. ","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-124.06791,46.2569]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-124.06791,"DECIMAL_LATITUDE":46.2569}},{"type":"Feature","id":52366,"geometry":{"type":"Point","coordinates":[-73.99903999999998,40.670570000000055]},"properties":{"ESRI_OID":52366,"MSI_UID":52366,"ATU":1,"TITLE":"NAVAREA IV/General/Marine Construction (Excluding Bridges)/Survey Operations","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Survey Operations","WTRW_UID":100116382366,"MRN":"urn:mrn:iala:wwy:us:navIV","WATERWAY_NAME":"NAVAREA IV","CREATE_DATE":1787831708000,"MODIFIED_DATE":1787831712000,"BEGIN_DATE":1787788800000,"END_DATE":1790467199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Survey Operations\n\nFrom: 2026-09-02 To: 2026-09-26\n\nAqua Survey, Inc. submitted a Local Notice to Mariners information form for planned sediment sampling operations in the Gowanus Canal, Brooklyn, NY, between the 4th and 11th Street Turning Basins. Work is scheduled for September 2 through September 25, 2026, Monday through Friday, from 0800 to 1600. The vessels expected on scene are R/V Schuylkill, R/V Packanack, and R/V Jon II. Vessels may be contacted on VHF Channels 13 and 16. The project team indicated that vessels can move on demand and will not impede navigation. The listed point of contact is Lisa Pipolo of Aqua Survey, Inc., reachable at 908-788-8700 or pipolo@aquasurvey.com.\n\n\nLocation:\n40-40-14.052N/073-59-56.544W\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.99904,40.67057]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.99904,"DECIMAL_LATITUDE":40.67057}},{"type":"Feature","id":52401,"geometry":{"type":"Point","coordinates":[-82.53509999999994,43.430330000000026]},"properties":{"ESRI_OID":52401,"MSI_UID":52401,"ATU":9,"TITLE":"LAKE HURON - Port Sanilac/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386120,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:porsan","WATERWAY_NAME":"Port Sanilac","CREATE_DATE":1787837019000,"MODIFIED_DATE":1787837027000,"BEGIN_DATE":1788220800000,"END_DATE":1794787199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-09-01 To: 2026-11-15\n\nDredging the Port Sanilac Harbor Federal channel. Submerged pipe lying on the lake floor marked by orange round buoys every 1,000 feet. (2) white buoys will be seen North and South of the dredge. The white buoys indicate winch anchor locations. The disposal area starts South of the South breakwater 4,500’ and goes an additional 5,700’ Southward. Placement will be between the Ordinary High Watermark (Beach) to the 8’ depth contour. The disposal area will be marked with white buoys on each corner. The main contact will be Superintendent Joseph Martin. Cell# listed below. During rough seas our pipe pontoon will be floating outside of the channel. It is bright yellow, 25’x8’x6’ and has (2) flashing amber lights on each end that come on at night. Another pipe pontoon that is bright yellow (25’x8’x6’) and has (2) flashing amber lights on each end will be in the disposal area\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-82.5351,43.43033]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-82.5351,"DECIMAL_LATITUDE":43.43033}},{"type":"Feature","id":52413,"geometry":{"type":"Point","coordinates":[-78.86832999999996,42.861770000000035]},"properties":{"ESRI_OID":52413,"MSI_UID":52413,"ATU":9,"TITLE":"Buffalo River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386036,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:bufhar:lakont:lowniariv:niariv:lakeri:bufhar:bufriv","WATERWAY_NAME":"Buffalo River","CREATE_DATE":1787845841000,"MODIFIED_DATE":1787845848000,"BEGIN_DATE":1787788800000,"END_DATE":1793491199000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-08-27 To: 2026-10-31\n\nLocation:\n42-51-42.372N/078-52-05.988W\nThere will be repairs being conducted on the river wall near ADM elevator warf on the Buffalo river from August 31, 2026 to October 31, 2026. There will be two tug boats, a spud barge and 45 foot material float to conduct the repairs. \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-78.86833,42.86177]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-78.86833,"DECIMAL_LATITUDE":42.86177}},{"type":"Feature","id":52521,"geometry":{"type":"Point","coordinates":[-73.78743999999995,42.48374000000007]},"properties":{"ESRI_OID":52521,"MSI_UID":52521,"ATU":1,"TITLE":"Main Channel - Hudson River/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116382131,"MRN":"urn:mrn:iala:wwy:us:navIV:dis1:secnewyorexcecozon:secnewyortersea:secnewyorsublanact:ambcha:maicha:hudriv","WATERWAY_NAME":"Hudson River","CREATE_DATE":1787929924000,"MODIFIED_DATE":1787929978000,"BEGIN_DATE":1787875200000,"END_DATE":1830297599000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-08-28 To: 2027-12-31\n\nLocation:\n42-29-01.464N/073-47-14.784W\n\nCarver Companies will conduct maintenance dredging operations at the Port of Coeymans on the Hudson River, New York, at approximate position 42°29'01.45\"N, 073°47'14.78\"W (42.483737N, 73.787440W). Operations are scheduled to begin September 1, 2026, and continue through December 31, 2027, operating 24 hours per day, 7 days per week. Vessels may contact the operation on VHF-FM channels 13 and 81A. Mariners should contact the tending tug CMT PIKE via VHF for passing arrangements and coordination to avoid impeding navigation.  \n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-73.78744,42.48374]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-73.78744,"DECIMAL_LATITUDE":42.48374}},{"type":"Feature","id":52710,"geometry":{"type":"Point","coordinates":[-87.88575999999995,43.00667000000004]},"properties":{"ESRI_OID":52710,"MSI_UID":52710,"ATU":9,"TITLE":"LAKE MICHIGAN - Milwaukee/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes","WTRW_UID":100116386234,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:mil","WATERWAY_NAME":"Milwaukee","CREATE_DATE":1788264750000,"MODIFIED_DATE":1788264756000,"BEGIN_DATE":1788220800000,"END_DATE":1790380799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes\n\nFrom: 2026-09-01 To: 2026-09-25\n\nThere is a 100 ft barge conducting construction on the east end of the South Shore Cruise Dock. The standard working hours for the barge will be Monday through Saturday 6:00 am to 6:00 pm. If necessary, the barge will move out of the way. Mariners may contact the barge on VHF channel 16. Mariners are reminded to transit the area with caution and if possible, maintain a safe distance from the barge.\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-87.88576,43.00667]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-87.88575999999999,"DECIMAL_LATITUDE":43.00667}},{"type":"Feature","id":52711,"geometry":{"type":"Point","coordinates":[-86.21421999999995,42.77297000000004]},"properties":{"ESRI_OID":52711,"MSI_UID":52711,"ATU":9,"TITLE":"LAKE MICHIGAN - Holland Harbor/General/Marine Construction (Excluding Bridges)/Dredging","STATUS":"Approved","MSI_GROUP":"General","SUB_CATEGORY":"Marine Construction (Excluding Bridges)","TYPE":"Dredging","WTRW_UID":100116386159,"MRN":"urn:mrn:iala:wwy:us:navIV:dis9:stlawsea:lakont:lowniariv:niariv:lakeri:wesendoflakeri:detriv:lakstcla:stclariv:lakhur:lakmic:holhar","WATERWAY_NAME":"Holland Harbor","CREATE_DATE":1788264914000,"MODIFIED_DATE":1788264921000,"BEGIN_DATE":1788220800000,"END_DATE":1789516799000,"DESCRIPTION":"General/Marine Construction (Excluding Bridges)/Dredging\n\nFrom: 2026-09-01 To: 2026-09-15\n\nMariners are advised that hydraulic dredging will occur in Port Wing Harbor. Approximately 3,000 feet of submerged dredge pipeline will be used. Pipeline, anchor buoys, and associated equipment may be present within or near the navigation channel and placement area. The pipeline and buoys will be marked with lighting, reflective tape, and/or high-visibility markers. Buoys inside of the channel will be marked with lights. Mariners should avoid all pipeline, buoys, anchors, and dredging equipment, maintain a safe distance, reduce wake, and proceed with extreme caution. Contact the dredge operator on VHF-FM Channel 78 when necessary.\n\n","COORDINATES_JSON":"{\"type\":\"Point\",\"coordinates\":[-86.21422,42.77297]}","COORDINATES_TYPE":"Point","DECIMAL_LONGITUDE":-86.21422,"DECIMAL_LATITUDE":42.77297}}]}